AMENDMENT 0017 South Texas MACC N69450-11-R-0778
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT_0019.pdf | ||
| AMENDMENT_0018.pdf | ||
| Amendment_0016__SoTxMACC.pdf | ||
| Amendment_0015.pdf | ||
| Amendment_0014.pdf | ||
| Amend_0013.pdf | ||
| Amendment_0012.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR2259544
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N69450-11-R-0778 South Texas MACC See Page Tw o Continuation Offeror's must acknow ledge this Amendment in w riting.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Mar-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N69450-11-R-0778
X 9B. DATED (SEE ITEM 11)
30-Sep-2011
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Mar-2014
CODE
NAVFAC SOUTHEAST
IPT GULFCOAST
BLDG 903, PO BOX 30
NAS JACKSONVILLE
JACKSONVILLE FL 32212-0030
N69450 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N69450-11-R-0778
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0017
a. The purpose for this Amendment is to provide attachment Section 01 33 29.00 25 LEED™ DOCUMENTATION 08/12 NAVFAC SE VERSION . 1 of 10 pages. See attachment to this amendment.
b. Offerors must acknowledge this amendment in writing.
c. All other terms and conditions of the solicitation remain unchanged.
(End of Summary of Changes)
P470 NGIS Visitors Quarters 1107906 rev. 05 MAR 2014
SECTION 01 33 29.00 25
LEED(TM) DOCUMENTATION
08/12
NAVFAC SE VERSION
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
FOREST STEWARDSHIP COUNCIL (FSC)
FSC STD 01 001 (2000) Principles and Criteria for Forest Stewardship
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED GBDC (2009) LEED Reference Guide for Green Building Design and Construction
LEED NC (2009) Leadership in Energy and Environmental Design(tm) New Construction Rating System
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
LEED Implementation Plan; G
SD-11 Closeout Submittals
LEED Documentation Notebook; G
1.3 DESCRIPTION
LEED NC submittals are in addition to other submittals. If submitted item is identical to that submitted to comply with other project requirements, submit duplicate copies as a separate submittal to verify compliance with the indicated LEED NC requirements.
This project has been designed for, and shall be developed for a sustainable rating of silver in accordance with LEED NC, with an emphasis on maximizing potential points in the Energy and Atmosphere (EA) category.
The LEED Checklist identifies the LEED NC credit items that are designed into or otherwise required for this project. No variations or substitutions to the LEED NC credits identified for this contract shall be allowed without written consent from the Contracting Officer. Should there be a case where there is any problem meeting the full requirements of a
SECTION 01 33 29.00 25 Page 1
LEED NC credit identified for this project in checklist, the Contractor must bring this to the attention of the Contracting Officer immediately.
1.3.1 Credit Validation
This project will be registered with USGBC for validation of credits earned. Contractor is not responsible for registering the project with USGBC or for paying project registration fees to USGBC. Format and content of all construction documentation must be in accordance with the LEED GBDC requirements for supporting data required in event of USGBC audit of the particular credit. Contractor is required to coordinate through the Contracting Officer with Government's LEED NC consultant on assuring assembled data is acceptable to USGBC and responding to USGBC requests for additional construction data in the course of seeking project certification. Design documentation will be provided by others.
1.3.2 Contractor Responsibilities
Some LEED NC credits may be inherent and integral with the design in the materials selected for this project. The Contractor will be required to retain and provide shipping labels and product identification for "green" products. For these credits, the Contractor shall notify the Contracting Officer in advance of selection of any "alternates" to the specified materials or use of any permissible construction methods that may result in a deviation from the LEED designer's intent. Some LEED NC credits involve material selection and are generally identified within the technical sections with the notation "LEED NC," though not specifically identified in all occurrences. Some LEED NC credits are dependent on construction practices.
This project is required to achieve LEED Silver.
