Hydraulic Actuator Flow Test Stand (HAFTS) - Draft CDRLs R1.pdf
PDF 2 MB Posted
- Attached to
- Hydraulic Actuator Flow Test Stand
- Solicitation number
- N68520-27-RFPREQ-KN00000-0075
About this file
This document is a Contract Data Requirements List (CDRL) containing seven data items required for a Hydraulic Actuator Flow Test Stand contract with the requiring office FRCSW. The CDRL specifies technical and administrative deliverables organized as follows: (A001) Technical Data Package due 60 calendar days after Critical Design Review with four hard copies and one electronic copy; (A002) Contract Data Status and Schedule Report (Plan of Actions & Milestones) due within 14 calendar days after contract award, one copy, with contractor notification required prior to any changes; (A003) Design Review Information Package covering Preliminary and Critical Design Reviews with detailed submission schedules—PDR draft due within 90 days of award with 14-day Government review cycles, and CDR draft due within 30 days of PDR approval following the same review structure; (A004) Calibration System Description (Instrument Calibration Procedures Source Data) due 30 days after CDR approval; (A005) Acceptance Test Package (Acceptance Test Plan) due within 30 days of contract award; (A006) Training Materials (Printed Training Aids) due within 7 calendar days after satisfactory completion of acceptance testing; and (A007) Test/Inspection Report due as generated during testing. All deliverables are marked with Distribution Statement A and must not be marked proprietary per DFARS 252.227-7015, with distribution governed by FTXT.247-9505. The CDRL was prepared on 10/28/2026 and approved on 11/09/2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Hydraulic Actuator Flow Test Stand (HAFTS) - SOW.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ____ TM _____ OTHER ____________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBM.
Draft
Final Reg Repro
16. REMARKS
15. TOTAL ▬▬▬▬►
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DRAFT
michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ____ TM _____ OTHER ____________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBM.
Draft
Final Reg Repro
16. REMARKS
15. TOTAL ▬▬▬▬►
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DRAFT
michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ____ TM _____ OTHER ____________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBM.
Draft
Final Reg Repro
16. REMARKS
15. TOTAL ▬▬▬▬►
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DRAFT
michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ____ TM _____ OTHER ____________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBM.
Draft
Final Reg Repro
16. REMARKS
15. TOTAL ▬▬▬▬►
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DRAFT
michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ____ TM _____ OTHER ____________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBM.
Draft
Final Reg Repro
16. REMARKS
15. TOTAL ▬▬▬▬►
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DRAFT
michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ____ TM _____ OTHER ____________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBM.
Draft
Final Reg Repro
16. REMARKS
15. TOTAL ▬▬▬▬►
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DRAFT
michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ____ TM _____ OTHER ____________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBM.
Draft
Final Reg Repro
16. REMARKS
15. TOTAL ▬▬▬▬►
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DRAFT
michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line michael.a.anderson9 Line
| CDRL - Template (Single Page) |
| CDRL - Template - Copy (3) |
| CDRLs |
| CDRL - Template (Multiple Pages) |
| CDRL - Template - Copy (2) |
| CDRL - Template - Copy (3) |
| CDRL - Template - Copy (4) |
| CDRL - Template - Copy (5) |
| CDRL - Template - Copy (6) |
| CDRL - Template - Copy (7) |
| CDRL - Template - Copy (8) |
| CDRL - Template - Copy (9) |
| CDRL - Template - Copy (10) |
| CDRL - Template - Copy |
| CDRL - Template (Single Page) |
| CDRL - Template - Copy (3) |
| Untitled |
| Untitled |
| 2/A: |
| 2/B: A |
| 2/C Other: SESS |
| 2/C TM: |
| 2/D: Hydraulic Actuator Flow Test Stand |
| 2/E: |
| 2/F: |
| 2/1: A001 |
| 2/2: Technical Data Package |
| 2/3: Technical Data |
| 2/17: |
| 2/4: DI-SESS-80776B |
| 2/5: SOW Section 4.22 & 7.1.1. |
| 2/6: FRCSW |
| 2/7: NO |
| 2/8: N/A |
| 2/9: A |
| 2/10: 0TIME |
| 2/12: 60 Calendar days after CDR |
| 2/18: |
| 2/11: N/A |
| 2/13: N/A |
| 2/14/b/Reg 1: 4 |
| 2/14/b/Repro 1: |
| 2/14/b/Reg 2: |
| 2/14/b/Repro 2: |
| 2/14/b/Reg 3: |
| 2/14/b/Repro 3: |
| 2/14/b/Reg 4: |
| 2/14/b/Repro 4: |
| 2/14/b/Reg 5: |
| 2/14/b/Repro 5: |
| 2/14/b/Reg 6: |
| 2/14/b/Repro 6: |
| 2/14/b/Reg 7: |
| 2/14/b/Repro 7: |
| 2/14/b/Reg 8: |
| 2/14/b/Repro 8: |
| 2/14/b/Reg 9: |
| 2/14/b/Repro 9: |
| 2/14/b/Reg 10: |
| 2/14/b/Repro 10: |
| 2/14/b/Reg 11: |
| 2/14/b/Repro 11: |
| 2/14/b/Reg 12: |
| 2/14/b/Repro 12: |
| 2/14/b/Reg 13: |
| 2/14/b/Repro 13: |
| 2/14/b/Reg 14: |
| 2/14/b/Repro 14: |
| 2/14/b/Reg 15: |
| 2/14/b/Repro 15: |
| 2/14/b/Reg 16: |
| 2/14/b/Repro 16: |
| 2/14/b/Reg 17: |
| 2/14/b/Repro 17: |
| 2/14/b/Reg 18: |
| 2/14/b/Repro 18: |
| 2/14/b/Reg 19: |
| 2/14/b/Repro 19: |
| 2/14/b/Reg 20: |
| 2/14/b/Repro 20: |
| 2/14/b/Reg 21: |
| 2/14/b/Repro 21: |
| 2/14/b/Reg 22: |
| 2/14/b/Repro 22: |
| 2/14/b/Reg 23: |
| 2/14/b/Repro 23: |
| 2/14/b/Reg 24: |
| 2/14/b/Repro 24: |
| 2/14/b/Reg 25: |
| 2/14/b/Repro 25: |
| 2/15/Draft: 0 |
| 2/C TDP: |
| 2/14/a/1: See Block 16 |
| 2/14/b/Draft 1: |
| 2/14/a/2: |
| 2/14/b/Draft 2: |
| 2/14/a/3: |
| 2/14/b/Draft 3: |
| 2/14/b/Draft 4: |
| 2/14/b/Draft 5: |
| 2/14/b/Draft 6: |
| 2/14/b/Draft 7: |
| 2/14/b/Draft 8: |
| 2/14/b/Draft 9: |
| 2/14/b/Draft 10: |
| 2/14/b/Draft 11: |
| 2/14/b/Draft 12: |
| 2/14/b/Draft 13: |
| 2/14/b/Draft 14: |
| 2/14/b/Draft 15: |
| 2/14/b/Draft 16: |
| 2/14/b/Draft 17: |
| 2/14/b/Draft 18: |
| 2/14/b/Draft 19: |
| 2/14/b/Draft 20: |
| 2/14/b/Draft 21: |
| 2/14/b/Draft 22: |
| 2/14/b/Draft 23: |
| 2/14/b/Draft 24: |
| 2/14/b/Draft 25: |
| 2/14/a/4: |
| 2/14/a/5: |
| 2/14/a/6: |
| 2/14/a/7: |
| 2/14/a/8: |
| 2/14/a/9: |
| 2/14/a/10: |
| 2/14/a/11: |
| 2/14/a/12: |
| 2/14/a/13: |
| 2/14/a/14: |
| 2/14/a/15: |
| 2/14/a/16: |
| 2/14/a/17: |
| 2/14/a/18: |
| 2/14/a/19: |
| 2/14/a/20: |
| 2/14/a/21: |
| 2/14/a/22: |
| 2/14/a/23: |
| 2/14/a/24: |
| 2/14/a/25: |
| 2/15/Reg: 4 |
| 2/15/Repro: 0 |
| 2/16: |
Block 14:
• Administrative and Technical Data deliverables shall not be marked proprietary nor be marked with any other non-conforming or unjustified markings. See DFARS 252.227-7015
• See FTXT.247-9505 Technical Data and Information for distribution information
• Three (3) hard copies and one (1) electronic copy
| 2/H/Date_af_date: 10/28/2026 | |
| 2/J/Date_af_date: 11/09/2026 | |
| 2026-11-09T08:58:33-0800 | |
| ANDERSON.MICHAEL.A.1174913400 |
| 2026-11-09T10:01:26-0800 | |
| NGUYEN.KHOI.ANH.1258620646 |
| 3/A: |
| 3/B: A |
| 3/C/Other: MISC |
| 3/C/TM: |
| 3/D: Hydraulic Actuator Flow Test Stand |
| 3/E: |
| 3/F: |
| 3/1: A002 |
| 3/2: Contract Data Status and Schedule Report |
