N6945017R1309_Amendment0003.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6945017R1309_Amendment0005.pdf | ||
| N6945017R1309_Amendment0004.pdf | ||
| 0001.pdf | ||
| N6945017R1309.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to enter into Phase-Tw o w ith those offerors in the competitive range, revise the ordering period to five years w ithout requiring separate one year option periods per DFARS 217.204(e)(i)(A), provide the DD1155, provide Phase-Tw o Site Visit Information, revise the Bidding Schedule/Instructions to Bidder for Phase-Tw o, identify the SEED project, provide Phase-Tw o Evaluation Factors 5 and 6, provide proposal due date, delete and update clauses and provide Construction Wage Rate Requirements for the SEED project.
OFFERORS ARE ADVISED THAT FUNDING MAY NOT BECOME AVAILABLE. IF FUNDS ARE NOT AVAILABLE, NO AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION. OFFERORS WILL NOT BE REIMBURSED FOR ANY EFFORT OR PROPOSAL COSTS RESULTING
FROM THIS SOLICITATION.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 22
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-May-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6945017R1309
X 9B. DATED (SEE ITEM 11)
17-Aug-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-May-2018
CODE
NAVFAC SOUTHEAST
SOUTH CENTRAL
BLDG 135, PO BOX 30
NAS JACKSONVILLE
JACKSONVILLE FL 32212-0030
N69450 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6945017R1309
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0003
This amendment and all subsequent amendments to this solicitation are restricted to only those offerors who have been invited to participate in Phase-Two. Offerors invited to participate in Phase-Two of this solicitation have been notified under separate correspondence. Phase-Two offerors are encouraged to review section III. EVALUATION, E. EVALUATION FACTORS FOR AWARD, 3(c) Price (Phase- Two) of the solicitation for Phase-Two submission requirements.
Solicitation closing date for Phase-Two is 18 June 2018 at 2:00 PM Eastern Time.
The following revisions have been made to the solicitation:
1. Option years have been removed from the solicitation. Ordering period revised to 5 years on the base year CLIN.
2. DD1155 has been provided as Attachment A.
3. Section 00100-Bidding Schedule/Instructions to Bidder is revised to add Phase-Two Site Visit information as follows:
Phase-Two Site Visit: In accordance with FAR 52.236-27 Alt 1, the pre-proposal conference and site visit is scheduled for Wednesday, May 23, 2018 at 10:00 AM central time. The pre-proposal conference will be held at NAS Ft. Worth JRB Public Works Building, Main Conference Room, 1215 Depot Ave., Fort Worth, TX. A site visit of the worksite will follow the pre-proposal conference. This is the only anticipated site visit.
Site Visit instructions are provided in FAR 52.236-27 Alt 1, as specified herein.
4. Section 00100-Bidding Schedule/Instructions to Bidder is revised as follows:
PRE-PROPOSAL INQUIRIES (PPI)
All inquiries must be submitted in writing and received by the Contract Specialist by 01 June 2018 in order to permit adequate time to reply to the inquiry. Submit all questions to olisha.costa@navy.mil.
Individual replies will not be made to offerors. As answers become available, replies to PPIs will be made by posting a PPI log to NECO under the Additional Documents section of the RFP. Numerous updated PPI logs may be posted throughout the procurement process. It is recommended offerors periodically check the NECO Additional Documents section of the RFP to see if additional postings have been made. It is the offeror’s responsibility to check FedBizOpps/NECO for all postings.
Use of the PPI Log template (Attachment B) is encouraged. The PPI Log template can be found on the NECO website under the Additional Documents section.
b. PHASE-TWO: Price Proposal and Non-Cost/Price Proposal - The Price Proposal and the Non-Cost/Price Proposal shall be submitted in separate 3-ring binders, in sealed envelopes/boxes. All pages shall be numbered and binders shall be appropriately tabbed, conforming to the proposal submittal requirements’ structure for each evaluation factor.
Submit one original, one copy, and one electronic copy (CD format) of the Price Proposal. Pricing does not need to be included in the electronic copy of the price proposal. Price Proposal shall be labeled “PRICE PROPOSAL
FOR RFP N69450-17-R-1309, TX/LA/MS MACC, ATTN: OLISHA COSTA, SOUTH & CENTRAL
OPERATIONS GROUP; DO NOT OPEN IN MAIL ROOM”.
