This document is an Amendment of Solicitation/Modification of Contract (Standard Form 30) for a Blanket Purchase Agreement (BPA) for refrigerant decontamination and dehydration services for Navy submarines at the Trident Refit Facility in Kings Bay, Georgia. The amendment extends the response date to 22 April 2025 and corrects the Statement of Work (SOW), with the contract covering a two-year period for refrigerant flush and system dehydration services on submarine air conditioning systems.
The SOW details specific technical requirements, including 12-hour work shifts, EPA-certified technicians, and precise refrigerant handling procedures. The contract includes five Contract Line Item Numbers (CLINs) covering hours worked on-site, travel and per diem, equipment rental, shipping costs, and refrigerant usage. Key requirements include responding within 14 days' notice, using contractor-owned equipment, and performing technical tasks such as system pressurization, evacuation, nitrogen testing, and refrigerant flushing. The work will be performed pier-side on the USS Rhode Island at the Trident Refit Facility, with strict security and safety protocols for access and performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2.02a RFQ Combined Synopsis.pdf | ||
| 2.02 Combined Synopsis.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N4446625RC004JX
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Correct the Statement of Work (SOW).
2. Extend the response date to 22 April 2025.
3. All other terms and conditions shall remain in full force and effect.
Please see Sunmmary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 13
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Apr-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6883625Q0051
X 9B. DATED (SEE ITEM 11)
19-Mar-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Apr-2025
CODE
NAVSUP FLC JACKSONVILLE CONTRACTS DIV
KENNETH BROWN
110 YORKTOWN AVE, 3RD FLOOR
JACKSONVILLE FL 32212-0097
N68836 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6883625Q0051
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 18-Apr-2025 10:00 AM to 22-Apr-2025 04:00 PM.
The solicitation issue date has changed from 20-Mar-2025 to 19-Mar-2025.
The following have been modified:
SOW
Statement of Work (SOW) Flush Refrigerant and Dehydrate System on Navy Submarine(s)
1.0 Introduction
Trident Refit Facility (TRF) has a requirement for a Blanket Purchase Agreement (BPA) for A Refrigerant decontamination and or a dehydration of an A/C system on a submarine at Kings Bay, Georgia. This will be a (2) two-year agreement. Each line item will represent (1) one occurrence. TRF may have (1) one or more occupancies in one year. TRF may not have any occurrences. This BPA will allow flexibility in the event a Navy Submarine requires refrigerant services.
A separate PWS with exact specifics will be sent when a requirement is known. A task order then be placed on as needed purpose be placed against this BPA when a requirement is known.
All pricing on this BPA will be broken down in
1) Hours (working onsite) - 12 X 2 = 24
2) Total travel and Per Diem
3) Equipment rental as required per day
4) Total cost of shipping of required material
5) Flushing Refrigerant Usage- Refrigerant (medium) used to flush through the contaminated system)
Note: Average Flush on site could be between 5- 18 days @ 12-hour days.
Note 2: If onsite and travel time occurs on a holiday, holiday wages will be incurred.
- CLIN 1- Hours (working onsite) - 12 X 2 = 24
- CLIN 2 - Total travel and Per Diem
- CLIN 3 - Equipment rental as required per day
- CLIN 4 - Total cost of shipping of required material
- CLIN 5 – Flushing Refrigerant Usage -- Refrigerant (medium) used to flush through the contaminated system.
2.0 Scope
Contractor must be able to respond (on-site) within 14 days’ notice.
- All equipment required must be contactor owned and operated.
- All personnel must be trained, certified and possess the security access required to enter a
Navy Submarine. – into NAVY base all connections by TRF personnel.
Personnel must be trained and certified in handling R114 Refrigerant.
3.0 Procedures
Contractor will load in necessary equipment, cylinders, and transportation to perform the scope of work.
Kings Bay team will perform the on-vessel hookups necessary for performance of contractor’s scope.
- Please note: estimated time for this work would be roughly one day. Should the Kings Bay team need additional time for this work which keeps our team on stand-by, a day rate may need to go into effect to cover contractors’ team being on stand-by.
