N6945019R0508_N6945019R0508_Dry_Dock_Project_Information_Form.docx
DOCX document 17 KB Posted
- Solicitation number
- N6945019R0508
About this file
This sources sought notice from the Department of the Navy seeks capability statements from contractors for the Kings Bay Dry Dock Recapitalization project at Naval Submarine Base Kings Bay, Georgia. The project involves repairs to the dry dock concrete body, cover, and various mechanical and electrical systems to support operations. It is broken into three phases due to operational requirements, with Phase A focusing on preparation work, Phase B replacing and overhauling major components while no vessel is in dock, and Phase C addressing remaining work. Contractors should demonstrate experience with heavy concrete repair, industrial utility systems, cofferdam construction, steel caisson work, and pumping systems. Capability statements are due by February 19, 2019 and should not exceed 15 pages, including details on two to five relevant past projects utilizing the provided form. The notice is not a solicitation but aims to determine availability for the planned January 2020 contract award valued between $400-600 million.
N6945019R0508_N6945019R0508_Dry_Dock_Project_Information_Form.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6945019R0508_N6945019R0508_Dry_Dock_Contractor_Information_Form.docx | DOCX document | |
| N6945019R0508_KB_Dry_Dock_2019_01_30.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCES SOUGHT – PROJECT INFORMATION FORM
N69450-19-R-0508
KINGS BAY DRY DOCK RECAPITIALIZATION, SUBMARINE BASE (SUBASE) KINGS BAY, GEOGRIA
Use this form (one per project) to provide supporting information that demonstrates project experience relevant to the subject announcement. Submit up to five (5) projects. Please limit response to two pages per project.
| 1. |
| Contractor Name: |
| 2. | ||||
| Project No. (check one): | ||||
| |_| 1 | |_| 2 | |_| 3 | |_| 4 | |_| 5 |
| 3. |
| Contract Number: |
| Delivery/Task Order No.: |
| Project Number: |
| Title: |
| Location: |
| 4. |
| Award Date (mm/dd/yy): |
| 5. |
| Final Contract Price: |
| $ |
| Completion Date (mm/dd/yy): |
| (includes all options and mods) |
| Project is % complete (as of submission due date) |
| This is the |_| total project |_| subcontract price. |
| 6. | ||
| Type of work: | ||
| |_| New Construction | |_| Repair | |_| Renovation |
| 7. |
| Customer/Owner Name: |
| Point of Contact Name/Title: (person with project knowledge) |
| POC Phone Number: |
| POC Email Address: |
| 8. | |
| Were you the Prime contractor for this project? | |
| |_| Yes | |_| No |
| Were you a subcontractor for this project? | |
| |_| Yes | |_| No |
| If subcontractor, who was the Prime contractor? |
| 9. |
| Type of Contract (check all that apply): |
|_| Design-Build |_| Design-Bid-Build (fully designed project)
| |_| Other (explain): |
| If Design-Build, provide the following information: |
| |_| Design accomplished in-house |
| Lead design firm name: |
| Years working together: |
| Address: |
10. Provide a detailed description of the project:
11. Percentage of work you self-performed on this project: %.
Provide a detailed description of the work your firm self-performed on this project:
Form may be expanded. Please DO NOT change content of the form
File details come from the government source that posted it. Updated .