The Government, as the Designer of Record, will make a design phase submittal to LEED Online for the following credits:
SS Credit 1: Site Selection SS Credit 2: Development Density and Community Connectivity SS Credit 4.2: Alternative Transportation -- Bicycle Storage and Changing Rooms SS Credit 4.3: Alternative Transportation -- Low-Emitting and Fuel-Efficient Vehicles SS Credit 4.4: Alternative Transportation -- Parking Capacity SS Credit 5.2: Site Development -- Maximize Open Space SS Credit 6.1: Stormwater Design -- Quantity Control SS Credit 6.2: Stormwater Design -- Quality Control SS Credit 7.2: Heat Island Effect -- Roof SS Credit 8: Light Pollution Reduction WE prereq 1: Water Use Reduction -- 20% reduction WE Credit 1: Water Efficient Landscaping WE Credit 3: Water Use Reduction EA prereq 2: Minimum Energy Performance EA prereq 3: Fundamental Refrigerant Management EA Credit 1: Optimize Energy Performance MR prereq 1: Storage and Collection of Recyclables IEQ prereq 1: Minimum Indoor Air Quality Performance IEQ prereq 2: Environmental Tobacco Smoke Control IEQ Credit 1: Outdoor Air Delivery Monitoring IEQ Credit 5: Indoor Chemical and Pollutant Source Control IEQ Credit 6.1: Controllability of Systems -- Lighting IEQ Credit 6.2: Controllability of Systems -- Thermal Comfort
SECTION 01 33 29.00 25 Page 2
IEQ Credit 7.1: Thermal Comfort -- Design IEQ Credit 8.1: Daylight and Views -- Daylight IEQ Credit 8.2: Daylight and Views -- Views ID Credit 1.2: Exemplary Performance SSc5.2 Maximize Open Space RP Credit 1.1: Regional Priority: SSc6.1 Stormwater Design -- Quantity Control RP Credit 1.2: Regional Priority: SSc6.2 Stormwater Design -- Quality Control for a number of 36 points being pursued by the Government.
Prerequisites and credits indicated on the LEED Scorecard in the "Yes" column and not identified for Government submittal during the Design phase are Construction phase submittal required prerequisites and credits and must be achieved by the Contractor. The Contractor is required to achieve a minimum 18 points. The Contractor will select remaining credits from the credits marked as "maybe" or "?" on the LEED Scorecard. Credits marked as "no" on the LEED Scorecard are not allowed for this project. All LEED prerequisites and credits identified shall be documented by the Contractor. Detailed submittal requirements are contained in the LEED GBDC, in the LEED NC On-Line project website, in this section, and in the technical sections
In all cases where a material, product, or execution requirement is identified by "LEED NC" in the contract documents, additional data or certificates shall be submitted with the individual component or process validating the material or component complies with the respective LEED NC credit item. These additional data or certificates, validating that certain products meet prescriptive LEED NC requirements, shall be separable from the other submitted data and a copy shall be included in the LEED NC Documentation Notebook in addition to the distribution indicated in the submittal register.
1.4 LEED IMPLEMENTATION PLAN
LEED NC Implementation Plan shall be submitted within 30 days after notice to proceed. The plan, when completed, shall provide a detailed description of all activities that relate to accomplishing project LEED NC requirements, including construction practices, procurement practices, and proposed submittals and documentation for each LEED NC credit. Plan shall also include the following:
a. Names of LEED NC accredited individuals on the Contractor's staff responsible for ensuring LEED NC credits and prerequisites are earned and responsible for assembling documentation. A responsible LEED NC Accredited Professional shall be identified for each applicable credit.
b. The commissioning services will be provided by or sub-contracted by the construction contractor following rules of LEED V3 which states that buildings smaller than 50,000sf may have a Commissioning Agent on the construction team who is qualified, has the required experience, and reports findings directly to the Government. The Contractor(s) are responsible to execute the commissioning process according to this section and other commissioning sections. Provide a copy of proposed contract with the Commissioning Agent.
c. Templates to be used for tracking LEED NC credits. Listing of documents to be provided for each credit and schedule for their inclusion in LEED Documentation Notebook. Include proposed materials, SECTION 01 33 29.00 25 Page 3 associated estimated costs, and details necessary for LEED NC calculations in order to determine if the listed materials can be expected to achieve the project goal.
d. List of all plans required in the technical sections for LEED NC credit. Proposed submittal date for each plan. These shall be added to the LEED NC Implementation Plan as they are completed.
e. Implementation plan for cumulative materials credits, which shall use applicable template with proposed materials, associated estimated costs, and details necessary for LEED NC Calculations added in order to determine if the listed materials can be expected to achieve the project goal. Submit cumulative materials implementation plans before materials purchasing begins.
