This solicitation requests quotes for a Field Emission Scanning Electron Microscope (FESEM) for the Fleet Readiness Center Southwest located in San Diego, California. The Navy seeks to procure one FESEM unit along with installation, start-up, calibration, validation, and training services. Quotes are due by May 19, 2023 with award intended as a single-award firm-fixed-price contract. The FESEM must be delivered FOB destination within 90 days of award with a minimum one-year warranty. The Navy will evaluate quotes based on technical acceptability and price, with award going to the lowest priced technically acceptable offer. This solicitation incorporates standard FAR and DFARS clauses for acquisition of commercial items.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ Full Text Clauses and Provisions.docx | DOCX document | |
| Fld Emiss ScanElec Micro (FESEM)- SOW.docx | DOCX document | |
| Schedule of Items.docx | DOCX document | |
| Fld Emiss ScanElec Micro (FESEM)- SOW.docx | DOCX document | |
| RFQ Full Text Clauses and Provisions.docx | DOCX document | |
| Combined Synopsis and Solicitation.docx | DOCX document | |
| GFP Data Input Spreadsheet (XLSX).xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) Contract Data Requirements List (DD 1423s)
Procurement of a Field Emission Scanning Electron Microscope (FESEM)
FRCSW, Building 469N
November 2022
CONTRACT DATA REQUIREMENTS LIST
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| FESEM |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A001 |
| Commercial Off-The-Shelf (COTS) Manuals |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-TMSS-81815 |
| SOW paragraphs 3.1.1, 3.2, 3.7, 3.7.1, 3.7.2, 3.7.3, 3.7.4, 3.7.5, 3.7.6, 3.9 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
DD
| A |
| OTIME |
30DAC
b. COPIES
8. APP CODE
| 11. ASN/A OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| TPOC |
The Contractor shall submit the following technical documentation:
· New developments on equipment
· Equipment make, model, capacity, footprint, mechanical, pneumatic, and electrical requirements of the equipment
· Technical data, including but not limited to, manuals, training manuals, maintenance manuals, calibration manuals, onsite adjustment, test procedure report, as-built drawings, printed training aids
The Contractor shall submit two (2) hard copies and one (1) electronic copy to the TPOC.
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Heidi Murillo |
| 11/21/2022 |
| William Fields |
| 11/21/2022 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 2 |
| of |
| 4 |
| Pages |
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| FESEM |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A002 |
| Calibration Certificate/Report |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-TMSS-81675 A |
| SOW paragraph 4.1 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
DD
| A |
| OTIME |
EOC
b. COPIES
8. APP CODE
| 11. ASN/A OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| TPOC |
The Contractor shall submit one (1) calibration certificate/report to the TPOC.
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Heidi Murillo |
| 11/21/2022 |
| William Fields |
| 11/21/2022 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 3 |
| of |
| 4 |
| Pages |
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| FESEM |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A003 |
| Major Milestone Commonality and Configuration |
| None |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-82022 |
| SOW paragraphs 5.0, 5.1, 5.2, 5.3, 5.3.1, 5.3.2, 5.3.3 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
| OTIME |
| 30DAC |
b. COPIES
8. APP CODE
| 11. ASN/A OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| TPOC |
The Contractor shall submit the POA&M report to the TPOC which consists of:
· Milestones
· Program Scheduling
· Program Review (engineering documentation, system documentation: validation report, system user’s manuals, calibration procedures, maintenance/corrective manuals, provisioning technical documents, schematics/drawings)
· Validation Plan and Procedure
The Contractor shall submit two (2) hard copies and one (1) electronic copy to the TPOC.
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Heidi Murillo |
| 111/21/2022 |
| William Fields |
| 11/21/2022 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 4 |
| of |
| 4 |
| Pages |
File details come from the government source that posted it. Updated .