If changed since Phase-One, offeror’s shall include the following information with its price proposal:
Authorized negotiator’s (POC) name POC telephone number POC email address CAGE code DUNS number (offeror and any team members) TIN (taxpayer ID number)
Submit one original, three copies, and one electronic copy (CD format) of the Non-Cost/Price Proposal. Non- Cost/Price Proposal shall be labeled “NON-COST/PRICE PROPOSAL FOR RFP N69450-17-R-1309, TX/LA/MS MACC, ATTN: OLISHA COSTA, SOUTH & CENTRAL OPERATIONS GROUP; DO NOT
OPEN IN MAIL ROOM”.
Entire Phase-Two Non-Cost/Price Proposal shall be formatted on 8.5 x 11 inch paper with one inch margins using 12 point, Times New Roman font, and shall not exceed the page limits specified under individual evaluation factors.
This includes all typed pages, catalogue cuts, and brochure or other pre-printed material that may be submitted. This does not include any required drawings. Any pages beyond these maximum limits will not be evaluated.
c. The offeror’s proposal must include all data and information required and must be submitted in accordance with these instructions. Offeror shall be compliant with the requirements as stated herein, for non-conformance may result in an unfavorable proposal evaluation.
d. Proposals (Phase-Two) shall be mailed or hand-delivered to the following address:
NAVFAC SOUTHEAST
ATTN: Olisha Costa, South & Central Operations Group Bldg. 135N, Ajax Street (Rear Entrance) NAS Jacksonville, FL 32212
e. Hand Carried Proposals: If you are hand delivering your proposal and do not already have a vehicle pass to access the base, you MUST submit an AMAG form for the individual who will be "driving a vehicle" onto the base, and any passengers. Forms must be submitted via email as an attachment no later than three working days prior to the closing date/time and forwarded to: Olisha Costa at olisha.costa@navy.mil.
An AMAG form (Attachment C) has been uploaded to NECO under the Additional Documents section.
Submission of an AMAG form is no guarantee that you will be able to get on the base. If for any reason you get to the gate and are not allowed onto the base (even if you have submitted an AMAG form), you will need to find another way to get your proposal delivered. Government personnel will not come to the gate to sponsor you on base to deliver your proposal or pick up the proposal from you. Ultimately, it is the offeror's responsibility to ensure timely proposal submission to the specified location. Due to heightened security, it is recommended that you allow additional, sufficient time to get into the building and turn in your proposal. Use of a delivery service such as the US Postal Service, FedEx, UPS, etc. is highly encouraged.
The submitted AMAG form is only good for the proposal due date. If the due date is extended, a new AMAG form must be submitted to reflect the new proposal submission date. If any other information listed on a submitted AMAG form changes (name, driver license information, address etc.), a new AMAG form with the updated information must be submitted.
VEHICLES WITHOUT A VEHICLE PASS WILL NOT BE PERMITTED ON THE BASE. VEHICLE PASS
REQUESTS RECEIVED AFTER THE DEADLINE WILL NOT BE ACCEPTED. VEHICLE DRIVERS MUST
STOP AT THE SECURITY AND PASS OFFICE TO OBTAIN THEIR VEHICLE PASS.
You must have a valid picture ID, vehicle registration, and proof of insurance. Please arrive early as it may take some time to get the vehicle pass. All passengers in the vehicle must have picture ID. The Security and Pass Office is located at the Main Gate, Yorktown Gate, 1st building on your right.
Be advised that ALL visitors entering NAS Jacksonville are subject to a background investigation (BI). Visitors must complete the Base Access Pass Registration form (Attachment D) and give to the Security Personnel at the Pass and ID office.
Visitors must also bring acceptable identification documents as specified on the Base Access Pass Registration form, as well as vehicle registration and proof of insurance. Visitors may be asked to fill out additional paperwork.
If the visitor refuses the investigation, they will be denied access to the base. All visitors MUST know the name of the command they are visiting and MUST provide the last six numbers of their SSN to the security clerk at the Pass & ID window.
A Base Access Pass Registration form has been uploaded to NECO under the Additional Documents section.
f. PROPOSALS SUBMITTED IN RESPONSE TO THIS REQUEST FOR PROPOSAL MUST BE RECEIVED NO LATER THAN 18 June 2018 at 2:00PM Eastern time. Proposals not received by the date and time specified shall be treated in accordance with FAR 52.215-1 “Instruction to Offerors - Competitive Acquisitions” and may be rejected.
