N69450-19-R-0106 INDEFINITE DELIVERY/INDEFINITE QUANTITY CONTRACT FOR ENVIRONMENTAL CONSULTING SERVICES WITHIN THE NAVFAC SOUTHEAST GEOGRAPHIC AREA OF RESPONSIBILITY Description: ALL INFORMATION NEEDED FOR INTERESTED PARTIES TO SUBMIT A STANDARD FORM SF 330, ARCHITECT ENGINEER QUALIFICATIONS IS CONTAINED HEREIN. THERE IS NO SEPARATE REQUEST FOR PROPOSALS (RFP) PACKAGE TO DOWNLOAD.
ALL RFIs MUST BE SUBMITTED IN WRITING IN ORDER TO BE ANSWERED. RFIs WILL BE ANSWERED VIA NECO AND FEDBIZOPS. NO PHONE CALLS WILL BE RESPONDED TO DURING OPEN PROCUREMENTS. RFIs MUST BE SUBMITTED BY 12 NOVEMBER 2018 AT 2 PM EDT TO JASON.SUMMERS1@NAVY.MIL AND BRENT KUPFER, AT BRENT.KUPFER@NAVY.MIL.
This procurement will result in an Indefinite Delivery/Indefinite Quantity (IDIQ) contract for Architect-Engineer (AE) services for environmental consulting within the Naval Facilities Engineering Command Southeast (NAVFAC SE) Geographic Area of Responsibility (AOR). A sources sought was issued for N69450-18-R-0015 on 03 July 2018. As a result of the sources sought this procurement is being solicited as a small business set-aside. This procurement method was approved by the Small Business Association (SBA) on 29 October 2018 via DD2579. These services will be procured in accordance with 40 USC Chapter 11, Selection of Architects and Engineers, as implemented by FAR Subpart 36.6. The IDIQ contract will be for a base period of five years. The total fee for the contract shall not exceed $15M. The guaranteed minimum for the contract term is $5,000. Firm-fixed price task orders will be negotiated for this contract. There will be no dollar limit per task order and no dollar limit per year as long as the contract capacity is not exceeded. The Government makes no representation as to the number of task orders or the actual amount of work to be ordered. AEs are not guaranteed work in excess of the minimum guarantee. This contract has a five year ordering period. Estimated start date is July 2019.
NAVFAC SE has an AOR that includes the following: Alabama, Florida, Georgia, Louisiana, Mississippi, Texas, South Carolina, Tennessee, Guantanamo Bay Cuba, Andros Island Bahamas, and Puerto Rico. Installations include, but are not limited to, Naval Bases, Marine Bases, Air Force Bases, and Navy and Marine Corps Reserve Centers and Non-DoD Installations. Although less frequently, this contract could be used for design services at activities located within the entire NAVFAC AOR (worldwide).
This proposed contract is being solicited as a SMALL BUSINESS SET-ASIDE PROCUREMENT. North American Industrial Classification System (NAICS) Code 541620 will be used with a Small Business size standard of $15,000,000. The Government seeks the most highly qualified firm to perform the required services, based on the demonstrated competence and qualifications, in accordance with the selection criteria.
The primary purpose of this contract is for Environmental Consulting. The required professional services for the proposed contract will include the following services:
· Potable Water - Work pertaining to potable water may include evaluating the condition and capacity requirements of the supply, treatment, distribution, and storage systems; performing studies pertaining to cross connection control, water distribution operation and maintenance, disinfectants and disinfection byproducts, sanitary surveys, corrosion control in distribution systems, water conservation, and well head protection; performing computerized hydraulic analyses of potable water distribution systems; developing unidirectional flushing programs; preparing/updating Operation and Maintenance (O&M) manuals; preparing sampling plans; providing SCADA control system design and assistance; conducting flow and/or leak detection testing within the distribution system; and performing and/or updating vulnerability assessments and emergency response plans for water treatment facilities.
· Wastewater - Work pertaining to domestic/industrial wastewater may include evaluating the condition, capacity, and optimization requirements of the treatment and associated collection systems; performing studies pertaining to Total Maximum Daily Loads and predictive evaluations (e.g., mixing zones), water quality modeling, wastewater treatment pilot testing, infiltration/inflow, sanitary sewer system condition evaluation, wastewater reuse, alternative disinfection, wastewater characterization and treatability, oily waste/waste oil, and industrial wastewater management; preparing/updating O&M Manuals; providing SCADA control system design and assistance; and preparing Federal and/or state point and non-point National Pollutant Discharge Elimination System (NPDES) permit and industrial pretreatment permit applications.
