20R0092 Solicitation Amendment 6.docx

DOCX document 165 KB Posted

Attached to
Millimeter Wave Power Modules (MMPM)
Solicitation number
N6893620R0092
Issued by

View the file

Other files

File Type Posted
20R0092 Amendment 8.docx DOCX document
20R0092 Solicitation Amemdment 0007.docx DOCX document
20R0092 Amendment 6.zip ZIP file
20R0092 Amendment 5.docx DOCX document
20R0092 Amendment 4.docx DOCX document
20R0092 Amendment 3.docx DOCX document
20R0092 Amendment 2.docx DOCX document
20R0092 Amendment.docx DOCX document
20R0092 Solicitation.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6893620R0092

Section A - Solicitation/Contract Form

QUESTIONS AND ANSWERS

1. Question: What is the desired monthly and annual delivery rate Yr. 1 - 5 and what is the minimum annual requirement?

Answer: The minimum monthly delivery rate is 5 per month. There is no minimum annual requirement.

2. Question: How many units are currently in the field?

Answer: 6

3. Question: What is the typical monthly/annual rate for teardown and evaluation?

Answer: 6 annually

4. Question: Please provide the three most common failure modes.

Answer: 1) Amp fails to operate after being in storage 2) Tube gone bad 3) Power supply gone bad

5. Question: Must the design meet all of the requirements of the outline drawing No. 1611AS12205 Rev. C or can an alternative mechanical configuration be proposed?

Answer: Yes, mechanical configuration is imperative unless smaller footprint is being proposed.

6. Question: Rather than hard copy submission could we submit electronically via DoD safe.

Answer: Yes. Section L has been updated accordingly.

7. Question: Responses to the first round of questions may generate additional questions and so will a second round of questions be permitted and if so, what is the due date?

Answer: Yes. Section L has been updated accordingly.

8. Question: Will the due date for proposals be extended in order to address the responses to questions?

Answer: Yes, the due date for proposals is extended to 26 OCT 2020.

9. Question: 1611AS12205 Rev A para. 3.3.17 Fault Protection: Is it permissible for the MPM to enter a permanent fault state if certain damaging fault conditions are continuously present each time the MPM attempts to restart after a fault? (Manual reset would be required to continue. Fault override function would still apply) Answer: Some applications we would require fault override function and Gov’t assume the risk of fault.

10. Question: 1611AS12205 Rev A para. 3.7.2 First Article Tests, 3.7.2.5 First Article Reliability Test - Is it necessary to perform both environmental testing and reliability testing on the same First Article Unit? Harsh environmental testing could impact reliability.

Answer: Yes, reliability tests would be run on the same first article sample that has gone through environmental testing.

11. Question: 1611AS12205 Rev A para. 4.2.3 Operating Conditions - Since RF output connector J2006 is WR-28 waveguide, a 50 ohm load would be difficult to achieve. We assume this is not intended to be a mismatched load requirement. Would a WR-28 waveguide load be acceptable?

Answer: WR-28 waveguide load is acceptable.

QUESTIONS AND ANSWERS

1. Question: In response to a previous question the minimum monthly delivery rate is 5 per month. This would suggest a total of 60 units per year however the solicitation lists a maximum quantity over the 5 year period of only 125 units (average of 25/year). Please can you explain this discrepancy and confirm the total requirements as this will significantly impact the pricing?

Answer: The Government’s response to Question 1 regarding desired delivery rate was inadvertently inaccurate. In accordance with FAR Clause 52.211-8, the Government’s minimum required delivery rate for CLIN 0002 is 3 units per month to commence within 300 days after issuance of delivery order, or upon completion of prior delivery order. The rate of delivery has no impact on the maximum number of units the Government plans to order over the 5 year period, which remains 125 for CLIN 0002.

1. Question: For first article test, is it expected that this price would include any non-recurring engineering costs necessary to meet the updated specifications?

Answer: Yes.

1. Question: If any non-recurring engineering costs are allowed is there any method for making payments against these costs or would it be paid upon completion of first article testing?

Answer: FAR Clause 52.232-16 is included in the solicitation, so offerors may propose Progress Payments. Otherwise, the price of the First Article would be paid upon completion of testing.

1. Question: Are you able to provide any details of the system that this device will be used in?

Answer: All pertinent information is included in the SOW. Vendors are encouraged to carefully read the SOW.

1. Question: Will the due date for proposals be extended in order to address the responses to questions? We would request at least an additional 14 days.

Answer: Yes, the due date for proposals is extended to 10 NOV 2020.

QUESTIONS AND ANSWERS 3

Questions and Answers

1. Question: Ref. 3.7.2.2 As CS101, as well as CS114 (curve 5) through CS118 are new requirements for this program, would it be acceptable to add external filter circuits to an MPM that would otherwise meet the specified requirements in this solicitation? The outline of the MPM would meet the outline drawing in the RFP. The filters would likely take the form of a connectorized pigtail that would be placed between the MPM and the aircrafts wiring harness, other form factors could be discussed as well.

Answer: This is an acceptable approach to meet specified requirements.