1.5 LEED DOCUMENTATION NOTEBOOK
The Contractor shall prepare a comprehensive notebook documenting compliance for each LEED NC credit identified in LEED Checklist. LEED NC Documentation Notebook shall be formatted to match LEED NC numbering system and tabbed for each credit and prerequisite. LEED NC documentation in notebook shall contain up to date information through the previous month's work, and at least one set shall be available on the jobsite at all times.
The Notebook may be maintained and available for reference electronically if preferred. Completed pages shall be prevented from being altered. If the Contractor fails to maintain the LEED NC Documentation Notebook as specified herein, the Contracting Officer will deduct from the monthly progress payment an amount representing the estimated cost of maintaining the Notebook. This monthly deduction will continue until an agreement can be reached between the Contracting Officer and the Contractor regarding the accuracy and completeness of the Notebook. The original, one copy, and an electronic version on CD of the notebook shall be submitted at project closeout.
1.5.1 Content
Notebook shall include LEED checklist, applicable product data for material selection, final calculations, certifications for construction practices, procurement data, cumulative calculations and other items as identified in the approved LEED NC Implementation Plan. Notebook must contain all required data to support full compliance with the indicated LEED NC credit. LEED NC credits that are inherent to the design will be documented by the designer of record.
1.5.2 LEED Calculations
Calculations showing compliance with a required LEED NC credit identified in LEED checklist or within the LEED NC Implementation Plan. Calculations shall be current and available for monthly review. Final calculations shall be included in the LEED NC Documentation Notebook under the appropriate tab.
1.5.3 Submittals
All "G" designated submittals required for inclusion in the LEED NC Documentation Notebook shall be separable from other submitted data and shall be included in the LEED NC Documentation Notebook in addition to the distribution indicated on the submittal register.
SECTION 01 33 29.00 25 Page 4
Provide a statement indicating total cost for building materials used for this project. Include a statement indicating total cost of mechanical and electrical components.
1.6 REQUIREMENTS
LEED NC credits as identified in LEED Checklist shall be incorporated and documented as required by the Contract documents and in full compliance with the LEED GBDC and the LEED NC On-Line project templates for each prerequisite and credit. LEED NC credits not identified elsewhere in the Contract documents and those requiring further instruction are specified below. Refer to the LEED GBDC and to the LEED NC On-Line project templates for further definitions and requirements.
1.6.1 Sustainable Sites Prerequisite 1, Construction Activity Pollution Prevention
a. Provide copies of the project drawings to document the erosion and sedimentation control measures implemented on the site.
b. Develop an erosion and sedimentation control drawing and/or a written erosion and sedimentation control plan with specifications that detail the erosion and control best management practices used on the project site and the responsible parties for implementation.
c. Over the course of the site work activities, document implementation of the erosion and sedimentation control plan through date-stamped photos, inspection logs or reports, description or corrective action in response to problems, and similar items.
1.6.2 Energy & Atmosphere Prerequisite 1, Fundamental Commissioning
a. Submit a copy of the Owner's Project Requirements (OPR) and the designer's Basis of Design (BOD).
b. Submit a copy of the initial Commissioning Plan and revisions to the plan throughout the project.
c. Submit a copy of the Commissioning Specifications.
d. Submit a copy of the completed installation verification checklists, training manual, O&M manual, and performance tests.
e. Submit a copy of the final commissioning report.
f. Submit a narrative demonstrating that the project's fundamental commissioning requirements have been successfully executed.
1.6.3 Materials & Resources Credit 2, Construction Waste Management
a. Provide a narrative describing the project's construction waste management approach. Provide any additional comments or notes to describe special circumstances or considerations regarding the project's credit approach.
b. Provide a copy of the project's Construction Waste Management Plan.
c. Submit photos of the CWM onsite, including dumpsters, separated piles, sorting, etc.
SECTION 01 33 29.00 25 Page 5
d. Provide construction waste calculation tables with general description of each type/category of waste generated, location of receiving agent (recycler/landfill) for waste, quantity of waste diverted (by category) in tons, or cubic yards.
e. Provide haul tickets to document all recycling activities.
1.6.4 Materials and Resources Credit 4, Recycled Content
Contractor shall select materials so that the sum of post-consumer recycled content value plus one-half of post-industrial recycled content value constitutes at least 10 percent of the total materials cost for the project. EPA Comprehensive Procurement Guidelines has a supplier database.
