Revised_SOW.doc

DOC document 41 KB Posted

Attached to
China Lake Telecommunication Expansion for Danville
Solicitation number
N6893618R0011
Issued by

About this file

Revised SOW

View the file

Other files

File Type Posted
18R0011_RFQ-RFP_Solicitation_Amendment_4.doc DOC document
Add_Q&A.docx DOCX document
Spec_Sheet_.doc DOC document
18-R-0011_Solicitation.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

China Lake Telecommunication Expansion for Danville

01 November 2017

Revised 26 December 2017

1.0 SCOPE

The Statement of Work defines the requirements for the contractor to provide equipment, installation, integration, and training for the expansion of the China Lake Telecommunication system. The solution must be compatible with the existing NORTEL MSL-100 telephone switch. The expansion shall provide service for 2 new buildings which requires Single-line telephones, Multi-line telephones, Integrated Services Digital Network, and Digital Subscriber Line connectivity at Naval Air Weapons Center, Weapons Division (NAWCWD) China Lake, CA.

2.0 APPLICABLE DOCUMENTS

Document
Date
Title
Danville Telecommunications Specifications
17 OCT 2017
NAWCWD Telecommunications Danville Project- Specification

3.0 REQUIREMENTS

3.1 EQUIPMENT REQUIREMENTS

3.1.1 The contractor shall furnish a complete telecommunications system. The telecommunications system shall meet the specifications listed in Section 2.0.

3.2 SYSTEM INSTALLATION/INTEGRATION REQUIREMENTS

3.2.1 The contractor shall provide written details describing how they will provide integrated solution with the new telecommunication hardware.

3.2.2 The contractor shall engineer, furnish, install, test, and commission this new solution.

3.2.2.1 The contractor shall use certified engineers and technicians.

3.2.2.2 Installation shall include hardware, software, racks, power supplies, cabling, cable management, mounting hardware, wiring, terminal blocks, conduit, connectors, and miscellaneous mounting hardware.

3.2.2.3 The contractor shall properly ground all equipment and framing using green cloth #6 ground wire or according to manufacture specifications.

3.2.2.4 The contractor shall stitch all power and communications cabling to existing relay and ladder racks.

3.2.2.5 The contractor shall connect the remote building carrier systems/remote subscriber terminal in a redundant East/West fiber configuration back to the Main Site Host Central Office carrier system/local exchange terminal.

3.2.2.6 The contractor shall ensure that optical switching between the working OC-12c and the protest OC-12c occurs in milliseconds with no loss of calls our disruption to service.

3.2.2.7 The contractor shall install fiber patch cables in a slit corrugated orange loom tubing between the new system equipment and the outside plant fiber optic patch panel.

3.3 TRAINING

3.3.1 The contractor shall provide 2 days on-site training for up to 8 people at China Lake.

3.3.1.1 The course shall be an instructor-led course.

3.3.1.2 The course shall provide the knowledge and skills needed to perform basic installation, provisioning, and maintenance tasks of the new telecommunications system.

3.3.1.3 The contractor shall conduct training within 60 days of system installation.

4.0 TRAVEL

4.1 The contractor shall travel to China Lake, CA to support the installation and integration of the telecommunications solution and to conduct training support.

5.0 LOCATION OF PERFORMANCE

5.1 The place of performance will be principally at Government facilities at China Lake, CA.