Contractor will recover and dehydrate the refrigerant from the System.
Kings Bay team will need to remove the compressor the system and install blank off plates with 1” ports (including ball valves) on the suction, discharge, and liquid lines.
- Contractor can remain on-call during this performance of work, and a day rate for standby will go into effect (total charges to be determined at the end of performance of scope and set up using a change order).
After the compressor has been removed and plates with ports/valves installed.
Contractor will pressurize the system with nitrogen and perform a 6-hour standing hold test.
Contractor will utilize our equipment to perform a dehydration of chiller.
Acceptance criteria shall be when vacuum is pulled below 1000 microns and held for up to four hours.
After completion of the hold test, contractor will perform a refrigerant flush of the refrigerant piping of the system using R-11.
- Contractor will provide the necessary refrigerant for this flush.
- Thermal expansion valves and solenoid valves of the System will need to be removed and temporary piping installed, or otherwise bypassed.
- Flush will be performed for 24 non-continuous hours.
- Acceptance criteria shall be a visual inspection measured by bag test. Flush shall be considered complete with the volume of particulates in the bag is less than that of a dime.
- A Goetz tube visual inspection shall be performed, and acceptance criteria shall be when the presence of oil is 0.1% or less.
- After completion of the flush of the System, contactor will recover the service refrigerant and charge the System with standing pressure of dry nitrogen (1-2 PSI).
After restoring of all components to the system, contractor will pressurize the system with nitrogen and perform a 6-hour standing hold test.
- Contractor will provide the nitrogen to perform this work.
- Contractor will pressurize to 50 PSI. Acceptance criteria shall be no loss of pressure during the 6 hours hold test.
Contractor will perform a triple evacuation on each System.
Acceptance criteria for evacuations will be a hold of below 5000 microns for 1 hours, with no more than a 3000 micron rise during the 1-hour hold test. Acceptance criteria for evacuation 3 shall be a hold of below 5000 microns for 6 hours, with no more than 3000 micron rise during the 6 hours.
After completion of the triple evacuation, Contractor will recharge the System with the recovered refrigerant.
Contractor will perform bump and run procedures on the unit and receiver. Contractor will need assistance of Customer for operation of the unit during the Bump and Runs.
- Bump and runs will consist of running each system for a short time.
- Contractor to pull charge from the vessel and clean the refrigerant and checks for contaminants.
- Bump and run procedures are repeated until the acceptance criteria is met.
- Acceptance criteria shall be a visual inspection measured by bag test. Acceptance shall be when volume of particulates in filter bag is less than a dime, Goetz tube <0.1% oil.
- Kings Bay team will disconnect all necessary equipment and materials.
- Contactor will collect equipment and demobilize from site.
- Procedure and scope could change per job requirements or vessel timeline requirements.
4.0 General Requirements
In performing these services Contractor shall:
Work utilizing 12-hour shifts.
Provide all necessary transportation of equipment and supplies to and from the job site in compliance with all applicable DOT and regulations and requirements.
Perform all work in compliance with EPA regulations with respect to section 608 of the Clean Air Act.
Utilize only EPA certified technicians for the performance of the project and will comply with all applicable EPA regulations and requirements.
Clarifications and Exclusions:
This proposal assumes that any valves that may exist that isolate the two systems will hold. Any delays due to valve leakages that prevent contractor from performing scope may incur a change order.
System compressors must be removed, and adapter flanges installed for performance of the refrigerant flush. This work is to be performed by others.
Thermal expansion valves and solenoid valves must be bypassed or removed for performance of the refrigerant flush. This work is to be performed by others.
Marine chemist, if required, to be provided by others.
Contractor does not have Red Badge ID, so if required, escorts must be supplied.
Any additional refrigerant required is excluded from this proposal but can be quoted upon request.
Customer agrees to provide the following:
- Power – 460V 3 phase at 100 amp (pier-side)
- Fresh-water supply for condensing and cooling process, including waste drain and disposal.
- Un-obstructed work area on pier (12’ x 50’) for staging of contractor pumping and recovery unit.
- Safe non-restricted workplace.
