_RFP_N6945014R1261_Division00_.pdf

PDF 457 KB Posted

Attached to
NAS Jacksonville Airfield and Lighting Repairs
Solicitation number
N69450-14-R-1261
Issued by

About this file

Solicitation N69450-14-R-1261 is hereby posted. Information concerning the Pre-Proposal Conference and Site Visit is found in provision 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) in Section 00100 Bidding Schedule/Instructions to Bidders. RFP Attachment B NAS JAX Base Access AMAG Form must be submitted by April 4 2014. See RFP for all infiormation.

View the file

Other files

File Type Posted
_RFP_Attachment_B_AMAG_Base_Access_Request_PPC_SV_.xls XLS spreadsheet
_RFP_Attachment_I_AMAG_Base_Access_Request_Proposal_.xls XLS spreadsheet
_RFP_Drawings_Volume_1of3_17-ELECTRICAL_.pdf PDF
_RFP_Drawings_Volume_1of3_18-ELECTRICAL_.pdf PDF
_RFP_Drawings_Volume_1of3_16-ELECTRICAL_.pdf PDF
_RFP_Drawings_Volume_1of3_1-GENERAL_.pdf PDF
_RFP_Drawings_Volume_1of3_8-STRUCTURAL_.pdf PDF
_RFP_Specifications_Volume_1of3_.pdf PDF
_RFP_Drawings_Volume_3_.pdf PDF
_RFP_Attachment_H_MAP_to_B135N_.pdf PDF
_RFP_Specifications_Volume_2of3_.pdf PDF
_RFP_Attachment_E_SBSP_.docx DOCX document
_RFP_Attachment_A_PPI_Log_.xls XLS spreadsheet
_RFP_Attachment_G_Form_PPQ-0_.docx DOCX document
_RFP_Drawings_Volume_1of3_6-GEOTECHNICAL_.pdf PDF
_RFP_Attachment_C_Construction_Experience_.docx DOCX document
_RFP_Drawings_Volume_1of3_4-LIFE_SAFETY_.pdf PDF
_RFP_Drawings_Volume_1of3_13-PLUMBING-MECH_.pdf PDF
_RFP_Drawings_Volume_1of3_19-ELECTRICAL_.pdf PDF
_RFP_Drawings_Volume_1of3_12-FIRE_ALARM_.pdf PDF
_RFP_Attachment_F_SB_Offeror_SB_Participation_Breakdown_.docx DOCX document
_RFP_Drawings_Volume_1of3_20-ELECTRICAL_.pdf PDF
_RFP_Drawings_Volume_2_.pdf PDF
_RFP_Drawings_Volume_1of3_9_ARCHITECTURAL_.pdf PDF
_RFP_Drawings_Volume_1of3_2-GENERAL_.pdf PDF
_RFP_Drawings_Volume_1of3_7-CIVIL_.pdf PDF
_RFP_Drawings_Volume_1of3_3-GENERAL_.pdf PDF
_RFP_Specifications_Volume_3of3_.pdf PDF
_RFP_Drawings_Volume_1of3_15-ELECTRICAL_.pdf PDF
_RFP_Drawings_Volume_1of3_21-ELECTRICAL_.pdf PDF
_RFP_Drawings_Volume_1of3_14-ELECTRICAL_.pdf PDF
_RFP_Drawings_Volume_1of3_10-ARCHITECTURAL_.pdf PDF
_RFP_Drawings_Volume_1of3_11-FIRE_PROTECTION_.pdf PDF
_RFP_Attachment_D_SB_PastPerformance_.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR2629422

SOLICITATION FOR NAS JACKSONVILLE AIRFIELD AND LIGHTING REPAIRS, NAVAL AIR STATION (NAS) JACKSONVILLE, FLORIDA (FL)

A preproposal conference and site visit have been scheduled for April 9, 2014 at NAS Jacksonville, FL. See Section 00100 Site Visit and FAR Clause 52.236-27 Alt I for details.

This acquisition is solicited on an unrestricted basis w ith full and open competition.

This is a negotiated source selection procurement using the Best Value Tradeoff Approach.

NAICS Code forthis design-bid-build procurement is 237310.

Estinmated cost range:Betw een $25,000,000 and $75,000,000

NOTICE: ADDITIONAL SECURITY MEASURES HAVE BEEN INITIATED AFTER THE EVENTS OF 11 SEPTEMBER 2011. YOU SHOULD TAKE NOT ACCOUNT THE IMPACT OF THESE MEASURES IN YOUR RESPONSE TO THIS REQUEST FOR PROPOSAL.