5. Section 00150 B. DESCRIPTION OF ACQUISITION is revised as follows (changes in bold):
2. Construction projects to be performed will primarily consist of general building type projects (new construction, renovation, alteration, demolition, and repair work) including industrial, airfield, aircraft hangar, aircraft traffic control, infrastructure, administrative, training, dormitory, and community support facilities for activities located in the Texas, Louisiana, and Mississippi areas.
The proposed seed project for this solicitation is Project P-077 KC-130J Enlisted Aircrew Training System (EACTS) Facility at Naval Air Station (NAS) Joint Readiness Base (JRB), Fort Worth, TX. This will be a new facility to house an aircraft KC-130J flight simulator. The project will consist of a high-bay facility that provides covered, all-weather training environment support administrative spaces to support the Marine Corps flight simulator training program. The training system will include a Cockpit Procedures Trainer (CPT), Weapons System Trainer (WST), and Fuselage Trainer (FUT), Observer Training Air (OTA) simulator. Site improvements include paving, parking, sidewalks, signage and environmental protection measures.
The magnitude of construction for this project is more than $10,000,000, with a completion schedule of 450 days from task order award. Liquidated damages will be assessed in the amount of $5,057 per day.
The following drawings and specifications for the seed project are posted to NECO under the Additional Documents section, for the offerors invited to Phase-Two:
KC-130J EACTS JRB Conformed Design_Drawings_Signed P-077 KC-130J EACTS Facility Final Design Spec Vol 1 of 2_Signed P-077 KC-130J EACTS Facility Final Design Spec Vol 2 of 2_Signed KC-130J EACTS Final_Environmental Report KC-130J EACTS Final_Geotech
6. Section 00150 III. EVALUATION, E. EVALUATION FACTORS FOR AWARD, (d) Non-cost
Price Factors (Phase-Two) is revised to add the following:
(d) Non-cost/price Factors (Phase-Two):
(4) Factor 5 – Technical Solution:
(a) Solicitation Submittal Requirements:
Provide a narrative describing your technical solution to an example project that meets the requirements of the RFP.
Where the offeror has projects illustrating competence in particular requirements, they may be provided. If past projects are not available, a narrative and conceptual drawings of how the problem would be solved or addressed are acceptable. Include the following:
(1) Architectural Technical Evaluation
(2) Structural Technical Evaluation
(3) Electrical Technical Evaluation
(4) Mechanical Technical Evaluation
Architectural Technical Evaluation Submitter shall provide sufficient information illustrating Architectural competency using narrative form and/or example drawings for the following items:
1. Air/Vapor Barrier- provide a narrative and an example Building sections, wall section(s), details, etc.
illustrating how to provide a continuous air/vapor barrier to control air and vapor leakage penetrating the building envelope.
2. Antiterrorism Requirements- provide a narrative and example drawings illustrating how an example project overcame Antiterrorism requirements as it relates to the building design and specifically doors and windows.
3. Architectural Sustainability- provide a narrative and example drawings illustrating how windows are incorporated into the design to achieve daylighting and enhancing views for the occupants/visitors to the building. Also, provide how window selection is incorporated in the HVAC loads for the building and when trade-offs are investigated.
4. Roof Design- provide a narrative and example drawings of a roof design illustrating the method of drainage, standard details and details unique to the project that fully illustrate moisture/environmental control.
5. Building Codes- provide a narrative and example drawings illustrating how building codes and other required criteria is incorporated into the building design.
6. Interior Design Elements- provide a narrative and example drawings of a floor plan indicating the use of various types of construction. The example floor plan is to illustrate knowledge of different wall types, systems and ratings and how they are used to accomplish design criteria (ex. Secure or Sensitive Rooms).
Narrative illustrating Architectural competency shall be limited to one (1) double-sided page (or two (2) single-sided pages) for each item. Conceptual drawings may be provided to supplement the narrative (i.e., single line, floor plans, and section details). Drawings are limited to one legible sheet for each item.
Structural Technical Evaluation Submitter shall provide sufficient information illustrating Structural competency using narrative form and/or example drawings for the following items:
1. Antiterrorism Force Protection- provide a narrative and an example project illustrating how the design solution overcame ATFP requirements as it relates to structural features and fenestrations, such as windows, doors, louvers and other openings.
2. Foundations- provide a narrative and example drawings illustrating a complex foundation system to address unsuitable soil and/or expansive clay conditions requiring pile design. Describe the different alternatives and the solution chosen and why.
