N6945018R4006_Amendment_0001.pdf
PDF 276 KB Posted
- Attached to
- Provide Temporary Elevator for Lease
- Solicitation number
- N6945018R4006
About this file
N6945018R4006_Amendment_0001.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6945018R4006_Amendment_0002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6945018R4006
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Statement of Work Section 6.2 dates should state 22 June 2018 through 15 January 2019.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 25
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-May-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6945018R4006
X 9B. DATED (SEE ITEM 11)
24-May-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-May-2018
CODE
NAVFAC SOUTHEAST
PWD KINGSBAY
910 USS HUNLEY AVE
NSB KINGSBAY
KINGSBAY GA 31547
N69450 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
STATEMENT OF WORK
Provide Temporary Elevator at Dry Dock Naval Submarine Base Kings Bay, GA
WO#: BWKBZ6
PROJECT TITLE: PROVIDE TEMPORARY ELEAVTOR AT DRY DOCK, KINGS BAY SUBMARINE
BASE, KINGS BAY, GA
1. PROJECT DESCRIPTION:
1.1. Work includes providing all labor, materials, equipment, and supervision necessary to provide a temporary personnel elevator at the Dry Dock, Naval Submarine Base Kings Bay, Georgia. Contractor shall provide and install a fully operational system in accordance with the requirements contained within this statement of work.
2. PROJECT LOCATION:
2.1. This project is located within the Waterfront Restricted Area (WRA) of the installation. Contractor shall refer to “SWFLANTINST 5530.7K, Appendix 3A”, as well as paragraphs below as reference for security requirements to enter restricted areas of the Base.
2.2. Prior to accessing the construction work area, the Contractor must coordinate with PWD and the Customer to obtain clearance. Work cannot begin until the contractor has been granted clearances. Contractor is responsible for scheduling his work in order to accommodate the duration of this contract, including the obtaining of clearance(s), final clean up, and submitting any/all required close out documentation .
3. DEFINABLE FEATURES OF WORK:
3.1. Install a temporary personnel elevator on the South West Corner of the Dry Dock. Elevator requirements are as follows:
3.1.1. Elevator Car: The car shall have a capacity of 5,000-6,000 lbs. or 25-30 passengers and shall be fully enclosed. The interior of the car shall be electric lighted and shall provide a 110 VAC GFI receptacle. Its interior dimensions shall be 11’ long +/- 2’; 5’ wide +/- 4”; and 7’ high + 1’/- 0’.
3.1.2. Car Movement: Elector car shall be moved on its support structure by electric motor at a rate of 150- 180 feet per minute.
3.1.3. Elevator Doors: Doors must be oriented and synchronized to open at the appropriate of 2 landings.
Minimum open door width shall be 50”.
3.1.4. Landings and Gates: Landing gates and other barriers at the landings, as required by ANSI A10.4 shall be provided and installed by the contractor. Landing gates shall be bi-parting unless precluded by unexpected site features.
3.1.5. Call-Up Feature: Elevator shall not require a specially skilled and continuous operator, but rather may be summoned by a landing call station to the appropriate landing and otherwise operated by a general shipyard worker. Instructions such as “Both doors must be closed before elevator will operate” shall be prominently displayed.
3.1.6. Electric Design: Electric components including motors, starts, relays, switches, and wiring shall conform to and be located in accordance with NFPA 79.
3.1.7. Electric Power Disconnect: A supply circuit disconnect device shall be provided and installed on the equipment. The device shall be either a fusible motor circuit switch or circuit breaker with a minimum interrupting rating of 42,000 amperes. Elevator shall feature a panel mount, mail, Duraline or similar E1016 series, black-white-red-with ground lug 480 VAC, three phase connection; and a Duraline or similar 3MT20 cable connection for 110 VAC.
3.1.8. Control Circuits: Main and auxiliary control circuits shall operate on a circuit of 115 volts or less derived from isolation transformer(s) integral with the equipment or from 115 volt power supplied by the Dry Dock.
3.1.9. Grounding: Exposed, non-current carrying metal parts on the equipment shall be maintained at common, zero ground potential. None of the primary circuits in the equipment shall be connected to ground. A ground stud or lug on the equipment shall provide means for grounding the equipment for safety to personnel. A NEMA type grounding plug that effectively grounds the equipment shall be acceptable for cord connected equipment.
3.1.10. Electromagnetic Interference Control: The elevator will be designed to operate in an industrial / ship repair environment where radar system and similar equipment testing will be a potential sour of electromagnetic interference.
3.1.11. Control Panels, Instruments, and Plates: The working and numbers on all control panels, instruments, charts, and plates shall be permanently and legibly displayed in bold face, English language characters on a contrasting background. Operator controls, instrumentation, and indicators shall be mounted convenient to operating personnel. Such devices shall be clearly and legibly marked for function and identification. Controls shall be fitted with suitable handles, pushbuttons, or control knobs, as applicable.
3.1.12. Installation Drawings: No later than 10 days after award, English language installation drawings and calculations, both stamped by a registered professional engineer, in the manufacturer’s standard format, shall be provided to the KO for Government approval. Government review period will not exceed 10 business days. Calculations, resulting from an analysis conducted by a Structural Engineer, showing that attachment to the floor of the dry dock, wall, and upper platform will be adequate to support elevator loads, shall be provided.