DIANNE L. HAYMANS 904-542-6246

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

31-Mar-2014

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

X

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________570 calendar days after receiving aw ard, notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10 ALT

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________5 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________15 May 2014 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

NAVFAC SOUTHEAST

IPT SOUTH ATLANTIC

BLDG 135, PO BOX 30

NAS JACKSONVILLE

JACKSONVILLE FL 32212-0030

N69450

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:30 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

(904) 542-6104FAX:TEL: TEL: FAX:

N69450-14-R-1261 112

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

N69450-14-R-1261

Section 00010 - Solicitation Contract Form

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Project Base CLIN

FFP

Repair Airfield Pavements ST15-08 and Energy Airfield Lighting Reliability Efficiency Improvements RM10-7582 in accordance with specifications and drawings incorporated into this solicitation.

FOB: Destination

PURCHASE REQUEST NUMBER: ACQR2629422

PROJECT: ST15-08/RM10-7582

NET AMT

0002 1 Project OPTION Option Item 1

FFP

Option Item 1 - P-8A Training & Parking Apron Expansion P-659 in accordance with specifications and drawings incorporated into this solicitation. This option may be exercised within 270 days from date of contract award.

FOB: Destination

PROJECT: P659

0003 1 Project OPTION Option Item 2

FFP

Option Item 2 - P-8A Runway Thresholds and Taxiways P-631 in accordance with specifications and drawings incorporated into this solicitation. This option may be exercised within 270 days from date of contract award.

PROJECT: P631

TABLE OF CONTENTS

SOLICIATION N69450-14-R-1261

NAS JACKSONVILLE AIRFIELD AND LIGHTING REPAIRS

DIVISION 00

PROPOSAL FORMS & DOCUMENTS

TABLE OF CONTENTS

SECTION 00010 SOLICITATION CONTRACT FORM (SF 1442)

CONTRACT ADMINISTRATION POINT OF CONTACT (POC)

PROVISIONS

SECTION 00100 BIDDING SCHEDULE / INSTRUCTION TO BIDDERS

INFORMATION TO OFFERORS

APPLICABLE PROVISIONS

Section 00102 LIST OF DRAWINGS (See SECTION 00800)

SECTION 00202 SUBMISSION REQUIREMENTS AND EVALUATION FACTORS FOR AWARD

SSECTION 00600 REPRESENTATIONS & CERTIFICATIONS

SECTION 00700 CONTRACT CLAUSES

SECTION 00800 SPECIAL CONTRACT REQUIREMENTS

Section 00102 LIST OF DRAWINGS (See SECTION 00800)

SECTION 00830 DAVIS-BACON WAGE DETERMINATIONS

ATTACHMENTS: (Posted to FedBizOpps) Attachment A – Pre-Proposal Log Template (EXCEL) Attachment B – NAS JAX Base Access AMAG Form (EXCEL) Pre-filed for Pre-Proposal Conference Attachment C – Construction Experience Project Data Sheet Attachment D – Small Business Past Performance Attachment E – Small Business Subcontracting Plan Attachment F – Small Business Offeror Small Business Participation Breakdown Attachment G – NAVFAC/USACE Past Performance Questionnaire (Form PPQ-0) Attachment H – Map to NAS JAX Building 135 Attachment I – NAS JAX Base Access AMAG Form (EXCEL) Pre-filled for Proposal Hand Delivery

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 570 dys. ADC 1 NAVFAC SOUTHEAST

DIANNE L. HAYMANS

IPT SOUTH ATLANTIC

BLDG 135, PO BOX 30

NAS JACKSONVILLE

JACKSONVILLE FL 32212-0030

904-542-6246

N69450

0002 570 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

0003 570 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

CONTRACT ADMINISTRATION POC

All post award submittals, correspondence, contact, etc. shall be directed to the office identified in Block 26.

ADMINISTERED BY of the Standard Form (SF) 1442. Specific point of contact is:

(To be completed at time of award)

Section 00100 - Bidding Schedule/Instructions to Bidders

INFORMATION FOR OFFERORS

This procurement is solicited as full and open competition.

PRE-PROPOSAL INQUIRIES (PPI)

All inquiries (PPIs) must be submitted in writing and received by the Contract Specialist AT LEAST 15 CALENDAR DAYS PRIOR TO THE CLOSING DATE OF THE SOLICITATION in order to permit adequate time to reply to the inquiry. Submit all questions to Dianne L. Haymans at dianne.haymans@navy.mil using the PPI Log Template, Attachment A.

Individual replies will not be made to contractors. As answers become available, replies to PPIs will be made by posting a PPI log to FedBizOps. Numerous updated PPI logs may be posted throughout the procurement process.

It is recommended contractors check FedBizOpps periodically to see if additional postings have been made. It is the contractor’s responsibility to check FedBizOpps for all postings.

PRE-PROPOSAL CONFERENCE AND SITE VISIT

A MANDATORY pre-proposal conference and site visit has been scheduled for this project. Information concerning the site visit is found in provision 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995) in Section 00100 Bidding Schedule/Instructions to Bidders.