3. Seismic and Wind Code- provide a narrative and an example project in which the design incorporated Seismic and wind code into the design of the structural system. Describe the criteria implications and the steps taken to achieve a design solution.
Narrative illustrating Structural competency shall be limited to one (1) double-sided page (or two (2) single-sided pages) for each item. Conceptual drawings may be provided to supplement the narrative (i.e., single line, floor plans, and section details). Drawings are limited to one legible sheet for each item.
Electrical Technical Evaluation
Submitter shall provide sufficient information illustrating Electrical competency using narrative form and/or example drawings for the following items:
1. Service Entrance- provide a narrative and example drawings describing a difficult service entrance with physical and /or Electrical restraints and how the design solution overcame these restraints. Describe the advantages for the system chosen for the type of facility and long term maintainability for the system.
2. Branch Wiring: provide a narrative and example drawings illustrating your means of control for the Branch Wiring System to comply with the UFC and ASHRAE 90.1.
3. Lighting Design- provide a narrative and example drawings describing daylight lighting schemes that were used to incorporate and coordinate daylighting and lighting fixtures. Describe the lighting equipment that were used (fluorescent, LED) and the basis for the design solution.
4. Communications- provide a narrative and example drawings illustrating installation of cabling and telecommunication room and separation of NIPR and SIPR spaces per UFC’s and TIA’s
Narrative illustrating Electrical competency shall be limited to one (1) double-sided page (or two (2) single-sided pages) for each item. Conceptual drawings may be provided to supplement the narrative (i.e., single line, floor plans, and section details). Drawings are limited to one legible sheet for each item.
Mechanical Technical Evaluation
Submitter shall provide sufficient information illustrating Mechanical competency using narrative form and/or example drawings for the following items:
1. High Performance and Sustainable Buildings- provide a narrative describing an example project illustrating the use of UFC 1-200-02 High Performance and Sustainable Buildings including plumbing and HVAC.
The narrative shall include the following:
Provide a description of design strategies of the various systems used to meet requirements of
a) Description of Plumbing systems:
(1) Potable water systems; include fixture flow rates and equipment included.
(2) Drain, waste and vent systems including storm drainage.
(3) Solar water heating system, provide description of a system and various components including size and location of solar collection panels. Also include percentage of building hot water demand provided by a solar water heating system. Describe if system was able to meet a minimum of 30% of hot water requirements.
b) Description of Heating Ventilation and Air Conditioning systems:
(1) Provide in the narrative a description of the HVAC system. Describe building type, use and the complexities of the design. Also, include alternatives investigated and the chosen solution for the project as it pertains to energy management and tradeoffs.
(2) Describe the energy recovery system as it pertains to the overall energy efficiency of the design.
Narrative illustrating Mechanical competency shall be limited to one (1) double-sided page (or two (2) single-sided pages) for each item. Up to three (3) conceptual drawings may be provided to supplement the narrative (i.e. floor plan, exterior elevation, and site plan). Drawings are limited to one legible sheet for each item.
(b) Basis of Evaluation:
1) The Government will evaluate the narrative and example drawings (if included) considering the extent to which the Offeror demonstrates a clear understanding of the architectural aspects required of this contract. 2) The Government will evaluate the narrative and example drawings (if included) considering the extent to which the Offeror demonstrates a clear understanding of the structural aspects and complexities of the area of responsibility required of this contract. 3) The Government will evaluate the narrative and example drawings (if included) considering the extent to which the Offeror demonstrates a clear understanding of the electrical engineering requirements to solve complex problems. The offeror will be evaluated on how well they recognize the advantages and disadvantages of complex service entrance design and provided compliant equipment. They will also be evaluated on the proper use of energy efficient branch wiring systems, flexibility of their lighting systems and the energy efficiency by incorporating new technologies and understanding the complexities of communication separation and use. 4) The Government will evaluate the narrative and example drawings (if included) considering the extent to which the Offeror demonstrates a clear understanding of mechanical engineering requirements to solve complex problems while satisfying various codes, criteria and energy management.
(5) Factor 6 – Energy Design Reduction
(a) Solicitation Submittal Requirements:
1. Energy Efficiency Approach Narrative:
Provide a detailed narrative describing an example project that exceeded ASHRAE 90.1 baseline building. Describe strategies and methods used; including HVAC energy savings and management systems, window glazing, roof and wall insulation, etc. Do not exceed one (1) double-sided page (or two (2) single-sided pages.
