SUMMARY

OPERATION ENDURING PROMISE - PAITA

BID SCHEDULE SUMMARY
SITESO&MN
ACE Team$ - 0
Fleet Landing Zone$ - 0
Helo Landing Zone (HLZ) #1 ESTACION NAVAL DE PAITA$ - 0
Med Site #1 CENTRO DE SALUD MENTAL COMUNITARIO "SAN ALFONSO"$ - 0
Med Site #2 CENTRO DE SALUD JUAN VALER SANDOVAL$ 1,500.00
GRAND TOTAL$ 1,500.00

ACE TEAM

ACE TEAM PERU - Aeropuerto Internacional de Piura, Piura, Peru

COMMENTS
PERIOD25 OCT 2018 - 7 NOV 2018
DAYS OF SERVICE14
PERSONNEL
MAIN PERSONNEL5
Total8
ITEMDESCRIPTION OF SUPPLIES OR SERIVESDAYSQTYUNIT PRICEOM&N TotalCOMMENTS
TRANSPORTATIONTOTAL
16-Pax 4x4 SUV 4WD/w DRIVER, UNLIMITED MILEAGE142$0.0024 HOURS/DAY turned over to base camp upon departure of ACE team.
COMMUNICATIONDAYSQTYTOTAL
5SMART PHONES WITH SIM CARD145$0.00ENTIRE DET HOST NATION CARRIER PROVIDED Unlimited international calls, local calls, txt, and data
TOTAL$0.00

FLEET LANDING

FLEET LANDING

COMMENTS
PERIOD30 OCT 2018 - 7 NOV 2017
DAYS OF SERVICE9
PERSONNEL
MAIN PERSONNEL240
TOTAL240
ITEMDESCRIPTION OF SUPPLIES OR SERVICESDAYSQTYUNIT PRICEOM&N TotalCOMMENTS
TRANSPORTATIONDAYSQTYTOTAL
46-Pax 4x4 SUV 4WD/w DRIVER, UNLIMITED MILEAGE92$0.00COMMAND ELEMENT 24 HOURS/DAY
COMMUNICATIONDAYSQTYTOTAL
6SMART PHONES WITH SIM CARD920$0.00ENTIRE DET HOST NATION CARRIER PROVIDED Unlimited local calls and txt, and data
TOTAL$0.00
Fleet LandingEstacion Naval De Paita
Fleet Landing (Alternate)Terminales Portuarios Euroandinos

HLZ #1

HELO LANDING ZONE #1 ESTACION NAVAL DE PAITA

COMMENTS
PERIOD30 OCT 2018 - 7 NOV 201730-31 Setup. 01-05 Mission Execute. 06-07 Breakdown.
DAYS OF SERVICE9
PERSONNEL
MAIN PERSONNEL240
TOTAL240
ITEMDESCRIPTION OF SUPPLIES OR SERVICESDAYSQTYUNIT PRICEO&MN TotalCOMMENTS
LINE HAULDAYSQTYTOTAL
7Line Haul from location 3 to location 122$0.0060' Diesel flatbed truck to move a variety of TRICON CONTAINERS (8 ft L X 6 ft W X 8 ft, approx. 6,000 lbs each), ISU-90 Containers (88"x108"x90 approx.6,000 lbs each)Med Site 1
810,000 LB FORKLIFT and W/DRIVER, FUEL, UNLIMITED MILEAGE, 14 hours a day.21$0.001 All-Terrain Forklift per truck w/operator, fuel, unlimited mileage to load and offload.
9TRUCK TRACTOR W/ 52’SEMITRAILER LOWBED 55 TON W/ DRIVER, FUEL, UNLIMITED MILAGE AND ASSOCIATED STRAPS/LOAD SECURING GEAR 14 hours a day21$0.00Truck Tractor with an attached 8’ x 52’ LOWBED SEMITRAILER to move one (1) 10k all-terrain forklift with (preferred) hydraulic powered self-contained detachable gooseneck. Shall include chains, straps/securing gear. Truck Tractor provided w/operator, fuel and unlimited mileage to load and transport (1) Forklift
10Line Haul from location 3 to location 222$0.0060' Diesel flatbed truck to move a variety of TRICON CONTAINERS (8 ft L X 6 ft W X 8 ft, approx. 6,000 lbs each), ISU-90 Containers (88"x108"x90 approx.6,000 lbs each)Med Site 2
1110,000 LB FORKLIFT and W/DRIVER, FUEL, UNLIMITED MILEAGE, 14 hours a day.21$0.001 All-Terrain Forklift per truck w/operator, fuel, unlimited mileage to load and offload.
12TRUCK TRACTOR W/ 52’SEMITRAILER LOWBED 55 TON W/ DRIVER, FUEL, UNLIMITED MILAGE AND ASSOCIATED STRAPS/LOAD SECURING GEAR 14 hours a day21$0.00Truck Tractor with an attached 8’ x 52’ LOWBED SEMITRAILER to move one (1) 10k all-terrain forklift with (preferred) hydraulic powered self-contained detachable gooseneck. Shall include chains, straps/securing gear. Truck Tractor provided w/operator, fuel and unlimited mileage to load and transport (1) Forklift
13Line Haul from location 1 to location 322$0.0060' Diesel flatbed truck to move a variety of TRICON CONTAINERS (8 ft L X 6 ft W X 8 ft, approx. 6,000 lbs each), ISU-90 Containers (88"x108"x90 approx.6,000 lbs each)Med Site 1
1410,000 LB FORKLIFT and W/DRIVER, FUEL, UNLIMITED MILEAGE, 14 hours a day.21$0.001 All-Terrain Forklift per truck w/operator, fuel, unlimited mileage to load and offload.
15TRUCK TRACTOR W/ 52’SEMITRAILER LOWBED 55 TON W/ DRIVER, FUEL, UNLIMITED MILAGE AND ASSOCIATED STRAPS/LOAD SECURING GEAR 14 hours a day21$0.00Truck Tractor with an attached 8’ x 52’ LOWBED SEMITRAILER to move one (1) 10k all-terrain forklift with (preferred) hydraulic powered self-contained detachable gooseneck. Shall include chains, straps/securing gear. Truck Tractor provided w/operator, fuel and unlimited mileage to load and transport (1) Forklift
16Line Haul from location 2 to location 322$0.0060' Diesel flatbed truck to move a variety of TRICON CONTAINERS (8 ft L X 6 ft W X 8 ft, approx. 6,000 lbs each), ISU-90 Containers (88"x108"x90 approx.6,000 lbs each)Med Site 2
1710,000 LB FORKLIFT and W/DRIVER, FUEL, UNLIMITED MILEAGE, 14 hours a day.21$0.001 All-Terrain Forklift per truck w/operator, fuel, unlimited mileage to load and offload.
18TRUCK TRACTOR W/ 52’SEMITRAILER LOWBED 55 TON W/ DRIVER, FUEL, UNLIMITED MILAGE AND ASSOCIATED STRAPS/LOAD SECURING GEAR 14 hours a day21$0.00Truck Tractor with an attached 8’ x 52’ LOWBED SEMITRAILER to move one (1) 10k all-terrain forklift with (preferred) hydraulic powered self-contained detachable gooseneck. Shall include chains, straps/securing gear. Truck Tractor provided w/operator, fuel and unlimited mileage to load and transport (1) Forklift
TOTAL$0.00

