Attachment_01_-_Bid_Schedule.pdf

PDF 463 KB Posted

Attached to
Household Goods Services
Solicitation number
N6883617T0091
Issued by

About this file

Attachment 1

View the file

Other files

File Type Posted
Amendment_3.pdf PDF
Amendment_2.pdf PDF
Amendment_1.pdf PDF
Attachment_G5_-_Acronyms.pdf PDF
Attachment_02_-_CDRL.PDF PDF
Appendix_D.pdf PDF
Appendix_E.pdf PDF
Attachment_G1_-_Figures.pdf PDF
Attachment_G2_-_Pubs_and_Com_Stndrds.pdf PDF
Attachment_G6_-_DPM_Claims_and_Liability.pdf PDF
Attachment_G3_-_Contractor_Docs_Rqmt_Listings.pdf PDF
N68836-17-T-0091.pdf PDF
Attachment_G4_-_Definitions.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 01: Bid Schedule

ESTIMATED QUANTITIES

The quantities shown by area of performance for each item in this solicitation are the Government’s estimates of requirements that may be ordered during the period of the contract.

The Government’s estimates maximum daily requirements, excluding Saturday, Sundays; national, state and local holidays are listed below by area of performance with each schedule. Offeror’s must complete the “Offeror’s

Guaranteed daily capability”, which must equal or exceed the Government’s minimum acceptable daily capability, for all items within an area of performance for which they submit bids. Failure to do so may render the bid nonresponsive.

Government’s Government’s Offeror’s

EST Maximum Minimum Guaranteed

Daily Daily Daily

Requirement Capability Capability

OUTBOUND

(Schedule I)

550 NCWT 300 NCWT NCWT

INBOUND

(Schedule II)

550 NCWT 300 NCWT NCWT

LOT I BASE YEAR (1 June 2017 – 30 Nov 2018)

SCHEDULE I

OUTBOUND SERVICES

Item 0001 Complete Service – GTMO Outbound (HHGs). Outbound services of Jacksonville FL AOR HHG destine to GTMO, service must include premove survey, servicing of appliances, disassembly of furniture, packaging, inventorying, tagging, wrapping, padding, packing and bracing of HHG in Government-owned and furnished shipping containers (Shipping Container Commercial Spec ASTM-D4169-01, SDDC Pamphlet 55-12) at member’s/employee’s residence, or at contractor’s facility when ordered by the contracting officer, properly securing and sealing for shipment, weighing, obliterating old markings, marking, strapping, and drayage of the container within an area of performance. Service must also include loading of shipments on linehaul carrier’s equipment at the contractor’s facility. When containers will not accommodate all articles of any one lot, loose articles must be packed in the said containers before any over-packed articles are placed therein. Overflow, oversize, and other shipments must be paid for under Item 0003.

EST

ANNUAL UNIT

QTY UNIT PRICE TOTAL

AA. At owners residence:

Container, FED SPEC

PPP-B-580, or MTMC

Pam. 55-12

(1) Drayage Included 2000 NCWT $ $_______

(2) Drayage Not Included 130 NCWT N/C N/C

AB. At Contractors Facility

PPP-B-580, or MTMC

Pam. 55-12

(1) Drayage Included 40 NCWT $ $_______

(2) Drayage Not Included 40 NCWT N/C N/C

Item 0002 Outbound GTMO (HHGs From Non-Temporary Storage). Outbound services of NTS from

Jacksonville FL AOR HHG destine to GTMO Service must be the same as Item 0001 above except that: (a) HHG must be picked up at a nontemporary storage facility and transported to contractor’s facility; or (b) HHG must be delivered to contractor’s facility; and (c) premove survey, servicing of appliances, preliminary packing and accessorial services must not be provided. Overflow articles requiring containerization will be paid for under Item

0003.

EST

ANNUAL UNIT UNIT

QTY PRICE TOTAL

AA. Pickup by Contractor:

PPP-B-580, or MTMC

Pam. 55-12

(1) Drayage Included 330 NCWT $ $_______

(2) Drayage Not Included 10 NCWT N/C N/C

AB. Delivered to Contractor:

PPP-B-580, or MTMC

Pam. 55-12

(1) Drayage Included 31 NCWT $ $_______

Item 0003. Complete Service-GTMO Outbound (HHG-Overflow Articles and HHG Shipments requiring other than ASTM-D4169-01 or SDDC Pamphlet 55-12). Service must be the same as Item 0001 or Item 0002 except that the loose articles are drayed to contractor’s facility when ordered by the contracting officer for containerization in Government-furnished or contractor-furnished containers. Overflow, other shipments, and oversize containers must be constructed IAW ASTM-D6251. Each container must be caulked during assembly.

Overflow boxes and other shipments must be limited to one per shipment. Other shipments are small HHG shipments that normally require a lesser size box than specified in Commercial Spec ASTM-D4169-01 or SDDC

Pamphlet 55-12. Overflow containers are of a lesser size than specified in Commercial Spec ASTM-D4169-01 or

SDDC Pamphlet 55-12 and oversized containers are always of a greater size than specified in Commercial Spec

ASTM-D4169-01 or SDDC Pamphlet 55-12. One or more of these containers may be required per shipment. Price bid for Item 0003 includes container plus weight of its contents.