Customer shall designate an individual with authority to operate the system, approve and execute all change orders, and to certify completion of the project, which individual shall be available at all times during the project.
The system must be proven to be leak free prior to contractor work. In addition to the foregoing, Customer shall make modifications to the System prior to commencement of work by contractor.
The following are typical modifications and requirements. Actual system modifications will be reviewed upon award.
-Remove, leave open and or bypass refrigerant metering devices, solenoid valves and other restrictions to refrigerant flow. Other restrictions: filters, strainers shall be removed.
5.0 Access and General Protection/Security: Policy and Procedures. Contractor and all associated subcontractor-Contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative). The Contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DoD, Department of the Navy (DoN) and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.
5.1 Defense Biometric Identification System (DBIDS). The Defense Biometric Identification System (DBIDS) is a DoD-owned and operated system developed by Defense Manpower Data Center as a force protection program to manage personnel identity and access at DoD installations. DBIDS is a network database system designed to easily verify access authorization of personnel entering military installations by using barcodes and fingerprint biometric identifications.
To improve management and force protection at Navy installations, the Navy is transitioning from using the Navy Commercial Access Control System (NCACS) to the Defense Biometric Identification System (DBIDS) for Contractors and vendors requiring access to an installation at no cost to them. The transition will begin 17 April 2017 and individuals will have up to 180 days to obtain the permanent card. After August 14, 2017, NCACs cards will no longer be accepted.
In order to obtain base access, an individual need to acquire DoD sponsorship, have a thorough identity check, be properly vetted, and have a legitimate reason for base access. Identity checks require a passport or a Real ID Act-compliant state driver's license. Vetting occurs when the individual's background and ID are compared against authoritative criminal justice data bases, and the individual has a letter or official document from the sponsoring organization which articulates the reason for access. When the above criteria are satisfactorily met, DBIDs credentials are issued.
Additional information is available at https://www.cnic.navy.mil/om/dbids.html.
5.2 Security Requirements
a. Personnel. Individuals must be United States Citizens. Contractor MUST certify employees and subcontractors are U.S. Citizens by viewing the U.S. government issued document, Employment Eligibility Verification Form I-9. Personnel with a valid government issued clearance are exempt from this requirement; verification will be accomplished using the Defense Information System for Security (DISS).
b. Submarine access including the Dry Dock basin when submarine is present, personnel must possess a valid personnel security clearance, minimum SECRET access level required. Personnel with “INTERIM” clearance are not authorized access to the Engine Room or access to Restricted Data and Navy Nuclear Propulsion Information (NNPI) and will be issued a “purple” colored badge. Contractor will submit Personnel Security clearance data to the SRS- 36 Security Officer. Including company CAGE code, clearance access, investigation type and issuing authority and investigation closed date. This information can be sent via the Defense Information System for Security (DISS) to “Security Manager at SRS-36 SMO Code N611076”.
c. Personnel without a valid security clearance access level who require access to the Waterfront Restricted Area (WRA) (TRIDENT Refit Facility Wharf Enclave) or Site Six piers, less submarine or Dry Dock Basin access when submarine is present, must complete a trustworthiness determination background check and meet WRA access requirements contained in SWFLANTINST 5530.12. Trustworthiness determination, require the individual to complete a government initiated security questionnaire (SF 85P), OF-306 and provide fingerprints. Additionally, each individual must consent to a National Crime Information Center (NCIC) background check. The government reserves the right to deny access based upon unfavorable trustworthiness determination, unfavorable NCIC results, or failure to provide requested security questionnaire information. Such determinations will be final. There are no appeal rights to a determination to deny access. It is the COs prerogative to deny access to any area under their jurisdiction.
d. Contractor will:
(1) Provide a worksite access list containing: company name, individual’s full name, social security account number, date and place of birth, date, citizenship, to SRS-36 Security Officer. Contractor is required to maintain an accurate worksite access list throughout the period of contract.
