1.31 Legacy Flight JA Redacted.pdf
PDF 1 MB Posted
- Attached to
- Notice of Intent to award a sole source contract to Navy Legacy Flight Foundation (NLFF)
- Solicitation number
- N6883625Q0013
About this file
This is a Memorandum to File justifying the use of other than full and open competition for an acquisition under the simplified acquisition threshold. The document details the justification for sole-sourcing to the Navy Legacy Flight Foundation (NLFF) for demonstration flights and support at Navy community outreach events using vintage aircraft including F4U Corsair, F8F Bearcat, F7F Tigercat, FG1-D Corsair, FM-2 Wildcat, and F6F Hellcat.
The justification is based on "Other Reasons" rather than restrictive rights or exclusive licensing agreements. The document explains that NLFF is the only organization capable of providing these specific vintage aircraft in flyable condition for the required demonstrations. The foundation operates a specialized fleet of rare aircraft maintained under strict safety protocols and has a proven track record with the Navy. The contracting officer indicates that using any other source would result in substantial costs that could not be recovered through competition and would potentially impact the Navy's mission of preserving its naval aviation heritage. The document is signed by technical POC WR Sides on May 17, 2024 and Contracting Officer Jodi McCarty with an approval date of December 17, 2024.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B. ___ BRAND NAME. Item required must be a brand name product, or feature of a product, particular to one manufacturer. Discuss why you are precluding consideration of a product manufactured by another company. Describe how the particular brand name, product, or feature is essential to the
C. ___ UNUSUAL AND COMPELLING URGENCY. The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals. Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:
1. Date on which the requirement was first identified:
2. Required delivery date/period of performance:
3. Explanation of why delivery/commencement of services by the date mentioned above is required:
Explain the impact to the mission if the date above is not met, any special circumstances or conditions
4. If appropriate, include any additional pertinent information.
OTHER THAN FULL AND OPEN COMPETITION
Pursuant to Title 41 U.S.C. 3304 and 10 U.S.C. 2304(c) each authorize, under certain conditions, contracting without providing for full and open competition.
Each contract awarded without providing for full and open competition shall contain a reference to the specific authority under which it was so awarded.
Contracting without providing for full and open competition shall not be justified on the basis of
a. A lack of advance planning by the requiring activity or
b. Concerns related to the amount of funds available (e.g., funds will expire) to the agency or activity for the acquisition of supplies or services.
c. The requirement came down last minute.
d. Suggested vendor has done work for the Government in the past.
e. The Government has a good working relationship with the suggested vendor.
It is the responsibility of each activity to provide and certify the data that will support contracting with other than full and open competition procedures. Each justification shall contain sufficient facts and rationale to justify the use of said procurement. It shall have a detailed explanation as to why an item or service can only be provided by one responsible source and no other supplies or services will satisfy agency requirements. Statements such as "only known source", "only source that can meet required compatible with existing equipment" is not enough information to constitute a valid sole source justification. An adequate sole source justification shall include the following minimum information:
a. The intended use of the item or service
b. A description of the item to include the critical or unique characteristics of the material or service which are mandatory that limit the requested item to a sole source
c. The reason why no other source can furnish the requested item (e.g. patents, copyrights or other proprietary data).
Sole Source
Sole Source purchases occur when the required supplies or services can be bought from only one source, thereby eliminating all competition.
Acquisitions conducted under simplified acquisition procedures are exempt from the requirements in Part
6. However, the acquisition team must
a. Conduct sole source acquisitions, as defined in 2.101, (including brand name) under this subpart only if the need to do so is justified in writing and approved at the levels specified in paragraph (a)(2) of this section;
b. Prepare sole source (including brand name) justifications using the format at FAR Subpart 6.303- 2, modified to reflect that the procedures in FAR subpart 13.5 were used in accordance with 41 U.S.C. 1901 or the authority of 41 U.S.C. 1903.
Some valid reasons for a sole source are:
a. Repair parts only available through equipment manufacturer (market survey has been conducted)
b. Compatibility with existing equipment (requires documentation of existing equipment value and special features, which no other manufacturer can provide)
c. The source can / has established proprietary rights in the item or service required
d. The work is so closely related to that of an on-going contract that would not be feasible to consider another potential contractor
e. Similar products lack features that are necessary to meet the Government's minimum needs or other contractors are not qualified to perform necessary services (specific, detailed features or qualifications must be provided in the purchase description or statement of work)
f. Compliance with the agency's standardization program (e.g. Shipboard Copier Program (SCP))
g. National security - disclosure of the agency's needs would compromise the national security
Brand Name
An acquisition or portion of an acquisition that uses a brand-name description or other purchase description to specify a particular brand-name, product, or feature of a product, peculiar to one manufacturer
a. Does not provide for full and open competition, regardless of the number of sources solicited; and
b. Shall be justified and approved in accordance with FAR 6.303 and 6.304.
Acquisitions conducted under simplified acquisition procedures are exempt from the requirements in Part
6. However, the acquisition team must
a. Conduct sole source acquisitions, as defined in 2.101, (including brand name) under this subpart only if the need to do so is justified in writing and approved at the levels specified in paragraph (a)(2) of this section;
b. Prepare sole source (including brand name) justifications using the format at FAR Subpart 6.303- 2, modified to reflect that the procedures in FAR subpart 13.5 were used in accordance with 41 U.S.C. 1901 or the authority of 41 U.S.C. 1903.
Unusual and Compelling Urgency
Unusual and Compelling Urgency is a serious situation that can lead to a cascading mission failure.
Within their respective justifications, the Contracting Officer has to not only explain what the compelling urgency is, but also describe the irreparable damage the Government will endure if the award is either delayed or denied. This type of statutory authority is used by the Department of Defense (DoD) during international conflicts or natural disasters.
Government would be seriously injured unless the agency is permitted to LIMIT the number of sources from which it solicits bids or proposals, full and open competition need not be provided for.
This authority applies in those situations where
a. An unusual and compelling urgency precludes full and open competition, and
b. Delay in award of a contract would result in serious injury, financial or other, to the Government.
Limitations
a. Contracts awarded using this authority shall be supported by the written justifications and approvals described in 6.303 and 6.304. These justifications may be made and approved after contract award when preparation and approval prior to award would unreasonably delay the acquisition.
b. This statutory authority requires that agencies shall request offers from as many potential sources as is practicable under the circumstances.
Some valid reasons for an Unusual and Compelling Urgency are:
a. A crane rental to transport boats out of the water because a hurricane.
b. An engine part of a ship that is broken down off the coast.
c. New fall protection equipment to replace the damaged equipment.
File details come from the government source that posted it. Updated .