EST

AA. Government-Furnished

Containers:

(1) Overseas Pack:

Drayage Required

a. Overflow Articles N/A NCWT

b. Oversize Articles N/A NCWT

c. Other Shipments N/A NCWT

(2) Overseas Pack:

Drayage Not Required

a. Overflow Articles N/A NCWT

AB. Government-Furnished

(1) Domestic Pack:

Drayage Required

a. Overflow Articles N/A NCWT

(2) Domestic Pack:

a. Overflow Articles N/A NCWT

AC. Contractor-Furnished

(1) Overseas Pack:

Drayage Required

a. Overflow Articles N/A NCWT

Contractor-Furnished

Drayage Required

(2) Domestic Pack:

a. Overflow Articles N/A NCWT

a. Overflow Articles N/A NCWT

Item 0004 Complete Service - GTMO Outbound (Unaccompanied Baggage). Service includes packaging, inventorying, packing in Government approved containers, weighing, strapping, obliteration of old markings, marking, and loading shipments on the linehaul carrier’s equipment. Service must be performed at member’s/employee’s residence. (Service may be performed at contractor’s facility when ordered by the Ordering

Officer.)

EST

(1) Drayage Included 44 NCWT $ $______

(2) Drayage Not Included 10 NCWT N/C N/C

AB. Contractor-Furnished

Containers:

(1) Drayage Included 1210 NCWT $ $_______

Item 0005 Complete Service - GTMO Outbound (Unaccompanied Baggage from Nontemporary

Storage). Service must be the same as Item 0004 except that (a) unaccompanied baggage must be picked up at a nontemporary storage facility and transported to contractor’s facility; or (b) unaccompanied baggage must be delivered to contractor’s facility; and (c) servicing of appliances, preliminary packing and accessorial services must not be provided.

EST

(1) Drayage Included 22 NCWT $ $_______

AB. Contractor-Furnished

(1) Drayage Included 28 NCWT $ $_______

Item 0006 Outbound Service - GTMO Unaccompanied Baggage Packed By Member/Employee.

Service must include weighing, strapping banding, obliterating old markings, and marking. Service may include

(when necessary) containerization in outer shipping containers as ordered by the Ordering Officer. Service shall include two or more shipments picked up from a Government office, warehouse, or facility. Service shall also include loading of shipments on line-haul carrier’s equipment at the contractor’s facility or drayage to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers.

EST

AA. Containerization Required:

(1)(Drayage Included) 19 GCWT $ $_______

(2)Drayage Not Included 10 NCWT N/C N/C

AB. Containerization Not Required:

(1)(Drayage Included) 22 GCWT $ $_______

Item 0007 Expensive and Valuable Items. Service must include inventorying each item, packing in

Government-approved, Contractor- furnished container(s), marking, banding and cubing at member/employee's residence. Drayage if required, will be ordered by the contracting officer. If drayage is required, weighing shall be done on properly certified scales and a certified weight ticket shall be furnished. If drayage is not required, weighing must be done at member/employee's residence on portable or bathroom scales. In jurisdictions where local law prohibits the certification of portable scales, a weight certificate will not be required. However, upon the written authority of the contracting officer, the Contractor may apply a constructive weight of 11 pounds per gross cubic foot of the container.

EST

AA. Drayage Included N/A NCWT

AB. Drayage Not Included N/A NCWT

Item 0008 Storage. Storage of containerized articles must be furnished when ordered by the contracting officer.

Charges must not commence earlier than the sixth (6th) workday following date of transportation officer's receipt of notification of completion of containerization service. Storage charges apply for each 30-day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges.

EST

N/A NCWT

Item 0009 Containers. Service must consist of the furnishing of the following types of new containers or specially constructed wooden crates. Containers furnished or specially constructed are to be assembled and ready for loading.

When a specific container from the SDDC Pamphlet 55-12 is ordered, the order will indicate the SDDC approval number.

EST

AA. Container (FED SPEC PPP-B-500) 44 EA $ $_______

AB. Container (MTMC Pam 55-12)* 44 EA $ $_______

AC. Crate (MIL-C-52950) N/A CU FT or fraction thereof

Item 0010 Remarking, Coopering, and Assembling/Disassembly Service.

AA. Remarking of Shipments for Reconsignment. Service must consist of obliteration of all old markings, stenciling of necessary information on loaded shipping containers scheduled for reconsignment and loading on the hauling carrier's vehicle.

EST

33 PC $ $_______

AB. Coopering. Service must consist of repair of containers not to exceed 30% of total area of shipping container or cost of repairs will not exceed 50% of the container replacement cost. Minor repair, such as replacement of bolts, nails, and bands shall be accomplished at no expense to the Government.

10 PC N/C N/C

AC. Assembly/Disassembly of Government-Owned Containers. Contractor will assemble government-owned containers. The government will furnish component parts. Contractor will disassemble government-owned containers. Component parts will be put into a cloth bag and attached to the container. Knocked down container sections will be banded.

EST

(1)Assembly 10 PC N/C N/C

(2)Disassembly 10 PC N/C N/C

Item 0011 Drayage Beyond the Contract Area of Performance. Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed 60 miles. Mileage must be computed on the shortest highway distance commencing with the applicable point of pickup to the outer boundary of the contract area of performance.

EST

AA. Household goods 10 per N/C N/C loaded mile

AB. Unaccompanied baggage 10 per N/C N/C

Item 0012 Attempted Pickup. When the initial attempt to pickup a shipment at the owner's residence is unsuccessful, charges apply provided the Contractor notified the contracting officer via telephone and provided that after contractor's notification, the contracting officer (a) cannot locate the owner within 30 minutes, (b) cannot have the owner at the residence within one hour after notification, and (c) the Contractor left a notice of attempted pickup at the residence.