2. Question: Table 3.7.4 Acceptance Test Requirements refers to paragraphs 3.6.3.1, 3.6.3.2.1, and

3.6.3.2.2. These paragraphs do not exist in specification 1611AS12205 Rev. A. Please state what this table actually is meant to refer to? A reproduction of the table is below.

Answer: Updated Table is uploaded and attached.

CLAUSES INCORPORATED BY FULL TEXT

FOR YOUR INFORMATION:

The following addresses and points of contact are provided:

Name:Beth Steude (Contract Specialist)
Phone:(760) 793-4158

Email address: beth.steude@navy.mil

U.S. Postal Service Mailing Address:

COMMANDER
CODE 254430D (B. Steude – 760-793-4158)
NAVAIRWARCENWPNDIV
1 Administration Circle, MAIL STOP 1303
CHINA LAKE, CA 93555-6108

Direct Delivery Address (UPS, FedEx, etc.):

COMMANDER
CODE 254430D (B.Steude)
NAVAIRWARCENWPNDIV
BLDG 02334, MAIL STOP 1303
CHINA LAKE, CA 93555-6108
Name:Chris Bigelow (Contracting Officer)
Phone:(760) 939- 2530
DSN:437- 2530

Email address: christopher.bigelow@navy.mil

U.S. Postal Service Mailing Address:

COMMANDER
CODE 254430D (C. BIGELOW – 760-939-2530)
NAVAIRWARCENWPNDIV
1 Administration Circle, MAIL STOP 1303
CHINA LAKE, CA 93555-6108

Direct Delivery Address (UPS, FedEx, etc.):

COMMANDER
CODE 254430D (C. BIGELOW)
NAVAIRWARCENWPNDIV
BLDG 02334, MAIL STOP 1303
CHINA LAKE, CA 93555-6108

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

First Article Unit and Test Report

FFP

The contractor shall provide Millimeter Wave Power Module (MMPM) First Article unit and test report in accordance with paragraphs 2.0 and 3.1 of the SOW.

FFP

FOB: Destination

PURCHASE REQUEST NUMBER: 1300765189

PSC CD: 5996

MAX

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
125
Each

MMPM Production Units

The contractor shall provide MMPM production units and test reports in accordance with paragraphs 2.0 and 3.2 of the SOW.

Production Units Subject to Indefinite Quantity Clause Step Ladder Pricing

Production Year 1 (27 Sep 2020 - 26 Sep 2021) QTY UNIT Price

1 EA $

2-4 EA $

5 or more EA $

Production Year 2 (27 Sep 2021 26 Sep 2022) QTY UNIT Price

1 EA $

2-4 EA $

5 or more EA $

Production Year 3 (27 Sep 2022 - 26 Sep 2023) QTY UNIT Price

1 EA $

2-4 EA $

5 or more EA $

Production Year 4 (27 Sep 2023 - 26 Sep 2024) QTY UNIT Price

1 EA $

2-4 EA $

5 or more EA $

Production Year 5 (27 Sep 2024 - 26 Sep 2025) QTY UNIT Price

1 EA $

2-4 EA $

5 or more EA $

** Dates subject to change based on contract award date.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
250
Each

Teardown and Evaluations

The contractor shall provide for the teardown and evaluation of units in accordance with paragraphs 2.0 and 3.3.of the SOW.

Units subject to Indefinite Quantity Clause. The unit price listed in Section B shall not be utilized for orders. The CLIN unit price in Section B is based on the average price for a quantity of 1 EA for the ordering period.

Step Ladder Pricing

Production Year 1 (27 Sep 2020 - 26 Sep 2021) QTY UNIT Price

1+ EA $

Production Year 2 (27 Sep 2021 26 Sep 2022)

Production Year 3 (27 Sep 2022 - 26 Sep 2023)

Production Year 4 (27 Sep 2023 - 26 Sep 2024)

1+ EA $

Production Year 5 (27 Sep 2024 - 26 Sep 2025) QTY UNIT Price

** Dates subject to change based on contract award date.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
250
Each

Repairs

The contractor shall provide repair services in accordance with paragraphs 2.0 and 3.4 of the SOW.

Units subject to Indefinite Quantity Clause. The unit price listed in Section B shall not be utilized for orders. The price of repairs will be negotiated at the time of award of an order under this CLIN.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
250
Each

Hardware Modifications

The contractor shall provide modifications in accordance with paragraphs 2.0 and 3.5 of the SOW.

Units subject to Indefinite Quantity Clause. The unit price listed in Section B shall not be utilized for orders. The price of modifications will be negotiated at the time of award of an order under this CLIN.

MAX

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

CDRLs

The contractor shall provide data in accordance with Exhibit A - DD Form 1423 CDRLs

ESTIMATED

Section C - Descriptions and Specifications

STATEMENT OF WORK

PERFORMANCE BASED

STATEMENT OF WORK

For Millimeter Wave Power Modules

CLIN 0001 - The contractor shall provide Millimeter Wave Power Module (MMPM) First Article unit and test report in accordance with paragraphs 2.0 and 3.1 below and Contract Data Requirements List (CDRL) A005 and A006.

CLIN 0002 – The contractor shall provide MMPM production units and test reports in accordance with paragraphs 2.0 and 3.2 below and CDRL A005 and A007.