· Storm Water – Work pertaining to storm water systems may include Storm Water Pollution Prevention programs and best management practices as required under federal or state Multi-Sector General Permit (MSGP) programs for Industrial Activities and preparation and revision of Storm Water Management Plans and Storm Water Action Plans for Storm Water Management Programs at military facilities classified as Municipal Separate Storm Sewer Systems (MS4’s). Required services may include: preparation of sampling plans, development of computerized mapping of storm drainage systems and facilities associated with MS4’s and industrial activities, assessment of potential storm water pollution sources, illicit discharge investigations to identify cross connections and sources of industrial wastewater, development of Best Management Practices (BMPs), development of training for base personnel, development of storm water public education and outreach programs, development of storm water public involvement programs, development of construction site runoff control programs, development of post construction runoff controls programs, development of storm water good housekeeping programs, performance of annual facility site compliance evaluations, storm water sampling and analysis, preparation of permit applications, preparation and revision of storm water pollution prevention plans, preparation and revision of storm water management programs, preparation of military project planning documentation (DD Form 1391) to implement structural BMPs, and development of relational databases which can be linked to storm water drainage, sanitary sewer and other utility mapping and informational systems to form a geographic information system (GIS) for effective source control and storm water program management.
· Spill Control – Work pertaining to spill control may include the following professional services: preparation of, or revisions, updates or amendments to Spill Prevention, Control, and Countermeasure (SPCC) Plans; Oil and Hazardous Substance Spill Contingency Plans (OHS SCP); Oil Storage Tank Management Plans; Facility Response Plans (FRP); and Integrated Contingency Plans (ICP) in accordance with applicable federal, state and local regulations and applicable industry standards; preparation and performance of spill drills and exercises to assess the effectiveness of response plans and readiness of facility response personnel; preparation of strategies (including booming strategies) to protect fish, wildlife and sensitive environments; initial preparation of, or revision to, existing Marine Fueling Operations Manuals for vessel fueling; preparation of oil spill prevention and response training material; provision of Natural Resource Damage Assessment planning and implementation services; preparation of Petroleum Storage Tank and Piping related studies and reports; preparation of contamination assessments procedures, reports, corrective action plans associated with leaking petroleum storage tanks or other petroleum-related spills or leaks.
· Miscellaneous Services - Services in addition to those mentioned above may also include:
· developing/modifying GIS and AUTOCAD drawings;
· preparing or updating O&M Manuals;
· building foreseeable environmental projects and estimates for budget planning for SDWA or CWA requirements
· identifying environmental project requirements and preparing military project justifications (e.g., DD form 1391);
· preparing plans and specifications with construction cost estimates;
· conducting soil investigations and various testing;
· obtaining environmental permits;
· reviewing shop drawings;
· providing construction consultation and construction or inspection services; and
· preparing construction record drawings.
The A-E shall also be able to provide personnel who have the capability to obtain Secret Clearance and SBE facilities and equipment to manage classified documents. In Addition, field crews shall be composed of U.S. citizens who qualify for access to restricted areas.
Laboratory Services - The A-E shall have access to an accredited laboratory or be able to perform laboratory services to include sampling, monitoring, and analytical testing for constituents in soil, water, wastewater, rinsate water, groundwater, and waste and other environmental compliance media as required by the individual task orders. Services may include 24-hour laboratory testing response time for specified constituents, and preparing an analytical report of the results (to include statistical evaluation of the data, as needed), including electronic data transfer upon request. After contract award, the A-E shall comply with the Quality Systems Documentation requirements of "Department of Defense Policy and Guidelines for Acquisitions Involving Environmental Sampling or Testing" dated November 2007 for in-house or contract laboratories to be utilized under this contract. The A-E shall ensure that all laboratories selected for use possess state or host nation certification and/or be accredited by a nationally recognized laboratory accreditation body compliant with ISO/IEC 17011:2004. The A-E shall also ensure that all laboratories selected for use have an established and documented quality system that conforms to ISO/IEC 17025:2005 along with any additional state requirements.