EST

AA. Household goods 10 Ea N/C N/C

Shpmt

AB. Unaccompanied baggage 10 Ea N/C N/C

NOTE: All Above Items are included in the evaluation of bids

Item 0013 Additional Services. The contractor must provide additional services not included in the schedule, but required for satisfactory completion of the services ordered under this contract, at a rate comparable to the rate for like services as contained in tenders on file with the state regulatory bodies or SDDC, in effect at the time of the order.

Item 0014 Complete Service – GTMO Outbound (UB & HHGs). Services must include at contractor’s facility, when ordered by the contracting officer, weighing, obliterating old markings, marking and drayage of containers/shipments to air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers within an area of performance for onward movement. Service must also include off loading of shipments from linehaul carrier’s equipment at the contractor’s facility.

EST

2200 NCWT $ $_______

RECAPITULATION SCHEDULE I

SCHEDULE TOTAL - $_______

SCHEDULE II

INBOUND SERVICES

Item 0015 Complete Service – GTMO Inbound (HHGs). Services of HHG to Jacksonville FL AOR from

GTMO must include drayage from contractor's facility to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, drayage to member’s/employee’s residence, decontainerization and unpacking of loaded containers of HHG and placing goods in rooms as directed by member/employee, unservicing appliances, assembly of any disassembled articles and removing shipping containers, barrels, boxes/crates, and debris from member’s/employee’s residence and drayage of empty containers to contractor’s or Government facility.

EST

330 NCWT $ $_______

Item 0016 Complete Service - GTMO Inbound (HHGs). Service must be same as Item 0015 above except that drayage of shipment to residence is not required.

EST

10 NCWT N/C N/C

Item 0017 Complete Service GTMO Inbound (HHGs). Service must be the same as Item 0015 above except removal of items from outer container will be as the Contractor's facility and articles will be drayed to member’s/employee’s residence.

EST

Item 0018 GTMO Inbound Service - Contractor Facility (HHGs). Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle into the contractor’s facility and delivery of articles to property member/employee, motor van carrier, or NTS contractor at the contractor’s facility.

EST

201 NCWT $ $_______

Item 0019 Complete Service - Expensive and Valuable Items. Services must include drayage from the storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, decontainerization and unpacking of containers at member’s/employee’s residence, and removal of shipping containers and debris from the residence.

EST

AB. Drayage Not Included N/A NCWT _____

Item 0020 Complete Service - GTMO Inbound (Unaccompanied Baggage).

Service must include drayage from contractor's facility to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivery carrier's vehicle, handling into contractor’s facility, drayage of unaccompanied baggage containers to owner’s residence, unpacking of containers, reassemble of articles and removal of all shipping containers and debris from the residence.

EST

495 NCWT $ $_______

Item 0021 Complete Service - GTMO Inbound (Unaccompanied Baggage). Service must be same as Item

0020 except that drayage to residence is not required.

EST

Item 0022 GTMO Inbound Service - Contractor Facility (Unaccompanied Baggage). Service must be the same as Item 0020 above except service shall also include removal of unaccompanied baggage from outer shipping containers for pickup by the member/employee or release to a motor carrier or other contractor at the contractor's facility.

EST

55 NCWT $ $_______

Item 0023 Storage. Storage of containerized articles must be furnished when ordered. Charges under this item must not commence earlier that the sixth (6th) workday following date of Contractor’s notification to the transportation officer of arrival of shipment. Storage charges apply for each 30-day period or fraction thereof. Date of release from storage shall not be considered in computation of storage charges.

220 NCWT $ $_______

Item 0024 Remarking, Coopering and Assembly/Disassembly Service.

AA. Remarking of Shipments for Reconsignment Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, obliteration of all old markings, stenciling of necessary information on loaded shipping containers schedule for reconsignment loading on the hauling carrier’s vehicle.

EST

66 PC $ $_______

AB. Coopering. Service must consist of repair of containers not to exceed 30% of total area of shipping container or cost of repairs will not exceed 50% of the container replacement cost. Minor repair, such as replacement of bolts, renailing and rebanding shall be accomplished at no expense to the Government.

AC. Assembly/Disassembly of Government-Owned Containers.

Containers will assemble government-owned containers. The Government will furnish component parts. Contractor will disassemble government-owned containers. Component parts will be put into a cloth bag and attached to the container. Knocked down container sections will be banded.

Item 0025 Attempted Delivery. When the initial attempt to deliver a shipment at the owner's residence is unsuccessful, charges apply provided the Contractor notified the contracting officer via telephone and provided that after contractor's notification, the contracting officer (a) cannot locate the owner within 30 minutes, (b) cannot have the owner at residence within one hour after notification, and (c) the Contractor left a notice of attempted delivery at the residence.

EST

AA. Household Goods 15 PS N/C N/C

AB. Unaccompanied baggage 15 PS N/C N/C

Item 0026 Reweighing. Service shall consist of weighing the loaded containers prior to delivery and weighing the empty containers after delivery.