CLIN 0003 – The contractor shall provide for the teardown and evaluation of units in accordance with paragraphs 2.0 and 3.3.

CLIN 0004 – The contractor shall provide repair services in accordance with paragraphs 2.0 and 3.4.

CLIN 0005 - The contractor shall provide modification services in accordance with paragraphs 2.0 and 3.5.

CLIN 0006 – The contractor shall provide data in accordance with paragraphs 3.1.2, 3.1.3, 3.1.4, 3.2.2, 3.2.3, 3.2.4, 3.3.2, 3.4.6, 3.4.7, 3.5.2.2, 3.5.2.3, 3.5.3, 5.0 below, Exhibit A, DD Form 1423, and CDRLs.

1.0 SCOPE

The contractor shall fabricate test and deliver the MMPM as required in individual orders, the contractor shall perform teardown and evaluations, repairs and modification services to modify or develop variants of the MMPM to meet new threats.

2.0 APPLICABLE DOCUMENTS

2.1 Specifications:

1611AS12205 Millimeter Wave Power Module

2.2 NAVAIR Drawing

1611AS12205 Millimeter Wave Power Module

2.3 Quality Assurance:

ANSI/ISO/ASQ Q9000 Series Quality Management Systems Requirements Standard OR Equivalent Quality System Model with Government approval (per Paragraph 4.0)

3.0 REQUIREMENTS

The contractor shall manufacture, test and deliver the MMPM in accordance with the specifications and drawings specified in paragraph 2.0.

3.1 First Article (CLINs 0001):

3.1.1 The contractor shall provide one MMPM as specified in individual delivery orders. The MMPM shall meet the requirements of paragraph 2.0.

3.1.2 Monthly Progress: The contractor shall provide Monthly Progress Reports in accordance with Exhibit A. The report shall include the following items: technical progress, scheduling, issues and status of billings and funds received against the contract including both progress and final acceptance payments (CDRL A001).

3.1.3 First Article Testing. The contractor shall provide First Article Test Procedures and obtain Government concurrence. The contractor shall test the First Article unit and document results (CDRLs A005 and A006).

3.1.4 First Article Inspection. CLIN 0001is for the First Article unit (hereinafter referred to as First Article). First Article tests shall be conducted on this item representative of the production units to be supplied under the contract. First article test report shall be delivered in accordance with CDRL A006, and shall be the property of the Government. The first article unit shall be delivered to the Government, in accordance with the specification and drawing referenced in paragraph 2.0, for testing purposes but shall not be considered as part of the production units. Upon successful completion of testing, the Government will accept the First Article unit.

3.1.5 Waiver of First Article Requirement. The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver from the Government but the decision to grant a waiver will rest solely with the Government. The technical point of contact (TPOC) for the Government shall review the waiver request and approve/disapprove as necessary.

3.2 MMPM Production Units (CLIN 0002):

3.2.1 The contractor shall provide the quantities as specified in individual delivery orders. The MMPM shall meet the requirements referenced in paragraph 2.0.

3.2.2 Monthly Progress: The contractor shall report monthly on the following items: technical progress, production scheduling, issues and status of billings and funds received against the contract including final acceptance payment. (CDRL A001)

3.2.3 Configuration Management/Data Management: The contractor shall document any proposed Engineering Change Proposal, engineering fabrication upgrades and Request for Variance, and receive Government approval prior to commencing work. (CDRLs A002, A003 and A004)

3.2.4 Production Testing: The contractor shall document proposed Production Test Procedures and obtain Government approval. The contractor shall test all production units and document test results. All production units shall pass acceptance test procedures and be compliant with the specifications provided in paragraph 2.0. (CDRLs A005 and A007).

3.3 Teardown and Evaluation (CLIN 0003):

3.3.1 The Government will ship units owned by the Government in need of repair to the contractor for disassembly and evaluation. The evaluation and subsequent repair proposal shall be due within 30 days of receipt of the hardware.

3.3.1.1 After disassembly, the contractor shall provide the Government with a repair proposal in accordance with 5252.216-9534 task order procedures, as well as a list of all material required and whether the material is new, used, refurbished or if it is Government Furnished Equipment. The Government will review the proposal for acceptability and enter into discussion with the contractor, if necessary. Upon completion of this process, the Government may issue a fixed price delivery order under CLIN 0004 to cover the repairs. Once the contractor receives the executed order, the contractor shall complete the effort within the negotiated schedule.

3.3.1.2 If the government determines that the unit is beyond economical repair, the contractor shall return the unit in a disassembled state to the Government for disposition or, if directed, keep the unit to facilitate the repair of other units. If the Government directs the contractor to keep a unit to facilitate repair, the contractor shall be required to track the equipment as GFE/GFM. Upon completion of the contract the contractor shall return all GFE/GFM to the Government.

3.3.2 The contractor shall include status of the teardown and evaluation efforts in the monthly progress report. (CDRL A001)

3.4 Repair Services (CLIN 0004):

3.4.1 The contractor shall furnish all parts, components, materials, documentation and necessary technical services for the repair of the MMPM that are owned by the Government.

3.4.2 Repairs shall not include any research and development efforts, nor will it include any parts, components, subassemblies or materials which are not an integral part of the original units.