| 3/3: Plan Of Actions & Milestones |
| 3/17: |
| 3/4: DI-MISC-80167A |
| 3/5: SOW Sections 4.23. & 7.1.2. |
| 3/6: FRCSW |
| 3/7: NO |
| 3/8: |
| 3/9: A |
| 3/10: ONE/R |
| 3/12: See Block 16 |
| 3/18: |
| 3/11: N/A |
| 3/13: N/A |
| 3/14/b/Reg 1: 1 |
| 3/14/b/Repro 1: |
| 3/14/b/Reg 2: |
| 3/14/b/Repro 2: |
| 3/14/b/Reg 3: |
| 3/14/b/Repro 3: |
| 3/14/b/Reg 4: |
| 3/14/b/Repro 4: |
| 3/14/b/Reg 5: |
| 3/14/b/Repro 5: |
| 3/14/b/Reg 6: |
| 3/14/b/Repro 6: |
| 3/14/b/Reg 7: |
| 3/14/b/Repro 7: |
| 3/14/b/Reg 8: |
| 3/14/b/Repro 8: |
| 3/14/b/Reg 9: |
| 3/14/b/Repro 9: |
| 3/14/b/Reg 10: |
| 3/14/b/Repro 10: |
| 3/14/b/Reg 11: |
| 3/14/b/Repro 11: |
| 3/14/b/Reg 12: |
| 3/14/b/Repro 12: |
| 3/14/b/Reg 13: |
| 3/14/b/Repro 13: |
| 3/14/b/Reg 14: |
| 3/14/b/Repro 14: |
| 3/14/b/Reg 15: |
| 3/14/b/Repro 15: |
| 3/14/b/Reg 16: |
| 3/14/b/Repro 16: |
| 3/14/b/Reg 17: |
| 3/14/b/Repro 17: |
| 3/14/b/Reg 18: |
| 3/14/b/Repro 18: |
| 3/14/b/Reg 19: |
| 3/14/b/Repro 19: |
| 3/14/b/Reg 20: |
| 3/14/b/Repro 20: |
| 3/14/b/Reg 21: |
| 3/14/b/Repro 21: |
| 3/14/b/Reg 22: |
| 3/14/b/Repro 22: |
| 3/14/b/Reg 23: |
| 3/14/b/Repro 23: |
| 3/14/b/Reg 24: |
| 3/14/b/Repro 24: |
| 3/14/b/Reg 25: |
| 3/14/b/Repro 25: |
| 3/15/Draft: 0 |
| 3/C/TDP: |
| 3/14/a/1: See Block 16 |
| 3/14/b/Draft 1: |
| 3/14/a/2: |
| 3/14/b/Draft 2: |
| 3/14/a/3: |
| 3/14/b/Draft 3: |
| 3/14/b/Draft 4: |
| 3/14/b/Draft 5: |
| 3/14/b/Draft 6: |
| 3/14/b/Draft 7: |
| 3/14/b/Draft 8: |
| 3/14/b/Draft 9: |
| 3/14/b/Draft 10: |
| 3/14/b/Draft 11: |
| 3/14/b/Draft 12: |
| 3/14/b/Draft 13: |
| 3/14/b/Draft 14: |
| 3/14/b/Draft 15: |
| 3/14/b/Draft 16: |
| 3/14/b/Draft 17: |
| 3/14/b/Draft 18: |
| 3/14/b/Draft 19: |
| 3/14/b/Draft 20: |
| 3/14/b/Draft 21: |
| 3/14/b/Draft 22: |
| 3/14/b/Draft 23: |
| 3/14/b/Draft 24: |
| 3/14/b/Draft 25: |
| 3/14/a/4: |
| 3/14/a/5: |
| 3/14/a/6: |
| 3/14/a/7: |
| 3/14/a/8: |
| 3/14/a/9: |
| 3/14/a/10: |
| 3/14/a/11: |
| 3/14/a/12: |
| 3/14/a/13: |
| 3/14/a/14: |
| 3/14/a/15: |
| 3/14/a/16: |
| 3/14/a/17: |
| 3/14/a/18: |
| 3/14/a/19: |
| 3/14/a/20: |
| 3/14/a/21: |
| 3/14/a/22: |
| 3/14/a/23: |
| 3/14/a/24: |
| 3/14/a/25: |
| 3/15/Reg: 1 |
| 3/15/Repro: 0 |
| 3/16: |
Block 10: The contractor shall notify the Government prior to making any changes to the POA&M.
Block 12: No later than fourteen (14) calendar days after contact award.
Block 14:
• Administrative and Technical Data deliverables shall not be marked proprietary nor be marked with any other non-conforming or unjustified markings. See DFARS 252.227-7015
• See FTXT.247-9505 Technical Data and Information for distribution information
| 3/H/Date_af_date_af_date: 10/28/2026 | |
| 3/J/Date_af_date_af_date: 11/09/2026 | |
| 2026-11-09T08:59:05-0800 | |
| ANDERSON.MICHAEL.A.1174913400 |
| 2026-11-09T10:02:12-0800 | |
| NGUYEN.KHOI.ANH.1258620646 |
| 4/A: |
| 4/B: A |
| 4/C/Other: SESS |
| 4/C/TM: |
| 4/D: Hydraulic Actuator Flow Test Stand |
| 4/E: |
| 4/F: |
| 4/1: A003 |
| 4/2: Design Review Information Package |
| 4/3: Preliminary/Critical Design Review |
| 4/17: |
| 4/4: DI-SESS-81757A/T |
| 4/5: SOW Sec 4.24., 4.25., & 7.1.3. |
| 4/6: FRCSW |
| 4/7: NO |
| 4/8: A |
| 4/9: A |
| 4/10: ONE/R |
| 4/12: See Block 16 |
| 4/18: |
| 4/11: N/A |
| 4/13: N/A |
| 4/14/b/Reg 1: 1 |
| 4/14/b/Repro 1: |
| 4/14/b/Reg 2: |
| 4/14/b/Repro 2: |
| 4/14/b/Reg 3: |
| 4/14/b/Repro 3: |
| 4/14/b/Reg 4: |
| 4/14/b/Repro 4: |
| 4/14/b/Reg 5: |
| 4/14/b/Repro 5: |
| 4/14/b/Reg 6: |
| 4/14/b/Repro 6: |
| 4/14/b/Reg 7: |
| 4/14/b/Repro 7: |
| 4/14/b/Reg 8: |
| 4/14/b/Repro 8: |
| 4/14/b/Reg 9: |
| 4/14/b/Repro 9: |
| 4/14/b/Reg 10: |
