13-R-0070_Amd_0001.pdf

PDF 98 KB Posted

Attached to
F/A-18 E/F/G Alignment Fixture Federal contract opportunity
Solicitation number
N6893613R0070
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

N68936-13-R-0070 Amd 0001

View the file

Other files for this federal contract opportunity

Other files attached to F/A-18 E/F/G Alignment Fixture, newest first.
File Type Posted
13-R-0070_Amd_0002.pdf PDF
13-R-0070_RFP.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1XXXX

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The reason for this amendment is: See Herein. The follow ing sections have been amended: Section A - For Your Information, Section C, PWS Paragraph 4.0, Section J, Section L, Content of Proposals, and Section M, Basis for Aw ard.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 12

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Oct-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N68936-13-R-0070

X 9B. DATED (SEE ITEM 11)

17-Sep-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Oct-2013

CODE

CDR NAWCWD CODE 254200D

ATTN: S. FERRUCCI

(760) 939-2378

429 E BOWEN RD - STOP 4015

CHINA LAKE CA 93555

N68936 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N68936-13-R-0070

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 18-Oct-2013 03:00 PM to 28-Oct-

2013 10:00 AM.

The following have been modified:

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

STATEMENT OF WORK

INFORMATION FOR OFFERORS

CLIN 0001- The contractor shall provide a F/A-18 Alignment Fixture in accordance with the PWS below.

CLIN 0002 – The contractor shall provide data in accordance with Exhibit A, DD Form 1423 CDRLs.

CLIN 0003 – The contractor shall provide as required (Option)

F/A-18 Alignment Fixture Performance Work Statement

September 2013

1.0 Scope: This Statement of Work (SOW) defines the requirements to fulfill Fleet Readiness Center Southwest’s (FRCSW) procurement of an F/A-18 E/F/G alignment repair fixture. The new fixture will locate and securely hold the Fuselage of an F/A-18 E/F/G aircraft while it is separated into subassemblies to facilitate repair procedures. The airframe will then be reassembled in the Fixture maintaining compliance with blueprint specifications.

2.0 Applicable Documents:

Engineering drawing set: E137900 – E137966 and E137971, US Government CAGE: 91145 (Only available in CATIA VERSION 5, REV. 22, released in 2013)

NAVAIR 17-1-114.1 (Technical Manual, Volume 1, Organizational intermediate and depot maintenance with illustrated parts breakdown inspection and proof load testing of lifting slings for aircraft and related components. ):

2007.

22 CFR Parts 120-130, The International Traffic in Arms Regulations (ITAR) 1997

Non-Government standards and other publication:

AWS (American Welding Society): 2010, Revision D1.1

OPNAVINST 5100.23 (Safety and Occupational Health (SOH) Navy Programs): 2012

General Industry Standard, 29 CFR 1910, Subpart D (OSHA General Industry Standards, Walking Working Surfaces) Revised: 1997

ISO 9001 (International Organization for Standardization): 2008

AS 9100 (Quality Management Systems Requirements for Aviation, Space and Defense Organizations):2009 Revision C

ASME Y14.41 (American Society of Mechanical Engineers), Digital Product Definition Data Practices: 2003

Availability of DOD Documents: Unless otherwise indicated, copies of certain specifications, standards and handbooks are available from the standardization documentation order desk, 700 Robbins Ave, Bldg 4D, Philadelphia PA 19111-5094

3.0 Requirements: This project is to procure an F-18 E/F/G Alignment Fixture to be located in building 378, FRCSW, San Diego, CA. The Contractor shall provide turnkey delivery and installation of the fixture to FRCSW.

3.1 The contractor shall manufacture the fixture and supporting equipment per model drawing number E137900 through E137966, and E137971, CAGE Code 91145 specifications. Specifications are provided in Model Based Definition (MBD) conforming to ASME Y14.41-2003 Digital Product Definition Data Practices. The Government will provide the drawings to registered offerors on the Federal Opportunities (FBO) Website, www.fbo.gov, Non-FBO secure link. Access is controlled by the System for Award Management (SAM) database at the following website: https://www.sam.gov.