3.4.3 The Government will issue a fixed price delivery order, under CLIN 0004, to cover the repairs after negotiating proposals received as required under paragraph 3.3.1.1.

3.4.4 The contractor shall provide repair services and replacement parts for existing equipment, to return non-operational equipment to its original performance specifications.

3.4.5 The contractor shall ensure that the repaired unit meets the specification, technical requirements document, and/or drawing specified in the applicable delivery order.

3.4.6The repaired unit shall be tested in accordance with the acceptance test procedures as specified in the applicable delivery order and the results documented. All repaired units shall pass acceptance test procedures and be compliant with the specifications provided in paragraph 2.0. (CDRL A007)
3.4.7The contractor shall include the repair effort in the monthly progress report. (CDRL A001)

3.5 Modification Services (CLIN 0005):

3.5.1 The contractor shall furnish all material, parts, components and modification services necessary to modify and/or develop variants of the MMPM to address new and emerging threats.

3.5.2 On receipt of a new requirement, the Government will provide the contractor with a PBSOW, revised performance specification and/or drawing (if applicable). The PBSOW will specify if existing GFE/GFM is to be modified or if a unit currently in production is to be modified and whether the modified unit will be considered a prototype or First Article unit.

3.5.2.1 Upon receipt of the PBSOW and revised performance specification and/or drawing, the contractor shall provide a short technical narrative as to how the new performance requirement will be incorporated into the existing design together with a cost and schedule proposal in accordance with 5252.216-9534 order procedures for the subject effort. The Government will review the proposal for acceptability and enter into discussions with the contractor, if necessary. Upon completion of this process, the Government may issue a Firm Fixed Price task order under CLIN 0005 to cover the work. Once the contractor receives the executed order, the contractor shall complete the effort within the negotiated schedule.

3.5.2.2 The Government-provided PBSOW, revised performance specification and/or drawing (if applicable) will describe the required level of testing. If applicable, the contractor shall revise existing test procedures or generate new procedures to meet the requirements of the PBSOW, which will be submitted for Government approval. (CDRL A005)

3.5.2.3 The contractor shall test and document the modified units to verify conformance with the PBSOW and revised performance specification or drawing. All modified units shall pass acceptance test procedures and be compliant with the specifications in paragraph 2.0. (CDRL A007)

3.5.3 The contractor shall include the modification effort in the monthly progress report. (CDRL A001)

4.0 QUALITY ASSURANCE

4.1 The contractor’s quality assurance (QA) program shall meet the requirements of ANSI/ISO/ASQ(E) Q9001-2015 OR EQUIVALENT QUALITY SYSTEM MODEL WITH PRIOR Government approval. The QA program shall address material and parts selection, process control, workmanship, inspection and configuration management.

5.0CONTRACT DATA REQUIREMENTS LIST
CDRL Number
Title
A001
Program Progress Report
A002
Engineering Change Proposal
A003
Notice of Revision
A004
Request for Variance
A005
First Article/Production Test Procedures
A006
First Article Test/Inspection Report
A007
Test/Inspection Report

Production Test Data

6.0 SECURITY:

6.1 The contractor will only be required to access controlled unclassified information/limited distribution information is support of this contract. The contractor shall implement and maintain security procedures and controls to prevent unauthorized disclosure of controlled unclassified information and to control distribution of controlled unclassified information in accordance with DoD 5200.01 DoD Information Security Program and SECNAV M-5510.36. Department of The Navy Information Security Program. All Contract facilities shall provide an appropriate means of storage for controlled unclassified information and materials. All controlled unclassified information shall be appropriately identified and marked as For Official Use Only in accordance with DoDM 5200.01 (Information Security Program Manual) and DoD 5400.7-R (Freedom of Information Act Regulation) (Chapter 3).

For Official Use Only information generated and/or provided under this contract shall be marked and safeguarded as specified in DoD 5200.1, Information Security Program Manual (Volume 4) available at http://www.dtic.mil/whs/directives/corres/pdf/520001_vol4.pdf and DoD 5400.7-R Freedom of Information Program Chapter 3 (pages 31-42) available at http://www.dtic.mil/whs/directives/corres/pdf/540007r.pdf.

All controlled unclassified technical information shall be appropriately identified and marked with Distribution Statement “D.”:

Contractor may be required access to The Naval Air Warfare Center, Weapons Division (NAWCWD) Point Mugu, CA site and shall be escorted at all times by ATSO civilian members of NAWCWD. The movement of visitors shall be restricted to protect classified and sensitive information and to ensure visitors have access only to information they are authorized to receive. Escorts must be authorized access to the area the visitor(s) will be visiting and will be knowledgeable of the safety and security procedures for the area(s) visited. Contractor employees shall comply with host installation’s Physical Security Plan for detailed guidance concerning visit control procedures.

Contractor personnel visiting a federal installation shall report to the Command Security Manager any adverse information or circumstances they are aware pose a threat to the security of DoD personnel, contractor personnel, or resources.