2. Energy Modeling:
Provide an example energy model illustrating competency in performing this task. Identify the program used to complete energy modeling, such as Carrier HAP, Trane TRACE, eQuest or other product complying with the requirements of ASHRAE 90.1 Appendix G.
List assumptions used to obtain baseline and proposed building models. Include in the following:
1) Location: Climate zone, outdoor design conditions.
2) Orientation, configuration and shape of building.
3) Envelope properties- fenestration, solar heat gain coefficients (SHGC), wall and roof insulation values (U-values), window U-values.
4) Mechanical- HVAC, plumbing, and domestic hot water heating systems, including any solar hot water systems.
5) Electrical systems- lighting and control systems, including any interior and exterior lighting systems, renewable energy and control systems.
6) Guiding Principles Certification- provide a narrative illustrating how an example project has been vetted through a third party verification process and achieved certification.
(b) Basis of Evaluation:
1) Energy Efficiency Narrative and Solution: The Government will evaluate the narrative and example project (if included) considering the extent to which the Offeror demonstrates a clear understanding of Energy Design Reduction requirements to solve complex problems while satisfying codes and criteria for anticipated projects as related to this contract.
2) Energy Model Evaluation: the government will evaluate the energy model to determine competency in complying with ASHRAE 90.1 Appendix G methodology, assumptions and accuracy.
3) Government will evaluate validity of third party verification and certification as it pertains to Guiding Principles Certification.
7. The following clauses have been modified to include the seed project requirements:
a. 52.236-37 Site Visit Alt 1
b. 52.211-10 Commencement, Prosecution, and Completion of Work
c. 52.211-12 Liquidated Damages – Construction
d. 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment
Opportunity for Construction
e. 52.236-4 Physical Data
f. 252.236-7001 Contract Drawings and Specifications
8. The following clauses have been deleted:
a. 52.217-5 Evaluation of Options
b. 52.217-7 Option for Increased Quantity - Separately Priced Line Item
c. 52.217-9 Option to Extend the Term of the Contract
9. The Wage Determination has been modified.
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 03-Oct-2017 02:00 PM to 18-Jun-2018 02:00 PM.
The number of offeror copies required has increased by 1 from 2 to 3.
CLIN 0001
The CLIN extended description has changed from:
DB General Construction ProjectsDesign-Build (DB) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for the Texas, Louisiana, and Mississippi area.Period of Performance: From date of contract award through one year, with four additional option years. Specific dates to be specified at time of award.
To:
DB General Construction ProjectsDesign-Build (DB) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for the Texas, Louisiana, and Mississippi area.Period of Performance: From date of contract award through five years. Specific dates to be specified at time of award.
The following have been modified:
ATTACHMENTS
Attachment A – DD1155 Attachment B – PPI Log template Attachment C – AMAG Form Attachment D – Base Access Pass Registration form (SECNAV 5512) Attachment E – Digital Visitor Access Request Form
Attachments are posted to NECO under the Additional Documents section.
The following drawings and specifications for the seed project are posted to NECO under the Additional Documents section, for the offerors invited to Phase-Two:
KC-130J EACTS JRB Conformed Design_Drawings_Signed
P-077 KC-130J EACTS Facility Final Design Spec Vol 1 of 2_Signed P-077 KC-130J EACTS Facility Final Design Spec Vol 2 of 2_Signed KC-130J EACTS Final_Environmental Report
NOTE
The contracts awarded as a result of this solicitation will be for a maximum of 60 months (base year, no option year periods) or maximum dollar value not-to-exceed (NTE) $99,000,000 for all contracts, whichever comes first.
A task order in the amount of $1,000 for the minimum guarantee will be issued concurrently with the award of the basic contract. Once the value of task orders placed exceeds the minimum guarantee amount, the minimum guarantee task order will be modified to de-obligate the funds from the task order.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female
(to be specified on individual task orders) (to be specified on individual task orders)
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is [Contracting Officer shall insert description of the geographical areas where the contract is to be performed, giving the State, county, and city - to be specified on individual task orders].
For the SEED Project
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority
Goals for female
18.2% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Tarrant County, TX.