Electronic Accessibility Services - The A-E shall have online access to e-mail via the Internet to facilitate routine communication and exchange of correspondence and other documentation. The A-E shall establish and maintain a site to facilitate interactive information sharing for uploading and downloading of electronic files. This site can be in the form of either File Transfer Protocol (FTP) or web HTML.
System for Award Management: Firms are required to be registered in the DoD System for Award Management (SAM) database, prior to the award of a contract. Failure to register in the SAM database may render a firm ineligible for award. For more information, check the SAM website: http://www.sam.gov or refer to DoD FAR Supplement (DFARS), Part 204 Subpart 204.12. In addition, The Federal Acquisition Regulation (FAR) requires the use of the Representations and Certifications application in Federal solicitations as part of the proposal submission process. Refer to FAR 52.204-8 Annual Representations and Certifications (Apr 2016) and DFARS 252.204-7007, Alternate A.
FAR Subpart 9.405(d)(1) require contracting officers to review the SAM exclusions after the receipt of all offers. FAR Subpart 9.405(d)(4) requires contracting officers to review the SAM exclusions again, immediately prior to award, to ensure that no award is made to a listed firm. FAR Subpart 9.405-1(b) also requires the contracting officers to check the SAM exclusions prior to awarding “new work” as defined in this provision. Failure to verify the firm(s) or its principals’ status may render a firm ineligible for award. For more information, check the System for Award Management at www.sam.gov/.
Firms are required to invoice and be paid via Wide Area Workflow (WAWF). Failure to register or agree to these terms may render a firm ineligible for award. For more information, check the WAWF website: https://wawf.eb.mil/.
In accordance with FAR 36.601-4(b) the AE firm must be a registered/licensed architectural and/or engineering firm to be eligible for award. Provide proof that firm is permitted by law to practice the professions of architecture or engineering (e.g.., state registration number, or a brief explanation of the firm’s licensing in jurisdictions that do not register firms, etc.). Failure to submit the required proof could result in a firm’s elimination from consideration. FIRMS WHO ARE OFFERING AS A JOINT VENTURE SHOULD INCLUDE WITH THEIR SUBMISSION A COPY OF THE JOINT VENTURE AGREEMENT. FAILURE TO INCLUDE THE JOINT VENTURE AGREEMENT WILL RESULT IN THE FIRM’S ELIMINATION FROM FURTHER EVALUATION.
JOINT VENTURE, TEAMING OR SUBCONTRACTOR UTILIZATION: Firms formally organized as Joint Ventures that have associated specifically for performance of this contract, consortia of firms, or any other interested parties may submit proposals. Team Arrangements are considered an arrangement in which (1) two or more companies form a partnership or joint venture to act as a potential prime firm; or (2) a potential prime firm agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program. In accordance with FAR Subpart 9.6, the Government will recognize the integrity and validity of firm team arrangements; provided, the arrangements are identified and company relationships are fully disclosed in the offer. The firm shall identify the major or critical aspects of the requirement to be performed by those identified in the Firm Team Arrangement. The submission must contain a narrative that clearly explains the relevance to a particular factor of information concerning a company that is part of a Firm Team Arrangement. The Government will consider the adequacy of this explanation in deciding the relevance of the information to this procurement.
Notwithstanding the specific requirements of any other area of this synopsis, information submitted about any company other than the firm, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries) that will not perform major or critical aspects of this requirement, or other associated business, WILL NOT be evaluated for any factor unless the proposal contains a detailed narrative explaining why this submitted information is relevant to this acquisition. The Government will consider the adequacy of this explanation in deciding the relevance and weight, if any, of the information to this procurement.
The awarded contract will be subject to specific provisions addressing the avoidance of organizational conflicts of interest, including NFAS 5252.209-9300, Organizational Conflicts of Interest. The prime firm for this contract will be required to perform throughout the contract term.