3.2 The contractor shall manufacture Handing Fixture Hoist Tool- Lex/Inlet Assembly per drawing number

HFHT 74A320150 -5007 TD & -5008 TD.

3.3 The contractor shall manufacture an Aircraft lifting device (sling) per drawing E137971. The sling shall be load tested to 200% of the rated capacity for a minimum of 3 minutes as specified by NAVAIR Technical Manual 17-1-114.1. FRCSW shall be delivered a proof load certificate indicating the sling was proof load tested at 200% for a minimum of 3 minutes. The load test equipment shall be calibrated with National Institute of Standards and Technology (NIST) traceable equipment. The NIST traceable equipment used to determine the proof load shall be stated on the certificate. As per the Technical Manual 17-1-114.1, the proof load equipment shall be accurate to within +/- 2 % of the traceable to NIST traceable approximate size, shape and materials.

3.4 During the construction of the Missile Drill Jigs and Wing Lug subcomponents according to drawings E137900-E137971, the FRCSW government representative shall be contacted to determine if digital data or master tooling will be used to set the missile launcher locations. The government’s preferred method for setting the missile launcher locations is the use of the master tooling. If master tooling is not provided by the government to the contractor then the digital data provided by the drawings stated in paragraph 5.1 of this statement of work will be used as the setting method for the Missile Drill Jigs and Wing Lug subcomponents.

3.5 All unpainted surfaces and laser targets shall be manufactured with corrosive resistant materials or corrosion resistance coatings. These surfaces shall be dimensionally stable against changes due to scaling and corrosive deposits.

3.6 All welds shall be in accordance with ASW D1.1

3.7 Non-machined surfaces shall be painted Aircraft Light Gray, hazardous components shall be painted yellow, exception shall be granted by the US Government representative in FRCSW.

3.8 Work stands shall be manufactured to conform to OPNAVINST 5100.23 Series and the General Industry Standard, 29 CFR 1910, Subpart D.

3.9 The Contractor shall be responsible for the shipment of all the tools, materials, and supplies required for the installation of the fixture at FRCSW, North Island, and any storage of those items if required.

3.10 According to the drawings stated in paragraph 3.1 of this statement of work, dampeners will be required.

If at the time of fabrication and installation the dampeners do not provide adequate resistance, at no cost to the government the contractor shall provide Commercial Off –The-Shelf (COTS) dampeners of larger/smaller capacity to address the increased resistance between the subcomponent and the aircraft component.

3.11 The Government is responsible for removing the existing fixture currently located at the site where the F-18 Fixture is to be installed. The contractor shall notify the Government 4 (four) months prior to fixture delivery at FRCSW to allow sufficient time for removal and relocation.

3.12 After the government removes the existing fixture, the contractor shall level and prepare the area occupied by the previously removed anchor points of the old structure. The contractor shall make the repaired area level with the existing floor which will include matching the epoxy of the repaired areas before installation of the new fixture takes place. The contractor is hereby notified that the foundation located at the installation site may not be stable; movement due to tides and radiant energy may be experienced, a site visit may be authorized prior to contract award.

4.0 Support Requirements: The design and tolerance specifications shall be provided in a CATIA Version 5

Release 20 format.

4.1 The contractor shall have prior documented and demonstrated proficiency in operating the native CATIA Version 5 Release 20 files and in fabricating & inspecting from Model Based Definitions.

4.2 The contractor shall be registered and conform to the quality management system ISO 9001:2008 standard and/or be registered to the aerospace standard for “Quality management system – Requirements for aviation, space, and defense organizations” AS9100:2009 Revision C standard.

4.3 The contractor is notified that all data, documents, and taskings pertaining to this request are protected by the United States International Traffic in Arms Regulations (ITAR). The contractor shall protect this data and be compliant with ITAR mandates.

5.0 Reviews/Access: Reviews are designed to align government and contractor teams at critical and regular points in the program’s schedule.

