The document provided appears to be a set of questions and answers related to a Request for Proposal (RFP) for the upgrade of the Cooling Turbine Test Stand located at Marine Corps Air Station (MCAS) Cherry Point, North Carolina.

The key details include:

  • The RFP is seeking a firm-fixed price contract from a small business to remove the existing system, design, acquire, install, integrate, and test an upgraded cooling turbine test stand.
  • The government is providing various attachments referenced in the Statement of Work (SOW), which the contractor has requested access to in order to assist with the quoting process.
  • The contractor has asked several clarifying questions related to the equipment, disposal, and asbestos testing requirements outlined in the SOW.
  • The solicitation number is N6852024Q0029, with a quote due date of June 22, 2024. The contracting agency is the Department of the Navy Naval Air Systems Command.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Reference: SOW 3.7.7.1 We are to produce an additional F-18 cart Question:

Is the F-18 heat exchanger part of the cart?

If so, do we use the exact heat exchanger or is a substitute heat exchanger allowed?

The F-18 Heat Exchanger is considered part of the cart. A substitute heat exchanger may be used as long as it meets all performance requirements of the contract.

Reference: SOW Tables 1, 2, and 3 Throughout these tables, 17 different attachments are referenced Question:

To assist in the quoting process, can the Government please provide these attachments?

Contracting Office to provide.

Reference: SOW 3.6 The existing CTTS test system in the control room consists of a pressure cabinet, a DAQ cabinet, a operators table, and a computer cabinet.

Question:

Can the Government confirm if there is any additional equipment to be removed from the control room?

The pressure transducer cabinet, DAQ cabinet, computer cabinet, and operators table should encompass all CTTC equipment in the control room.

Reference: SOW 3.6 Contractor is responsible for disposal.

Question:

Will the government provide space for a temporary dumpster/construction disposal unit?

The government can provide space for a temporary dumpster if required.

Can we get pictures of the cart please?

Which cart? There are multiple test carts.

Can we get confirmation that the pipe insulation in the channel room does not contain asbestos please?

Pipe isolation should not contain asbestos. However, contractor shall test for the presence of Asbestos to confirm.

Are there working isolation valves up stream of the pressure control valves in the hot and cold air pipe?

There are isolation values. However, it’s the responsibility of the contractor to verify safe operation/isolation of said valves.

Can the government provide the several attachments referenced in the SOW. Specifically:

Attachment 4 , LCP-CPB-MX-1288 Local Calibration Procedure; Cooling Turbine T/C Attachment 5,NAVAIR 03-75-6 Attachment 6,,A1-550BE-MDB-000 Attachment 7,,NAVAIR 03-80F-46 Attachment 8,F5,A1-570EF-410-000 Attachment 9,A1-570AC-410-000 Attachment 10,NAVAIR 03-80C-22 Attachment 11,NAVAIR 03-30AK-94 Attachment 12,A1-460QA-MDB-000 Attachment 13, NAVAIR 03-80FB-1 Attachment 14,FUNTIONAL TEST