MEDSITE #1

MED SITE #1 CENTRO DE SALUD MENTAL COMUNITARIO "SAN ALFONSO"

COMMENTS
PERIOD30 OCT 2018 - 7 NOV 201730-31 Setup. 01-05 Mission Execute. 06-07 Breakdown.
DAYS OF SERVICE9
PERSONNEL
MAIN PERSONNEL120
TOTAL120
ITEMDESCRIPTION OF SUPPLIES OR SERVICESDAYSQTYUNIT PRICEO&MN TotalCOMMENTS
TRANSPORTATIONDAYSQTYTOTAL
240 Pax Bus w/Driver & Fuel93$0.0012 HOURS/DAY REQUIRED TO TRANSPORT 120 PERSONNEL TO EACH MED SITE
BOTTLE WATERDAYSQTYTOTAL
19CASES OF WATER945$0.0024-16.9oz per case (45 cases delivered every morning)
ICEDAYSQTYTOTAL
21ICE (units in quantity are kg)9100$0.00100kg a day delivered with insulated ice chests provided.
WASTEDAYSQTYTOTAL
2355 Gallon Trash Can910$0.00Emptied 2x daily
LATRINE/WATER WASTEDAYSQTYTOTAL
25Portable Latrines (PORTA POTTIES) (3'X3'X7')916$0.00To include cleaning/restocking 4 rolls of toilet paper/pumping 2x a day early in the morning and evening.
26Triple-sink Handwashing station 3 faucets, soap & paper dispenser95$0.00With own water supply, to be cleaned, restocked, and pumped 2x a day loaded and offloaded from the camp-site by contractor.
VECTOR/GRASSDAYSQTYTOTAL
29VECTOR CONTROL (spraying)1EA$0.004 acres on 26 October 2018
POTABLE WATERDAYSQTYTOTAL
31Distilled Water (Dental Chairs)1150$0.00Delivered in Distilled 5 GL Containers
FUELDAYSQTYTOTAL
33MOGAS (GAL)1300$0.00FPCON FUEL REQUIREMENTS
34DIESEL (GAL)1340$0.00FPCON FUEL REQUIREMENTS
RENTAL EQUIPTMENTDAYSQTYTOTAL
35Security Barriers, pedestrian, size 3' length9200$0.00Length is in Feet
36Canopies (15' x 15') free standing95$0.00
37Chairs , plastic, stacking or folding9550$0.00
38Tables, 6ft Folding950$0.00
39Portable Pedestal Oscillating fan935$0.00
40Rental Generators (20kw)/With Fuel94$0.00240-120V
41Night Security Lighting gas powered w/fuel910$0.0012 hours of use. Fueled Daily. 15ft high mast with 4 high intensity light heads
42LED work lights910$0.00Portable standing LED or cool touch worklights, 2 light heads per stand for room illumination
CONSTRUCTIONDAYSQUANTITYU/PO&MN TotalCOMMENTS
51Room Cleaning130$0.0030 Rooms cleaned with bleach, or a sutiable alternative, dusted, swept, vacuumed, mopped and sanitized. ESC will be responsible for cleanup and removal of all debris.
52Paver Installation11$0.00In accordance with the medical site schematics remove all existing plants and paver walkways where indicated. Save the plants for future use. Remove dirt and grade areas so that water will drain into the established drainage basins. Install approximately 2,000 square feet of pavers (reuse existing pavers as needed) taking care to ensure that the back compound gate is able to open and that the pavers present a smooth surface for patient movement
SITE TOTAL$0.00