5.1 The contractor shall prepare for a technical design and manufacturing review at the completion of each major subsystem and at the subsystem’s assembly to the overall structure. The FRCSW government representatives will request a formal technical design and manufacturing review if one has not been conducted within the last 3 months. Reviews are to be performed at the contractor’s facility; however the contractor shall be prepared to participate or conduct reviews at FRCSW North Island at the request of the government representative. The US government representative retains complete authority for any changes and final decisions made to this project.

5.2 Informal reviews and site visits shall be held at times agreed to by the government and Contractor.

5.3 The contractor shall grant the government access to the components of the fixture for the purpose of developing Tool Usage Instructions (TUI) and Support Equipment Usage Instruction (SEUI).

5.4 In accordance with paragraph 7.1.2 of this document, during the manufacture of the fixture the contractor shall document and closely coordinate design changes due to discrepancies in the drawings with FRCSW Engineers or the designated engineering representatives, names will be provided by the Designated Government Representative (DGR) to the contractor after contract has been awarded.

5.5 Prior to delivering the completed fixture to the government, the contractor shall perform a full assembly of the fixture at the contractor’s facility. Exceptions of a full fixture assembly shall be granted in writing by the designated FRCSW engineer(s) representative(s). Upon satisfactory review and inspection of the full assembly of the fixture at the contractor’s facility, the FRCSW representative shall grant written authorization for delivery of the fixture to the FRCSW designated location.

6.0 Acceptance, Installation and Integration:

6.1 Installation & Integration:

Contractor shall install and integrate new hardware/software as specified in Paragraph 7 of this document and perform system level functional tests after installation and integration.

6.2 Acceptance Test Plan:

A draft acceptance test plan for the fixture shall be delivered 45 (forty five) days after contract award date.

FRCSW will review the draft acceptance test plan and provide comments within 30 days of receiving the draft. Contractor shall make any incorporations, modifications, additions, comments, or changes to the draft acceptance test plan at no charge to the government. Within 30 (thirty) days of receiving the government comments, a final acceptance test plan incorporating FRCSW comments, changes, modifications, additions, or incorporations shall be delivered to the government for final approval (CDRL A001).

6.3 Acceptance:

6.3.1 The Acceptance sign-off shall be completed in two stages consisting of: one sign off performed at the manufacturing site according to paragraph 5.6 of this statement of work, and the second stage at FRCSW designated location by the government representative. In each stage, the fixture shall be assembled to verify the ability to perform as intended in the Tool Usage Instructions (TUI) and maintain the functional requirements through the Support Equipment Usage Instruction (SEUI).

6.3.2. The contractor shall perform a fit check of the fixture’s interfacing features to their respective aircraft components. Each design feature shall function as intended per the design and as indicated in the TUI.

FRCSW will provide a verification aircraft component for this demonstration. Any deficiencies discovered during this verification shall be corrected by the contractor via an Engineering Change Order (ECO) received from the US Government and/or its designated engineering representatives. Acceptance will be by FRCSW’s Aircraft Engineer and verified by the DGR.

6.3.3 The contractor shall perform an inspection of the fixture and document the inspection to verify its compliance with built tolerances. Additionally a 2nd inspection shall be performed and documented to demonstrate the fixture’s ability to sustain its position and orientation as indicated in the SEUI. The contactor shall repair and/or stiffen the fixture via an ECO should a performance issue arise during validation. The contractor shall prepare for a technical design and manufacturing review to be conducted at FRCSW – North Island should a major performance or manufacturing issue arise. Acceptance will be provided by FRCSW’s Tooling Engineer and verified by the DGR. (CDRLs A002, A003)

6.3.4 The contractor shall conduct the final inspection for acceptance in the presence of FRCSW’s Engineers and DGR.

7.0 Deliverables:

7.1 Technical Data Package: Contractor shall provide the following data in the specified format upon delivery of the fixture or as indicated.