Public Release: Any controlled unclassified information pertaining to this contract shall not be released for public dissemination, including posting to any social media sites such as Facebook or Twitter, unless it has been approved for public release by appropriate U.S. Government authority. Proposed public releases shall be submitted for approval prior to release through Commander, Code 4L0000D, Naval Air Warfare Center Weapons Division, 1 Administration Circle, STOP 6305, China Lake, California 9355-56100.

Operations Security (OPSEC): All work shall be performed in accordance with Department of Defense (DoD) and Department of Navy (DoN) OPSEC requirements per the National Security Decision Directive 298.D0DD 5205.02E, DoD OPSEC Program, DoD 5205.02M, DoD OPSEC Program Manual OPNAVINST 3432.1A DoN Operations Security, and NAWCWD 5500.1 Command Security Program Regulation.

In the case of an unclassified contract that requires no access to Classified Military Information (CMI), but that does require access to Controlled Unclassified Information (CUI), NAWCWD Restricted Areas, and/or Government IT systems, contractors are required to comply with non-NISP processing requirements before local access to CUI, Restricted Areas, and IT can be granted. This process shall be coordinated by the Contracting Officer’s Representative (COR) or Technical Point of Contact (TPOC) through the NAWCWD Industrial Security office.

Section D - Packaging and Marking

5252.247-9507PACKAGING AND MARKING OF REPORTS (NAVAIR)(OCT 2005)
(a) All unclassified data shall be prepared for shipment in accordance with best commercial practice. Classified reports, data and documentation, if any, shall be prepared for shipment in accordance with the National Industry Security Program Operating Manual, DoD 5220.22-M.
(b) The contractor shall prominently display on the cover of each report the following information:
(1) Name and business address of contractor.
(2) Contract Number/Delivery/Task order number.
(3) Contract/Delivery/Task order dollar amount.
(4) Whether the contract was competitively or non-competitively awarded.
(5) Name of sponsoring individual.
(6) Name and address of requiring activity.

5252.247-9508 PROHIBITION AND LIMITATIONS FOR PACKAGING MATERIALS

(NAVAIR) (FEB 2020)

For additional information regarding appropriate content to be included in Section D, Packaging and Marking, of your contract, coordinate with your requirements office and/or either of the following subject matter experts on the topic of Packaging, Handling, Storage, and Transportation (PHS&T):

Frank MagnificoMary Ellen Spina
frank.magnifico@navy.milmaryellen.spina@navy.mil
732-323-7856732-323-2631
5252.247-9514TECHNICAL DATA PACKING INSTRUCTIONS (NAVAIR)(SEP 1999)
Technical Data and Information shall be packed and packaged for domestic shipment in accordance with best commercial practices. The package or envelope should be clearly marked with any special markings specified in this contract (or delivery/task order), e.g., Contract Number, CLIN, Device No., and document title must be on the outside of the package. Classified reports, data and documentation, if applicable, shall be prepared for shipment in accordance with Defense Industrial Manual for Safeguarding Classified Information, DoD 5220.22M.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Destination
Government
Destination
Government
0002
Destination
Government
Destination
Government
0003
Destination
Government
Destination
Government
0004
Destination
Government
Destination
Government
0005
Destination
Government
Destination
Government
0006
N/A
N/A
N/A
N/A

CLAUSES INCORPORATED BY REFERENCE

52.246-2
Inspection Of Supplies--Fixed Price
AUG 1996
52.246-4
Inspection Of Services--Fixed Price
AUG 1996
52.246-16
Responsibility For Supplies
APR 1984
52.246-11HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(a) The Contractor shall comply with the higher-level quality standard selected below.
[ ]ANSI/ISO/ASQ Q9000 Series
[ ]Equivalent Quality System Model (Subject to Government Approval )
5252.246-9512INSPECTION AND ACCEPTANCE (NAVAIR)(OCT 2005)
(a) Inspection and acceptance of the supplies or services to be furnished hereunder shall be performed by Airborne Threat Simulation Organization (ATSO), Code EB46100.
(b) Acceptance of all Contract Line Items/Sub Line Items (CLINs/SLINs) shall be made by signature of the accepting authority on a DD 250 submitted through the WAWF system. Acceptance will only occur when the accepting authority is sure that inspections performed demonstrate compliance with contract requirements.
5252.246-9517CONSTRUCTIVE ACCEPTANCE PERIOD (NAVAIR) (MAR 1999)
For the purpose of FAR Clause 52.232-25, "Prompt Payment", paragraph (a)(5)(i), Government acceptance shall be deemed to have occurred constructively on the 30th day after the contractor delivered the supplies or performed the services.