(2) Adhere to personnel worksite access requirements as stated above when hiring subcontractor or temporary service personnel.
e. Visitors and delivery personnel who do not possess a clearance or a trustworthiness determination are required to be escorted while inside the WRA or Site VI piers, and must consent to NCIC background check before being granted access to Submarine Base, Kings Bay, GA.
f. A limited number of Contractor personnel may be authorized WRA escort privileges upon favorable completion of trustworthiness determination process or with an approved security clearance. Escorts will exercise positive control of personnel while within restricted areas, or the designated escort and unescorted personnel will be ejected from the restricted area. If required, due to time constraints, the government may provide this service until such time the contactor is capable of assumption.
g. Material Deliveries. Material deliveries to the worksite other than government authorized vehicles, provide name of company, name of driver, U.S. citizenship, vehicle information, purpose of delivery, actual date, time, point of contact (including phone number) and description of load material on government provided Restricted Area Vehicle Access Request (RAVAR) form to TRIDENT Refit Facility, Kings Bay (TRIREFFAC-KB) Security Office. Notification should be at least 1 working day prior to expected arrival.
h. No privately owned vehicles including rental cars are allowed access to the WRA or Site Six pier.
i. General Security Requirements. It will be the Contractor’s responsibility to provide employees (including subcontractors) who comply with these requirements, the regulations in force on the station or those, which may be promulgated at a later date. All personnel will keep within the limits of the work and avenues of ingress and egress and will not enter any restricted areas without prior approval of the SRS-36 Security Officer. The Contractor’s equipment will be conspicuously marked for identification. Government Security Force and Law Enforcement personnel challenges must be answered and all orders obeyed. During performance of the contract work, government drills may be conducted and may temporarily affect access to the work site. The Government will take effort in keeping the Contractor informed of anticipated major delays of one hour or more.
j. If the Contractor is required to bring their vehicle into the work site, it must be approved by the SRS-36 Security Officer. A RAVAR will be submitted for each company vehicle where the Contractor must provide proof of insurance, license and registration for the vehicle(s). Once approved, vehicles must have the company’s name permanently attached and displayed on each of the vehicles in a manner and size that is clearly visible.
k. No cameras, to include Portable Electronic Devices (PED’s) and Personal Digital Assistants (PDA’s) with photographic capabilities are allowed within TRIREFFAC-KB work spaces, work centers, or offices unless approved by the TRIREFFAC-KB Security Officer, via the SRS-36 Security Officer. The TRIREFFAC-KB Security Officer or designated representative will approve all photographs taken inside a restricted area for release. Cell phones and other PEDs/PDAs with photo capability are strictly prohibited from use and possession within a designated Restricted Area.
l. External photography of a submarine is prohibited unless specifically authorized by the Commanding Officer (CO) or his designated representative. Internal photography of the submarine is prohibited unless the classification for the space, equipment, or operation to be photographed has been established, specific permission is obtained from the Immediate Superior- In Command (ISIC), and the ships CO or his designated representative is briefed and positive control shipboard has been established to ensure the space, equipment, operations is properly sanitized to prevent disclosure.
6.0 Payment Information:
METHOD OF PAYMENT SHALL BE VIA WIDE AREA WORKFLOW (WAWF). WAWF
FORM ATTACHED, SERVICE CANNOT BE PREPAID IN ACCORDANCE WITH
APPROPRIATIONS LAW. VENDOR MAY BILL MONTHLY, QUARTERLY OR YEARLY
IN ARREARS
7.0 Designated Government Representative (DGR) and Contracting Officer’s Representative.
The Contracting Officer’s Representative under this action and the person responsible for performing inspection and acceptance of the contractor’s performance at the destination is:
COR: Gary Moberg Voice Phone: 912-573-9374 E-Mail: gary.l.moberg.civ@us.navy.mil
The Designated Government Representative for this contract is Theresa Liger, (912) 573-4121 and E-mail: Theresa.liger@navy.mil.