California Integrated Waste Management Board (CIWMB) Recycled Content Directory also contains product and supplier data at www.ciwmb.ca.gov/rcp.
a. Provide the total project materials cost for Divisions 2-10 and 31-35.
b. Provide a tabulation of each material used on the project that is being tracked for recycled content. Include description of the material, manufacturer of material, product cost, the pre-consumer and/or post-consumer recycled content percentage, and the source of the recycled content data. Collect cutsheets or manufacturers' letters to document the listed products' recycled content.
c. Provide a narrative describing any special project circumstances or considerations regarding the project's credit approach.
d. Calculations: LEED NC Letter Template forms shall be used for tracking and documentation. Recycled content value of project materials shall be determined by the method described in the LEED GBDC. For this credit, performance is measured separately for each facility/facility type indicated to achieve this credit in LEED checklist.
e. Substitutions: In the case of conflict between this requirement and individual technical section requirements, Contractor may submit for Government approval proposed alternative products or systems that provide equivalent performance and appearance and have greater contribution to project recycled content requirements. All such proposed substitutions shall be submitted with the LEED NC Implementation Plan accompanied by product data that demonstrates equivalence.
1.6.5 Materials and Resources Credit 5, Regional Materials
Contractor shall select materials so that a minimum of 10 percent (by dollar value) of materials and products for the project are extracted, harvested, or recovered, as well as manufactured, regionally within a 500 mile radius of the project site.
a. Provide the project's total materials cost. Note that this cost must be consistent across all MR credits.
b. Calculations: LEED NC Letter Template forms shall be used for tracking and documentation. Amount of regional project materials shall be determined by the method described in the LEED GBDC. Provide the following information for each tracked material: material manufacturer, total product cost for each tracked material, percentage of product, by weight, that meets both the extraction and manufacture criteria;
SECTION 01 33 29.00 25 Page 6 distance between the project site and extraction/harvest/recovery site;
distance between the project site and final manufacturing location.
c. Provide a narrative describing any special project circumstances or considerations regarding the project's credit approach.
1.6.6 Materials and Resources Credit 7, Certified Wood
Select materials so that a minimum of 50 percent (by dollar value) of permanently installed wood-based materials and products for the project are certified in accordance with FSC STD 01 001.
a. Provide a statement indicating costs for each product containing certified wood.
b. Provide a statement indicating total cost for wood-based materials used for the project, including non-rented temporary construction.
c. Calculations: LEED NC Letter Template forms shall be used for tracking and documentation. Amount of FSC-certified project materials shall be determined by the method described in the LEED GBDC.
d. Provide a narrative describing any special circumstances or considerations regarding the project's credit approach.
1.6.7 Indoor Environmental Quality Credits 3.1 and 3.2, Construction IAQ Management Plan
Provide an IAQ management plan as defined by LEED NC. Implementation of plan shall include keeping records of material storage on site, filter replacements, and sequence of construction activities. IAQ plan to document either Option 1 or Option 2 methods prior of occupancy per the requirements of LEED NC.
a. Provide narrative within IAQ plan describing method to obtain each credit.
b. Submit records of filter replacements, sequence of construction activities associated with HVAC material installation, storage locations and prior occupancy flushing methods.
c. Submit documentation required for LEED credits per LEED NC guidelines.
1.6.8 Indoor Environmental Quality Credits 4.1 through 4.4, Low Emitting Materials
4.1 - Adhesives and Sealants
4.2 - Paints and Sealants
4.3 - Flooring Systems
4.4 - Composite Wood and Agrifiber Products
a. Submit a listing of all adhesives & sealants; paints & coatings; carpet products; and composite wood products used on this project along with the manufacturer's documentation of the stated VOC level (g/L) for each applicable product or material, and the corresponding allowable VOC level or compliance with the respective CRI Standard from the referenced standard in the LEED GBDC. Confirm that composite wood and agrifiber products do not contain any added urea-formaldehyde.
SECTION 01 33 29.00 25 Page 7
b. Provide a narrative to describe any special circumstances on non-standard compliance paths taken by the project.
c. Submit a copy of the project specifications with the noted VOC requirements.
d. Submit product data sheets for all low-emitting materials used in the project.
e. Provide copies of invoices, shipping labels, and other packaging and labeling materials as confirmation that the required low-emitting materials were used on this project.