PROPOSAL SUBMISSION INSTRUCTIONS

In response to this request for proposal, the complete proposal shall include both the Price Proposal and the Non- Price Proposal, submitted as follows:

A. Price Proposal and Non-Price Proposal

The Price Proposal and the Non-Price Proposal shall be submitted in separate 3-ring binders. The proposal submission of Non-Price Factor 4 Small Business Utilization shall be submitted in the Price Proposal Binder. The Price Proposal shall be placed in a sealed envelope if delivered in the same package as the Non-Price Proposal. The front of both the Price and Non-Price Proposal binder should clearly state:

Type of Proposal (Price or Non-Price) Original or Copy RFP Number and Title of Project Offeror’s Name

Offeror’s shall include the following information with their price proposal:

Authorized negotiator’s (Point of Contact (POC)) name POC telephone number POC email address DUNS Number CAGE Code Federal Tax ID Number

It is recommended to also include an additional POC’s contact information.

All pages shall be numbered and binders shall be appropriately tabbed, conforming to the proposal submittal requirements’ structure for each evaluation factor.

The outside of the proposal package shall be labeled “RFP N69450-14-R-1261, NAS JACKSONVILLE AIRFIELD

AND LIGHTING REPAIRS, NAVAL STATION JACKSONVILLE, JACKSONVILLE, FLORIDA, ATTN:

DIANNE L. HAYMANS, IPT-SA; DO NOT OPEN IN MAIL ROOM”.

NOTE: PLEASE SEE SECTION 00202 SUBMISSION REQUIREMENTS AND EVALUATION

FACTORS FOR AWARD FOR EVALUATION SUBMISSION.

B. Delivery of Proposal

Address for hand-carried or UPS/FEDEX/USPS:

NAVFAC SE

ATTN: Dianne L. Haymans, IPT-SA Ajax Street, BLDG 135N, Rear Entrance NAS Jacksonville, FL 32212

Hand carried proposals will require access to NAS Jacksonville. If the offeror needs access to NAS Jacksonville, the offeror must complete the NAS JAX Base Access AMAG Form, Attachment I, which, for the individual who will be "driving a vehicle" onto the base. Passengers do not have to submit a form. Forms must be submitted via email as an EXCEL attachment (not a PDF) no later than four (4) business days prior to the closing date of the solicitation to Sandra McClamb at sandra.mcclamb@navy.mil and copy to dianne.haymans@navy.mil. The submitted NAS JAX Base Entry AMAG form is only good for the proposal due date. If the due date is extended, the offeror will need to submit an updated NAS JAX Base Entry AMAG form to reflect the new proposal submission date.

You must have a valid picture ID, vehicle registration, and proof of insurance. Please arrive early as it may take some time to get the vehicle pass. All passengers in the vehicle must have picture ID. The Security and Pass Office is located at the Main Gate, Yorktown Gate, 1st building on your right. Vehicles without a vehicle pass will not be permitted on the base. Vehicle pass requests received after the deadline will not be accepted. Vehicle drivers must stop at the Security Pass Office to obtain their vehicle pass.

All visitors MUST know the name of the command they are visiting and MUST provide the last six numbers of their SSN to the security clerk at the Pass & ID window. Be advised that ALL visitors entering NAS Jacksonville are subject to a background investigation. All vehicles are subject to random searches.

Ultimately, it is the contractor's responsibility to ensure timely proposal submission to the specified location. Due to heightened security/traffic, it is recommended that you allow plenty of extra time to get access to base, get into the building, and turn in your proposal.

C. Proposal Due Date

PROPOSALS SUBMITTED IN RESPONSE TO THIS REQUEST FOR PROPOSAL MUST BE RECEIVED NO

LATER THAN MAY 15, 2014 AT 2:30PM EASTERN TIME. Proposals not received by the time and date specified shall be treated in accordance with Far 52.215-1 “Instruction to Offerors - Competitive Acquisitions” and may be rejected.

SECTION 00202 SUBMISSION REQUIREMENTS AND EVALUATION FACTORS FOR AWARD

I. INTRODUCTION

A. Intentionally left blank

B. DESCRIPTION OF ACQUISITION

1. This acquisition will result in the award of a Firm-Fixed Price (FFP) contract for construction.

2. NAS Jacksonville Airfield and Lighting Repairs, Naval Air Station, Jacksonville, Florida.

3. The description of the basic and option CLINs are as follows:

CLIN 0001: Repair Airfield Pavements ST15-08 and Energy Airfield Lighting Reliability Efficiency Improvements

RM10-7582

CLIN 0002: Option Item 1 - P-8A Training & Parking Apron Expansion P-659

CLIN 0003: Option Item 2 - P-8A Runway Thresholds and Taxiways P-631

The Government may exercise CLINs 0002 and 0003 (Option Items 1 and 2) within 270 days from date of contract award.

4. The completion dates are as follows:

Phase 1 - As described on NAVFAC Drawing No. 15072736 PH100.