7.1.1 Modifications and deviations during the manufacturing process from original design shall be documented in the form of a manufacturing Engineering Change Order (ECO) and/or Material Substitution Requests (MSR). Approval or alternatives of these modifications shall be provided by a US Government engineer or its designated engineering representatives. (CDRLs A002, A003)

7.1.2 Conflicts, errors and omissions found in the drawing/modeling package shall be submitted in the form of a Requests For Information (RFI). The US Government or its designated representatives will provide clarifications and/or corrections in response to the RFI. (CDRL A004)

7.1.3 ECO and MSR records originating and received by the contractor shall be assembled and delivered digitally in a .pdf format to FRCSW’s designated engineers upon request. (CDRLs A002, A003)

7.1.4 The original build inspection records and certifications (final inspection and US Government acceptance of built condition) records shall be delivered in digital .pdf format and hard copy format. The native inspection files shall be delivered on a removable media. The inspection reports shall contain critical hard points and be identifiable in the report. The report shall contain the nominal design values, the as-built measured values and their tolerances. (CDRL A005)

7.1.5 During the manufacturing process, should any discrepancy arise between the drawings stated in paragraph 2.0 of this statement of work and the manufacturing of the fixture, the contractor shall notify the government representative in writing of the discrepancies. After receiving written notice by the contractor, the government representative will make the final decision in writing on the necessary changes to fix the discrepancy. (CDRL A004).

7.1.6 Manuals obtained through the purchase of Commercial Off The Shelf (COTS) items shall be delivered before or upon final acceptance. (CDRL A006)

7.1.7 All data, digital files, reports and records (hereby defined as Technical Data) generated during the performance of this contract shall become the complete and sole ownership of the US Government, Department of the Navy. The US government authorizes the contractor to maintain copies of technical data generated under this contract for the sole internal use of supporting this fixture. The contractor shall obtain expressed written permission from the US government to distribute the technical data (in whole or in parts) to an external party.

8.0 Laser Alignment Measuring Equipment: The laser alignment measuring equipment shall conform to the following minimum specifications.

8.1 Laser measuring equipment shall be utilized in the manufacturing, assembly and validation of this fixture.

8.2 Tooling/Construction balls and pads shall be manufactured to incorporate protective covers, when not in use. Exception to this requirement will be granted in writing should the pads and covers interfere with other components or are functionally prohibitive.

8.3 Where line of sight is permissible a half inch target holders shall be used in lieu of a half inch spherical tooling balls, unless otherwise agreed to by FRCSW’S Engineer(s).

8.4 A record of part temperature shall be logged and documented every 2 hours during a laser measurement procedure. The log record shall be provided upon request and shall contain the following information:

Nomenclature of the part being measured, date & time of reading and temperature in °F.

8.5 The laser tracker shall have a maximum uncertainty of ±.0006 in + .00007 in/ft measured from the center of the tracker’s head.

8.6 Calibration of the laser measuring equipment shall be performed to the Original Equipment Manufacturer/Manufacturing (OEM) original specifications and certification shall be provided and be valid throughout the performance period of this contract.

8.7 All laser tracker adapters (ex: sphere offsets, drift nests, tooling/construction balls, vector bars) unique to this fixture and/or required for its function and its annual validation shall be included with the fixture. At the time of delivery any lose adapters should be in a protective case.

8.8 Tooling pads used to orientate and locate the laser tracker into the coordinate reference frame shall be permanently labeled with their nomenclature and corresponding coordinate values. Reference values shall be labeled with parentheses. Example: (X.XXX) where X.XXX is the referenced value.)

8.9 Additions of tooling pads are at the sole discretion of FRCSW’s Tooling Engineer, up to but no more than 10% of all laser measurement points. Notification of additional tooling pads shall be provided throughout the fabrication phase. Completion of this addition shall be completed prior to acceptance.

9.0 Calibration:

The Contractor shall calibrate the system upon arrival to the facility. The procedure shall be the SEUI.

10.0 Project Manager:

10.1 All contractor tasks and requirements covered by this SOW shall be coordinated through the DGR and FRCSW Engineers.

10.2 The contractor shall plan, direct, coordinate, monitor and evaluate contractor task specified in this SOW.

The contractor shall notify FRCSW DGR by email, of management problems requiring government action.

11.0 Warranty:

Warranty to start the day after all punch lists, closing documents, final acceptance, agreement from FRCSW, and government parties has been signed, delivered, and final funds have been delivered to contractor.

Warranty to be 12 (twelve) months from completion of project and final acceptance has been made based on the acceptance test criteria of this SOW).

12.0 Post Acceptance Support:

12.1 A qualified technical contractor representative shall provide telephone technical support assistance until the fixture is delivered which shall continue through the specified warranty period. The Contractor shall provide a single point of contact for support; the Contractor representative shall be available on an “on-call” basis during the normal business hours of 0600-1650 Monday through Friday for troubleshooting purposes specific to the fixture. The emergency technical support on-site services shall have a response time of 24 hours after verbal notification by the government.

12.2 The contractor shall provide support, including modification and correction if the fixture fails to meet its fabrication requirements within 12 months of acceptance.

12.3 The contractor shall repair weld fractures discovered during the initial 12 months after acceptance.

12.5 The contractor shall replace or repair COTS items that have failed within 12 months of acceptance.

12.6 The contractor shall correct misalignment and shifting of rails discovered during the initial 12 months of acceptance.

12.7 The contractor shall provide assistance and clarification if questions arise or clarifications are needed during regular inspections throughout the warranty period.

13.0 Security:

The Contractor shall submit an email or letter to the FRCSW DGR requesting site clearance for all personnel thirty (30) calendar days prior to on-site installation of the fixture at FRCSW. The Contractor shall notify the Government if any key personnel require access to the facility for the duration of the project by submitting an email or letter to the FRCSW DGR requesting site clearance. The email or letter shall include the name(s), date(s) of birth, place(s) of birth, and last four of Social Security number for all personnel needing access. The email or letter shall also include the date(s) and anticipated duration of work. Contractor shall send (email and/or fax) a copy of the clearance requested to the DGR at: Capital Investment Project Manager (CIP Manager). Address, fax, and email to be provided at contract award.

FOR YOUR INFORMATION:

This procurement is reserved for 100% small business set-aside.

The following addresses and points of contact are provided:

Name: Sarah Ferrucci Phone: (760) 939-2378

DSN: 437-2378

FAX: (760) 939-3095

Email address: sarah.ferrucci@navy.mil

U.S. Postal Service Mailing Address:

COMMANDER

CODE 254200D (S. FERRUCCI – 760-939-2378)

NAVAIRWARCENWPNDIV

429 E. BOWEN RD. MAIL STOP 4015

CHINA LAKE, CA 93555-6108

Direct Delivery Address (UPS, FedEx, etc):

COMMANDER

CODE 254200D (S. FERRUCCI)

NAVAIRWARCENWPNDIV

BLDG 982, MAIL STOP 4015

CHINA LAKE, CA 93555-6108

**The Government will provide the specifications required for proposal purposes to registered offerors on the Federal Business Opportunities (FBO) website, www.fbo.gov. Access is controlled by the System for Award Management (SAM) database at the following website: https://www.sam.gov. To request access to the specifications, please contact Sarah Ferrucci at sarah.ferrucci@navy.mil / 760-939-2378 and Debra Zamarron at debra.zamarron@navy.mil / 760-939-9658.

**Please Note: The process for requesting access to the specifications for this requirement has changed and is reflected in the paragraph above. This change is also listed in Section J of this solicitation.

Questions:

“One question I do have about this solicitation is in the Standards portion of the PO it says you have a requirement of the company being certified to AS9100. Is that a requirement that can be waived?”

Answers:

Please see Section C: Statement of Work, Paragraph 4.0, Sub-Section 4.2 for updated requirements.

Sections L and M also reflect this change in requirements.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

SPECIFICATIONS

Specifications:

The Government will provide the specifications required for proposal purposes to registered offerors on the Federal Business Opportunities (FBO) website, www.fbo.gov. Access is controlled by the System for Award Management (SAM) database at the following website: https://www.sam.gov. To request access to the specifications, please contact Sarah Ferrucci at sarah.ferrucci@navy.mil / 760-939-2378 or Debra Zamarron at debra.zamarron@navy.mil / 760-939-9658.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

L - [1] CONTENT OF PROPOSALS (SUPPLIES OR SERVICES) (JUN 2011) (MAR 2013)

(a) General. The offeror must submit one original and two copies of their technical proposal and one original and one copy of the price proposal.

(1) Any data previously submitted in response to another solicitation will be assumed unavailable to the government; and this data must not be incorporated into the technical proposal by reference.

(2) Clarity and completeness of the proposal are of the utmost importance. The proposal must be written in a practical, clear and concise manner. It must use quantitative terms whenever possible and must avoid qualitative adjectives to the maximum extent possible.

(b) Technical Proposal. Offerors must comply with the following:

(1) No cost or price information may be included in the technical proposal.

(2) The technical proposal may not be classified and must be in a separate volume from the price proposal.

The technical proposal must clearly demonstrate that the offeror has a thorough understanding of the technical services and products required for the complete accomplishment of the tasks detailed in the Statement of Work (SOW). Mere statements that the offeror understands or will meet the requirements of the SOW or parts thereof are inadequate.

(3) In order to ensure the Government has sufficient information to fully evaluate the offeror’s technical proposal the offeror shall provide the following:

Offeror’s approach, method, and ability to provide the F/A-18 E/F/G Alignment Fixture in accordance with the PWS in Section C of the RFP/Solicitation, the specifications and drawings found in Section J, and the paragraphs below.

The method of approach should substantiate the company’s ability to fabricate, deliver the alignment fixture, and ability to provide post award customer support which meets the requirements listed in the PWS.

In addition, the Offeror shall provide documentation on how they meet the following qualifications:

The contractor shall have prior documented proficiency and demonstrate proficiency in operating the native

CATIA Version 5 Release 20 files and fabricating & inspecting from Model Based Definitions.

The contractor shall be registered and conform to the quality management system ISO 9001:2008 standard and/or be registered to the aerospace standard for “Quality management system – Requirements for aviation, space, and defense organizations” AS9100:2009 Revision C standard.

The contractor is hereby notified that all data pertaining to this request is protected under by the United

States’ International Traffic in Arms Regulations (ITAR). The contractor shall protect this data and be compliant with ITAR controls.

A qualified technical contractor representative shall provide telephone technical support assistance until the fixture is delivered. Coverage shall continue through the specified warranty period.

(c) Past Performance. Offeror’s must comply with the following:

Offerors shall submit contact information of 3 (three) previous customers to which they have sold similar item(s) within the last 5 years. The information shall include at a minimum a description of the item(s), agency/company name, contact name, position/title, phone number, and e-mail address.

Offerors shall have prior documented experience manufacturing a minimum of 3 (three) complex and close tolerance tooling over the full length of large aircraft assembly and disassembly fixtures (over 40 ft long).

Detail specifications and tolerances are found in the drawing and model package.

Offerors shall have prior experience using laser tracker(s) for fabrication and validating fixtures used in the assembly of major aircraft components. A minimum of 3 (three) years of in-house laser tracker experience, and in-house ownership of laser tracker equipment is required.

Offerors shall have a minimum of 3 (three) years of experience with installation of fixtures similar to the size and scope of the subject fixture on hanger floors with varying stability. The contractor shall provide examples and outcome of such experiences.

(d) Price Proposal. The Lowest Evaluated Price relates to the sum of all extended prices inserted in Section B, CLINS. The offeror is instructed to enter a unit price and extended price for all CLINS in Section B. The price proposal shall be separate from the technical proposal.

(e) Any questions pertaining to the RFP shall be submitted no later than 3:00 p.m. (PST) 5 calendar days after the solicitation is posted. Questions shall be submitted through e-mail to sarah.ferrucci@navy.mil and debra.zamarron@navy.mil with the RFP # as the subject line. Any questions submitted after this time will not be answered. All pertinent questions will be answered in an amendment to the RFP that will be posted on FedBizOpps.

(f) Offerors shall submit their proposal electronically to sarah.ferrucci@navy.mil with the RFP# in the subject line.