(End of provision)
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for-- [to be specified on individual task orders, as applicable]
(c) Participants will meet at-- [to be specified on individual task orders, as applicable]
For the SEED Project
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for—
Wednesday, 23 May 2018 @ 10:00 AM central time
(c) Participants will meet at—
NAS Ft. Worth JRB Public Works Building Main Conference Room 1215 Depot Ave Fort Worth, TX 76127
Site Visit/Base Access Instructions:
Submit Digital Visitor Access Request Form (Attachment E) to Olisha Costa at olisha.costa@navy.mil no later than Thursday, May 17, 2018, in order to be included on the visitation list to attend the site visit.
Please allow 1-2 hours to get on the base. If you have any issues accessing the base on the day of the site visit, please contact Ronald Pyles at (817) 782-6379, or ronald.pyles@navy.mil.
(End of provision)
The following have been deleted:
52.217-5 52.233-2
SECTION 00700 - CONTRACT CLAUSES
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within (to be specified on individual task orders) calendar days after the date of contract award, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than (to be specified on individual task orders). The time stated for completion shall include final cleanup of the premises.
For the SEED Project
The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date of task order award, ) prosecute the work diligently, and (c) complete the entire work ready for use not later 450 days from task order award. The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $ (to be specified on individual task orders) for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
For the SEED Project
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $5,057 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
52.236-4 PHYSICAL DATA (APR 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by . . . . . . . . . [insert a description of investigational methods used, such as surveys, auger borings, core borings, test pits, probings, test tunnels]. (to be specified on individual task orders, as applicable) For the seed project: Topographic Survey by Jacobs Engineering Geotechnical Investigation Report by CMJ Engineering Environmental Report by Breitling Consulting
(b) Weather conditions . . . . . . . . . (insert a summary of weather records and warnings). (to be specified on individual task orders, as applicable) For the seed project: N/A
(c) Transportation facilities . . . . . . . . . (insert a summary of transportation facilities providing access from the site, including information about their availability and limitations. (to be specified on individual task orders, as applicable) For the seed project: N/A
(d) . . . . . . . . . . (insert other pertinent information). (to be specified on individual task orders, as applicable) For the seed project: N/A
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title File Drawing No.
(All drawings and specifications applicable to individual task order solicitations will be provided via NECO)
For the SEED Project
Title File Drawing No.
KC-130J EACTS JRB Conformed Design_Drawings_signed P-077 KC-130J EACTS Facility Final Design Spec Vol 1 of 2_Signed P-077 KC-130J EACTS Facility Final Design Spec Vol 2 of 2_Signed KC-130J EACTS Final_Environmental Report
5252.228-9305 Alt I NOTICE OF BONDING REQUIREMENTS Alternate I (DEC 2000)
(a) Within 15 days after receipt of award, the bidder/offeror to whom the award is made shall furnish the following bond(s) each with satisfactory security:
__X_ A Performance Bond (Standard Form 25). The performance bond shall be in a penal sum equal to 100% percent of the price payable for the contract guaranteed minimum for the basic indefinite quantity contract award or the task order price for each subsequent task order award.
__X_ A Payment Bond (Standard Form 25A). The payment bond shall be in a penal sum equal to 100% of the price payable for the contract guaranteed minimum for the basic indefinite quantity contract award or the task order price for each subsequent task order award.
(b) Any surety company holding a certificate of authority from the Secretary of Treasury as an acceptable Surety on Federal bonds will be accepted. Individual sureties will be permitted as prescribed in FAR 28.203 and FAC 5252.228-9300. Alternative types of security in lieu of furnishing sureties on performance and/or payment bonds will be permitted as prescribed in FAR 28.204, and will be held for at least one year after the completion of the contract. Additional bond security may be required as prescribed in FAR 52.228-2. Bonds shall be accompanied by a document authenticating the agent’s authority to sign bonds for the surety company.
(c) The contract time for purposes of fixing the completion date, default, and liquidated damages shall begin to run zero (0) days from the date of award, regardless of when performance and payment bonds or deposits in lieu of surety are executed.
The following have been deleted:
52.217-7 52.217-9
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
WAGE DETERMINATION
Wage Rate Requirements (Construction) wage determinations will be provided under individual task orders.