Completion Date: From date of contract award to, and including, 31 March 2015

Phase 2a - As described on NAVFAC Drawing No. 15072737 PH101.

Completion Date: From 01 April 2015 to, and including, 15 September 2015 (167 calendar days)

Phase 2b - As described on NAVFAC Drawing No. 15072737 PH101.

Completion Date: From 01 April 2015 to, and including, 01 March 2016 (335 calendar days)

Phase 3 - As described on NAVFAC Drawing No. 15072738 PH102.

Completion Date: From 01 March 2016 through 01 May 2016 (61 calendar days)

The liquidated damages in the following amounts will be assessed for each calendar day of delay:

During Phase 1 – No liquidated damages (accounted for in phases below) During Phase 2a - $ 4,828.00 During Phase 2b - $29,750.00 During Phase 3 - $ 2,450.00

5. The Government’s cost estimate for this work is as follows:

The estimated construction cost for the project (CLIN 0001 plus all option items) is between $25,000,000 and $75,000,000.

6. The Government intends to award a contract resulting from this solicitation to the responsible offeror whose proposal represents the best value after evaluation in accordance with the factors and their relative importance in the solicitation.

7. This acquisition will be solicited on an unrestricted basis with full and open competition.

II. Intentionally left blank

III. EVALUATION

A. BASIS FOR AWARD

1. In accordance with the Federal Acquisition Regulation, the Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the offeror submitting the proposal determined to represent the best value—the proposal most advantageous to the Government, price and other factors considered.

2. As stated in the solicitation, the Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

3. The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror.

4. As stated in the solicitation, all technical factors when combined are of equal importance to the performance confidence assessment (past performance) rating; and all technical factors and the performance confidence assessment (past performance) rating, when combined, are approximately equal to price.

5. Any proposal found to have a deficiency in meeting the stated solicitation requirements or performance objectives will be considered ineligible for award, unless the deficiency is corrected through discussions. Proposals may be found to have either a significant weakness or multiple weaknesses that impact either the individual factor rating or the overall rating for the proposal. The evaluation report must document the evaluation board’s assessment of the identified weakness(s) and the associated risk to successful contract performance resulting from the weakness(s). This assessment must provide the rationale for proceeding to award without discussions.

B. Intentionally left blank

C. Intentionally left blank

D. Intentionally left blank

E. Intentionally left blank

F. EVALUATION FACTORS FOR AWARD

1. The solicitation requires the evaluation of price and the following non-price factors:

Factor 1 – Experience Factor 2 – Technical Solution Factor 3 – Safety Factor 4 – Small Business Utilization Factor 5 – Past Performance on Recent, Relevant Projects

The distinction between experience and past performance is that experience pertains to the volume of work completed by a contractor that are comparable to the types of work described under the definition of recent, relevant projects, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.

2. The relative order of importance of the non-price evaluation factors is the technical factors (Factors 1, 2, 3, and 4) are of equal importance to each other and, when combined are equal in importance to the past performance evaluation/performance confidence assessment factor (Factor 5). When the proposal is evaluated as a whole, the technical factors and past performance/performance confidence assessment factor combined (i.e., the non-price evaluation factors) are approximately equal to price.

3. Basis of Evaluation and Submittal Requirements for Each Factor.

(a) Price:

(1) Solicitation Submittal Requirements:

Provide one (1) original and one (1) copy of the solicitation submittal requirements identified below.

(i) Executed SF1442. Offeror shall insert its company name, address, DUNS Number, CAGE Code, and Federal Tax ID number in Block #14, telephone number in Block #15, acknowledge all amendments in Block #19 (if applicable), name and title of person authorized to sign in Block #20A, signature in Block #20B, and offer date in Block #20C of the SF1442.

(ii) Bid bond (SF-24). Offeror shall submit a bid bond (SF24) in the amount of 20% of your total project bid price or $3,000,000 whichever amount is less.

(iii) SAM registration. Offeror shall ensure current registration on the SAM website, www.sam.gov, including Annual Representations and Certifications, are complete and updated for this procurement. If a Representation or Certification required by Section 00600 of the RFP is not provided in SAM, include the Representation or Certification in your price proposal.

(iv) Federal Awardee Performance and Integrity Information System (FAPIIS). Offeror shall ensure FAPPIIS Certification as required by FAR 52.209-7, Information Regarding Responsibility Matters (July 2013).

(v) VETS-100 registration. Offeror shall ensure a current VETS-100 report has been submitted to the Department of Labor website http://www.dol.gov/vets/vets-100.html, if the offeror is required to submit. An email confirmation of submission can be requested and received by the offeror from the DOL website and submitted in the price proposal. If the offeror is not required to submit a report to VETS-100, include a brief statement stating that the offeror is not required to submit a report. Visit the VETS-100 website for details concerning if your company is required to submit a VETS-100 report and to request an email confirmation of submission.