1.6.9 Innovation and Design Credit(s) 1.1, 1.3, 1.4, and 1.5 Reduced Mercury Lamps, Heat Island Effect Non-Roof: Exemplary Performance, Bio-Based Products, and Moisture Control.
a. Procure construction materials that are designated as BioPreferred.
Procure fluorescent lamps with lowest mercury content.Establish and implement a moisture control strategy for controlling moisture flows and condensation to prevent building damage, minimize mold contanimation, and reduce health risks related to moisture. Meet the requirements of ASHRAE 189.1 Section 10.3.1.5 (Moisture Control) and UFC 3-101-01 Chapter 3, building Envelope Requirements, and include Moisture Control Plan that addresses at a minimum:
1. Moisture control through design details for the envelope and for HVAC humidity controls
2. Specified plan for construction materials storage and protection from mold and moisture infiltration
3. Specified humidity control during construction
4. Operations and Maintenance plan (to include warranty and follow-on maintenance contracts) for building maintenance to control moisture after Beneficial Occupancy Date.
b. Provide a narrative statement of the Credit Intent with goal of staying under 70 picograms for a point associated with Low mercury content in lamps. . See http://www.wbdg.org/references/mou bc.php for the following requirements to achieve a point associated with bio-based products:
Construction materials: 85 percent;
Composite board: 70 percent;
Landscaping materials: 100 percent;
Compost: 100 percent;
Adhesives: 80 percent;
Furniture: can be designated as biobased products if 90 percent of all of the adhesives used in the production are biobased adhesives
Submit narrative statement for intent to achieve 1 point for a successful moisture control plan during contruction.
c. Provide a narrative statement of the Credit Requirements. See http://www.biopreferred.gov/bioPreferredCatalog/faces/jsp/catalogLanding.jsp for a catalog of products brandishing the USDA Bio-Based label.
d. Provide a detailed narrative describing the project's approach to achievement of each credit. This narrative should include a description of the quantifiable environmental benefits each credits
SECTION 01 33 29.00 25 Page 8 proposal.
e. Provide copies of any dproduct data that serve to illustrate the project's approach to this credit.
1.6.10 Innovation and Design Credit 2, LEED NC Accredited Professional
a. Provide the name of the LEED NC AP.
b. Provide the name of the LEED NC AP's company.
c. Provide a brief description of the LEED NC AP's project role(s).
d. Provide a copy of the LEED NC AP certificate.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 COORDINATION MEETINGS
There will be three onsite coordination meetings. The first will be a preconstruction meeting to review the LEED NC Implementation Plan. The requirements for this meeting may be fulfilled during the coordination and mutual understanding meeting outlined in Section 01 45 00.00 25 QUALITY CONTROL. The second will be a pre-closeout meeting to review LEED NC Documentation Notebook for completeness and identify any outstanding issues relating to final score and documentation requirements. The third is a closeout meeting to review the final LEED NC Documentation Notebook. All meetings shall be attended by Contractor's designated individual responsible for LEED NC documentation, Government representative and Installation representative. At closeout meeting a final score for the project will be determined based on review of project performance and documentation. Contractor shall make a set of contract drawings and specifications available for review at each meeting as well as an updated LEED NC Documentation Notebook.
3.1.1 LEED at Red Zone
At approximately 75-80 percent construction schedule complete, Contracting Officer will convene "Red Zone" meeting. Contractor's construction QC Manager, Contracting Officer CM, Commissioning Authority, will discuss expediting contract close out and commissioning requirements. As part of this Red Zone meeting LEED NC Closeout requirements and completeness status of LEED construction phase documentation will be reviewed. Designer of Record or assigned LEED NC AP and NAVFAC representatives may be notified to participate via phone or be requested to attend in person.
3.2 TABLE
LEED NC credits as identified in LEED checklist are contract requirements and shall be incorporated in full compliance with the LEED GBDC and the LEED NC On-Line project template.
3.3 LEED CLOSEOUT REQUIREMENTS
Within 30 days after Beneficial Occupancy Date (BOD) submit all LEED NC and
SECTION 01 33 29.00 25 Page 9
Commissioning related documentation. Retainage will be held by Contracting Officer until LEED NC construction phase documentation is acceptable.
-- End of Section --