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE
0001
POP 27-SEP-2020 TO

26-SEP-2025

N/A
NAVAL BASE VENTURA COUNTY

RECEIVING OFFICER

C0DE N41VW/BLDG 65

625 LAGUNA ROAD

POINT MUGU CA 93042-5033

(805) 989-8107

N63126

0002
POP 27-SEP-2020 TO

26-SEP-2025

N/A
(SAME AS PREVIOUS LOCATION)

N63126

0003
POP 27-SEP-2020 TO

26-SEP-2025

N/A
(SAME AS PREVIOUS LOCATION)

N63126

0004
POP 27-SEP-2020 TO

26-SEP-2025

N/A
(SAME AS PREVIOUS LOCATION)

N63126

0005
POP 27-SEP-2020 TO

26-SEP-2025

N/A
(SAME AS PREVIOUS LOCATION)

N63126

0006
N/A
N/A
N/A
N/A
52.242-15
Stop-Work Order
AUG 1989
52.242-17
Government Delay Of Work
APR 1984
52.247-34
F.O.B. Destination
NOV 1991
52.247-55
F.O.B. Point For Delivery Of Government-Furnished Property
JUN 2003

52.211-8 Time of Delivery

(a) The Government requires delivery to be made according to the following schedule at a minimum:

REQUIRED DELIVERY SCHEDULE

CLIN
Within Days after Date of Contract or Date of Order, as applicable
0001
Deliver first article unit 15 days after Government acceptance of first article test report (CDRL A006).
0002
Deliver at a minimum rate of 3 units each per month per CLIN (unless the order is less than 3 units) to commence within 300 days after issuance of delivery order, or upon completion of prior delivery order.
0003, 0004 & 0005
As specified in the order
0006
Deliver in accordance with the schedules and destinations as specified in the Contract Data Requirements List, DD Form 1423, “Exhibit A”.

* In the event that 2 or more delivery orders are issued for CLINs 0001-0005 and the delivery schedules overlap, the deliveries shall commence 30 days after the last delivery on the previous order.

CLINS 0003-0005 period of performance will be specified in individual delivery orders.

CLIN 0006 as specified in the Contract Data Requirements List, DD Form 1423, “Exhibit A”.

Contractors are authorized to exceed the delivery rate, or to complete performance of this contract prior to the time set forth in the schedule provided, however, nothing contained herein shall obligate the Government to perform any of its obligations to the contractor at an earlier date than is set forth in this contract in order to assist the contractor to make deliveries on an accelerated basis. In addition, nothing contained herein shall result in an increase in the scheduled prices.

The Government reserves the right to prioritize individual delivery orders. Deliveries of all orders for production units shall be serial in nature by award date unless the Government executes this right.

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required deliver period specified above will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFEROR’S PROPOSED DELIVERY SCHEDULE

ITEM NO.QUANTITYWITHIN DAYS AFTER DATE
OF RECEIPT OF A WRITTTEN
NOTICE OF AWARD
5252.216-9506MINIMUM AND MAXIMUM QUANTITIES (NAVAIR)(MAR 1999)
As referred to in paragraph (b) of FAR 52.216-22 " Indefinite Quantity" of this contract, the contract minimum quantity is 1 unit and the maximum quantity is 876 units.
5252.247-9505TECHNICAL DATA AND INFORMATION (NAVAIR)(FEB 1995)
Technical Data and Information shall be delivered in accordance with the requirements of the Contract Data Requirements List, DD Form 1423, Exhibit [A], attached hereto, and the following:
(a) The contractor shall concurrently deliver technical data and information per DD Form 1423, Blocks 12 and 13 (date of first/subsequent submission) to all activities listed in Block 14 of the DD Form 1423 (distribution and addresses) for each item. Complete addresses for the abbreviations in Block 14 are shown in paragraph (g) below. Additionally, the technical data shall be delivered to the following cognizant codes, who are listed in Block 6 of the DD Form 1423.
(1) PCO, Code [TBD]
(2) ACO, Code [TBD]
(b) Partial delivery of data is not acceptable unless specifically authorized on the DD Form 1423, or unless approved in writing by the PCO.
(c) The Government review period provided on the DD Form 1423 for each item commences upon receipt of all required data by the technical activity designated in Block 6.
(d) A copy of all other correspondence addressed to the Contracting Officer relating to data item requirements (i.e., status of delivery) shall also be provided to the codes reflected above and the technical activity responsible for the data item per Block 6, if not one of the activities listed above.
(e) The PCO reserves the right to issue unilateral modifications to change the destination codes and addresses for all technical data and information at no additional cost to the Government.
(f) Unless otherwise specified in writing, rejected data items shall be resubmitted within thirty (30) days after receipt of notice of rejection.
(g) DD Form 1423, Block 14 Mailing Addresses: [TBD]
F-TXT-ATSSHIPPING INSTRUCTIONS (MAR 2016)
SHIP TO:NAVAL BASE VENTURA COUNTY (NBVC)
Receiving Officer, Bldg 65
N68936-XX-X-XXXX*
625 Laguna Road
Point Mugu, CA 93042-5033
805-989-8107

Failure to mark each shipping label and packing list as indicated above may result in return of shipment at your expense, or will cause a delay in processing your invoice for payment.

DOCK HOURS are from 0800 TO 1530, MONDAY THROUGH THURSDAY EXCLUDING HOLIDAYS WHEN THE RECEIVING DOCK WILL BE CLOSED.

*To be filled in at time of award.