| 4/14/b/Repro 10: |
| 4/14/b/Reg 11: |
| 4/14/b/Repro 11: |
| 4/14/b/Reg 12: |
| 4/14/b/Repro 12: |
| 4/14/b/Reg 13: |
| 4/14/b/Repro 13: |
| 4/14/b/Reg 14: |
| 4/14/b/Repro 14: |
| 4/14/b/Reg 15: |
| 4/14/b/Repro 15: |
| 4/14/b/Reg 16: |
| 4/14/b/Repro 16: |
| 4/14/b/Reg 17: |
| 4/14/b/Repro 17: |
| 4/14/b/Reg 18: |
| 4/14/b/Repro 18: |
| 4/14/b/Reg 19: |
| 4/14/b/Repro 19: |
| 4/14/b/Reg 20: |
| 4/14/b/Repro 20: |
| 4/14/b/Reg 21: |
| 4/14/b/Repro 21: |
| 4/14/b/Reg 22: |
| 4/14/b/Repro 22: |
| 4/14/b/Reg 23: |
| 4/14/b/Repro 23: |
| 4/14/b/Reg 24: |
| 4/14/b/Repro 24: |
| 4/14/b/Reg 25: |
| 4/14/b/Repro 25: |
| 4/15/Draft: 0 |
| 4/C/TDP: |
| 4/14/a/1: See Block 16 |
| 4/14/b/Draft 1: |
| 4/14/a/2: |
| 4/14/b/Draft 2: |
| 4/14/a/3: |
| 4/14/b/Draft 3: |
| 4/14/b/Draft 4: |
| 4/14/b/Draft 5: |
| 4/14/b/Draft 6: |
| 4/14/b/Draft 7: |
| 4/14/b/Draft 8: |
| 4/14/b/Draft 9: |
| 4/14/b/Draft 10: |
| 4/14/b/Draft 11: |
| 4/14/b/Draft 12: |
| 4/14/b/Draft 13: |
| 4/14/b/Draft 14: |
| 4/14/b/Draft 15: |
| 4/14/b/Draft 16: |
| 4/14/b/Draft 17: |
| 4/14/b/Draft 18: |
| 4/14/b/Draft 19: |
| 4/14/b/Draft 20: |
| 4/14/b/Draft 21: |
| 4/14/b/Draft 22: |
| 4/14/b/Draft 23: |
| 4/14/b/Draft 24: |
| 4/14/b/Draft 25: |
| 4/14/a/4: |
| 4/14/a/5: |
| 4/14/a/6: |
| 4/14/a/7: |
| 4/14/a/8: |
| 4/14/a/9: |
| 4/14/a/10: |
| 4/14/a/11: |
| 4/14/a/12: |
| 4/14/a/13: |
| 4/14/a/14: |
| 4/14/a/15: |
| 4/14/a/16: |
| 4/14/a/17: |
| 4/14/a/18: |
| 4/14/a/19: |
| 4/14/a/20: |
| 4/14/a/21: |
| 4/14/a/22: |
| 4/14/a/23: |
| 4/14/a/24: |
| 4/14/a/25: |
| 4/15/Reg: 1 |
| 4/15/Repro: 0 |
| 4/16: |
Section 4:
• Preliminary Design Review
- DID 2.1. Section 1 - Not required
- DID 2.2. Section 2 - Not required
- DID 2.7. Section 7 - Not required
- DID Section 8 - Not required
- DID Section 9 - Not required
- DID 2.8. Section 10 - Not required
- DID 2.9. Section 11 - Not required
- DID 2.10. Section 12 - Not required
• Critical Design Review
- DID 2.1. Section 1 - Not required
- DID 2.2. Section 2 - Not required
- DID 2.3. Section 3 - Not required
- DID 2.4. Section 4 - Not required
- DID 2.5. Section 5 - Not required
- DID 2.6. Section 6 - Not required
- DID 2.7. Section 7 - Not required
- DID 2.9. Section 11 - Not required
- DID 2.10. Section 12 - Not required
Block 8 & 12:
• Preliminary Design Review (PDR): The Contractor shall submit the draft for approval no later than 90 days after award. The Government will provide comments in writing within 14 days of receipt of the draft. The Contractor shall submit a revision resolving the Government’s comments within 14 days of receipt of the comments. The Government will provide any comments on a resubmission within 7 days of receipt. IF revision of this or any subsequent resubmission is required, the Contractor shall submit the revision within 7 days of receipt of the Government review. The Contractor shall distribute the Final within 3 days of written authorization by the Government.
• Critical Design Review (CDR): The Contractor shall submit the draft for approval no later than 30 days after PDR is approved. The Government will provide comments in writing within 14 days of receipt of the draft. The Contractor shall submit a revision resolving the Government’s comments within 14 days of receipt of the comments. The Government will provide any comments on a resubmission within 7 days of receipt. IF revision of this or any subsequent resubmission is required, the Contractor shall submit the revision within 7 days of receipt of the Government review. The Contractor shall distribute the Final within 3 days of written authorization by the Government.