EST

AA. Household Goods 22 PS $ $_______

AB. Unaccompanied baggage 22 PS $ $_______

Item 0027 Drayage Beyond the Contract Area of Performance. Service shall consist of drayage of packed shipments beyond the contract area of performance, not to exceed 60 miles. Mileage shall be computed on the shortest highway distance commencing with the applicable point of departure from the outer boundary of the contract area of performance to the destination point.

per

AA. Household Goods 50 loaded N/C N/C mile per

AB. Unaccompanied baggage 50 loaded N/C N/C

Item 0028 Partial Withdrawal Service shall be the same as Item 0015 or Item 0016 above, except a partial removal of the items from the outer container will be performed at the contractor's facility. Articles not removed from the shipment will remain at the contractor’s facility.

EST

ANNUAL UNIT

QTY UNIT PRICE TOTAL

Drayage Included

AA. Household Goods N/A NCWT

AB. Unaccompanied Baggage N/A NCWT

Drayage Not Included

AC. Household Goods N/A NCWT

AD. Unaccompanied Baggage N/A NCWT

Item 0029 Complete Service - GTMO Inbound (UB & HHGs). Service must include when ordered by the contracting officer, drayage of containers/shipment from air and surface transportation terminals military installations shipping offices and ocean or river terminals/piers within area of performance to contractor’s facility for onward movement. Service must also include loading of shipment to carrier’s equipment at the contractor’s facility.

10,000 NCWT $ $_______

Item 0030. Reserved. (See additional services).

RECAPITULATION SCHEDULE

Schedule II Total - $_______

Item 0030. Reserved. (See additional services).

OPTION YEAR I (1 June 2018 – 30 Nov 2019)

SCHEDULE I OPTION I

Item 1001 Complete Service – GTMO Outbound (HHGs). Outbound services of Jacksonville FL AOR HHG destineD to GTMO, service must include premove survey, servicing of appliances, disassembly of furniture, packaging, inventorying, tagging, wrapping, padding, packing and bracing of HHG in Government-owned and furnished shipping containers (Shipping Container Commercial Spec ASTM-D4169-01, SDDC Pamphlet 55-12) at member’s/employee’s residence, or at contractor’s facility when ordered by the contracting officer, properly securing and sealing for shipment, weighing, obliterating old markings, marking, strapping, and drayage of the container within an area of performance. Service must also include loading of shipments on linehaul carrier’s equipment at the contractor’s facility. When containers will not accommodate all articles of any one lot, loose articles must be packed in the said containers before any over-packed articles are placed therein. Overflow, oversize, and other shipments must be paid for under Item 0003.

PPP-B-580, or MTMC

Pam. 55-12

(1) Drayage Included 2200 NCWT $ $_______

(2) Drayage Not Included 143 NCWT N/C N/C

PPP-B-580, or MTMC

Pam. 55-12

(1) Drayage Included 44 NCWT $ $_______

(2) Drayage Not Included 44 NCWT N/C N/C

Item 1002 Outbound GTMO (HHGs From Non-Temporary Storage). Outbound services of NTS from

Jacksonville FL AOR HHG destine to GTMO Service must be the same as Item 0001 above except that: (a) HHG must be picked up at a nontemporary storage facility and transported to contractor’s facility; or (b) HHG must be delivered to contractor’s facility; and (c) premove survey, servicing of appliances, preliminary packing and accessorial services must not be provided. Overflow articles requiring containerization will be paid for under Item

0003.

EST

PPP-B-580, or MTMC

Pam. 55-12

(1) Drayage Included 363 NCWT $ $_______

PPP-B-580, or MTMC

Pam. 55-12

(1) Drayage Included 34 NCWT $ $_______

Item 1003. Complete Service-GTMO Outbound (HHG-Overflow Articles and HHG Shipments requiring except that the loose articles are drayed to contractor’s facility when ordered by the contracting officer for containerization in Government-furnished or contractor-furnished containers. Overflow, other shipments, and oversize containers must be constructed IAW ASTM-D6251. Each container must be caulked during assembly.

Overflow boxes and other shipments must be limited to one per shipment. Other shipments are small HHG shipments that normally require a lesser size box than specified in Commercial Spec ASTM-D4169-01 or SDDC

Pamphlet 55-12. Overflow containers are of a lesser size than specified in Commercial Spec ASTM-D4169-01 or

SDDC Pamphlet 55-12 and oversized containers are always of a greater size than specified in Commercial Spec

ASTM-D4169-01 or SDDC Pamphlet 55-12. One or more of these containers may be required per shipment. Price bid for Item 0003 includes container plus weight of its contents.

EST

(3) Overseas Pack:

Drayage Required

a. Overflow Articles N/A NCWT

(4) Overseas Pack:

a. Overflow Articles N/A NCWT

(3) Domestic Pack:

Drayage Required

a. Overflow Articles N/A NCWT

(4) Domestic Pack:

a. Overflow Articles N/A NCWT

(2) Overseas Pack:

Drayage Required

a. Overflow Articles N/A NCWT

Drayage Required

(2) Domestic Pack:

a. Overflow Articles N/A NCWT

a. Overflow Articles N/A NCWT

Item 1004 Complete Service - GTMO Outbound (Unaccompanied Baggage). Service includes packaging, inventorying, packing in Government approved containers, weighing, strapping, obliteration of old markings, marking, and loading shipments on the linehaul carrier’s equipment. Service must be performed at member’s/employee’s residence. (Service may be performed at contractor’s facility when ordered by the Ordering

Officer.)