Additionally, the contractor shall mark all shipments under this contract in accordance with the following:

1. Nomenclature
2. Quantity
3. Government Contract Number:
4. Delivery Order Number:
5. Serial Number:
6. From: (Contractor's name and address)
7. To:Receiving Officer
Naval Air Station
Point Mugu, CA 93042-5049
M/F: ATS Receiving Desk, Code EB4610, Bldg, 351, Room 1210
805-989-0883
8. Attn: Jo-Ellen Poston, 805-989-3553

Section G - Contract Administration Data

252.232-7006WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions, as used in this clause--
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
_______________TBD____________________________________________________________
(Contracting Officer: Insert applicable document type(s). Note: If a "Combo" document type is identified but not supportable by the Contractor's business systems, an "Invoice" (stand-alone) and "Receiving Report" (stand-alone) document type may be used instead.)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
_______________TBD____________________________________________________________
(Contracting Officer: Insert inspection and acceptance locations or "Not applicable.")
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC:TBD
Issue By DoDAAC:N68936
Admin DoDAAC:TBD
Inspect By DoDAAC:N68936
Ship To Code:N69232
Ship From Code:TBD
Mark For Code:N68936
Service Approver (DoDAAC):N68936
Service Acceptor (DoDAAC):N68936
Accept at Other DoDAAC:N/A
LPO DoDAAC:N/A
DCAA Auditor DoDAAC:N/A
Other DoDAAC(s):N/A
(*Contracting Officer: Insert applicable DoDAAC information or "See schedule" if multiple ship to/acceptance locations apply, or "Not applicable.")
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the "Send Additional Email Notifications" field of WAWF once a document is submitted in the system.

_________joellen.posten@navy.mil______________________________________________________ (Contracting Officer: Insert applicable email addresses or "Not applicable.")

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact. For Navy WAWF questions call DFAS Customer Care 1-800-756-4571 option 6
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
5252.201-9500TECHNICAL POINT OF CONTACT (TPOC)(NAVAIR)(SEP 2012)
(a) The Technical Point of Contact (TPOC) for this contract is Don Fitch, don.fitch@navy.mil,(b) This individual is not a Contracting Officer nor a Contracting Officer's Representative (COR)/Task Order COR (TOCOR) and has no authority to make changes, verbally or otherwise, to the existing contract or order. Further, no authority has been delegated to this individual by the Procuring Contracting Officer (PCO).
(c) The contractor may use this technical POC for technical questions related to the existing contract or order. Also, as a representative of the requiring activity, the TPOC may perform or assist in such areas as: base access forms, security related issues, IT access requirements, Contractor Performance Assessment Reporting System (CPARS), clarification of technical requirements, and statement of work inquires.
(d) The contractor shall immediately notify the Procuring Contracting Officer in writing if the contractor interprets any action by the TPOC to be a change to the existing contract.
5252.204-9503EXPEDITING CONTRACT CLOSEOUT (NAVAIR) (JAN 2007)
(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party might be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
5252.242-9511CONTRACT ADMINISTRATION DATA (NAVAIR)(NOV 2017)
(a) Contract Administration Office.
(1) Contract administration functions (see FAR 42.302(a) and DFARS 242.302(a)) are assigned to: See the ADMINISTERED BY Block on the face page of the contract, modification, or order.
(b) Special Instructions (see FAR 42.202(b) and (c)):
(1) The following contract administration functions are retained (see FAR 42.302(a) and DFARS 242.302(a)):
Functions Retained
Retained for Performance By:
FAR 42.302(a) (3), (4), (30), (51), (58), (59), (62)
PCO
FAR 42.302(a) (38), (44), (45), (46), (47), (48)
TPOC
(2) The following additional contract administration functions are assigned (see FAR 42.302(b)):
Additional Functions
Retained for Performance By:
FAR 42.302(b)(1), (3), (4), (5), (6), (9), (10)
See the ADMINISTERED BY Block on the face page of the contract, modification or order.

(c) Inquiries regarding payment should be referred to: MyInvoice through the Wide Area Workflow eBusiness Suite: https://wawf.eb.mil.

G-TXT-0001 PAYMENT INSTRUCTIONS (FEB 2018)

Note: Payment Clause 52.232-1 applies to this contract.

FOR GOVERNMENT USE ONLY

Contract/Order Payment Clause
Type of Payment Request
Supply
Service
Construction
Payment Office

Allocation Method

52.212-4 (Alt I), Contract Terms and Conditions—Commercial Items 52.216-7, Allowable Cost and Payment 52.232-7, Payments under Time-and-Materials and Labor-Hour Contracts

Cost Voucher
X
X
N/A
Line item specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN on the deliverable line or deliverable subline item for which payment is requested.
52.232-1, Payments
Navy Shipbuilding Invoice (Fixed Price)
X
N/A
N/A
Line Item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.

52.232-1, Payments;

52.232-2, Payments under Fixed-Price Research and Development Contracts;

52.232-3, Payments under Personal Services Contracts;

52.232-4, Payments under Transportation Contracts and Transportation-Related Services Contracts; and 52.232-6, Payments under Communication Service Contracts with Common Carriers

Invoice
X
X
N/A
Line Item Specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN on the deliverable line or deliverable subline item for which payment is requested.
52.232-5, Payments Under Fixed-Price Construction Contracts
Construction Payment Invoice
N/A
N/A
X
Line Item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.
52.232-16, Progress Payments
Progress Payment*
X
X
N/A
Contract-wide proration. Funds shall be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN. Progress Payments are considered contract level financing, and the “contract price” shall reflect the fixed price portion of the contract per FAR 32.501-3.

