N6945019R0502-0002.pdf
PDF 152 KB Posted
- Solicitation number
- N6945019R0502
About this file
This document provides details for an amendment to a solicitation and the related federal contract opportunity. The amendment updates the solicitation submittal requirements for Phase One and Two, extending the proposal due date to January 31, 2019. It also provides instructions for submitting proposals in both electronic and paper formats.
The related federal contract opportunity is a solicitation from the Naval Facilities Engineering Command Southeast to award approximately five Design-Build and Design-Bid-Build Indefinite Delivery/Indefinite Quantity Multiple Award Construction Contracts for general construction projects in the South Texas Area of Responsibility. The total maximum value of all contracts awarded is $99 million over five years. Task orders will typically range from $4-20 million and include new construction, renovation, repair and other facility projects at bases including Naval Air Station Corpus Christi and Naval Air Station Kingsville. The source selection process will utilize a two-phase best value tradeoff method to evaluate technical and price factors.
N6945019R0502-0002.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6945019R0502-0001.pdf | ||
| N6945019R0502.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide updated solicitation submittal requirements for Phase One and Tw o; and to extend the proposal due date.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Jan-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6945019R0502
X 9B. DATED (SEE ITEM 11)
13-Dec-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Jan-2019
CODE
NAVFAC SOUTHEAST
ACQUISITION CORE
BLDG 903, PO BOX 30
NAS JACKSONVILLE
JACKSONVILLE FL 32212-0030
N69450 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6945019R0502
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
The purpose of this amendment is to provide updated solicitation submittal requirements for Phase One and Two;
and to extend the proposal due date. See changes below:
1) Section III.E.3.a. Submission Requirements, 1. Solicitation Submittal Requirements (pg11) is revised as follows
(changes in bold):
ADD (in bold):
Provide one (1) original and one electronic copy (CD format) of the solicitation submittal requirements identified below. Offerors are encouraged to simply staple or bind proposal and enclose in an envelope.
Three ring binders or presentation folders are unnecessary.
2) Section III.E.3.b.Non-Cost/Price Factors (Phase One) (pg12) is revised as follows (changes in bold):
Provide one (1) original, one (1) copy and one (1) electronic copy (CD format) of the solicitation submittal requirements for Factors 1 through 4 identified below. In case of variation, original paper submittal takes precedence over electronic or paper copies. Entire Phase One proposal shall not exceed 50 pages in length (single sided only) or 25 pages (double-sided) utilizing an Arial or Times New Roman font size twelve point (12pt) or larger for Factors 1, 2, 3, and 4. Title page, table of contents, dividers, and any pages specifically excluded under each factor do not count towards the total page count and should not be numbered. Any pages beyond the first 50 pages submitted will not be evaluated. Documentation for Joint Venture (JV) Agreements, partnerships, subcontractors or teaming arrangements does not count towards the page count. Offerors are encouraged to simply staple or bind and three hole-punch proposal, and enclose in an envelope. Three ring binders or presentation folders are unnecessary.
3) Section III.E.3.c. Price (Phase Two) (Pg 17) is revised as follows (changes in bold):
Provide one (1) original and one (1) electronic copy (CD format) of the solicitation submittal requirements identified below. Offerors are encouraged to simply staple or bind proposal and enclose in an envelope.
4) Section III.E.3.d. Non-Cost/Price Evaluation Factors (Phase Two) (Pg 18) is revised as follows (changes in bold):
Provide one (1) original, one (1) copy and one (1) electronic copy (CD format) of the solicitation submittal requirements identified below. In case of variation, original paper submittal takes precedence over electronic or paper copies. Entire Phase Two proposal shall not exceed 50 pages in length (single-sided only) or 25 pages (double-sided) utilizing an Arial or Times New Roman font size twelve point (12pt) or larger for Factors 5 and 6. Title page, table of contents, dividers, and any pages specifically excluded under each factor do not count towards the total page count and should not be numbered. Any pages
N6945019R0502 beyond the first 50 pages submitted will not be evaluated. Documentation for JV Agreements, partnerships, subcontractors or teaming arrangements does not count towards the page count. Offerors are encouraged to simply staple or bind and three hole-punch proposal, and enclose in an envelope.
All other terms and conditions remain unchanged.
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 17-Jan-2019 03:00 PM to 31-Jan-2019 03:00 PM.
(End of Summary of Changes)