EST

(1) Drayage Included 48 NCWT $ $_______

(1) Drayage Included 1331 NCWT $ $_______

Item 1005 Complete Service - GTMO Outbound (Unaccompanied Baggage from Nontemporary

Storage). Service must be the same as Item 0004 except that (a) unaccompanied baggage must be picked up at a nontemporary storage facility and transported to contractor’s facility; or (b) unaccompanied baggage must be delivered to contractor’s facility; and (c) servicing of appliances, preliminary packing and accessorial services must not be provided.

(1) Drayage Included 24 NCWT $ $_______

(1) Drayage Included 30 NCWT $ $_______

Item 1006 Outbound Service - GTMO Unaccompanied Baggage Packed By Member/Employee.

Service must include weighing, strapping banding, obliterating old markings, and marking. Service may include

(when necessary) containerization in outer shipping containers as ordered by the Ordering Officer. Service shall include two or more shipments picked up from a Government office, warehouse, or facility. Service shall also include loading of shipments on line-haul carrier’s equipment at the contractor’s facility or drayage to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers.

(1)(Drayage Included) 21 GCWT $ $_______

(1)(Drayage Included) 24 GCWT $ $_______

Item 1007 Expensive and Valuable Items. Service must include inventorying each item, packing in

Government-approved, Contractor- furnished container(s), marking, banding and cubing at member/employee's residence. Drayage if required, will be ordered by the contracting officer. If drayage is required, weighing shall be done on properly certified scales and a certified weight ticket shall be furnished. If drayage is not required, weighing must be done at member/employee's residence on portable or bathroom scales. In jurisdictions where local law prohibits the certification of portable scales, a weight certificate will not be required. However, upon the written authority of the contracting officer, the Contractor may apply a constructive weight of 11 pounds per gross cubic foot of the container.

EST

Item 1008 Storage. Storage of containerized articles must be furnished when ordered by the contracting officer.

Charges must not commence earlier than the sixth (6th) workday following date of transportation officer's receipt of notification of completion of containerization service. Storage charges apply for each 30-day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges.

Item 1009 Containers. Service must consist of the furnishing of the following types of new containers or specially constructed wooden crates. Containers furnished or specially constructed are to be assembled and ready for loading.

When a specific container from the SDDC Pamphlet 55-12 is ordered, the order will indicate the SDDC approval number.

AA. Container (FED SPEC PPP-B-500) 48 EA $ $_______

AB. Container (MTMC Pam 55-12)* 48 EA $ $_______

AC. Crate (MIL-C-52950) N/A CU FT

Item 1010 Remarking, Coopering, and Assembling/Disassembly Service.

AA. Remarking of Shipments for Reconsignment. Service must consist of obliteration of all old markings, stenciling of necessary information on loaded shipping containers scheduled for reconsignment and loading on the hauling carrier's vehicle.

36 PC $ $_______

AB. Coopering. Service must consist of repair of containers not to exceed 30% of total area of shipping container or cost of repairs will not exceed 50% of the container replacement cost. Minor repair, such as replacement of bolts, nails, and bands shall be accomplished at no expense to the Government.

EST

containers. The government will furnish component parts. Contractor will disassemble government-owned containers. Component parts will be put into a cloth bag and attached to the container. Knocked down container sections will be banded.

EST

Item 1011 Drayage Beyond the Contract Area of Performance. Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed 60 miles. Mileage must be computed on the shortest highway distance commencing with the applicable point of pickup to the outer boundary of the contract area of performance.

Item 1012 Attempted Pickup. When the initial attempt to pickup a shipment at the owner's residence is unsuccessful, charges apply provided the Contractor notified the contracting officer via telephone and provided that after contractor's notification, the contracting officer (a) cannot locate the owner within 30 minutes, (b) cannot have the owner at the residence within one hour after notification, and (c) the Contractor left a notice of attempted pickup at the residence.

Item 1013 Additional Services. The contractor must provide additional services not included in the schedule, but required for satisfactory completion of the services ordered under this contract, at a rate comparable to the rate for like services as contained in tenders on file with the state regulatory bodies or SDDC, in effect at the time of the order.

Item 1014 Complete Service – GTMO Outbound (UB & HHGs). Services must include at contractor’s facility, when ordered by the contracting officer, weighing, obliterating old markings, marking and drayage of containers/shipments to air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers within an area of performance for onward movement. Service must also include off loading of shipments from linehaul carrier’s equipment at the contractor’s facility.

2,420 NCWT $ $_______

RECAPITULATION SCHEDULE I OPTION I

SCHEDULE II OPTION I

Item 1015 Complete Service – GTMO Inbound (HHGs). Services of HHG to Jacksonville FL AOR from

GTMO must include drayage from contractor's facility to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, drayage to member’s/employee’s residence, decontainerization and unpacking of loaded containers of HHG and placing goods in rooms as directed by member/employee, unservicing appliances, assembly of any disassembled articles and removing shipping containers, barrels, boxes/crates, and debris from member’s/employee’s residence and drayage of empty containers to contractor’s or Government facility.

Item 1016 Complete Service - GTMO Inbound (HHGs). Service must be same as Item 0015 above except that drayage of shipment to residence is not required.

EST

Item 1017 Complete Service GTMO Inbound (HHGs). Service must be the same as Item 0015 above except removal of items from outer container will be as the Contractor's facility and articles will be drayed to member’s/employee’s residence.