52.232-29, Terms for Financing of Purchases of Commercial Items;

52.232-30, Installment Payments for Commercial Items

Commercial Item Financing*
X
X
N/A
Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2) and 32.1007(b)(2).
52.232-32, Performance-Based Payments
Performance-Based Payments*
X
X
N/A
Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2) and 32.1007(b)(2).
252.232-7002, Progress Payments for Foreign Military Sales Acquisitions
Progress Payment*
X
X
N/A
Allocate costs among line items and countries in a manner acceptable to the Administrative Contracting Officer.

*Liquidation of Financing Payments. Liquidation will be applied by the payment office against those ACRNs which are identified by the payment instructions for the delivery payment and in keeping with the liquidation provision of the applicable contract financing clause (i.e., progress payment, performance-based payment, or commercial item financing).

Section H - Special Contract Requirements

5252.211-9502GOVERNMENT INSTALLATION WORK SCHEDULE (NAVAIR)(DEC 2014)
(a) The Holidays applicable to this contract are: New Year's Day, Martin Luther King's Birthday, Presidents' Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, and Christmas Day.
(b) In the event that any of the above holidays occur on a Saturday or Sunday, or alternate Friday, then such holiday shall be observed as they are by the assigned Government employees at the using activity.
(c) The Naval Air Warfare Center Weapons Division works a 4/5/9 work schedule. Therefore alternate Fridays are not a part of the normal workweek for work performed on-site at a Naval Air Warfare Center Weapons Division site. The majority of the Government offices are closed on alternate Fridays.
(d) No deviation in the normal workweek will be permitted without express advance approval by the designated Contracting Officer with coordination of the using departments.
5252.211- 9510CONTRACTOR EMPLOYEES (NAVAIR)(MAY 2011)
(a) In all situations where contractor personnel status is not obvious, all contractor personnel are required to identify themselves to avoid creating an impression to the public, agency officials, or Congress that such contractor personnel are Government officials. This can occur during meeting attendance, through written (letter or email) correspondence or verbal discussions (in person or telephonic), when making presentations, or in other situations where their contractor status is not obvious to third parties. This list is not exhaustive. Therefore, the contractor employee(s) shall:
(1) Not by word or deed give the impression or appearance of being a Government employee;
(2) Wear appropriate badges visible above the waist that identify them as contractor employees when in Government spaces, at a Government-sponsored event, or an event outside normal work spaces in support of the contract/order;
(3) Clearly identify themselves as contractor employees in telephone conversations and in all formal and informal written and electronic correspondence. Identification shall include the name of the company for whom they work;
(4) Identify themselves by name, their company name, if they are a subcontractor the name of the prime contractor their company is supporting, as well as the Government office they are supporting when participating in meetings, conferences, and other interactions in which all parties are not in daily contact with the individual contractor employee; and
(5) Be able to provide, when asked, the full number of the contract/order under which they are performing, and the name of the Contracting Officer’s Representative.
(b) If wearing a badge is a risk to safety and/or security, then an alternative means of identification maybe utilized if endorsed by the Contracting Officer’s Representative and approved by the Contracting Officer.
(c) The Contracting Officer will make final determination of compliance with regulations with regard to proper identification of contractor employees.
5252.216-9512PAPERLESS CONTRACTING (NAVAIR)(JUN 2009)
(a) Orders and requests for proposals are hereby authorized to be issued by facsimile or by electronic commerce (including e-mail and paperless methods of delivery). Nothing in this contract should be read to prohibit these types of orders. In the event of a conflict with any other provision of this contract, this clause shall govern.
(b) To the extent the terms "written", "mailed", or "physically delivered" appear in other provisions of this contract, these terms are hereby defined to explicitly include electronic commerce, email, or paperless delivery methods.
5252.243-9505ENGINEERING CHANGES (NAVAIR)(OCT 2005)
(a) After contract award, the Contracting Officer may solicit, and the contractor is encouraged to propose independently, engineering changes to the equipment, software specifications or other requirements of this contract. These changes may be proposed for reasons of economy, improved performance, or to resolve increased data processing requirements. If the proposed changes are acceptable to both parties, the contractor shall submit a price change proposal to the Government for evaluation. Those proposed engineering changes that are acceptable to the Government will be processed as modifications to the contract.
(b) This applies only to those proposed changes identified by the contractor, as a proposal submitted pursuant to the provisions of this clause. As a minimum, the following information shall be submitted by the contractor with each proposal:
(1) A description of the difference between the existing contract requirement and the proposed change, and the comparative advantages and disadvantages of each.
(2) Itemized requirements of the contract that must be changed if the proposal is adopted, and the proposed revision to the contract for each such change.
(3) An estimate of the changes in performance costs, if any, that will result from adoption of the proposal.
(4) An evaluation of the effects the proposed change would have on collateral costs to the Government such as Government-furnished property costs, costs of related items, and costs of maintenance and operation.
(5) A statement of the time by which the change order adopting the proposal must be issued so as to obtain the maximum benefits of the changes during the remainder of this contract. Also, any effect on the contract completion time or delivery schedule shall be identified.