24Q0200 Solicitation Amendment.docx
DOCX document 32 KB Posted
- Attached to
- Incinerate IT Material Federal contract opportunity
- Solicitation number
- N6893624Q0200
About this file
This document is a Solicitation Amendment for a federal contract opportunity to destroy classified and sensitive materials related to the F-35 Joint Program. The key details are:
The contractor is required to incinerate approximately 10,000 pounds of Secret//SAR materials in accordance with AF-MAN 17-1301 and DoDM 5205.07 requirements for destroying accountable and non-accountable special access program (SAP) materials. The contractor must have the appropriate SAP-briefed personnel to perform the destruction, use NSA/CSS-approved equipment, and provide signed destruction records to the government. The destruction facility must be located within 300 miles of Ridgecrest, California. This is a sole source requirement awarded to HVF Percious Metals LLC as the only vendor capable of performing the required incineration/sanitization services in the western region. Any other interested parties must submit a written response detailing their capabilities within 5 days of the notice publication.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 24Q0200 Solicitation.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6893624Q0200
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
STATEMENT OF WORK
UNCLASSIFIED
STATEMENT OF WORK FOR DESTRUCTION OF SECRET//SAR MATERIALS
F-35 IPT needs to destroy Program level material in accordance with AF-MAN 17-1301 and DoDM 5205.07.
DoDM 5205.07 states Accountable SAP material will be destroyed using two SAP-briefed employees with access to the level of material being destroyed. Non-accountable SAP material may be destroyed by a single SAP-briefed employee with access to the level of material being destroyed. All classified waste containing SAP information will be destroyed as soon as possible. Such materials must not accumulate beyond 30 days unless approved by the PSO. NSA/CSS-approved equipment and their destruction procedures will be used to destroy SAP material as authorized by the PSO. Destruction of non-standard SAP materials will be approved by the PSO. Accountable and non-accountable SAP material will be maintained in accordance with the DoD Components record management manuals and instructions AF-MAN17-1301 Sanitization of classified devices follows the National Security Agency/Central Security Service Policy Manual 9-12, NSA/CSS Storage Device Sanitization Manual, and involves the destruction of the media and/or data via degaussing, incineration, disintegration, shredding, embossing/knurling, chopping/pulverizing/wet pulping (paper), grinding, strip shredding/cutting, or power removal (dynamic random-access memory, static random-access memory, and volatile field programmable gate array). Only products listed on the National Security Agency Evaluated Products List or received approval from the National Security Agency may be used to destroy classified information (to include media and devices) per National Security Agency/Central Security Service Policy Manual 9-12.
OVERVIEW
F-35 IPT needs a contractor to destroy Secret//SAR material according to the below steps.
SCOPE OF WORK
1. Once the shipment arrives to the facility the contractor shall unload the truck and move all the material to the incineration room.
2. The contractor shall not open or look in the boxes.
3. The facility shall have a viewing room where the Government representatives are able to watch the destruction of the material.
4. There is approximately 10,000 pounds of material that shall be destroyed by the contractor.
5. The contractor shall destroy all the material by incineration.
6. The contractor shall provide a qualified team for the destruction of material.
7. The contractor shall be responsible for unloading the palatized material from the truck/vehicle and transporting it to the incinerator for destruction.
8. The contractor shall destroy all material from inside the truck/vehicle.
9. Once incineration is complete records shall be properly signed and given to Government representatives.
10. The contractor shall have a signed memorandum for a “commercial destruction facility review” from the OSI PJ/CS for destruction of Secret//SAR material.
11. The contractor shall produce above memorandum upon request.
12. Performance for the contractor is described below.
13. The destruction facility shall be within 300 miles of Ridgecrest, California.
SERVICE REQUIREMENTS
The contractor shall unload and transport all the materials from the truck/vehicle to the incineration room. The materials shall be properly incinerated according to regulation. The contractor shall not open or look at material in the banded boxes. Once the incineration is complete records shall be properly signed and given to the Government representatives.
UNCLASSIFIED
(End of Summary of Changes) image1.wmf