Spec_Sheet_.doc
DOC document 27 KB Posted
- Solicitation number
- N6893618R0011
About this file
Spec Sheet
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 18R0011_RFQ-RFP_Solicitation_Amendment_4.doc | DOC document | |
| Add_Q&A.docx | DOCX document | |
| Revised_SOW.doc | DOC document | |
| 18-R-0011_Solicitation.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAWCWD Telecommunications Danville Project Specification
Require telephone carrier systems to support 2 new buildings to integrate into existing Nortel MSL-100. Each building requires: 56 Single-lines, 3 Multi-lines, 8 ISDN, and 1 MCU, redundant power supplies, common logic cards, optical transport cards, inter-shelf OC-3 cards, system rectifier, top-of-rack DC fuse panel, and an 8 hour uninterruptable power supplies within each building. The new system will be connected by OC-12C fiber.
The remote sites require 19x84 inch 2-post relay racks anchored with proper grounding with stand-offs for cable management and connected to the wall with 4 foot ladder rack; the Central Office (CO) has existing 23” equipment rack.
Main distribution frame (MDF) wire blocks are required to connect the 25-pair cables for Main-site Central Office (CO). The Remote sites require 110 wire blocks to connect the 25-pair cables between the systems RST equipment.
Require compatible fiber patch cables with Slit Wall Corrugated Orange Loom Tubing between the system equipment and the outside plant (OSP) fiber optic patch panel (FOPP).
Must be current business Partner with solution. Contract shall provide proof of current business Partner with solution with his/her RFP response.
File details come from the government source that posted it.