Slate, Interview and Selection Procedures The firm shall demonstrate its capability to perform planning work as required under this contract using the Standard Form 330 (SF330). The firm is required to complete ALL sections of Part I and Part II of the SF330. The Government will evaluate the completed SF330. This section describes the tasks required for completion of a fair, comprehensive, and impartial slate-selection process.
| 1. | Evaluations. The evaluation for this project will be conducted using a Slate/Selection (one board) procedure and will be held in Jacksonville, FL. The Slate-Selection Board Chairman (SSBC) will make arrangements for the evaluation upon completion of the screening of the SF330 by Acquisition Division. Each SF330 submitted will be evaluated individually and independently. |
| 2. | Familiarization. All members of the architect-engineer evaluation board will be composed of members who, collectively, have experience in architecture, engineering, planning and Government and related acquisitions matters. Members will be appointed from among highly qualified professional employees from NAVFAC-SE or other agencies. The members are required to be familiar with the contents of the synopsis before evaluation begins. The Chairman will bring the evaluation team members and advisory staff together prior to the evaluation of proposals to discuss the synopsis, the rating methodology, and each member’s responsibilities. |
| 3. | Communication. All members of the evaluation organization are to communicate via e-mail and/or verbally whenever possible and prudent to the Government. All e-mail communication among the evaluation organization is to be protected as sensitive to source selection. |
| 4. | Receipt and Preparation of SF330. The Contract Specialist will screen all SF330s to ensure that each is properly completed, executed and submitted in accordance with the synopsis requirements. After this initial screening, the Contract Specialist will forward the SF330s to the SSBC for evaluation. |
| 5. | Slate Evaluation. Each member of the evaluation board will independently evaluate each SF330 submitted to identify compliance with the synopsis, strengths and weaknesses, potential clarifications and possible deficiencies. The evaluation will be documented in accordance with the guidelines established in this synopsis. |
| 6. | Narrative assessments. The evaluators’ narrative assessment of each SF330 is the cornerstone of the evaluation process. The narratives form the basis for the award decision. Narrative comments must be clear, detailed and self-explanatory. Narratives will be prepared in ink or computer generated. Evaluators must indicate, as a minimum, (1) where the SF330 meets or fails to meet minimum requirements; (2) strengths/advantages and the benefit to the government should the firm receive award; (3) weaknesses/disadvantages/deficiencies and the impact each would have on the capability to perform. |
| 7. | The rating given under each of the evaluation criterion reflects the degree to which the proposed approach meets or does not meet the requirement through an assessment of the strengths, weaknesses, deficiencies, and risks of an offeror. The methodology used to evaluate the SF330 and related risk will be based on a Met or Not Met determination for each evaluation criterion. An overall rating will not be given. |
| 8. | Consensus. Upon completion of individual evaluations, the evaluation team and Chairman shall meet and establish a final rating for each firm on each evaluation factor. Ratings will not be averaged, but will represent the consensus opinion of the evaluators. The Chairman will record these consensus results and document the basis for each. The Chairman will present the consensus results to the PCO and legal counsel (if required) for review and/or concurrence. |
| 9. | Discussions/ Interviews: After Procuring Contracting Officer review of the consensus results, a minimum of three of the most highly qualified firms will be short listed and invited to participate in face-to-face discussions/interviews. Interviews are conducted for the purpose of obtaining any additional information that will help the board in ranking the firms in order of preference and distinguish between the most highly qualified firms. It provides the board an opportunity to gain a better understanding of the firm’s qualifications, to clarify questions regarding the SF330 and to assess their understanding of the work. The firms are given an opportunity to provide their presentation followed by a question and answer period led by the SSBC. The questions may be provided to the firms for preparation; however additional questions may arise based on the information presented during the interview. Any information received during the interview process may be used as justification for the ranking of the firms based on the published selection criteria. During the interviews, the firms are invited to present their approach and discuss the concepts and the relative utility of alternative methods of furnishing the required services. |
10. Interviewed firms must be prepared to provide a listing of present business commitments with their required completion schedules; financial and credit references (include name and telephone numbers of officers at their financial institutions) and performance references other than NAVFAC Southeast (include three (3) or more with names and telephone numbers of the contract administrators).