Note: The bid bond, SAM, and VETS-100 registrations must be in the name/CAGE/DUNS of the offeror identified on the SF1442.

(2) Basis of Evaluation: The Government will evaluate price based on the total price. Total price consists of the basic requirements and all option items. The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evalution of Options (JUL 1990) in the solicitation. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the options. Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:

(i) Comparison of proposed prices received in response to the RFP.

(ii) Comparison of proposed prices with the IGE.

(iii) Comparison of proposed prices with available historical information.

(iv) Comparison of market survey results.

In accordance with FAR 52.219-4, a price evaluation preference will be given to offerors certified by the U.S. Small Business Administration as a HUBZone Small Business Concerns.

(b) Non-price Factors:

Provide one (1) original, five (5) copies, and one (1) electronic copy (CD) of the solicitation submittal requirements for Factors 1, 2, 3, 4, and 5 identified below. In case of variation, original paper submittal takes precedence over electronic or paper copies. Entire proposal shall not exceed 50 pages in length (single-sided only) utilizing a minimum Arial Font of 11 for Factors 1 through 5. Title page, table of contents, dividers, and any pages specifically excluded under each factor do not count towards the total page count and should not be numbered.

Documentation for JV Agreements, partnerships, subcontractors or teaming arrangements does not count towards the page count. Submission for Factor 4 Small Business Utilization does not count towards the page count and shall be included in the Price Proposal binder. If page count exceeds 50 single-sided pages, only the first 50 pages will be reviewed.

The Offeror’s response to Factors that require the submission of Experience Narrative and Past Performance shall be based on the following relevancy definition:

RELEVANT PROJECT: Relevant projects include those that demonstrate construction capability on combined airfield paving and airfield lighting projects with a construction value of $30M or greater. The airfield paving portion of a project must utilize slip form paving and be valued at $10M or greater and the airfield lighting portion of the project must be valued at $5M or greater. Projects must have been completed by the offeror within approximately the last seven (7) years of the date of issuance of this RFP.

The Construction Experience Data Sheets (Attachment C) that are requested in Factor 1 Experience must be relevant construction projects. The Past Performance information requested in Factor 5 Past Performance on Recent, Relevant Projects must be for the same construction projects that the Offeror submits for Experience in Factor 1.

(1) Factor 1, Experience:

(i) Solicitation Submittal Requirements:

(1) Experience:

Submit Construction Experience Data Sheets for a minimum of (2) two to a maximum of (5) five construction projects that the offeror completed and served as the prime construction contractor that best demonstrates experience on relevant projects that are similar in size, scope, and complexity to the RFP.

For purposes of this evaluation, a relevant project is further defined as: Relevant projects include those that demonstrate construction capability on combined airfield paving and airfield lighting projects with a construction value of $30M or greater. The airfield paving portion of a project must utilize slip form paving and be valued at $10M or greater and the airfield lighting portion of the project must be valued at $5M or greater. Projects must have been completed by the offeror within approximately the last seven (7) years of the date of issuance of this

RFP.

*Note: Maximum of five (5) projects may be submitted.

Provide a narrative describing the proposed primary construction firm and the primary subcontractors (airfield paving and airfield lighting) for this contract and the rationale for proposing this arrangement. The technical narrative shall not exceed one (1) double-sided page or two (2) single-sided pages.

Submitted construction projects must have been performed under a single task order or stand-alone contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project. Offerors shall submit the work performed under a single task order or stand-alone contract as a project.

The attached Construction Experience Project Data Sheet (Attachment C) is MANDATORY and SHALL be used to submit project information. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page or two (2) single-sided pages.

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.: unique features, area, construction methods).

If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects shall be submitted for each Joint Venture partner. Offerors who fail to submit experience for all Joint Venture partners may be rated lower. Offerors are still limited to a total of five (5) projects combined.

(ii) Basis of Evaluation:

RELEVANT PROJECT: Relevant projects include those that demonstrate construction capability on combined airfield paving and airfield lighting projects with a construction value of $30M or greater. The airfield paving portion of a project must utilize slip form paving and be valued at $10M or greater and the airfield lighting portion of the project must be valued at $5M or greater. Projects must have been completed by the offeror within approximately the last seven (7) years of the date of issuance of this RFP.

The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant construction projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review five (5) projects.

Relevant projects where the Offeror and the proposed primary subcontractor(s) (airfield paving and/or lighting) have previously worked together may be considered more favorably.

(2) Factor 2, Technical Solution:

(i) Solicitation Submittal Requirements:

I. Technical Narrative

Provide a narrative describing the technical approach to the project that meets the requirements of the RFP.

Narrative shall focus on the following:

- Approach to safely and successfully completing the project within the requirements in Specification Section 01 14 00.00 25 WORK RESTRICTIONS and on Phasing plan drawing sheets, PH100, PH101 and PH102.