MEDSITE #2

MED SITE #2 CENTRO DE SALUD JUAN VALER SANDOVAL

COMMENTS
PERIOD30 OCT 2018 - 7 NOV 201730-31 Setup. 01-05 Mission Execute. 06-07 Breakdown.
DAYS OF SERVICE9
PERSONNEL
MAIN PERSONNEL120
TOTAL120
ITEMDESCRIPTION OF SUPPLIES OR SERVICESDAYSQTYUNIT PRICEO&MN TotalCOMMENTS
TRANSPORTATIONDAYSQTYTOTAL
340 Pax Bus w/Driver & Fuel93$0.0012 HOURS/DAY REQUIRED TO TRANSPORT 120 PERSONNEL TO EACH MED SITE
BOTTLE WATERDAYSQTYTOTAL
20CASES OF WATER945$0.0024-16.9oz per case (45 cases delivered every morning)
ICEDAYSQTYTOTAL
22ICE (units in quantity are kg)9100$0.00100kg a day delivered with insulated ice chests provided.
WASTEDAYSQTYTOTAL
2455 Gallon Trash Can910$0.00Emptied 2x daily
LATRINE/WATER WASTEDAYSQTYTOTAL
27Portable Latrines (PORTA POTTIES) (3'X3'X7')916$0.00To include cleaning/restocking 4 roles of toilet paper/pumping 2x a day early in the morning and evening.
28Triple-sink Handwashing station 3 faucets, soap & paper dispenser94$0.00With own water supply, to be cleaned, restocked, and pumped 2x a day loaded and offloaded from the camp-site by contractor.
VECTOR/GRASSDAYSQTYTOTAL
30VECTOR CONTROL (spraying)1EA$0.001 acre on 26 October 2018
POTABLE WATERDAYSQTYTOTAL
32Distilled Water (Dental Chairs)1150$0.00Delivered in Distilled 5 GL Containers
RENTAL EQUIPTMENTDAYSQTYTOTAL
43Security Barriers, pedestrian, size 3' length9300$0.00Length is in Feet
44Canopies (15' x 15') free standing98$0.00
45Canopies (15' x 15') with sides92$0.00Must be secured in place
46Chairs , plastic, stacking or folding9250$0.00
47Tables, 6ft Folding930$0.00
48Portable Pedestal Oscillating fan930$0.007,500-10,000 CFM
49Rental Generators (20kw)/With Fuel93$0.00240-120V
50Night Security Lighting gas powered w/fuel96$0.0012 hours of use. Fueled Daily.
CONSTRUCTIONDAYSQUANTITYU/POM&N TotalCOMMENTS
53Chain Link Fence,Permanent11$0.00Install approximately 175 feet of 10 foot high chain link fence topped with an outward-facing barb wire array of three strands. Fencing must be installed using a minimum of 4 inch diameter galvanized steel poles placed into concret at least three feet deep. The installation will include two double sided swinging gates allowing an opening of 12 feet in width. Placement of the fence and gates is contained in the attached drawing.
54Roof Repair11$0.00Remove and re-install galvanized steel roof , approximate area 36 x 16 feet. Current roof is sagging and unsafe. New roof can utilize existing roof materiel but will incorporate new galvanized steel framework. Wood framework is not adequate for the span. Renovation will include a increase in height of the existing outside wall so that there are no openings and so that the wall is ajoined to the bottom of the roof.
55Lighting Installation112$0.00Install 12 each 4 foot long four bulb flourescent lighting fixtures with a plug end in the indicated dental and radiology rooms. These rooms are divided in half each half should have two light fixtures installed. Lights should be able to be run from the installed generators and will be left in place at the end of the mission.
56Room Cleaning110$0.0010 Rooms cleaned with bleach, or a suitable alternative, dusted, swept, vacuumed, mopped and sanitized. ESC will be responsible for cleanup and removal of all debris.
MISCELLANEOUS MATERIALSDAYSQUANTITYU/PO&MN TotalCOMMENTS
57Miscellaneous materials to assist in tasking11$1,500.00$1,500.00NOT TO EXCEED (NTE) $1,500.00 and all cost must be approved by the Contracting Officer and COR before proceeding.
SITE TOTAL$1,500.00