| 11. | Selection: Following the interviews, the Evaluation Board shall reach a consensus on the order of preference of the short listed firms and provide the Selection Board Report recommendation to the selection authority, in order of preference, at least three firms that are considered to be the most highly qualified. The Selection Board Report will include clear justification for the basis of selecting the most highly qualified firm and will be based solely on the evaluation criteria identified in the publicized synopsis. When only one board is used, the Slate/Selection report will include documentation supporting the decision to include and exclude firms from the slate. If two boards are used, an approved Pre-Selection/Slate Board Report must be included must be included as an enclosure to the Selection Report. Final selection decision shall be made by the agency head or a designated selection authority. |
| 12. | After Selection: After the Selection Report has been approved, the Procuring Contracting Officer may release information identifying only the AE firm selected as the most highly qualified with which negotiations will be conducted. Because of the Selection of Architects and Engineers procedures, if a fair and reasonable price cannot be negotiated with the number one ranked firm, the next most highly qualified firm may be contacted and requested to provide a fee proposal. At that time the name of the second firm may be released. Offers are reminded that if the proposal is submitted by a Joint Venture (JV), the JV must be approved by the Small Business Administration (SBA) in writing prior to award. |
SUBMISSION REQUIREMENTS: Architect-Engineer firms desiring to be considered for this contract must submit a completed SF330 package. The SF330 shall be typed, one sided, at least 11 point Times New Roman or larger. Part I shall not exceed 60 single-sided 8.5 by 11 inch pages (the page limit does not include certificates, PPQs, or licenses, nor does the page limit include cover sheets or dividers, provided that these do not contain any substantive information submitted in response to the synopsis or intended to demonstrate the qualifications of the firm). Part I pages shall be numbered sequentially. The organizational chart may be one-page single sided 11 by 17 foldout, using 11-point font or larger (font limitations do not apply to graphics, captions or tables). Introductions shall be included in front of Section E and will not be part of the page count of the package. Firms shall include your DUNS, CAGE, and TIN numbers in Block 30 of the SF330. Interested firms shall submit 1 original plus 3 paper hard copies of the SF330 and 1 CD to Naval Facilities Engineering Command Southeast, Code N69450, Attn: ENV ACQ (Jason Summers), Building 903 Yorktown Avenue, Jacksonville, Florida 32212-0030. Responses are due no later than 2:00pm EST, 04 December 2018. Late responses will be handled in accordance with FAR 52.215-1. The primary point of contact is Jason Summers, Contract Specialist, at jason.summers1@navy.mil. The alternate point of contact is, Brent Kupfer, at brent.kupfer@navy.mil. If an SF 254/SF 255 is submitted for this solicitation, it will not be reviewed or considered.
It is the contractor’s responsibility to ensure delivery to the location specified.
Commercial couriers such as FEDEX, DHL or UPS follow the installation procedures and they are required to have a background check if they do not have a DBIDS badge. Firms should check with their intended courier to ensure they have the proper identification credentials.
Electronic (E-mail, facsimile, etc.) submissions are not authorized.
Inquiries concerning this procurement should include the solicitation number and title and be forwarded via email to jason.summers1@navy.mil and brent.kupfer@navy.mil.
THIS IS NOT A REQUEST FOR PROPOSAL.
SELECTION CRITERIA: Firms responding to this synopsis will be evaluated to determine the most highly qualified firms to perform the required services in accordance with the published selection criteria. Failure to comply with instructions, or provide complete information may affect the firm’s evaluation or disqualify the firm from further consideration. The following seven (7) Selection Criteria (listed in descending order of importance) will be used to evaluate and award this contract. Specific selection criteria include:
| 1. | Specialized Experience |
| 2. | Professional Qualifications and Technical Competence |
| 3. | Past Performance |
| 4. | Scheduling and Capacity |
| 5. | Quality Control Program Management |
| 6. | Firm Location |
| 7. | Volume of Work |
Criterion 1—Specialized Experience (SF330, Part I, Section F): Firms will be evaluated in terms of their specific project experience on projects completed within the past five years, including team members who performed this work. Explain both firm and team experience in performing services related to the following categories of work described below in accordance with applicable federal, state and local laws and regulations both domestic and overseas, including experience with the Final Governing Standards (FGS), host nation laws, Overseas Environmental Baseline Guidance Document (OEBGD) and DOD/Navy policy and guidance:
Potable Water
a. Sanitary Surveys of drinking water treatment and distribution systems;
b. Cross Connection and Control Studies of drinking water distribution systems;
c. Hydraulic Modeling and Analysis of drinking water distribution systems;
d. Vulnerability Assessments of drinking water treatment systems;
Storm Water
e. Preparation of Storm Water Pollution and Prevention Plans (SWPPP) to comply with MSGPs;
f. Preparation of Storm Water Management Programs (SWMP) to comply with MS4s;
Wastewater
g. Preparation of NPDES permit application packages,
h. Wastewater Characterization/Treatability Studies;
i. Sanitary Sewer Evaluation Studies;
Spill Control
j. Preparation of Spill Prevention, Control, and Countermeasure (SPCC) Plans and Facility Response Plans (FRP’s) and providing related spill response booming strategies;
k. Training and Facilitating in drills and exercises under SPCC and FRP and,
l. Evaluation of Petroleum Storage Tanks and related fueling systems against industry standards.