- Identify the major challenges to performing the work in accordance with the required work restrictions and construction phasing in the RFP. Describe the preventative measures and/or specific steps the offeror will take to mitigate the impacts of these challenges.

- Approach to delivering paving materials to the project site while maintaining all the material quality requirements identified in the contract documents.

Narrative shall not exceed one (1) double-sided page or two (2) single-sided pages. Up to three (3) conceptual drawings may be provided to supplement the narrative (i.e. site plans and coordination drawings).

II. Schedule

Provide a Critical Path Method (CPM) time scaled logic diagram and schedule reports showing critical path activities using software applications such as SURTRACK or Primavera Project Planner. This schedule shall include key milestones and activities, including submittals, procurement, major construction items, Quality Control and Testing, work requirements as specified in Specification Section 01 14 00.00 25 WORK RESTRICTIONS along with project phasing requirements as specified on Phasing plan drawing sheets PH100, PH101 and PH102.

The awardees proposed schedule will become the basis for the contractor’s initial schedule submission as outlined in Specification Section 01 32 17.00 25 NETWORK ANALYSIS SCHEDULES.

(ii) Basis of Evaluation:

The Government will evaluate the narrative and schedule considering the extent to which the Offeror demonstrates a clear understanding of the requirements of the project. The Government will evaluate the effectiveness of the technical approach to determine the likelihood that the work will be performed in accordance with the requirements of the RFP. A technical approach which provides benefit to the government by one of the following prioritized items (listed in order of importance) while also maintaining all requirements of the RFP may be evaluated more favorably for this factor:

Reduced construction duration for Phase 2b Reduced construction duration for Phase 2a Reduced regular work day schedule to 16 hrs/day

(3) Factor 3, Safety:

(i) Solicitation Submittal Requirements: The Offeror shall submit the following information: (For a partnership or joint venture, the following submittal requirements are required for each contractor who is part of the partnership or joint venture; however, only one safety narrative is required. EMR and DART Rates shall not be submitted for subcontractors.):

(1) Experience Modification Rate (EMR): For the three (3) previous complete calendar years 2011, 2012, and 2013, submit your EMR (which compares your company’s annual losses in insurance claims against its policy premiums over a three (3) year period). If you have no EMR, affirmatively state so, and explain why. Any extenuating circumstances that affected the EMR and upward or downward trends should be addressed as part of this element. Lower EMRs will be given greater weight in the evaluation.

(2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate: For the three (3) previous complete calendar years 2011, 2012, and 2013, submit your OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate, as defined by the U.S. Department of Labor, Occupational Safety and Health Administration. If you cannot submit an OSHA DART Rate, affirmatively state so, and explain why. Any extenuating circumstances that affected the OSHA DART Rate data and upward or downward trends should be addressed as part of this element. Lower OSHA DART Rates will be given greater weight in the evaluation.

(3) Technical Approach for Safety: Describe the plan that the Offeror will implement to evaluate safety performance of potential subcontractors, as a part of the selection process for all levels of subcontractors. Also, describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at all subcontractor levels. The Safety Narrative shall be limited to one (1) double-sided page or two

(2) single-sided pages.

(ii) Basis of Evaluation: The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The Government will evaluate the Offeror’s overall safety record, the Offeror’s plan to select and monitor subcontractors, any and innovative safety methods that the Offeror plans to implement for this procurement. The Government’s sources of information for evaluating safety may include, but are not limited to, OSHA, NAVFAC’s Enterprise Safety Applications Management System (ESAMS), Naval Engineering Training and Operating Procedure and Standard (NETOPS) 23, and other related databases.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete safety information regarding these submittal requirements rests with the Offeror. The evaluation will collectively consider the following:

- Experience Modification Rate (EMR)

- OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate

- Offeror Technical Approach to Safety

- Other sources of information available to the Government

(1) Experience Modification Rate (EMR): The Government will evaluate the EMR to determine if the Offeror has demonstrated a history of safe work practices taking into account any upward or downward trends and extenuating circumstances that impact the rating. Lower EMRs will be given greater weight in the evaluation.

(2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate: The Government will evaluate the OSHA DART Rate to determine if the Offeror has demonstrated a history of safe work practices taking into account any upward or downward trends and extenuating circumstances that impact the rates. Lower OSHA DART Rates will be given greater weight in the evaluation.

(3) Technical Approach to Safety: The Government will evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on the upcoming project. The Government will also evaluate the narrative to determine the degree to which innovations are being proposed that may enhance safety on this procurement. Those Offerors whose plan demonstrates a commitment to hire subcontractors with a culture of safety and who propose innovative methods to enhance a safe working environment may be given greater weight in the evaluation.