The offers shall be in two separate documents/attachments: one titled “technical” and one titled “price proposal and past performance references.” The price information shall include data regarding the general financial condition of the Offeror and specific plans for financing the proposed contract. The government does not intend to provide any financial assistance for this procurement.

(g) The offeror shall agree to hold the all elements of the proposal in its offer firm for 120 calendar days.

SECTION M - EVALUATION FACTORS FOR AWARD

5252.215-9524 BASIS FOR AWARD (NAVAIR) (JUL 1998)

(a) Award will be made to that responsible offeror proposing the lowest evaluated price for supplies or services meeting the requirements of the solicitation and the technical acceptability standards as follows:

(1) Technical Acceptability: All proposals will be reviewed for technical acceptability which includes the offeror’s approach, method, and ability to provide the F/A-18 E/F/G Alignment Fixture in accordance with the PWS in Section C of the RFP/Solicitation, the specifications and drawings found in Section J, and the following qualifications:

The contractor shall have prior documented proficiency and demonstrate proficiency in operating the native CATIA Version 5 Release 20 files and fabricating & inspecting from Model Based Definitions.

The contractor shall be registered and conform to the quality management system ISO 9001:2008 standard and/or be registered to the aerospace standard for “Quality management system – Requirements for aviation, space, and defense organizations” AS9100:2009 Revision C standard.

The contractor is hereby notified that all data pertaining to this request is protected under by the United States’ International Traffic in Arms Regulations (ITAR). The contractor shall protect this data and be compliant with ITAR controls.

A qualified technical contractor representative shall provide telephone technical support assistance until the fixture is delivered. Coverage shall continue through the specified warranty period.

Technical acceptability will be evaluated as follows:

Technically Acceptable- Proposal clearly meets the minimum requirements of the solicitation.

Technically Unacceptable- Proposal does not clearly meet the minimum requirements of the solicitation.

(2) Past Performance:

Offerors shall submit contact information of 3 (three) previous customers to which they have sold similar item(s) within the last 5 years. The information shall include at a minimum a description of the item(s), agency/company name, contact name, position/title, phone number, and e-mail address.

Offerors shall have prior documented experience manufacturing a minimum of 3 (three) complex and close tolerance tooling over the full length of large aircraft assembly and disassembly fixtures (over 40 ft long). Detail specifications and tolerances are found in the drawing and model package.

Offerors shall have prior experience using laser tracker(s) for fabrication and validating fixtures used in the assembly of major aircraft components. A minimum of 3 (three) years of in-house laser tracker experience, and in-house ownership of laser tracker equipment is required.

Offerors shall have a minimum of 3 (three) years of experience with installation of fixtures similar to the size and scope of the subject fixture on hanger floors with varying stability. The contractor shall provide examples and outcome of such experiences.

The evaluators will review the vendor’s provided information regarding prior contracts for similar items; however, past performance information may be obtained from other sources available to the Government, to include, but not limited to, the Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; interviews with Program Managers, Contracting Officers, and Defense Contracting Management Agency.

The Past Performance evaluation results in an assessment of the offeror’s probability of meeting the minimum past performance solicitation requirements. The assessment is based on the offeror’s record of relevant and recent past performance information that pertains to the product outlined in the solicitation requirement. The evaluation will consider recent and relevancy of past performance information in aspects of similarity of product, complexity, and dollar value. In addition, the evaluation will consider how well the offeror performed on previous contracts in the areas of quality of product, adherence to promised delivery schedules, and business relations.

Past performance will be evaluated as follows:

Acceptable- Based on the offer’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown. (See below)

Unacceptable- Based on the offer’s performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.

Note: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable”-

(b) Proposals that do not conform to the requirements of the solicitation may be rejected without further evaluation, deliberation or discussion. The low priced, technically acceptable offer submitted by a responsible offeror will be awarded the contract.

(c) The Government intends to evaluate proposals and award a contract without discussions. Therefore, each initial offer should contain the offeror’s best terms from a price and technical standpoint. The government reserves the right to conduct discussions if determined necessary by the Contracting Officer.

(End of Summary of Changes)