3.1.13. Installation Coordination: The contractor shall coordinate the proposed installation schedule with the KO within 10 days after award of contract. The installation schedule shall be subject to approval of the receiving activity. Approval of the installation schedule shall not relieve the contractor of any responsibility for performance.
3.1.14. Installation Requirements: Elevator shall be installable by wall ties mounted to the dry dock wall, and by anchoring to the dry dock floor. Anchoring to the dry dock floor will use female anchors or a similar method so that elevator removal will leave a flat surface. Anchoring hardware intended to be left behind after elevator removal shall be stainless steel. Structure supporting car shall be of hot dipped galvanized steel construction and shall not rise over 20 feet above upper landing. Power requirement will not exceed 100 amp, 480 VAC. Elevator will operate on a supply of 3 phase, 480 volt, 60 hz. power and a supply of 110 VAC, single phase, 60 hz. power. Electrical disconnect enclosure shall be located at the base of the elevator.
3.1.15. Preservation of Dry Dock Connections: Upon removal of elevator, threaded female anchors shall remain in the Dry Dock wall and floor, but shall be plugged with removable sealant or elastomer to minimize the future fouling of threads.
3.1.16. Maintenance/Repair: The contractor shall provide all required maintenance and repairs in accordance with the Original Equipment manufacturers Recommendations. Contractor will perform periodic preventative maintenance and will respond within 24 hours by visiting the site as necessary to correct a failure. After 24 hours, each day (calculated to the nearest full 24-hr day) of down time will be deducted from that month’s invoice. All servicing work where personnel may be exposed to hazardous energy will be performed IAW NAVSEA OSHECM Chapter 250 and OSHA 1915.89 Hazardous Energy Control Program requirements.
3.1.17. Testing and Certification: The contractor shall perform all required initial and follow up testing required for the elevator to be certified for use. Government inspection oversight and final certification will be provided. The contractor shall coordinate all testing with the KO to coordinate Government oversight/certification.
3.1.18. Certifications: All tests shall be performed by the contractor and witnessed by the Government provided Elevator Inspector per ANSI/ASSE A10.4 (2007). Acceptance and periodic inspection, test, and certification shall be per the NAVFAC VTE Program, Attachment 001. Contractor shall provide notification of testing a minimum of 10 days of scheduled testing to KO. Contractor shall provide the required test weights.
3.1.19. Emergency Elevator Removal: In rare circumstances, hurricanes and other damaging weather may require that all equipment be removed from the dry dock. It shall be an option to this contract that the contractor shall remove elevator components within 48 hours of emergency notifications.
The contractor will receive 3 weeks’ notice prior to potential removal date. Bidder’s quote will be for one emergency removal, but this option may be exercised multiple times depending on the frequency of destructive weather events.
3.1.20. Elevator Reinstallation After Emergency Removal: It shall be an options to this contract to reinstall elevator after emergency removal. Reinstallation must be complete within 3 days of notification. Acceptance, certification evaluation, and test shall be required each time the elevator system is installed, and shall be certified by the Government Elevator Inspector prior to being placed in operation for productive service. Bidder’s quote will be for one reinstallation, but this option may be exercised multiple times depending on the frequency of destructive weather events.
3.2. Estimated time table for the lease of the temporary elevator: 22 June 2018 – 15 January 2018, with an option for an additional 90 day lease period.
4. Drawings/Attachments
4.1. Any drawings that accompany this project description are the property of the Government and shall be used for reference purposes only. The contractor is responsible for field verifying all conditions, system configuration, and equipment that is referenced in the as-built drawings. Any drawings found in the technical library or supplied by the Government are for reference purposes only, unless expressly noted otherwise.
4.2. Attachments to, and standards referenced within this scope of work, shall be considered part of the contract; including, but not necessarily limited to, the Unified Facilities Guide Specifications and the United Facilities Criteria.
4.3. Attachment 001 – NAVFAC VTE Program
5. References and Standards
5.1. All equipment and installation methods are to comply with the most current and appropriate publications and standards. In the event of conflict between standards referenced or provided in this scope, the most stringent criteria shall apply.
5.2. When items are required to conform to specific standards of an organization, such as the American Society for Testing and Materials (ASTM), proof of such conformance shall be submitted to the Contracting Officer for approval. Proof of compliance shall be in the form of a label or listing from the organization indicating compliance with the specified standard or a certificate from an independent testing organization certified to perform acceptance tests.
6. Period of Performance:
6.1. The period of performance of this contract is 250 days from notice to proceed.
6.2. Estimated time table for the lease of the temporary elevator: 22 June 2018 – 15 January 2019, with an option for an additional 90 day lease period.
6.3. All work shall be accomplished between the hours of 7:00 a.m. and 5:00 p.m., Monday through Friday (excluding Federal holidays). Requests to work outside of this time frame shall be made to the Contracting Officer in writing at least five (5) working days in advance, and shall provide a justification for the change, shall identify the work to be performed, and shall include a list of personnel that will be on site for the days and times requested. The requested variance shall not be performed without written approval from the Contracting Officer.
7. Post Award Meetings:
7.1. Prior to commencement of installation, the Contractor shall schedule a meeting with the Contracting Officer.
8. Submittals
8.1. Contractor shall submit shop drawings or manufacturer drawings to the Government prior to installation.
Upon approval of the shop drawings, notice to proceed for delivery and installation will be issued with the lease period to follow per the period of performance outlined above.
9. General Provisions
9.1. The site visit for this job will be conducted at a date and time established with the contracting officer. NO
CONTRACTOR PERSONNEL ARE ALLOWED TO VISIT THE SITE UNESCORTED OR AT ANY
OTHER TIME THAN SPECIFIED.
10. SUBBASE Kings Bay Specific Guidelines
10.1. Station Access/Regulations
10.1.1. The Contractor and his employees and subcontractor(s) shall become familiar with and obey all station regulations, including fire, traffic and security regulations. All Contractor personnel shall keep within the limits of the work (and avenues of ingress and egress), and shall not enter any restricted areas unless required to do so and are cleared for such entry. The Contractor's and his subcontractor's equipment shall be conspicuously marked for identification.
10.1.2. Contractor employees and representatives performing work under this contract are required to be United States citizens.
10.2. Upper Base Access Requirements
10.2.1. Access to the front gate of SUBASE Kings Bay will be controlled by the Defense Biometric Identification System (DBIDS) program.
10.2.2. Visit requests are required through SUBASE sponsor for enrollment into DBIDS.
10.2.3. Complete a National Crime Information Center (NCIC) background check (SECNAV 5512/1 Consent form).
10.3. Restricted Area Access Requirements
10.3.1. Contractor shall plan for 15% down time per day related to site access restrictions, weapons handling, inspections, condition two storms, and special security conditions.
10.3.2. Contractor shall plan that approximately 30% of his anticipated workforce will not be granted access to the site due to security screening concerns. The contractor shall plan for additional alternative personal to cover this contingency.
10.3.3. Personnel security screening for access to these areas is accomplished through a government issued trustworthiness background check under the Facility Access Determination (FAD) Program
(SECNAVINST 5510.30A).
10.3.4. Under the FAD process, each individual is required to complete a government provided security questionnaire (SF 85), provide fingerprints and must consent to a National Crime Information Center (NCIC) background check.
10.3.5. The government reserves the right to deny access based upon unfavorable trustworthiness determination, unfavorable NCIC results, or failure to provide requested security questionnaire information. Such determinations will be final. There are no appeal rights to a determination to deny access. It is the Commanding Officer's prerogative to deny access to any area under his jurisdiction.
10.3.6. Contractor shall provide a worksite access list containing: company name, individual’s full name, social security number, date and place of birth, date, citizenship. If applicable, include company cage code and type and issuing authority of individual’s personnel security investigation/FAD of all personnel requiring access to the worksite. Contractor is required to maintain the worksite access list in an accurate manner throughout the period of contract performance. Contractor shall adhere to personnel worksite access requirements stated above when hiring subcontractor or temporary service personnel.
10.3.7. Vehicle permits require documentary proof of liability insurance coverage, registration and all pertinent identification/description such as manufacturer's model, body type, and engine number.
Company vehicles must have permanently affixed company identification prominently displayed on the vehicle.
10.3.8. For material deliveries to the worksite other than government authorized vehicles, provide name of company, name of driver, U.S. citizenship, vehicle information, purpose of delivery, actual date, time, point of contact (including phone number) and description of load material on government provided Vendor Delivery Data Sheet to Security Office. Notification should be at least 1 working day prior to expected arrival.
10.4. Firearms and Weapons: As defined by Naval Submarine Base, Kings Bay instruction, weapons and firearms, including ammunition, are prohibited on board Naval Submarine Base, Kings Bay and any off base detachment.
10.4.1. Firearms are any devices that, when operated, propels an object or any device that produces a visible or audible effect by combustion, explosion, deflagration or detonation, including blank pistols, air guns, BB guns, electrical arms such as stun guns.
10.4.2. Weapons are any object used, displayed, offered or brandished in any manner to inflict, instill fear or inflicting bodily harm; or any object that by its very nature would be considered by a reasonable and prudent person to have been designed for the purpose of inflicting bodily harm. Some such weapons include but are not limited to; blackjacks, steel knuckles, switchblade knives, bows and arrows, crossbows and pocketknives with blades longer than 3 1/2-inches. Pocketknives will be considered weapons unless there is evidence to show the knife is required for some other legitimate use, such as work.
10.4.3. Note: Illegal firearms and weapons found on Naval Submarine Base Kings Bay will be confiscated by station police or by Security Detachment personnel. Weapons and firearms confiscated will not be returned and will be disposed of by normal supply channels pursuant to property disposal regulations.
10.5. Illegal drug use by contractors is forbidden. Contractors shall understand that routine, random inspections of vehicles on entry or exit, with drug detection dog teams, and random inspection of personal possessions on entry or exit can and will be conducted. Contractor shall also understand that engaging in any illegal drug activity will result in that employee may being restricted or detained for the period necessary until the employee can be removed from the installation or can be turned over to local law enforcement authorities having jurisdiction, when appropriate.
10.6.Smoking is permitted only in areas as may be designated by the Commanding Officer
10.7. There shall be no public release of information or photographs concerning any aspect of the materials or services relating to this contract or other documents resulting there from without prior written approval of the SUBASE Kings Bay Legal Department. The Contractor shall insert the substance of this paragraph in each subcontract or purchase order.