8.0 Normal Duty Hours. The Contractor is responsible for providing performance/service, between the hours of 0600 to 1700 hours except on Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor is responsible for providing performance/service, between the hours of 0600 through 1700, Eastern Standard Time (EST), Monday through Friday, except on Federal holidays. For other than firm fixed price contracts, the Contractor will not be reimbursed when the Government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
8.1 Federal Government Holidays
New Year’s Day 1st day of January Martin Luther King Jr.'s Birthday 3rd Monday of January Presidents Day 3rd Monday of February Memorial Day Last Monday of May Juneteenth 19th Day of June Independence Day 4th day of July Labor Day 1st Monday of September Columbus Day 2nd Monday of October Veterans Day 11th day of November Thanksgiving Day 4th Thursday of November Christmas Day 25th day of December
When one of the above designated legal holidays falls on a Sunday, the following Monday will be observed as a legal holiday. When a legal holiday falls on a Saturday, the proceeding Friday is observed as a legal holiday. This list of holidays relates to Government duty days and is not intended to supplement or otherwise alter the provisions of any Wage Determination regarding applicable paid holidays.
It is understood and agreed between the Government and the Contractor that observance of such days by Government personnel shall not be a reason for an additional period of performance, or entitlement of compensation except as set forth within the contract. In the event the Contractor’s personnel work during the holiday, the Contractor may reimburse them; however, no form of holiday or other premium compensation will be reimbursed either as a direct or indirect cost, other than their normal compensation for the time worked, unless stipulated otherwise. This provision does not preclude reimbursement for authorized overtime work if applicable.
When the Department of Defense grants excused absence to its employees, the Contractor agrees to continue to provide sufficient personnel to perform critical tasks already in operation or scheduled, and shall be guided by the instructions issued by the Contracting Officer (KO) or the Designated Government Representative (DGR). Changes in employee work schedules shall comply with the terms and conditions of the contract, to include payment provisions.
8.2 Inclement Weather. The contractor shall perform services as scheduled including during periods of inclement weather unless specific approval to delay is requested by the contractor and approved by the Designated Government Representative (DGR). Such approval will normally be granted only in cases of particular severe weather, such as hurricanes or tornados, etc. The contractor shall not request additional cost for schedule changes due to inclement weather.
9.0 Location of Services:
TRIDENT Refit Facility 990 USS Thomas Jefferson Dr.
Pier Side on the USS Rhode Island, SSBN 740 Kings Bay, GA 31547 POC: Gary Moberg, 912-573-9374, gary.l.moberg.civ@us.navy.mil
9.1 Motor Vehicle Operators. Contractor’s personnel, whose tasks involve operation of any vehicles, shall possess a valid U.S. state driver’s license, certificates and permits, applicable for the type and class of vehicle being operated.
10.0 Non-Personal Service Statement. Contractor management will ensure that employees properly comply with the performance work standards outlined in this Statement of Work.
Contractor employees will perform their duties independent of, and without the supervision of, any Government official or other Defense Contractor. The tasks, duties, and responsibilities set forth in this project may not be interpreted or implemented in any manner that results in any contractor employee creating or modifying Federal policy, obligating the appropriated funds of the United States Government, overseeing the work of Federal employees, providing direct personal services to any Federal employee, or otherwise violating the prohibitions set forth in Parts 7.5 and 37.1 of the Federal Acquisition Regulation (FAR). The Government will control access to the facility and will perform the inspection and acceptance of the completed work.
11.0 Employment of Federal Employees. The contractor shall not employ or enter into a contract with any person to perform work under this contract who is an employee of the United States Government, either military or civilian, unless such person receives approval IAW applicable Federal and DOD regulations.
12.0 Personnel Compliance. The contractor shall ensure that contractor employees observe and comply with all local and higher authority policies, regulations, and procedures concerning fire, safety, environmental protection, sanitation, security, traffic, parking, energy conservation, flag courtesy, “off -limits” areas, and possession of firearms or other lethal weapons. When two or more directives or instructions apply, the Contractor shall comply with the more stringent of the directives or instructions.
13.0 Identification (ID) Badge. The Contractor (to include subcontractors) shall provide each employee an Identification (ID) Badge, which includes at a minimum, the Company Name, Employee Name and a color photo of the employee. ID Badges shall be worn at all times during which the employee is performing work under this contract. Each Contractor (to include subcontractors) employee shall wear the ID Badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit. The Contractor (to include subcontractors) shall be responsible for collection of ID Badges upon completion of the contract or termination of employee. A listing of issued identification cards shall be furnished to the KO prior to the contract performance date and updated as needed to reflect Contractor and subcontractor personnel changes.