(4) Factor 4, Small Business Utilization:

Definitions: “SB” as used herein, is intended to include Small Business concerns, Small Disadvantaged Business concerns (SDB), Women-Owned Small Business concerns (WOSB), Historically Underutilized Business Zone Small Business concerns (HUBZone), Veteran-Owned Small Business concerns (VOSB), and Service-Disabled Veteran-Owned Small Business concerns (SDVOSB). All small business programs are self-certifying programs with the exception of HUBZone certifications, see HUBZone SB Certifications below. Small Business Program requirements and definitions may be found in the Federal Acquisition Regulations (FAR), Part 19.

HUBZone SB Certifications: Offerors are reminded that HUBZone SB concerns must obtain formal certification from the Small Business Administration (SBA) if they expect to receive the evaluation benefits associated with the HUBZone SB programs either as a prime or subcontractor(s). For more information on the HUBZone SB certification requirements and available benefits, contact your local SBA representative. Certified HUBZone SB firms are listed on the U.S. Small Business Administration’s Dynamic Small Business Search (DSBS) website at http://web.sba.gov/pro-net/search/dsp_dsbs.cfm. It is the responsibility of the prime contractor to periodically check the DSBS as certifications are subject to change.

A. - PAST PERFORMANCE IN UTILIZATION OF SMALL BUSINESS CONCERNS

(i) Solicitation Submittal Requirements: Proposals that do not include responses addressing ALL elements of the requirements stated below (a. through g.) must include an explanation why that element is not addressed.

a. Provide performance evaluation ratings (i.e., SF1420, DD2626, or equivalent) obtained on the implementation of small business subcontracting plans for all of the offeror’s contracts referenced under Factor 5, Past Performance on Recent, Relevant Projects. Recently completed project evaluations are desired, however, in the absence of recently completed project evaluations, interim ratings for projects that are 80% complete may be considered. If more than five (5) evaluation ratings are provided, only the first five (5) will be considered. In addition, the Government may consider past performance information on other projects as made available to the Government from other sources (such as the Construction Contractor Appraisal Support Systems (CCASS)), Architect-Engineer Contract Administration Support System (ACASS) and Contractor Performance Assessment Reporting System (CPARS)).

b. Provide information on national and industry-issued awards that offerors received for outstanding support to SB concerns within the past five (5) years. Include purpose, issuer, and date of award(s).

National and industry-issued awards received beyond five (5) years will not be considered.

c. Provide information on previous, existing, planned or pending mentor-protégé agreements (MPA) under any Federal Government or other program held within the last five (5) years. Information should include, at a minimum, the members, objectives, period of performance, and major accomplishments during the MPA.

d. Provide information on past use of Community Rehabilitation Program (CRP) organizations certified under the AbilityOne Program by NISH or the National Industry for the Blind (NIB). Information should include the contract type, type of work performed, period of performance, and number of employed severely handicapped persons.

e. Provide small business subcontracting history. Large businesses with Federal contracting experience shall provide final or current Subcontracting Report for Individual Contracts or Individual Subcontracting Reports (ISRs) on prime (only) contracts submitted under Factor 5, Past Performance on Recent, Relevant Projects. If Factor 5, Past Performance on Recent, Relevant Projects submitted contracts are not prime contracts, submit SF294s or ISRs for contracts of similar scope performed as a prime contractor. If goals were not met on any submitted contracts, an explanation for each unmet goals is required. Large Businesses with no documented SF294/ISR history shall submit a subcontracting history on Attachment (D) Small Business Past Performance. If more than five (5) reports are provided, only the first five (5) will be considered.

f. Small Business proposers shall provide a subcontracting history on Attachment D, Small Business Past Performance.

g. If an Offeror is utilizing past performance information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the solicitation), the proposal shall clearly demonstrate that the affiliates/subsidiaries/parent/LLC/LTD member companies will have meaningful participation of all members in the management of the subcontracting program/plan by identifying the personnel or resources from the member companies that will be dedicated to managing the plan, and an organization chart which demonstrates the reporting chain within the membership.

If the Offeror is a Joint Venture, Partnership LLC or other entity consisting of more than one entity, provide past performance information, elements a. through f., for each individual business entity(ies) that will be responsible for managing the subcontracting program/plan.

SMALL BUSINESS PARTICIPATION

(i) Solicitation Submittal Requirements: Identify in terms of dollar value and percentage of the total acquisition, the extent of work you will perform as the prime contractor. If submitting an offer as a Joint-Venture, identify the percentage of work each member will be responsible for and indicate the size status of each member, e.g., LB, SB, SDB, WOSB, HUBZone SB, etc.

If you are a Large Business, submit a Small Business Subcontracting Plan for this project in the format provided in Attachment E for this factor, to include all information required in the attachment. If you are a Small Business, submit a subcontracting participation breakdown in the format provided in Attachment F for this factor. All proposers: To demonstrate commitment in using small business concerns, the Small Business Subcontracting Plan or subcontracting participation breakdown may list all subcontractors by name. If the proposed Small Business Subcontracting goals do not meet the minimum NAVFAC Small Business Subcontracting Targets, include a detailed explanation describing the actions taken to arrive at that determination, along with an explanation for the goals that actually were proposed. For proposals submitted on design-build solicitations, the proposer must identify its designer/design team in its Subcontracting Plan or Small Business Participation Breakdown.