Submission requirements: Provide a minimum of 3 and maximum of 8 projects completed within the past 5 years immediately preceding the date of issuance of this notice, similar in scope and complexity and with a project size of $50K to $1M that best demonstrate specialized experience of the proposed team in the areas outlined above. Sufficient information to determine the date of completion of the project must be included in the project description or the project will not be considered. The submission must include a variety of the types of projects listed above. If more than the maximum number of projects is submitted, the Government will only evaluate projects up to the maximum number authorized in the order submitted.
All projects provided in the SF330 must be completed by the actual office/branch/regional office/individual team member proposed to manage and perform work under this contract. Projects not meeting this requirement will be excluded from consideration in the evaluation. To enable verification, firms should include the DUNS number along with each firm name in the SF330 Part 1, Section F, block 25, “Firm Name.” Include a contract number or project identification number in block 21. Include an e-mail address and phone number for the point of contact in block 23(c). In block 24, include in the project description the contract period of performance, award contract value, current contract value, and a summary of the work performed that demonstrates relevance to specialized experience as outlined above. For projects performed as a subcontractor or a joint venture involving different partners, specifically indicate the value of the work performed as a subcontractor or by those firms proposed for this contract, and identify the specific roles and responsibilities performed as a subcontractor or by those firms on the project rather than the work performed on the project as a whole. If the project description does not clearly delineate the work performed by the entity/entities offering/teaming on this contract, the project could be eliminated from consideration.
NOTE: If the firm is a joint venture, projects performed by the joint venture should be submitted; however, if there are no projects performed by the joint venture, projects may be submitted for either joint venture partner, not to exceed a total of 8 projects.
Projects shall be submitted on the SF330 at Part I, Section F and shall be completed projects. Projects not completed will be excluded from evaluation consideration. For submittal purposes, a task order on an IDIQ contract is considered a project, as is a stand-alone contract award. Do not submit an IDIQ contract as an example project. Instead, list relevant task orders or stand-alone contract awards that fit within the definition above. Project titles and descriptions must clearly define work performed. The Government will not evaluate information provided for an IDIQ contract. Examples of project work submitted that do not conform to this requirement will not be evaluated.
All information for Criterion 1 should be submitted in the SF330, Part I, Section F of the SF330. The Government WILL NOT consider information submitted in addition to Part 1, Section F in evaluation of Criterion 1.
Criterion 2 — Professional Qualifications and Technical Competence (SF330, Part I, Sections E & G): Firms will be evaluated in terms of the competence and experience of the key personnel and technical team proposed to accomplish this work. Key personnel are individuals who will have major contract or project management responsibilities and/or will provide unusual or unique expertise. Experience with regulatory agencies and familiarity with applicable regulations, guidance, and DOD/Navy requirements relating specifically to the performance of the major categories of work described above will be evaluated. This includes:
a. Experience (with present and other firms) and roles of staff members especially in those areas specifically addressed in the Project Description and Evaluation Factor (2);
b. Technical qualifications of the firm’s team members to evaluate and design, (if needed), water, wastewater, storm water, and spill control systems;
c. Experience with and knowledge of the Navy/DOD’s water, wastewater, storm water, spill control programs and state environmental regulations, and all applicable Federal regulations particularly with the Safe Drinking Water Act, Clean Water Act, and Navy Policy including OPNAV M-5090.1 and the Navy Overseas Drinking Water Program;
d. Knowledge of Navy regulations and design criteria through recent design experience; and
e. Professional registration of the engineering staff which includes states within the geographical regions previously listed. It will not be necessary for prospective firms to hold registrations in all states in the NAVFAC Southeast AOR at the time of submission of the SF 330, but the ability to obtain registration where it may be needed will be considered in evaluating qualifications.
Submission Requirements:
SF330, Part I, Section E. Provide resumes for all proposed key personnel that illustrate experience in the work proposed under this contract. Resumes are limited to 2 pages and should indicate professional registration, certification, licensure and/or accreditation in appropriate disciplines with a minimum of 5 years of experience in their discipline; cite a minimum of 2 recent (completed within the past 5 years with a minimum value of at least $50K) project-specific experience in work relevant to the services required under this contract; and indicate proposed role in this contract. Indicate participation of key personnel in example projects in the SF330, Part 1, Section G.
Criterion 3—Past Performance (SF330, Part I, Section H):
Firms will be evaluated on past performance with Government agencies and private industry in terms of work quality, compliance with schedules, cost control, and stakeholder/customer satisfaction. Evaluating past performance and experience will include information provided in Past Performance Questionnaires (PPQs) or CPARS for Criterion 1 projects and may include customer inquiries, Government databases, and other information available to the Government including contacts with points of contact in other criteria. NOTE: Past performance information for projects listed under Criterion 1 may be given greater weight. If there is a CPAR evaluation available and a PPQ is submitted for the same project, the CPAR evaluation will be considered.
Submission Requirements:
SUBMIT A COMPLETED CPARS EVALUATION FOR EACH PROJECT UNDER CRITERION 1. IF A COMPLETED CPARS EVALUATION IS NOT AVAILABLE, the Past Performance Questionnaire (PPQ) (Attachment (A)) included in this notice is provided for the firm or its team members to submit to the client for each project included under Criterion 1, Specialized Experience. DO NOT SUBMIT A PPQ WHEN A COMPLETED CPARS IS AVAILABLE.
IF A CPARS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your SF330. If the firm is unable to obtain a completed PPQ from a client for a project(s) before the response date set forth in this notice, firms should complete and submit with their responses the first page of the PPQ (Attachment (A)), which will provide contract and client information for the respective project(s). Firms may submit a PPQ previously submitted under a different Notice/RFP (legible copies are acceptable) as long as it is on the same form as posted with this Synopsis. Firms should follow up with clients/references to ensure timely submittal of questionnaires. If requested by the client, questionnaires may be submitted directly to the Government's point of contact, Naval Facilities Engineering Command Southeast, Code N69450, Attn: Jason Summers via email at Jason.summers1@navy.mil and Brent Kupfer via email at brent.kupfer@navy.mil, prior to the response date. Firms shall not incorporate by reference into their response PPQs or CPARS previously submitted in response to other A/E services procurements. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
Firms may provide any information on problems encountered and the corrective actions taken on projects submitted under Criterion 1 Specialized Experience. Firms may also address any adverse past performance issues. Information shall not exceed four single-sided pages in total.
Awards, letters of commendation, certificates of appreciation, etc. shall not be submitted and will not be considered in the evaluation.
Criterion 4—Scheduling and Capacity (SF330, Part 1, Section H):
Firms will be evaluated according to their ability to perform work as required to meet schedules, capacity to accomplish multiple complex task orders simultaneously and in multiple states. This includes:
1. Demonstrating the ability to sustain the loss of key personnel without adverse impact upon assigned tasks and project schedules;
2. Indicate the firm’s present workload and projected workload with a plan and schedule to accomplish the work; and
3. Describe the firm’s capacity to establish and maintain a site to facilitate interactive information sharing for uploading and downloading electronic files, tracking and scheduling events, and customizing and sharing forms. Also, describe the A&E’s capacity to establish and maintain a File Transfer Protocol or web HTML site for transfer of large files.
Submission Requirements:
1. Describe your capacity to provide services described in Selection Criterion 4 above. Indicate projected workload and availability of the project team (including consultants) for a specified contract period starting in July 2019.
2. Provide an organizational chart for the team and discuss the management plan for this contract and personnel roles in the organization. Describe the ability of the firm to manage, coordinate and work effectively with team members, both internal staff and consultants. Discuss the history of working relationships with team members, including joint venture partners where applicable.
3. Describe the firm’s present workload and the availability of the project team (including consultants) for the specified contract performance period. Describe the workload/availability of the key personnel during the anticipated contract performance period and the ability of the firm to provide qualified backup staffing for key personnel to ensure continuity of services. Provide a visual representation such as a table or graph to convey information for this item. General statements of availability/capacity may be considered less favorably.
Criterion 5—Quality Control Program (SF330, Part I, Section H):
Firms will be evaluated on the strength of the quality control program proposed by the firm to ensure quality products and services under this contract, and means of ensuring quality services from their consultants/subcontractors.