Block 14:
• Administrative and Technical Data deliverables shall not be marked proprietary nor be marked with any other non-conforming or unjustified markings. See DFARS 252.227-7015
• See FTXT.247-9505 Technical Data and Information for distribution information
| 4/H/Date_af_date: 10/28/2026 | |
| 4/J/Date_af_date: 11/09/2026 | |
| 2026-10-29T03:50:00-0700 | |
| ANDERSON.MICHAEL.A.1174913400 |
| 2026-11-09T10:02:43-0800 | |
| NGUYEN.KHOI.ANH.1258620646 |
| 5/A: |
| 5/B: A |
| 5/C/Other: QCIC |
| 5/C/TM: |
| 5/D: Hydraulic Actuator Flow Test Stand |
| 5/E: |
| 5/F: |
| 5/1: A004 |
| 5/2: Calibration System Description |
| 5/3: Instrument Calibration Procedures Source (ICPS) Data |
| 5/17: |
| 5/4: DI-QCIC-80906 |
| 5/5: SOW Section 4.26. & 7.1.4. |
| 5/6: FRCSW |
| 5/7: NO |
| 5/8: A |
| 5/9: A |
| 5/10: ONE/R |
| 5/12: See Block 16 |
| 5/18: |
| 5/11: N/A |
| 5/13: N/A |
| 5/14/b/Reg 1: 1 |
| 5/14/b/Repro 1: |
| 5/14/b/Reg 2: |
| 5/14/b/Repro 2: |
| 5/14/b/Reg 3: |
| 5/14/b/Repro 3: |
| 5/14/b/Reg 4: |
| 5/14/b/Repro 4: |
| 5/14/b/Reg 5: |
| 5/14/b/Repro 5: |
| 5/14/b/Reg 6: |
| 5/14/b/Repro 6: |
| 5/14/b/Reg 7: |
| 5/14/b/Repro 7: |
| 5/14/b/Reg 8: |
| 5/14/b/Repro 8: |
| 5/14/b/Reg 9: |
| 5/14/b/Repro 9: |
| 5/14/b/Reg 10: |
| 5/14/b/Repro 10: |
| 5/14/b/Reg 11: |
| 5/14/b/Repro 11: |
| 5/14/b/Reg 12: |
| 5/14/b/Repro 12: |
| 5/14/b/Reg 13: |
| 5/14/b/Repro 13: |
| 5/14/b/Reg 14: |
| 5/14/b/Repro 14: |
| 5/14/b/Reg 15: |
| 5/14/b/Repro 15: |
| 5/14/b/Reg 16: |
| 5/14/b/Repro 16: |
| 5/14/b/Reg 17: |
| 5/14/b/Repro 17: |
| 5/14/b/Reg 18: |
| 5/14/b/Repro 18: |
| 5/14/b/Reg 19: |
| 5/14/b/Repro 19: |
| 5/14/b/Reg 20: |
| 5/14/b/Repro 20: |
| 5/14/b/Reg 21: |
| 5/14/b/Repro 21: |
| 5/14/b/Reg 22: |
| 5/14/b/Repro 22: |
| 5/14/b/Reg 23: |
| 5/14/b/Repro 23: |
| 5/14/b/Reg 24: |
| 5/14/b/Repro 24: |
| 5/14/b/Reg 25: |
| 5/14/b/Repro 25: |
| 5/15/Draft: 0 |
| 5/C/TDP: |
| 5/14/a/1: See Block 16 |
| 5/14/b/Draft 1: |
| 5/14/a/2: |
| 5/14/b/Draft 2: |
| 5/14/a/3: |
| 5/14/b/Draft 3: |
| 5/14/b/Draft 4: |
| 5/14/b/Draft 5: |
| 5/14/b/Draft 6: |
| 5/14/b/Draft 7: |
| 5/14/b/Draft 8: |
| 5/14/b/Draft 9: |
| 5/14/b/Draft 10: |
| 5/14/b/Draft 11: |
| 5/14/b/Draft 12: |
| 5/14/b/Draft 13: |
| 5/14/b/Draft 14: |
| 5/14/b/Draft 15: |
| 5/14/b/Draft 16: |
| 5/14/b/Draft 17: |
| 5/14/b/Draft 18: |
| 5/14/b/Draft 19: |
| 5/14/b/Draft 20: |
| 5/14/b/Draft 21: |
| 5/14/b/Draft 22: |
| 5/14/b/Draft 23: |
| 5/14/b/Draft 24: |
| 5/14/b/Draft 25: |
| 5/14/a/4: |
| 5/14/a/5: |
| 5/14/a/6: |
| 5/14/a/7: |
| 5/14/a/8: |
| 5/14/a/9: |
| 5/14/a/10: |
| 5/14/a/11: |
| 5/14/a/12: |
| 5/14/a/13: |
| 5/14/a/14: |
| 5/14/a/15: |
| 5/14/a/16: |
| 5/14/a/17: |
| 5/14/a/18: |
| 5/14/a/19: |
| 5/14/a/20: |
| 5/14/a/21: |
| 5/14/a/22: |
| 5/14/a/23: |
| 5/14/a/24: |
| 5/14/a/25: |
| 5/15/Reg: 1 |
| 5/15/Repro: 0 |
| 5/16: |
Block 12: The Contractor shall submit the draft for approval no later than 30 days after CDR is approved. The Government will provide comments in writing within 14 days of receipt of the draft. The Contractor shall submit a revision resolving the Government’s comments within 14 days of receipt of the comments. The Government will provide any comments on a resubmission within 7 days of receipt. IF revision of this or any subsequent resubmission is required, the Contractor shall submit the revision within 7 days of receipt of the Government review. The Contractor shall distribute the Final within 3 days of written authorization by the Government.
Block 14:
• Administrative and Technical Data deliverables shall not be marked proprietary nor be marked with any other non-conforming or unjustified markings. See DFARS 252.227-7015
• See FTXT.247-9505 Technical Data and Information for distribution information
| 5/H/Date_af_date: 10/28/2026 | |
| 5/J/Date_af_date: 11/09/2026 | |
| 2026-10-29T03:50:23-0700 | |
| ANDERSON.MICHAEL.A.1174913400 |
| 2026-11-09T10:03:20-0800 | |
| NGUYEN.KHOI.ANH.1258620646 |
| 6/A: |
| 6/B: A |
| 6/C/Other: QCIC |
| 6/C/TM: |
| 6/D: Hydraulic Actuator Flow Test Stand |
| 6/E: |
| 6/F: |
| 6/1: A005 |
| 6/2: Acceptance Test Package |
| 6/3: Acceptance Test Plan |
| 6/17: |
| 6/4: DI-QCIC-80553A |
| 6/5: SOW Section 4.27. and 7.1.5. |
| 6/6: FRCSW |
| 6/7: NO |
| 6/8: A |
| 6/9: A |
| 6/10: ONE/R |
| 6/12: See Block 16 |
| 6/18: |
| 6/11: N/A |
| 6/13: N/A |
| 6/14/b/Reg 1: 1 |
| 6/14/b/Repro 1: |
| 6/14/b/Reg 2: |
| 6/14/b/Repro 2: |
| 6/14/b/Reg 3: |
| 6/14/b/Repro 3: |
| 6/14/b/Reg 4: |
| 6/14/b/Repro 4: |
| 6/14/b/Reg 5: |
| 6/14/b/Repro 5: |
| 6/14/b/Reg 6: |
| 6/14/b/Repro 6: |
| 6/14/b/Reg 7: |
| 6/14/b/Repro 7: |
| 6/14/b/Reg 8: |
| 6/14/b/Repro 8: |
| 6/14/b/Reg 9: |
| 6/14/b/Repro 9: |
| 6/14/b/Reg 10: |
| 6/14/b/Repro 10: |
| 6/14/b/Reg 11: |
| 6/14/b/Repro 11: |
| 6/14/b/Reg 12: |
| 6/14/b/Repro 12: |
| 6/14/b/Reg 13: |
| 6/14/b/Repro 13: |
| 6/14/b/Reg 14: |
| 6/14/b/Repro 14: |
| 6/14/b/Reg 15: |
| 6/14/b/Repro 15: |
| 6/14/b/Reg 16: |
| 6/14/b/Repro 16: |
| 6/14/b/Reg 17: |
| 6/14/b/Repro 17: |
| 6/14/b/Reg 18: |
| 6/14/b/Repro 18: |
| 6/14/b/Reg 19: |
| 6/14/b/Repro 19: |
| 6/14/b/Reg 20: |
| 6/14/b/Repro 20: |
| 6/14/b/Reg 21: |
| 6/14/b/Repro 21: |
| 6/14/b/Reg 22: |
| 6/14/b/Repro 22: |
| 6/14/b/Reg 23: |
| 6/14/b/Repro 23: |
| 6/14/b/Reg 24: |
| 6/14/b/Repro 24: |
| 6/14/b/Reg 25: |
| 6/14/b/Repro 25: |
| 6/15/Draft: 0 |
| 6/C/TDP: |
| 6/14/a/1: See Block 16 |
| 6/14/b/Draft 1: |
| 6/14/a/2: |
| 6/14/b/Draft 2: |
| 6/14/a/3: |
| 6/14/b/Draft 3: |
| 6/14/b/Draft 4: |
| 6/14/b/Draft 5: |
| 6/14/b/Draft 6: |
| 6/14/b/Draft 7: |
| 6/14/b/Draft 8: |
| 6/14/b/Draft 9: |
| 6/14/b/Draft 10: |
| 6/14/b/Draft 11: |
| 6/14/b/Draft 12: |
| 6/14/b/Draft 13: |
| 6/14/b/Draft 14: |
| 6/14/b/Draft 15: |
| 6/14/b/Draft 16: |
| 6/14/b/Draft 17: |
| 6/14/b/Draft 18: |
| 6/14/b/Draft 19: |
| 6/14/b/Draft 20: |
| 6/14/b/Draft 21: |
| 6/14/b/Draft 22: |
| 6/14/b/Draft 23: |
| 6/14/b/Draft 24: |
| 6/14/b/Draft 25: |
| 6/12/a/4: |
| 6/12/a/5: |
| 6/12/a/6: |
| 6/12/a/7: |
| 6/12/a/8: |
| 6/12/a/9: |
| 6/12/a/10: |
| 6/12/a/11: |
| 6/12/a/12: |
| 6/12/a/13: |
| 6/12/a/14: |
| 6/12/a/15: |
| 6/12/a/16: |
| 6/12/a/17: |
| 6/12/a/18: |
| 6/12/a/19: |
| 6/12/a/20: |
| 6/12/a/21: |
| 6/12/a/22: |
| 6/12/a/23: |
| 6/12/a/24: |
| 6/12/a/25: |
| 6/15/Reg: 1 |
| 6/15/Repro: 0 |
| 6/16: |
Block 12: The Contractor shall submit the draft for approval no later than 30 days after contract award. The Government will provide comments in writing within 14 days of receipt of the draft. The Contractor shall submit a revision resolving the Government’s comments within 14 days of receipt of the comments. The Government will provide any comments on a resubmission within 7 days of receipt. IF revision of this or any subsequent resubmission is required, the Contractor shall submit the revision within 7 days of receipt of the Government review. The Contractor shall distribute the Final within 3 days of written authorization by the Government.
Block 14:
• Administrative and Technical Data deliverables shall not be marked proprietary nor be marked with any other non-conforming or unjustified markings. See DFARS 252.227-7015
• See FTXT.247-9505 Technical Data and Information for distribution information
| 6/H/Date_af_date: 10/28/2026 | |
| 6/J/Date_af_date: 11/09/2026 | |
| 2026-10-29T03:50:44-0700 | |
| ANDERSON.MICHAEL.A.1174913400 |
| 2026-11-09T10:04:58-0800 | |
| NGUYEN.KHOI.ANH.1258620646 |
| 7/A: |
| 7/B: A |
| 7/C/Other: ILSS |
| 7/C/TM: |
| 7/D: Hydraulic Actuator Flow Test Stand |
| 7/E: |
| 7/F: |
| 7/1: A006 |
| 7/2: Training Materials |
| 7/3: Printed Training Aids |
| 7/17: |
| 7/4: DI-ILSS-80872 |
| 7/5: SOW Section 4.29. & 7.1.6. |
| 7/6: FRCSW |
| 7/7: NO |
| 7/8: |
| 7/9: A |
| 7/10: 0TIME |
| 7/12: See Block 16 |
| 7/18: |
| 7/11: N/A |
| 7/13: N/A |
| 7/14/b/Reg 1: 1 |
| 7/14/b/Repro 1: |
| 7/14/b/Reg 2: |
| 7/14/b/Repro 2: |
| 7/14/b/Reg 3: |
| 7/14/b/Repro 3: |
| 7/14/b/Reg 4: |
| 7/14/b/Repro 4: |
| 7/14/b/Reg 5: |
| 7/14/b/Repro 5: |
| 7/14/b/Reg 6: |
| 7/14/b/Repro 6: |
| 7/14/b/Reg 7: |
| 7/14/b/Repro 7: |
| 7/14/b/Reg 8: |
| 7/14/b/Repro 8: |
| 7/14/b/Reg 9: |
| 7/14/b/Repro 9: |
| 7/14/b/Reg 10: |
| 7/14/b/Repro 10: |
| 7/14/b/Reg 11: |
| 7/14/b/Repro 11: |
| 7/14/b/Reg 12: |
| 7/14/b/Repro 12: |
| 7/14/b/Reg 13: |
| 7/14/b/Repro 13: |
| 7/14/b/Reg 14: |
| 7/14/b/Repro 14: |
| 7/14/b/Reg 15: |
| 7/14/b/Repro 15: |
| 7/14/b/Reg 16: |
| 7/14/b/Repro 16: |
| 7/14/b/Reg 17: |
| 7/14/b/Repro 17: |
| 7/14/b/Reg 18: |
| 7/14/b/Repro 18: |
| 7/14/b/Reg 19: |
| 7/14/b/Repro 19: |
| 7/14/b/Reg 20: |
| 7/14/b/Repro 20: |
| 7/14/b/Reg 21: |
| 7/14/b/Repro 21: |
| 7/14/b/Reg 22: |
| 7/14/b/Repro 22: |
| 7/14/b/Reg 23: |
| 7/14/b/Repro 23: |
| 7/14/b/Reg 24: |
| 7/14/b/Repro 24: |
| 7/14/b/Reg 25: |
| 7/14/b/Repro 25: |
| 7/15/Draft: 0 |
| 7/C/TDP: |
| 7/14/a/1: See Block 16 |
| 7/14/b/Draft 1: |
| 7/14/a/2: |
| 7/14/b/Draft 2: |
| 7/14/a/3: |
| 7/14/b/Draft 3: |
| 7/14/b/Draft 4: |
| 7/14/b/Draft 5: |
| 7/14/b/Draft 6: |
| 7/14/b/Draft 7: |
| 7/14/b/Draft 8: |
| 7/14/b/Draft 9: |
| 7/14/b/Draft 10: |
| 7/14/b/Draft 11: |
| 7/14/b/Draft 12: |
| 7/14/b/Draft 13: |
| 7/14/b/Draft 14: |
| 7/14/b/Draft 15: |
| 7/14/b/Draft 16: |
| 7/14/b/Draft 17: |
| 7/14/b/Draft 18: |
| 7/14/b/Draft 19: |
| 7/14/b/Draft 20: |
| 7/14/b/Draft 21: |
| 7/14/b/Draft 22: |
| 7/14/b/Draft 23: |
| 7/14/b/Draft 24: |
| 7/14/b/Draft 25: |
| 7/14/a/4: |
| 7/14/a/5: |
| 7/14/a/6: |
| 7/14/a/7: |
| 7/14/a/8: |
| 7/14/a/9: |
| 7/14/a/10: |
| 7/14/a/11: |
| 7/14/a/12: |
| 7/14/a/13: |
| 7/14/a/14: |
| 7/14/a/15: |
| 7/14/a/16: |
| 7/14/a/17: |
| 7/14/a/18: |
| 7/14/a/19: |
| 7/14/a/20: |
| 7/14/a/21: |
| 7/14/a/22: |
| 7/14/a/23: |
| 7/14/a/24: |
| 7/14/a/25: |
| 7/15/Repro: 0 |
| 7/16: |
Block 12: No later than 7 calendar days after satisfactory completion of acceptance testing
Block 14:
• Administrative and Technical Data deliverables shall not be marked proprietary nor be marked with any other non-conforming or unjustified markings. See DFARS 252.227-7015
• See FTXT.247-9505 Technical Data and Information for distribution information
| 7/H/Date_af_date_af_date: 10/28/2026 | |
| 7/J/Date_af_date_af_date: 11/09/2026 | |
| 2026-10-29T03:51:05-0700 | |
| ANDERSON.MICHAEL.A.1174913400 |
| 2026-11-09T10:06:38-0800 | |
| NGUYEN.KHOI.ANH.1258620646 |
| 9/A: |
| 9/B: A |
| 9/C/Other: NDTI |
| 9/C/TM: |
| 9/D: Hydraulic Actuator Flow Test Stand |
| 9/E: |
| 9/F: |
| 9/1: A007 |
| 9/2: Test/Inspection Report |
| 9/3: N/A |
| 9/17: |
| 9/4: DI-NDTI-80809B |
| 9/5: SOW Section 5.7.1. & 7.1.7 |
| 9/6: FRCSW |
| 9/7: NO |
| 9/8: N/A |
| 9/9: A |
| 9/10: 0TIME |
| 9/12: ASGEN |
| 9/18: |
| 9/11: N/A |
| 9/13: N/A |
| 9/14/b/Reg 1: 1 |
| 9/14/b/Repro 1: |
| 9/14/b/Reg 2: |
| 9/14/b/Repro 2: |
| 9/14/b/Reg 3: |
| 9/14/b/Repro 3: |
| 9/14/b/Reg 4: |
| 9/14/b/Repro 4: |
| 9/14/b/Reg 5: |
| 9/14/b/Repro 5: |
| 9/14/b/Reg 6: |
| 9/14/b/Repro 6: |
| 9/14/b/Reg 7: |
| 9/14/b/Repro 7: |
| 9/14/b/Reg 8: |
| 9/14/b/Repro 8: |
| 9/14/b/Reg 9: |
| 9/14/b/Repro 9: |
| 9/14/b/Reg 10: |
| 9/14/b/Repro 10: |
| 9/14/b/Reg 11: |
| 9/14/b/Repro 11: |
| 9/14/b/Reg 12: |
| 9/14/b/Repro 12: |
| 9/14/b/Reg 13: |
| 9/14/b/Repro 13: |
| 9/14/b/Reg 14: |
| 9/14/b/Repro 14: |
| 9/14/b/Reg 15: |
| 9/14/b/Repro 15: |
| 9/14/b/Reg 16: |
| 9/14/b/Repro 16: |
| 9/14/b/Reg 17: |
| 9/14/b/Repro 17: |
| 9/14/b/Reg 18: |
| 9/14/b/Repro 18: |
| 9/14/b/Reg 19: |
| 9/14/b/Repro 19: |
| 9/14/b/Reg 20: |
| 9/14/b/Repro 20: |
| 9/14/b/Reg 21: |
| 9/14/b/Repro 21: |
| 9/14/b/Reg 22: |
| 9/14/b/Repro 22: |
| 9/14/b/Reg 23: |
| 9/14/b/Repro 23: |
| 9/14/b/Reg 24: |
| 9/14/b/Repro 24: |
| 9/14/b/Reg 25: |
| 9/14/b/Repro 25: |
| 9/15/Draft: 0 |
| 9/C/TDP: |
| 9/14/a/1: See Block 16 |
| 9/14/b/Draft 1: |
| 9/14/a/2: |
| 9/14/b/Draft 2: |
| 9/14/a/3: |
| 9/14/b/Draft 3: |
| 9/14/b/Draft 4: |
| 9/14/b/Draft 5: |
| 9/14/b/Draft 6: |
| 9/14/b/Draft 7: |
| 9/14/b/Draft 8: |
| 9/14/b/Draft 9: |
| 9/14/b/Draft 10: |
| 9/14/b/Draft 11: |
| 9/14/b/Draft 12: |
| 9/14/b/Draft 13: |
| 9/14/b/Draft 14: |
| 9/14/b/Draft 15: |
| 9/14/b/Draft 16: |
| 9/14/b/Draft 17: |
| 9/14/b/Draft 18: |
| 9/14/b/Draft 19: |
| 9/14/b/Draft 20: |
| 9/14/b/Draft 21: |
| 9/14/b/Draft 22: |
| 9/14/b/Draft 23: |
| 9/14/b/Draft 24: |
| 9/14/b/Draft 25: |
| 9/14/a/4: |
| 9/14/a/5: |
| 9/14/a/6: |
| 9/14/a/7: |
| 9/14/a/8: |
| 9/14/a/9: |
| 9/14/a/10: |
| 9/14/a/11: |
| 9/14/a/12: |
| 9/14/a/13: |
| 9/14/a/14: |
| 9/14/a/15: |
| 9/14/a/16: |
| 9/14/a/17: |
| 9/14/a/18: |
| 9/14/a/19: |
| 9/14/a/20: |
| 9/14/a/21: |
| 9/14/a/22: |
| 9/14/a/23: |
| 9/14/a/24: |
| 9/14/a/25: |
| 9/15/Reg: 1 |
| 9/15/Repro: 0 |
| 9/16: |
Block 14:
• Administrative and Technical Data deliverables shall not be marked proprietary nor be marked with any other non-conforming or unjustified markings. See DFARS 252.227-7015
• See FTXT.247-9505 Technical Data and Information for distribution information
| 9/H/Date_af_date_af_date: 10/28/2026 | |
| 9/J/Date_af_date_af_date: 11/09/2026 | |
| 2026-10-29T03:51:25-0700 | |
| ANDERSON.MICHAEL.A.1174913400 |
| 2026-11-09T10:07:17-0800 | |
| NGUYEN.KHOI.ANH.1258620646 |
7/15/Reg: 1
File details come from the government source that posted it. Updated .