11. Weight Handling Equipment Requirements (Contractor Operated Cranes). The Contractor shall notify Public Works Transportation Department in advance of any cranes entering Kings Bay. Inspection and delivery requests shall be directed to Ms. Michelle Wadkins, at 912-573-8309 or at michelle.r.wadkins@navy.mil. The Contractor shall include the Contracting Officer in all communications concerning inspection and delivery requests.
12. Permits/Utilities.
12.1. Prior to performing any "hot work" (welding, burning, lead melting, blow torches, tar pots, and similar flame producing operations), obtain Hazardous Operations permit from the Base Fire Department, via the project manager.
12.2. Electrical Tagout Procedures: Red and yellow tags are used throughout Naval Submarine Base Kings Bay as a warning that a potential hazard exists to either personnel or equipment for unspecified reasons and that the electrical circuit identified by the tag has been de-energized. A red tag denotes that danger is either present or suspected and the associated electrical circuit is to remain de-energized. A yellow tag indicates that special procedures must be followed prior to energizing the electrical circuit. The use of these red/yellow TAGOUT procedures is mandatory and will be explained in detail by the project manager at the job site.
12.3. Utility services interruptions shall be kept to a minimum and shall be at such times and durations as approved. No interruption shall occur unless scheduled with the project manager and approved by them in advance as to time and duration of such interruption. Outage requests shall be submitted by the contractor to request interruptions. Outage requests shall be submitted 15 days prior to scheduled outage.
Attachment 001 – NAVFAC VTE Program
NAVFAC Vertical Transportation Equipment (VTE) Program
PW BMS B-15.12 Vertical Transportation Equipment
Process Requirements and Data Reporting Requirements
CHAPTER 1 INTRODUCTION
Page
Paragraph 1-1 PURPOSE........................................................................................................ 1-1 1-2 RESPONSIBILITY ............................................................................................ 1-1 1-3 NAVFAC VTE PROGRAM ADMINISTRATION .............................................. 1-2
CHAPTER 2 NAVFAC VTE INVENTORY
Paragraph 2-1 VTE APPLICABILITY .....................................................................................2-1 2-2 INVENTORY DATA .......................................................................................... 2-1
CHAPTER 3 VTE INSPECTION, TESTING, AND CERTIFICATION
Paragraph 3-1 INSPECTION AND TESTING.......................................................................... 3-1 3-2 INSPECTION FREQUENCY ........................................................................... 3-1 3-3 INSPECTION REPORTS ................................................................................. 3-1
CHAPTER 4 SAFETY CODE INSPECTOR QUALIFICATION, CERTIFICATION AND
LICENSING
Paragraph 4-1 INSPECTOR QUALIFICATIONS ..................................................................... 4-1 4-2 NAVFAC VTE CERTIFYING OFFICIAL .......................................................... 4-1 4-3 CONTRACT ELEVATOR INSPECTOR LICENSE ......................................... 4-3 4-4 VTE INSPECTION EQUIPMENT and EXECUTION ....................................... 4-3
CHAPTER 5 NAVFAC VTE PROGRAM ADMINISTRATION & RESPONSIBILITIES
Paragraph 5-1 NAVY VTE PROGRAM MANAGEMENT ........................................................ 5-1 5-2 NAVFAC FEC VTE LEAD CERTIFYING OFFICIAL ....................................... 5-2 5-3 NAVFAC VTE PROGRAM ADVISORY BOARD ............................................ 5-2
CHAPTER 6 NAVFAC VTE AUDIT PROGRAM
Paragraph 6-1 PURPOSE ........................................................................................................ 6-1
CHAPTER 7 NAVFAC VTE ACCIDENT INVESTIGATION
Paragraph 7-1 ACCIDENT INVESTIGATION .......................................................................... 7-1
APPENDIX A Types of VTE & Definitions......................................................................A-1
APPENDIX B Periodic VTE Inspection & Test Intervals .............................................................................B-1
APPENDIX C Applicable Safety Codes & Standards .................................................................................C-1
CHAPTER 1: INTRODUCTION
1-1 PURPOSE The purpose of this document is to identify the administration of the NAVFAC VTE Program and the processes and data reporting documentation necessary for compliance with the NAVFAC PW VTE BMS 15.12.
These requirements and responsibilities are necessary to ensure the safe, effective, and efficient procurement and operation of VTE in Navy and Marine Corps facilities.
Process and data reporting requirements include VTE Inventory Records, Certification Status, Inspection and Testing, Inspector Qualifications, VTE Maintenance and Service Contracts, FEC VTE Program Audits, and Accident Investigation.
For Navy and Marine Corps facilities, exceptions to these requirements shall not be made without the formal concurrence of the NAVFAC VTE Program Manager.
The authority for these requirements is a Chief of Naval Operations letter dated 22 October 1970, Inspections of Boilers, Unfired Pressure Vessels, Elevators, Dumbwaiters and Escalators.
1-2 RESPONSIBILITY The Commanding Officer of each Navy and Marine Corps Installation is responsible for the operation, inspection, certification, maintenance, and inventory management of VTE installed at their facilities. To ensure compliance with NAVFAC VTE Design Criteria and with applicable safety codes and standards, procurement, installation, and certification of all VTE must be coordinated with the NAVFAC FEC VTE LCO.
Each Navy and Marine Corps Installation Command is responsible for providing the necessary funding for the effective execution of these requirements, in accordance with this document. In addition, the Installation Command is responsible for providing the funding for a NAVFAC VTE Program audit of the VTE Certification Program Inspection, testing, and certification of VTE shall be performed by a NAVFAC VTE Certifying Official or by a contract inspector licensed by the NAVFAC VTE Program. Coordinate inspection and certification services with the appropriate NAVFAC VTE Program FEC Lead Certifying Official (LCO). The LCO will arrange for support to be provided by either NAVFAC or contract personnel, as necessary. Support is rendered on a reimbursable basis.
1-3 NAVFAC VTE PROGRAM ADMINISTRATION
1-3.1 VTE PROGRAM MANAGER The NAVFAC VTE Program Manager is the NAVFACENGCOM recognized technical expert and authority on VTE design, construction, maintenance, inspection, and certification. The program manager is responsible for VTE policy, criteria, and administration of the VTE Program. In addition, the NAVFAC VTE Program Manager provides technical and safety code direction to all NAVFAC VTE Certifying Officials.
1-3.2 VTE DEPUTY PROGRAM MANAGER The NAVFAC Deputy VTE
Program Manager works directly with the VTE Program Manager in the execution of the responsibilities of the VTE Program.
1-3.3 NAVFAC FEC VTE LEAD CERTIFYING OFFICIAL.
A NAVFAC FEC VTE Lead Certifying Official shall be established and identified for each NAVFAC Facilities Engineering Command. The NAVFAC FEC VTE LCO is responsible for the effective application of building code, safety code, and NAVFAC VTE Program requirements for all Navy and Marine Corps Installations within the FEC AOR. The NAVFAC FEC VTE LCO serves as the ASME QEI-1 Inspection Supervisor for all NAVFAC VTE Certifying Officials in their respective
FEC.
CHAPTER 2: NAVFAC VTE INVENTORY
2-1 VTE APPLICABILITY The following list identifies the equipment that is covered by the designation of VTE and the applicable safety code or standard:
- Elevators, Escalators, Moving Walks ASME A17.1
- Dumbwaiters, Material Lifts ASME A17.1
- Handicapped Accessibility Lifts, Stairlifts ASME A18.1
- Inclined Reciprocating Conveyors ASME B20.1
- Vertical Reciprocating Conveyors ASME B20.1
- Loading Dock Levelers and Levelators ASME MH 30.1
- Automotive Lifts ANSI ALI
2-2 INVENTORY DATA NAVFAC VTE Inventory Data shall be entered into Maximo. VTE Inventory Data includes the following:
Installation Building # Maintained By Building Description Applicable code and edition VTE Type Last Periodic inspection date Unit # Last Category one test date Service Last category five test date Manufacturer Certified YES/NO Installer Inspector Date Installed Inspector Certification # Capacity Stops Speed
CHAPTER 3: VTE INSPECTION, TESTING, AND CERTIFICATION
3-1 INSPECTION AND TESTING. All VTE in Navy and Marine Corps facilities shall be inspected, tested, and certified in accordance with applicable safety codes and standards and the NAVFAC VTE PW BMS B-15.12.
3-1.1 All operational VTE must display a valid and current NAVFAC Certificate.
3-1.2 All Acceptance, Category 5, and Category 3 Elevator and Escalator Inspection and Certification must be performed by a QEI NAVFAC VTE Certifying Official.
3-1.3 Category 1 and Periodic Elevator Inspection and Certification must be performed a NAVFAC VTE Certifying Official.
3-1.4 When a NAVFAC Certified VTE Inspector is not available, 6-month periodic inspections may be performed by a contract QEI Elevator Inspector who is licensed by the NAVFAC VTE Program.
3-1.5 All certification inspection support and testing must be conducted and performed by qualified personnel.
3-2 INSPECTION FREQUENCY. Certification and testing shall be performed according to the inspection frequency specified in Table N1 of ASME A17.1.
3-2.1 The Inspection frequency for additional types of VTE in Naval Facilities is identified in Appendix B.
3-3 INSPECTION REPORTS. For each VTE inspection, an inspection report must be provided to the Installation Public Works Officer and to the appropriate Facility Management Services manager, within 30 days of the date of the inspection.
3-3.1 The NAVFAC VTE Inspection Report must include all applicable NAVFAC VTE Test Data Sheets and checklists.
3-3.2 Inspection reports must include a listing of all safety code deficiencies and applicable safety code requirement references.
3-3.2 NAVFAC VTE Inspection Reports must be retained in a historical File for each piece of VTE. Acceptance Test and Category 5 Test Reports must be retained until the VTE is removed from inventory. Category 3, Category 1, and 6-month periodic reports must be retained for a minimum of 10 years.
CHAPTER 4: SAFETY CODE INSPECTOR QUALIFICATION,
CERTIFICATION, & LICENSING
4-1 INSPECTOR QUALIFICATIONS. Personnel who perform inspections, witness tests, submit reports, and issue certification on NAVFAC VTE must satisfy one of the following two conditions:
Posses a valid, current certification as a NAVFAC VTE Certifying Official;
or
Posses a valid, current Contract Elevator Inspector License, issued by the NAVFAC VTE Program.
4-2 NAVFAC VTE CERTIFYING OFFICIAL DoD employees can attain certification as a NAVFAC VTE Certifying Official through successful completion of the NAVFAC VTE Inspector Training & Evaluation Program.
4-2.1 NAVFAC VTE Inspector Training & Evaluation Program
4-2.1.1 Candidates for NAVFAC VTE Inspector Certification must be employed as full-time DoD employees and be qualified as follows:
Graduation from an accredited school, with an engineering degree.