Firms will be required to demonstrate that an internal Quality Control Program is consistently utilized to ensure the technical accuracy and the inter-disciplinary coordination of work products. The selected firm will also be required to demonstrate how “quality assurance” and “quality control” is completed on work products prepared by office and/or sub-consultant. Demonstration of this Evaluation Criteria shall be accomplished by providing a summary of the Quality Control Program utilized by your firm and/or any proposed subs.
Submission Requirements:
Describe the quality control program that will be utilized for all deliverables of this contract and the management approach for quality control processes and procedures. The description shall:
1. Explain the quality control program including an example of how the plan has worked for one of the projects submitted as part of SF330, Section F or how the plan will work if it has not been used previously.
2. Provide a quality control process chart showing the inter-relationship of the management and team components.
3. Describe specific quality control processes and procedures proposed for this contract to ensure technical accuracy in plans, studies and reports.
4. Identify the quality control manager and any other key personnel responsible for the quality control program and a description of their roles and responsibilities.
5. Describe how the firm’s quality control program extends to management of subcontractors.
Criterion 6— Firm Location (SF330, Part I, Section H) Firms will be evaluated based on their location in relation to the geographic region in order to ensure timely response to unanticipated requests for on-site support. Additionally, State engineering registrations and regulatory experience within NAVFAC SE’s area of responsibility will be considered. Firms will also be evaluated on their knowledge of probable site conditions and regulatory requirements that would affect projects.
Submission Requirements:
| 1. Indicate location of the office(s) that will be performing the work, including main offices, branch offices, and offices of team members. |
| 2. Provide a narrative describing the team’s knowledge of the primary geographic areas to be covered by this contract, state engineering licenses, probable site conditions and regulatory requirements. |
Criterion 7—Volume of Work (SF330, Part 1, Section H Firms will be evaluated in accordance with DoD Federal Acquisition Regulation Supplement (DFARS) Procedures, Guidance and Information (PGI) 236.602-1, and from data extracted from the Federal Procurement Data System (FPDS). Firms will be evaluated in terms of work previously awarded to the firm by DOD within the past twelve months with the objective of effecting an equitable distribution of contracts among qualified A&E firms including small, disadvantaged business firms, and firms that have not had prior DOD A&E contracts. Note; in addition to the prime contractor, all major subcontractors and joint venture partners included in the proposed team will be considered in the evaluation of this criterion.
Submission Requirements:
Firms do not submit data for this factor.
TO ASSIST THE EVALUATION BOARD IN REVIEWING YOUR APPLICATION, ENSURE THAT THE FOLLOWING INFORMATION IS INCLUDED IN THE BODY OF THE SF330:
Section D: As an attachment for Section D, provide an organization chart of the proposed team showing the names and roles of all key personnel listed in Section E with the associated firm as listed in Section C. (The organization chart will not be counted as part of the page limit and the chart must be bound with the submittal to avoid separation in handling.) The chart may be an oversize foldout. Note that all individuals listed in the organization chart are not required to have a resume, only those key personnel and disciplines listed in Criterion 2. List number of individuals in each discipline NOT assigned to proposed team who could be used to augment the proposed team (in event of loss of personnel or failure to maintain schedules). Provide the information requested for the proposed team members for the additional staff available to augment the proposed team.
Section E: Include resumes of team members included on the organizational chart listed as key personnel. Resumes should reflect the required professional qualifications, specialized experience cited in the Criterion 1.
Section F: Provide a matrix in Section F summarizing at least three (3), but no more than eight (8) of your most relevant projects required under the specialized experience category. For each of the presented projects, provide the following information where applicable:
| (a) | Project name/description/location; |
| (b) | Contract number and type; |
| (c) | Project cost (actual); |
| (d) | Currently proposed team members that worked on the project and roles; |
| (e) | An owner point of contact, with telephone number; |
| (f) | Project schedule including any owner approved extensions and final execution schedule; |
| (g) | Number and dollar value of change orders; and |
(h) Percentage of work performed as prime or subcontractor.
Summarize proposed team in tabular form with the following data:
| (a) | Firm name; |
| (b) | Individual's name; |
| (c) | Work history with the individual consultant firm; |
| (d) | Office location (home or branch office); |
| (e) | Professional degree(s), and date(s); |
| (f) | Professional Registration(s), date(s) and state(s); |
| (g) | Assigned team responsibility; |
| (h) | Percentage of time committed to this team |
| (i) | Synopsis of experience including firm name(s), years with each firm, and type of experience with each firm. |