EST

Item 1018 GTMO Inbound Service - Contractor Facility (HHGs). Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle into the contractor’s facility and delivery of articles to property member/employee, motor van carrier, or NTS contractor at the contractor’s facility.

EST

Item 1019 Complete Service - Expensive and Valuable Items. Services must include drayage from the storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, decontainerization and unpacking of containers at member’s/employee’s residence, and removal of shipping containers and debris from the residence.

EST

Item 1020 Complete Service - GTMO Inbound (Unaccompanied Baggage).

Service must include drayage from contractor's facility to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivery carrier's vehicle, handling into contractor’s facility, drayage of unaccompanied baggage containers to owner’s residence, unpacking of containers, reassemble of articles and removal of all shipping containers and debris from the residence.

Item 1021 Complete Service - GTMO Inbound (Unaccompanied Baggage). Service must be same as Item

0020 except that drayage to residence is not required.

EST

Item 1022 GTMO Inbound Service - Contractor Facility (Unaccompanied Baggage). Service must be the same as Item 0020 above except service shall also include removal of unaccompanied baggage from outer shipping containers for pickup by the member/employee or release to a motor carrier or other contractor at the contractor's facility.

EST

Item 1023 Storage. Storage of containerized articles must be furnished when ordered. Charges under this item must not commence earlier that the sixth (6th) workday following date of Contractor’s notification to the transportation officer of arrival of shipment. Storage charges apply for each 30-day period or fraction thereof. Date of release from storage shall not be considered in computation of storage charges.

EST

Item 1024 Remarking, Coopering and Assembly/Disassembly Service.

AA. Remarking of Shipments for Reconsignment Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, obliteration of all old markings, stenciling of necessary information on loaded shipping containers schedule for reconsignment loading on the hauling carrier’s vehicle.

EST

AB. Coopering. Service must consist of repair of containers not to exceed 30% of total area of shipping container or cost of repairs will not exceed 50% of the container replacement cost. Minor repair, such as replacement of bolts, renailing and rebanding shall be accomplished at no expense to the Government.

AC. Assembly/Disassembly of Government-Owned Containers. Containers will assemble government-owned containers. The Government will furnish component parts. Contractor will disassemble government-owned containers. Component parts will be put into a cloth bag and attached to the container. Knocked down container sections will be banded.

EST

Item 1025 Attempted Delivery. When the initial attempt to deliver a shipment at the owner's residence is unsuccessful, charges apply provided the Contractor notified the contracting officer via telephone and provided that after contractor's notification, the contracting officer (a) cannot locate the owner within 30 minutes, (b) cannot have the owner at residence within one hour after notification, and (c) the Contractor left a notice of attempted delivery at the residence.

EST

Item 1026 Reweighing. Service shall consist of weighing the loaded containers prior to delivery and weighing

EST

Item 1027 Drayage Beyond the Contract Area of Performance. Service shall consist of drayage of packed shipments beyond the contract area of performance, not to exceed 60 miles. Mileage shall be computed on the shortest highway distance commencing with the applicable point of departure from the outer boundary of the

Item 1028 Partial Withdrawal Service shall be the same as Item 0015 or Item 0016 above, except a partial removal of the items from the outer container will be performed at the contractor's facility. Articles not removed from the shipment will remain at the contractor’s facility.

EST

ANNUAL UNIT

QTY UNIT PRICE TOTAL

Item 1029 Complete Service - GTMO Inbound (UB & HHGs). Service must include when ordered by the contracting officer, drayage of containers/shipment from air and surface transportation terminals military installations shipping offices and ocean or river terminals/piers within area of performance to contractor’s facility for onward movement. Service must also include loading of shipment to carrier’s equipment at the contractor’s facility.

EST

Item 1030. Reserved. (See additional services).

RECAPITULATION SCHEDULE II OPTION I

OPTION YEAR II (1 June 2019 – 30 Nov 2020)

Item 2001 Complete Service – GTMO Outbound (HHGs). Outbound services of Jacksonville FL AOR HHG destine to GTMO, service must include premove survey, servicing of appliances, disassembly of furniture, packaging, inventorying, tagging, wrapping, padding, packing and bracing of HHG in Government-owned and furnished shipping containers (Shipping Container Commercial Spec ASTM-D4169-01, SDDC Pamphlet 55-12) at member’s/employee’s residence, or at contractor’s facility when ordered by the contracting officer, properly securing and sealing for shipment, weighing, obliterating old markings, marking, strapping, and drayage of the container within an area of performance. Service must also include loading of shipments on linehaul carrier’s equipment at the contractor’s facility. When containers will not accommodate all articles of any one lot, loose articles must be packed in the said containers before any over-packed articles are placed therein. Overflow, oversize, and other shipments must be paid for under Item 0003.

EST

PPP-B-580, or MTMC

Pam. 55-12

(1) Drayage Included 2420 NCWT $ $_______

(2) Drayage Not Included 157 NCWT N/C N/C

PPP-B-580, or MTMC

Pam. 55-12

(1) Drayage Included 48 NCWT $ $_______

(2) Drayage Not Included 48 NCWT N/C N/C

Item 2002 Outbound GTMO (HHGs From Non-Temporary Storage). Outbound services of NTS from

Jacksonville FL AOR HHG destine to GTMO Service must be the same as Item 0001 above except that: (a) HHG must be picked up at a nontemporary storage facility and transported to contractor’s facility; or (b) HHG must be delivered to contractor’s facility; and (c) premove survey, servicing of appliances, preliminary packing and accessorial services must not be provided. Overflow articles requiring containerization will be paid for under Item

0003.

EST

PPP-B-580, or MTMC

Pam. 55-12

(1) Drayage Included 399 NCWT $ $_______

PPP-B-580, or MTMC

Pam. 55-12

(1) Drayage Included 37 NCWT $ $_______

Item 2003. Complete Service-GTMO Outbound (HHG-Overflow Articles and HHG Shipments requiring except that the loose articles are drayed to contractor’s facility when ordered by the contracting officer for containerization in Government-furnished or contractor-furnished containers. Overflow, other shipments, and oversize containers must be constructed IAW ASTM-D6251. Each container must be caulked during assembly.

Overflow boxes and other shipments must be limited to one per shipment. Other shipments are small HHG shipments that normally require a lesser size box than specified in Commercial Spec ASTM-D4169-01 or SDDC

Pamphlet 55-12. Overflow containers are of a lesser size than specified in Commercial Spec ASTM-D4169-01 or

SDDC Pamphlet 55-12 and oversized containers are always of a greater size than specified in Commercial Spec

ASTM-D4169-01 or SDDC Pamphlet 55-12. One or more of these containers may be required per shipment. Price bid for Item 0003 includes container plus weight of its contents.

EST

(5) Overseas Pack:

Drayage Required

a. Overflow Articles N/A NCWT

(6) Overseas Pack:

a. Overflow Articles N/A NCWT

(5) Domestic Pack:

Drayage Required

a. Overflow Articles N/A NCWT

(6) Domestic Pack:

(3) Overseas Pack:

Drayage Required

a. Overflow Articles N/A NCWT

Drayage Required

(2) Domestic Pack:

a. Overflow Articles N/A NCWT

a. Overflow Articles N/A NCWT

Item 2004 Complete Service - GTMO Outbound (Unaccompanied Baggage). Service includes packaging, inventorying, packing in Government approved containers, weighing, strapping, obliteration of old markings, marking, and loading shipments on the linehaul carrier’s equipment. Service must be performed at member’s/employee’s residence. (Service may be performed at contractor’s facility when ordered by the Ordering

Officer.)

EST

(1) Drayage Included 53 NCWT $ $_______

(1) Drayage Included 1464 NCWT $ $_______

Item 2005 Complete Service - GTMO Outbound (Unaccompanied Baggage from Nontemporary

Storage). Service must be the same as Item 0004 except that (a) unaccompanied baggage must be picked up at a nontemporary storage facility and transported to contractor’s facility; or (b) unaccompanied baggage must be delivered to contractor’s facility; and (c) servicing of appliances, preliminary packing and accessorial services must not be provided.

EST

(1) Drayage Included 27 NCWT $ $_______

(1) Drayage Included 33 NCWT $ $_______

Item 2006 Outbound Service - GTMO Unaccompanied Baggage Packed By Member/Employee.

Service must include weighing, strapping banding, obliterating old markings, and marking. Service may include

(when necessary) containerization in outer shipping containers as ordered by the Ordering Officer. Service shall include two or more shipments picked up from a Government office, warehouse, or facility. Service shall also include loading of shipments on line-haul carrier’s equipment at the contractor’s facility or drayage to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers.

EST

(1)(Drayage Included) 23 GCWT $ $_______

(1)(Drayage Included) 27 GCWT $ $_______

Item 2007 Expensive and Valuable Items. Service must include inventorying each item, packing in

Government-approved, Contractor- furnished container(s), marking, banding and cubing at member/employee's residence. Drayage if required will be ordered by the contracting officer. If drayage is required, weighing shall be done on properly certified scales and a certified weight ticket shall be furnished. If drayage is not required, weighing must be done at member/employee's residence on portable or bathroom scales. In jurisdictions where local law prohibits the certification of portable scales, a weight certificate will not be required. However, upon the written authority of the contracting officer, the Contractor may apply a constructive weight of 11 pounds per gross cubic foot of the container.

Item 2008 Storage. Storage of containerized articles must be furnished when ordered by the contracting officer.

Charges must not commence earlier than the sixth (6th) workday following date of transportation officer's receipt of notification of completion of containerization service. Storage charges apply for each 30-day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges.

EST

Item 2009 Containers. Service must consist of the furnishing of the following types of new containers or specially constructed wooden crates. Containers furnished or specially constructed are to be assembled and ready for loading.

When a specific container from the SDDC Pamphlet 55-12 is ordered, the order will indicate the SDDC approval number.

EST

AA. Container (FED SPEC PPP-B-500) 53 EA $ $_______

AB. Container (MTMC Pam 55-12)* 53 EA $ $_______

AC. Crate (MIL-C-52950) N/A CU FT

Item 2010 Remarking, Coopering, and Assembling/Disassembly Service.

AA. Remarking of Shipments for Reconsignment. Service must consist of obliteration of all old markings, stenciling of necessary information on loaded shipping containers scheduled for reconsignment and loading on the hauling carrier's vehicle.

EST

ANNUAL UNIT

QTY UNIT PRICE TOTAL

40 PC $ $_______

AB. Coopering. Service must consist of repair of containers not to exceed 30% of total area of shipping container or cost of repairs will not exceed 50% of the container replacement cost. Minor repair, such as replacement of bolts, nails, and bands shall be accomplished at no expense to the Government.

containers. The government will furnish component parts. Contractor will disassemble government-owned containers. Component parts will be put into a cloth bag and attached to the container. Knocked down container sections will be banded.

EST

Item 2011 Drayage Beyond the Contract Area of Performance. Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed 60 miles. Mileage must be computed on the shortest highway distance commencing with the applicable point of pickup to the outer boundary of the contract area of performance.

EST

Item 2012 Attempted Pickup. When the initial attempt to pickup a shipment at the owner's residence is unsuccessful, charges apply provided the Contractor notified the contracting officer via telephone and provided that after contractor's notification, the contracting officer (a) cannot locate the owner within 30 minutes, (b) cannot have the owner at the residence within one hour after notification, and (c) the Contractor left a notice of attempted pickup at the residence.

Item 2013 Additional Services. The contractor must provide additional services not included in the schedule, but required for satisfactory completion of the services ordered under this contract, at a rate comparable to the rate for like services as contained in tenders on file with the state regulatory bodies or SDDC, in effect at the time of the

Item 2014 Complete Service – GTMO Outbound (UB & HHGs). Services must include at contractor’s facility, when ordered by the contracting officer, weighing, obliterating old markings, marking and drayage of containers/shipments to air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers within an area of performance for onward movement. Service must also include off loading of shipments from linehaul carrier’s equipment at the contractor’s facility.

2662 NCWT $ $_______

RECAPITULATION SCHEDULE I OPTION II

SCHEDULE II- OPTION II

Item 2015 Complete Service – GTMO Inbound (HHGs). Services of HHG to Jacksonville FL AOR from

GTMO must include drayage from contractor's facility to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, drayage to member’s/employee’s residence, decontainerization and unpacking of loaded containers of HHG and placing goods in rooms as directed by member/employee, unservicing appliances, assembly of any disassembled articles and removing shipping containers, barrels, boxes/crates, and debris from member’s/employee’s residence and drayage of empty containers to contractor’s or Government facility.

Item 2016 Complete Service - GTMO Inbound (HHGs). Service must be same as Item 0015 above except

Item 2017 Complete Service GTMO Inbound (HHGs). Service must be the same as Item 0015 above except removal of items from outer container will be as the Contractor's facility and articles will be drayed to member’s/employee’s residence.

EST

Item 2018 GTMO Inbound Service - Contractor Facility (HHGs). Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle into the contractor’s facility and delivery of articles to property member/employee, motor van carrier, or NTS contractor at the contractor’s facility.

EST

Item 2019 Complete Service - Expensive and Valuable Items. Services must include drayage from the storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, decontainerization and unpacking of containers at member’s/employee’s residence, and removal of shipping containers and debris from the residence.

EST

Item 2020 Complete Service - GTMO Inbound (Unaccompanied Baggage).

Service must include drayage from contractor's facility to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivery carrier's vehicle, handling into contractor’s facility, drayage of unaccompanied baggage containers to owner’s residence, unpacking of containers, reassemble of articles and removal of all shipping containers and debris from the residence.

EST

Item 2021 Complete Service - GTMO Inbound (Unaccompanied Baggage). Service must be same as Item

Item 2022 GTMO Inbound Service - Contractor Facility (Unaccompanied Baggage). Service must be the same as Item 0020 above except service shall also include removal of unaccompanied baggage from outer shipping containers for pickup by the member/employee or release to a motor carrier or other contractor at the contractor's facility.

EST

50 NCWT $ $_______

Item 2023 Storage. Storage of containerized articles must be furnished when ordered. Charges under this item must not commence earlier that the sixth (6th) workday following date of Contractor’s notification to the transportation officer of arrival of shipment. Storage charges apply for each 30-day period or fraction thereof. Date of release from storage shall not be considered in computation of storage charges.

EST

Item 2024 Remarking, Coopering and Assembly/Disassembly Service.

AA. Remarking of Shipments for Reconsignment Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, obliteration of all old markings, stenciling of necessary information on loaded shipping containers schedule for reconsignment loading on the hauling carrier’s vehicle.

EST

AB. Coopering. Service must consist of repair of containers not to exceed 30% of total area of shipping container or cost of repairs will not exceed 50% of the container replacement cost. Minor repair, such as replacement of bolts, renailing and rebanding shall be accomplished at no expense to the Government.

EST

AC. Assembly/Disassembly of Government-Owned Containers. Containers will assemble government-owned containers. The Government will furnish component parts. Contractor will disassemble government-owned containers. Component parts will be put into a cloth bag and attached to the container. Knocked down container sections will be banded.

EST

Item 2025 Attempted Delivery. When the initial attempt to deliver a shipment at the owner's residence is unsuccessful, charges apply provided the Contractor notified the contracting officer via telephone and provided that after contractor's notification, the contracting officer (a) cannot locate the owner within 30 minutes, (b) cannot have the owner at residence within one hour after notification, and (c) the Contractor left a notice of attempted delivery at the residence.

EST

Item 2026 Reweighing. Service shall consist of weighing the loaded containers prior to delivery and weighing

EST

Item 2027 Drayage Beyond the Contract Area of Performance. Service shall consist of drayage of packed shipments beyond the contract area of performance, not to exceed 60 miles. Mileage shall be computed on the shortest highway distance commencing with the applicable point of departure from the outer boundary of the

Item 2028 Partial Withdrawal Service shall be the same as Item 0015 or Item 0016 above, except a partial…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .