Drawing 3
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 14-T-0082_RFQ_Amd_0002.pdf | ||
| 14-T-0082_0001_Solicitation.pdf | ||
| Drawing_4_P-407.pdf | ||
| Drawing_2.docx | DOCX document | |
| Drawing_1.pdf | ||
| 14-T-0082_Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Filter Sock – 3
UST (tanks in concrete well)
Deluge valve vault – 5
SWPL Stand alone tanks
Bldg Tank Description
15813 1 150 Gallon Mixer
15980 2 Oxidizer Prep Bldg
15743 4 30 Gallon Mixer
15744 4 Oven Bldg
15741 5 1&5 Gallon Mixer
15742 5 Chemical Storage Bldg
15760 5 50 Gallon mixer
15754 5 SWECO grinder
15750 5 Prop Cure Bldg
15730 6 Cast Prop Mix Bldg
15700 8 Explosive Chemical Lab
15590 9 Mixing/Casting Bldg
15521/15522 10 Machining Bldg
15523/15524 10 Machining Bldg
15560 10 Old Quality Control lab
15564 10 Old Quality Control Dock
15530 11 Pressing Bldg
15510 11 Explosive Lab
Tank Approx Pipe
Lengths (Feet) (4"x6")
Approx Pipe Lengths (Feet) (2"x3")
1 310 150
2 50 0
4 180 0
5 1300 0
6 375 0
8 20 120
9 70 0
10 1500 75
11 525 0
SWPL 1
Deluge valve vault
SWPL 2
SWPL 4
SWPL 4
2”
2” at drain/trough
SWPL 5
2” at drain/trough
2” at drain/trough
2” at drain/trough
SWPL 5
SWPL 6
SWPL 6
9 rooms served by SWPL 6 4” at drain trough
SWPL 8
SWPL 8
FD
FD
FD
FD
SWPL 9
SWPL 9
Tank 9 containment includes filter sock and settling pot – see tank photo
Filter Sock
SWPL 10
SWPL 10
SWPL 11
SWPL 11
15510
Additional photos provided for assistance in bidding purposes only
SWPL 2 - Typical UST Tank
High Alarm Sensor
Pipe Low Point Sensor
Annular Space Sensor
Typical Drain Trough 15980 – To SWPL 2
15590 – SWPL 9
Non typical tank
Typical filter sock and deluge valve vaults
Typical Filter sock and deluge valve vaults
• Sample photos of pipe testing performed at SWPL 1
CVE on site to terminate, test, certify sensors (high alarm, low point, annular space) & perform pipe testing
SWPL 1
Thursday June 13, 2013
Pressure Testing Primary & Secondary
• Test #1 – Primary between SWPL 1 & Valve Vault
– Start 1129, Stop 1229; Held 10 psi for 1 hour - Pass
• Test #2 – Secondary between Valve Vault & Operating Bldgs
– Start 1154, Stop 1254; Held 5 psi for 1 hour - Pass
• Test #3 – Secondary between SWPL 1 & Valve Vault
– Start 1233, Stop 1333; Held 5 psi for 1 hour - Pass
• Test #4 – Primary between Valve Vault & Operating Bldgs
– Start 1411, Stop 1511; Held 10 psi for 1 hour - Pass
Plug – 2” pipe; Two Operating Bldgs Plug & pressure 4” pipe (Main Operating Bldg)
Plug stand pipe
Plug primary at SWPL 1
Deluge valve vault – SWPL 1
Connect to low point leak detector pipe & pressurize – testing secondary from Valve Vault to Operating Buildings
Deluge valve vault – SWPL 1
Plug low point leak detector pipe & pressurize – testing secondary from SWPL 1 to Valve Vault
Replacing removed influent pipe
Re-connecting to tank
High Alarm Sensor
Pipe Low Point Sensor
Annular Space Sensor
Testing complete Piping connected Sensors in place
Visual Light Indicator