14.0 Smoking/Drug/Alcohol Policy. The contractor shall comply with local command smoking policies and workforce requirements. The contractor shall also comply with all Federal statutes, laws, and regulations to implement a Drug Free Workplace Program (DFWP) as well as work force requirements and local command policies.
15.0 Personnel Conduct. The selection, assignment, reassignment, transfer, supervision, management, and control of contractor personnel employed to perform the work specified herein shall be the responsibility of the contractor. The contractor shall be responsible for the performance and conduct of contractor and subcontractor employees at all times. The contractor shall ensure that personnel present a professional appearance. Personnel employed by the contractor in the performance of this contract, or any representative of the contractor entering the installation shall abide by the security regulations listed in the contract and shall be subject to such checks by the Government as deemed necessary. The contractor shall not employ for performance under this contract any person whose employment would result in a conflict of interest with the Government’s standards of conduct.
16.0 Personnel Removal. Government rules, regulations, laws, directives, and requirements that are issued during the term of the performance period relating to law and order, installation administration, and security shall be applicable to all contractor employees and representatives who enter the installation. Violation of such rules, regulations, laws, directives, or requirements shall be grounds for removal (permanently or temporarily as the Government determines) from the work site or installation. Removal of employees does not relieve the contractor from the responsibility for the work defined in this statement of work. The contractor is expected to provide support services despite personnel removal or other unforeseen condition(s). Should replacement become necessary, the government reserves the right to review all resumes of proposed candidates.
•Removal by Installation Commander: The Installation Commander may, at his/her discretion, bar an individual from the installation under the authority of 18 U.S.C. 1382 (1972), for conduct that is determined to be contrary to good order, discipline, or installation security and safety.
•Removal Requested by Designated Government Representative (DGR): The DGR may require the contractor to remove am employee working under this contract for reasons of misconduct or security violations. Contractor employees shall be subject to dismissal from the premises upon determination by the DGR that such action is necessary in the interest of the Government.
•Removal by Military Police: Contractor employees may be denied entry to or may be removed from the installation by Military Police if it is determined that the employee’s presences on the installation may be contrary to good order, discipline, or installation security and safety.
•Removal for Unsatisfactory Performance: The government reserves the right to require the Contractor to remove and replace any personnel who provide unsatisfactory performance, demonstrate insufficient knowledge, or possess inadequate skill levels necessary to complete assigned tasks. The skill level of the staff provided shall be current and consistent with new technologies.
17.0 Interaction With Other Activities. Government and contractor personnel will be working in common areas during working hours. Contractor performance shall not interfere with Government work in the area where any service or maintenance work is being performed. In the event the contractor believes that Government and other contractor personnel are interfering with the performance of the tasks described in this SOW, the contractor shall notify the Designated Government Representative immediately. The contractor is obligated to continue performance of the effort described in this contract unless there is authorization from the KO or Designated Government Representative to stop work. Failure by the contractor to notify the Designated Government Representative and receive necessary instructions could result in denial of any additional costs incurred in performance of the contract under such conditions. Other Government contractor’s may be performing required services in areas that interrelate with the requirements of this contract. The Government will facilitate initial contact between contractor’s performing other contracts and this contract. The contractor shall provide all further required coordination between other contractor’s for any task specified in this contract that relates to or impacts on any other contracted work.
18.0 Safety. The Contractor is solely responsible for compliance of all safety regulations of employees while working on government owned facilities. All accidents which may arise out of, or in connection with, performance of services required herein which result in injury, death, or property damage, shall be reported in writing to the Contracting Officer and Designated Government Representative within twenty-four hours of such occurrence. Reports shall provide full details of the accident, including statements from witnesses. The fore-going procedures shall also apply to any claim made by a third party against the contractor as a result of any accident that occurs in connection with performance under this contract.
(End of Summary of Changes)