Accredited school is defined as an engineering school accredited by the Accreditation Board for Engineering Technology (ABET); or
High school diploma or GED and a minimum of 3 years journeyman experience in the elevator, electrical, or mechanical trades; or
High school diploma or GED and 3 years of experience working as an Engineering Tech or Equipment Specialist.
4-2.1.2 The NAVFAC VTE Inspector Certification Candidate must accomplish each of the following:
Complete the NAVFAC VTE Inspector Training Course with a minimum score of 85% on the final exam; and
Actively participate in a minimum of 30 certification inspections with a NAVFAC VTE Certifying Official, within one year of successful completion of the NAVFAC VTE Inspector Training Course. Inspections must include a minimum of 2 Acceptance Tests on electric traction elevators, 2 Acceptance Tests on hydraulic elevators, and 2 Category 5 Tests on electric traction elevators.
Demonstrate competency in the performance of Category 1 and Periodic elevator inspection and certification. Competency must be established through the successful performance of inspections under the supervision and oversight of the NAVFAC FEC LCO.
Demonstrate proficiency in the completion of NAVFAC VTE Inspection and Test Data Sheets and Inspection Reports for Category 1 and 5 Tests on hydraulic and electric traction elevators.
4-2.2 Request for NAVFAC Certification. Requests for certification from administrative supervisor or Commanding Officer shall be prepared as an official Command letter and forwarded to the NAVFAC VTE Program Manager. Include the following in the request:
Current position and Occupational Record.
Educational background.
Detailed listing of inspection training for the certification candidate.
A letter of recommendation for certification from the NAVFAC FEC LCO and from any additional NAVFAC VTE Certifying Official who conducted inspection and certification training.
Estimated inspection workload. Copy of Certificate from the NAVFAC VTE Inspector Training Course.
4-2.2 Maintenance of NAVFAC Certification. To retain NAVFAC Certification, NAVFAC VTE Certifying Officials must satisfy the following:
Within 2 years of initial NAVFAC VTE Inspector Certification, inspectors must attain ASME QEI Certification.
Maintain QEI Certification and successfully complete the NAVFAC VTE Inspector Training Course at least every three years, with a minimum score of 85% on the final exam.
NAVFAC VTE Certifying Officials must maintain a minimum inspection workload of 120 VTE inspections, including a minimum of 60 elevator inspections per year. For the NAVFAC FEC LCO, performance of new construction and modernization elevator design reviews, submittal reviews, and emergency personnel training sessions may be substituted for up to 50% of the required inspections.
4-3 CONTRACT ELEVATOR INSPECTOR LICENSE
4-3.1 Qualifications for NAVFAC Licensing. The NAVFAC VTE Program will license Contract QEI Elevator Inspectors for a period of 3 years. For a NAVFAC Contract Inspector License, contractor inspectors must satisfy the following conditions:
Possess a valid, current ASME QEI Elevator Inspector Certification issued by an ASME accredited organization.
Successfully complete the NAVFAC VTE Contract Inspector Orientation Class and apply for a NAVFAC Contract Inspector License. The NAVFAC License is valid for a period of 3 years.
4-3.2 Conflict of Interest. NAVFAC will not license any Contract QEI Elevator Inspector who:
Maintains or services any VTE in any federal government facility.
Supervises the maintenance or service of VTE in any DoD facility.
Works for a department or supervisor that is responsible for VTE maintenance or service in any capacity of their employment.
Owns, works for, or has any contractual relationship with a BOSC or Elevator Maintenance or Service Contractor responsible for the manufacture, installation, maintenance, service, and/or renovation of VTE in a federal facility.
4-4 VTE INSPECTION EQUIPMENT and EXECUTION. Failure to satisfy the following requirements will result in denial or revocation of NAVFAC VTE Certifying Official Certification or Contract QEI Elevator Inspector License.
4-4.1 Inspection Tools and Reference Standards. NAVFAC VTE Certifying Officials and Contract QEI Elevator Inspectors must comply with all ASME A17.1 and ASME QEI-1 requirements, including:
Possession of and access to all applicable reference standards.
Possession of all equipment and tools necessary to properly perform inspections and witness tests.
4-4.2 VTE Inspector Execution Requirements. The VTE Inspector shall:
Maintain a minimum workload of 120 VTE inspections, including a minimum of 60 elevator inspections per year.
Perform inspections, witness tests, and issue VTE certificates in compliance with the requirements identified in this document.
Effectively apply the requirements of all applicable reference standards.
4-4.3 VTE Inspection Reporting. The inspector shall:
Utilize and complete NAVFAC VTE Inspection and Test Data Sheets.
Identify safety and building code references that apply to each deficiency.
Complete and deliver inspection report within 30 days of inspection.
4-4.4 VTE Certification Certification inspection and testing is performed to ensure that the VTE installation and operation is in conformance with all applicable building codes, safety codes, and safety standards. If the VTE is not in conformance, the VTE must not be certified.
For existing VTE that cannot be certified, the NAVFAC FEC VTE LCO must communicate the non-certified status to the Installation PWO, with direction that the VTE must be removed from service.
4-4.4.1 Major Deficiencies with Immediate Safety Concerns When a NAVFAC VTE Certifying Official or Contract QEI Elevator Inspector identifies safety code or operational deficiencies with immediate safety implications, they shall direct the Elevator Service Provider to immediately remove the VTE from service.
4-4.4.2 Minor Deficiencies At the discretion of the NAVFAC VTE Certifying Official, certification may be issued when there are minor deficiencies that do not pose a safety hazard to VTE passengers or operators. All deficiencies must be corrected prior to the next scheduled periodic certification inspection.
4-4.4.3 Temporary, Limited Certification In the event that loss of VTE certification has a direct impact on a Navy or Marine Corps Installation Command mission critical need, the Command may prepare a request for a Temporary, Limited Certification, identifying the mission critical need, limitations of use, and the Plan of Action (POA) for correction of the safety code deficiencies.
The NAVFAC FEC VTE LCO shall conduct a risk analysis of the condition of the VTE and the proposed actions to manage any risk associated with operation of the VTE.
The NAVFAC FEC VTE LCO may prepare a Temporary, Limited Certification that identifies the limitations of use of the VTE and any other restrictions or requirements related to the certification. This type of certification may be issued for a maximum period of 90 days from date of issuance.
CHAPTER 5:
NAVFAC VTE PROGRAM ADMINISTRATION AND RESPONSIBILITES
5-1 NAVFAC VTE PROGRAM MANAGEMENT The NAVFAC VTE Program Manager is responsible for development and implementation of VTE policy and for the management and administration of the NAVFAC VTE Program.
5-1.1 NAVFAC VTE DEPUTY PROGRAM MANAGER The NAVFAC Deputy VTE Program Manager works directly with the VTE Program Manager in the execution of the responsibilities of the VTE Program.
5-1.2 AUTHORITY AND RESPONSIBILITIES OF NAVFAC VTE PROGRAM
The NAVFAC VTE Program Managers shall:
Develop and implement NAVFAC VTE Policy
Develop and implement NAVFAC VTE Design Criteria
Develop and implement NAVFAC VTE Inspection and Certification
Requirements
Develop and administer NAVFAC VTE Inventory Requirements
Develop and administer NAVFAC VTE Audit Requirements
Disseminate Policy and Criteria through written guidance and directives
Perform VTE Program oversight functions. Program oversight includes technical and safety code related direction to, and supervision of, NAVFAC VTE Certifying Officials.
Issue final judgment on Safety Code interpretations
Issue final determination on Safety Code waivers and variances
Develop and administer a formal VTE Inspector Training Program
Coordinate policy and criteria with NAVFAC Criteria and Safety Offices
Establish and maintain communication with VTE managers within the
Department of Defense and other government agencies
Establish and maintain communication with the elevator industry, trade and professional associations, and safety code development associations
5-2 NAVFAC FEC VTE LEAD CERTIFYING OFFICIAL.
A NAVFAC FEC VTE Lead Certifying Official shall be established and identified for each NAVFAC Facilities Engineering Command. The NAVFAC FEC VTE LCO is responsible for the application and execution of NAVFAC VTE Program requirements for all DON Installations within the FEC AOR. The LCO must be certified as an ASME Qualified Elevator Inspector (QEI).
5-2.1 The NAVFAC FEC VTE Lead Certifying Official is responsible for the following services. Services are provided on a reimbursable basis.
Inventory of all VTE within the FEC AOR
Schedule and Performance of recurring VTE Certification Inspections
Oversight of NAVFAC Licensed Contract QEI Elevator Inspectors
Design Reviews for all VTE Construction and Modernization
Submittal Reviews for all VTE Construction and Modernization
Acceptance Inspection, Testing, and Commissioning for all VTE Construction and Modernization
Elevator Rescue Training for Navy Fire Fighters and Emergency and Rescue Personnel
Coordination with the NAVFAC FEC Safety Officer
VTE Consultation Services to Supported Commands within the
FEC AOR
5-3 NAVFAC VTE PROGRAM ADVISORY BOARD.
The NAVFAC VTE Program Advisory Board shall consist of the NAVFAC VTE Program Manager, Deputy Program Manager, and the NAVFAC FEC VTE Lead Certifying Officials.
5-3.1 The NAVFAC VTE Program Advisory Board will meet once a year, via conference call, VTC or special meeting, for review and recommendations related to responsibilities and requirements of the NAVFAC VTE Program.
CHAPTER 6: NAVFAC VTE AUDIT PROGRAM
6-1 PURPOSE. The purpose of the audit is to ensure the safety and reliability of all VTE within Naval Facilities. The audit requirements are designed to determine if installation, inspection, certification, maintenance, and inventory are being executed and documented in accordance with NAVFAC VTE Program requirements.
6-1.1 EXECUTION. Audits of NAVFAC FEC VTE Programs shall be performed by the NAVFAC VTE Program Manager or Deputy Program Manager, in coordination with the NAVFAC FEC LCO, on one-fifth of Navy Shore Facilities per year.
The audit shall consist of a site visit, examination of inspection and inventory documentation, and a physical inspection of a representative sampling of the FEC VTE Inventory. The manager performing the audit shall determine the amount and extent of physical inspection necessary for an effective audit.
An audit report shall be prepared and forwarded to the FEC FM&S Coordinator and the NAVFAC VTE Program FEC LCO.
6-1.2 FUNDING. Funding for the audit is the responsibility of each individual Navy and Marine Corps Installation or Command that is included in the audit.
The NAVFAC VTE Program Manager will provide a funding request to the FEC VTE LCO. The percentage of the total funding required from each support Command will be determined by the NAVFAC FEC VTE LCO, in proportion to the number and complexity of the VTE at each Installation.
CHAPTER 7: NAVFAC VTE ACCIDENT INVESTIGATION
7-1 Accident Investigation. The responsible Command shall immediately notify the NAVFAC FEC VTE LCO of any accident involving personal injury or damage to VTE. The Command shall provide immediate access for the NAVFAC FEC LCO to inspect all areas of the VTE installation for investigating such accident. Service, repairs, and/or adjustments to the VTE shall not be conducted until authorized by the NAVFAC FEC LCO.
7-1.1 Certification. When an accident involves the failure, breakage, or damage to any component of the VTE, certification is revoked until an examination and/or inspection is performed by the NAVFAC VTE LCO. The LCO may designate another NAVFAC Certifying Official to perform the investigation and inspection.
7-1.2 Examination & Report. The NAVFAC VTE LCO shall make a prompt examination into the cause of the accident and enter a full and complete report to the NAVFAC VTE Program Manager for review and comment. Following review and comment, the LCO shall provide report to the Commanding Officer of the Installation and the NAVFAC FEC Safety Official.
7-1.3 Removal of damaged parts. In the event of an accident, no equipment or material shall be removed, including any part of the VTE equipment, building materials, or related equipment, until permission to do so has been granted by the NAVFAC FEC VTE LCO.
Appendix A: Types of VTE & Definitions
Elevator: An elevator is a hoisting and lowering mechanism, equipped with a car, that moves within guides, serves two or more landings, and is classified by type and use according to the requirements of ASME A17.1
Escalator: An escalator is a power-driven, inclined, continuous stairway used for raising or lowering passengers.
Dumbwaiter: A dumbwaiter is a hoisting and lowering mechanism equipped with a car of limited size which moves in guide rails and serves two or more landings and is used exclusively for carrying materials, and is classified by type according to the requirements of ASME A17.1
Material Lift: A material lift is a hoisting and lowering mechanism, equipped with a car, and used for transporting materials which are manually or automatically loaded or unloaded. Material Lift design has limitations related to speed, travel and use, according to the requirements of ASME A17.1 .
Moving Walks: A moving walk is a type of passenger-carrying device on which passengers are transported horizontally according tot eh requirements of ASME A17.1. Passengers can stand or walk on an uninterrupted surface that remains parallel to its direction of motion.
Vertical Platform Lifts: A vertical platform lift is a powered hoisting and lowering mechanism designed to transport mobility-impaired persons on a guided platform that travels vertically.
Inclined Stairway Lift: An inclined stairway lift is a powered, guided hoisting and lowering mechanism that is equipped with a seat and is used to transport seated passenger along a stairway.
Inclined Reciprocating Conveyor (IRC): An IRC is a power or gravity actuated hoisting and lowering mechanism that receives objects on a carrier and is not designed to carry passengers or an operator. . These units typically operate on inclines in the range of 30 deg. to 70 deg. from the horizontal.
Vertical Reciprocating Conveyor (VRC): A VRC is a power or gravity actuated mechanism that receives objects on a carrier and transmits these objects vertically between two or more levels. A VRC is not designed to carry passengers or an operator).
Automobile Lift: An automotive lift is a permanently installed or mobile lifting device that raises a vehicle by engaging structural elements of the vehicle such as wheels, body and frame members, axle housings, and wheel suspension components. Auto Lifts are defined and classified by
ALI.
Levellator: A levellator is a platform lift with less than 6 feet of travel and less than 2500 pounds capacity, permanently installed level with the lower landing.
Dock Leveler: Dock levelers are devices used to bridge the gap between a loading dock and a trailer, during loading and unloading. Dock levelers adjust vertically to the surface of a trailer bed, so that forklifts can make a smooth, safe transition into and out of the trailer.
Man-lift: A man lift is a device consisting of a power driven endless belt with hand-holds and with steps or platforms. A man-lift is used for vertical transportation of personnel from floor to floor.
Personnel Hoist: A personnel hoist is a mechanism for use in connection with the construction, alteration, maintenance, or demolition of a building, structure, or other work. It is used for hoisting and lowering workers or materials, or both, is equipped with a car that moves on guide members during its vertical movement, and includes its hoistway.
Appendix B: Periodic VTE Inspection and Test Intervals (in months)
Safety Code Safety Code Inspections Periodic Tests
Interval Intervals
Equipment Type
Electric elevators
Cat 1
Cat 3 n/a
Cat 5
Hydraulic elevators 6 12 n/a 60
Roped Hydraulic Elevators 6 12 36 60
Escalators and moving walks 6 12 n/a n/a
Sidewalk elevators 6 12 36 60
Private residence elevators 6 12 n/a n/a
Hand elevators 6 12 n/a n/a
Dumbwaiters 6 12 n/a n/a
Material lifts and dumbwaiters with automatic transfer devices
12 12 n/a 60
Special purpose personnel elevators 6 12 n/a 60
Inclined elevators 6 12 n/a 60
Shipboard elevators 6 12 36 60
Screw-column elevators 6 12 n/a n/a
Rooftop elevators 6 12 36 60
Limited-use/limited-application elevators 6 12 36 60
Elevators used for…