Firm commitments to subcontract to multiple companies: The Offeror may provide a demonstration of commitments in planned subcontracts by listing multiple names of companies that will be used to support specific small business category (i.e., SB, SDB, WOSB, HUBZone SB, VOSB and SDVOSB).

B. BASIS OF EVALUATION:

The following will be evaluated on all proposals:

The extent to which the proposal demonstrates the proposer’s level of past performance in utilizing Small Business (SB) concerns, AbilityOne, Mentor-Protégé Agreements, and other socio-economic programs, as defined in FAR Subparts 26.1 and 26.2, in subcontracting, and in meeting established Small Business subcontracting goals.

a. The extent to which the proposal demonstrates maximum practicable participation of SBs in terms of the total value of the acquisition, including options.

b. The extent to which the proposal demonstrates a commitment to use SB concerns that are specifically identified in the proposal, including but not limited to use of mentor protégé programs.

c. The extent to which the proposal demonstrates SB participation in a variety of industries expected during the performance of work.

d. The realism of the proposal to meet the proposed goals.

The following will be evaluated on proposals submitted by Large Business firms:

a. The extent to which the proposal provides Small Business Subcontracting goals that meet or exceed the minimum NAVFAC Small Business Subcontracting Targets, and utilization of AbilityOne CRP organizations.

Proposals that provide goals exceeding the NAVFAC Subcontracting Targets may be rated higher. The proposed goals and NAVFAC Subcontracting Targets are expressed as a percentage of total subcontracted values. The minimum NAVFAC Subcontracting Targets are as follows:

FY 2014

SB 66.67%

SDB 17.10%

WOSB 15.15%

HUBZone 8.85%

VOSB 3.00%

SDVOSB 3.00%

b. The extent to which the proposer’s Small Business Subcontracting Plan establishes reasonable efforts demonstrating the subcontracting targets can be met during the performance of the contract:

A copy of the blank forms to be used for offeror submission of Small Business Utilization are included as follows:

Attachment D – Small Business Past Performance Attachment E – Small Business Subcontracting Plan Attachment F – Small Business Offeror Small Business Participation Breakdown

(5) Factor 5, Past Performance on Recent, Relevant Projects:

(i) Solicitation Submittal Requirements:

RELEVANT PROJECT: Relevant projects include those that demonstrate construction capability on combined airfield paving and airfield lighting projects with a construction value of $30M or greater. The airfield paving portion of a project must utilize slip form paving and be valued at $10M or greater and the airfield lighting portion of the project must be valued at $5M or greater. Projects must have been completed by the offeror within approximately the last seven (7) years of the date of issuance of this RFP.

IF A COMPLETED CONTRACTOR PERFORMANCE ASSESSMENT REPORT SYSTEM (CPARS)

EVALUATION IS AVAILABLE, IT SHALL BE SUBMITTED WITH THE PROPOSAL. IF THERE IS NOT A COMPLETED CPARS EVALUATION, the NAVFAC/USACE Past Performance Questionnaire (Form PPQ-0) (PPQ) (Attachment G) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 1, Experience. AN OFFEROR SHALL NOT

SUBMIT A PPQ WHEN A COMPLETED CPARS IS AVAILABLE.

IF A CPARS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment G), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Dianne L. Haymans, via email, at dianne.haymans@navy.mil, prior to proposal closing date.

Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

Also include performance recognition documents received within the last 10 years such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

A copy of the blank NAVFAC/USACE Past Performance Questionnaire (Form PPQ-0) to be used for requesting client references is included as Attachment G.

(ii) Basis of Evaluation: The degree to which past performance evaluations and all other past performance information reviewed by the Government (e.g., PPIRS, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), performance recognition documents, and information obtained from any other source) reflect a trend of satisfactory performance considering:

- A pattern of successful completion of tasks;

- A pattern of deliverables that are timely and of good quality;

- A pattern of cooperativeness and teamwork with the Government at all levels (task managers, contracting officers, auditors, etc.);

- Recency of tasks performed that are identical to, similar to, or related to the task at hand; and

- A respect for stewardship of Government funds

CLAUSES INCORPORATED BY FULL TEXT

52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)

Any contract awarded as a result of this solicitation will be DO-C2 rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation.

(End of provision)

52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004)

(a) Definitions. As used in this provision--

“Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer's discretion, result in the offeror being allowed to revise its proposal.

“In writing or written” means any worded or numbered expression which can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.

“Proposal modification” is a change made to a proposal before the solicitation's closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.

“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.

“Time”, if stated as a number of days, is calculated using calendar days, unless…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .