This is a Questions and Answers document addressing offeror inquiries regarding the test and evaluation of Radiator Part No. 5101908 (NIIN 01-478-8141).
The Government will not provide OEM specifications or drawings for the radiator, placing responsibility on offerors to obtain such documentation independently. The pressure test requirement specifies 14-17 psi for 4.5 hours with no leaks as the acceptance criterion. For corrosion control and finish, offerors must apply a corrosion resistance primer and gloss black paint suitable for saltwater environments. Offerors should submit pricing only for test and evaluation of three radiators plus return shipping at the initial quote stage; repair pricing will be provided after inspection. The test and evaluation completion date of September 28, 2026, is measured from the contract award date, not from the contractor's receipt of units. The Government has identified corrosion buildup inside the enclosed top and bottom tanks as a known issue requiring attention.
The radiator core dimensions are 40 inches in height, 33.5 inches in width, and 5 inches in thickness, with flanges on the top and bottom. A recore operation includes blasting the top and bottom tanks, replacing the top filler neck, painting the complete assembly with corrosion resistance black paint, and assembling with new gaskets and bolts.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Please confirm the Government can or cannot provide the applicable OEM specifications, drawings, repair criteria, or pressure test requirements for Radiator Part No. 5101908, NIIN 01-478-8141, or whether the contractor is expected to already possess or obtain those documents independently.
a. We are unable to provide a Drawing for this Radiator.
2. Please confirm the required pressure test parameters, including required PSI, test duration, test method, and pass/fail acceptance criteria.
a. Radiator test parameters are 14-17 psi for a period of 4.5 hours with no leaks.
3. Please confirm whether any specific corrosion control and gloss black paint standard applies, including surface preparation, primer, coating type, or other required finish criteria.
a. A good corrosion resistance primer and gloss black paint especially since it will be in the presence of saltwater.
4. Please confirm whether offerors should provide pricing only for the test and evaluation of the three radiators, plus return shipping, at this stage, with repair pricing to be provided after inspection; or whether estimated repair option pricing is required with the initial quote.
a. Offerors should only provide pricing for the test and evaluation of the three radiators, plus return shipping, at this stage.
5. Please confirm whether the test and evaluation completion date of September 28, 2026, is based on the contract award date or the contractor’s receipt of the radiator units.
a. Test and evaluation completion date is based on the contract award date.
6. Can the Government provide any known issues or prior maintenance history.
a. (Issues) Buildup of corrosion inside of the enclosed top and bottom tank.
Radiator Core Dimensions
Core Height 40 “ Core Width 33 ½ “ Core Thickness 5” Core has flanges on the top and bottom.
Recore Definition:
• includes the blast the top and bottom tanks, replacing the top filler neck, paint the complete assembly unit with a corrosion resistance black paint, assemble with new gaskets and bolts.
Pressure Test Requirement:
• the radiator to 14-17 psi. for a period of 4.5 hours to verify the radiator has no leaks.