For the Seed Project:
General Decision Number: TX180322 01/12/2018 TX322
Superseded General Decision Number: TX20170322
State: Texas
Construction Type: Building
County: Tarrant County in Texas.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018 1 01/12/2018
ASBE0021-011 06/01/2016
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (Duct, Pipe and
Mechanical System Insulation)....$ 24.32 7.52
BOIL0074-003 01/01/2017
Rates Fringes
BOILERMAKER......................$ 28.00 22.35
CARP1421-002 04/01/2016
Rates Fringes
MILLWRIGHT.......................$ 26.60 8.65
* ELEV0021-006 01/01/2018
Rates Fringes
ELEVATOR MECHANIC................$ 39.97 32.645+a+b
FOOTNOTES:
A. 6% under 5 years based on regular hourly rate for all hours worked. 8% over 5 years based on regular hourly rate for all hours worked.
B. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and Veterans Day.
ENGI0178-005 06/01/2014
Rates Fringes
POWER EQUIPMENT OPERATOR
(1) Tower Crane.............$ 29.00 10.60
(2) Cranes with Pile Driving or Caisson Attachment and Hydraulic Crane 60 tons and above.....$ 28.75 10.60
(3) Hydraulic cranes 59 Tons and under..............$ 27.50 10.60
IRON0263-005 06/01/2017
Rates Fringes
IRONWORKER (ORNAMENTAL AND
STRUCTURAL)......................$ 23.25 7.32
PAIN0053-004 04/01/2014
Rates Fringes
PAINTER (Brush, Roller, and Spray (Excludes Drywall
Finishing/Taping))...............$ 16.40 5.45
PLUM0146-003 05/01/2016
Rates Fringes
PIPEFITTER (Excludes HVAC Pipe Installation)...............$ 29.48 8.30
SUTX2014-048 07/21/2014
Rates Fringes
BRICKLAYER.......................$ 20.66 0.00
CARPENTER, Excludes Drywall Hanging, Form Work, and Metal Stud Installation................$ 15.47 1.82
CEMENT MASON/CONCRETE FINISHER...$ 13.44 0.00
DRYWALL FINISHER/TAPER...........$ 16.24 3.94
DRYWALL HANGER AND METAL STUD
INSTALLER........................$ 16.20 3.40
ELECTRICIAN (Alarm Installation Only)...............$ 18.00 0.38
ELECTRICIAN (Low Voltage Wiring Only).....................$ 14.88 2.15
ELECTRICIAN (Sound and Communication Systems Only)......$ 17.79 2.41
ELECTRICIAN, Excludes Low Voltage Wiring and Installation of Alarms/Sound and Communication Systems........$ 20.59 3.98
FORM WORKER......................$ 12.35 0.00
GLAZIER..........................$ 16.61 2.96
HVAC MECHANIC (HVAC Unit Installation Only)...............$ 22.39 7.10
INSTALLER - SIDING
(METAL/ALUMINUM/VINYL)...........$ 15.77 0.00
IRONWORKER, REINFORCING..........$ 12.19 0.00
LABORER: Common or General......$ 11.30 0.00
LABORER: Mason Tender - Brick...$ 10.50 0.00
LABORER: Mason Tender - Cement/Concrete..................$ 10.81 0.00
LABORER: Pipelayer..............$ 13.00 0.35
LABORER: Roof Tearoff...........$ 11.28 0.00
LABORER: Landscape and Irrigation.......................$ 10.00 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 13.09 0.00
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 13.93 0.00
OPERATOR: Bulldozer.............$ 18.29 1.31
OPERATOR: Drill.................$ 17.60 0.50
OPERATOR: Forklift..............$ 14.20 0.00
OPERATOR: Grader/Blade..........$ 12.95 0.00
OPERATOR: Loader................$ 12.89 1.19
OPERATOR: Mechanic..............$ 17.52 3.33
OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 18.44 0.00
OPERATOR: Roller................$ 15.04 0.00
PIPEFITTER (HVAC Pipe Installation Only)...............$ 21.28 4.45
PLASTERER........................$ 15.30 0.00
PLUMBER, Excludes HVAC Pipe Installation.....................$ 22.10 4.17
ROOFER...........................$ 15.70 0.58
SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 21.54 5.59
SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 18.63 0.65
SPRINKLER FITTER (Fire Sprinklers)......................$ 19.27 3.68
TILE FINISHER....................$ 11.22 0.00
TILE SETTER......................$ 12.00 0.00
TRUCK DRIVER: Dump Truck........$ 12.39 1.18
TRUCK DRIVER: Flatbed Truck.....$ 19.65 8.57
TRUCK DRIVER: Semi-Trailer Truck............................$ 12.50 0.00
TRUCK DRIVER: Water Truck.......$ 12.00 4.11
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates.