CDRL - LM2500.pdf
PDF 2 MB Posted
- Attached to
- LM2500 Test Cell #19 and #20 Federal contract opportunity
- Solicitation number
- N6852022R0017
About this file
This document contains a Statement of Work and Contract Data Requirements List for the overhaul of two LM2500 engine test cells. The contractor will be responsible for the overhaul, upgrade, design, installation, integration, testing, and commissioning of each test cell located at Fleet Readiness Center Southwest in Building 397. The work will include restoring and upgrading test cell consoles, thrust stands, piping, interlocks, and other components. The contractor must integrate new system components to enable LM2500 engine testing and pass environmental, safety, and fire regulations. The contractor is required to provide operator manuals, drawings, calibration procedures, training, and acceptance testing to deliver fully operational test cells on a turn-key basis. The Contract Data Requirements List specifies data items due from the contractor before, during, and after the work including test plans, engineering documents, calibration certificates, equipment lists, procedures, and completion documents. The contract will utilize firm fixed price terms and have a 24 month period of performance.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| LM2500_RFP_N6852022R0017_28JUL22.docx | DOCX document | |
| CDRL - LM2500.pdf | ||
| Attachment 2 - Price Matrix LM2500.xlsx | XLSX spreadsheet | |
| RFP Question Submittal Form.xlsx | XLSX spreadsheet | |
| Attachment 1- CDRL - LM2500.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) Contract Data Requirements List (DD 1423s)
Overhaul of LM2500 Test Cells #19 & 20
FRCSW, North Island, Building 397
May 2022
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER
D. SYSTEM|ITEM E. CONTRACT/PR NO. F. CONTRACTOR
LM2500 Test Cells #19 & #20 TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A001 Acceptance Test Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-QCIC-80553A
SOW paragraphs 3.8, 3.8.9.2.6 FRCSW
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD A
ONE/R
90 days prior to installation b. COPIES
8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
A N/A 7DARC Reg Repr o
16. REMARKS TPOC 1 1 0
Block 4: Electronic format requested. Contract Format Acceptable.
Block 7: No source inspection, final inspection at destination; acceptance at destination.
Block 8: Requires written approval before distribution of final data. Government will require 30 days to review and approve/disapprove for final submission.
Block 9: Approved for public release; distribution is unlimited.
Block 10: One time with revisions (Draft to Final).
Block 12: 90 days prior to installation.
Block 13: 7 days after receipt of comments (Final).
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of a hard copy to the TPOC via overnight mail.
15. Total 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
05/25/2022 05/25/2022
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 2 of 17 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
A TDP TM X OTHER
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A002 Engineering Documentation Product Drawings, Modified and Sanitized
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-DRPR-81679A
SOW paragraphs 3.10.3, 3.18 FRCSW
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
OTIME 5DATC b. COPIES
SUBMISSION
a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repr o
16. REMARKS TPOC 4
Block 4: Electronic format requested. Contract Format Acceptable.
Block 7: No source inspection, final inspection at destination; acceptance at destination.
Block 8: No approval required.
Block 9: Approved for public release; distribution is unlimited.
Block 10: One time submission.
Block 12: 5 working days after test completion.
Block 14: Prints and/or Drawings shall be provided in three (2) electronic sets in CD/DVD format and three (2) hard copy sets to FRCSW TPOC before the final completion date.
Electronic copies shall be provided in PDF, SolidWorks 18 and AutoCAD 16 editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.
15. Total
5/25/2022 5/25/2022
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 3 of 17 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A003 Calibration Certificate
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-QCIC-80798
SOW paragraphs 3.8.8, 4.3.4 FRCSW
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
OTIME EOC b. COPIES
SUBMISSION
a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repr o
16. REMARKS TPOC 1
Block 4: Electronic format requested. Contract Format Acceptable.
Block 7: No source inspection, final inspection at destination; acceptance at destination.
Block 8: No approval required.
Block 9: Approved for public release; distribution is unlimited.
Block 10: One time submission.
Block 12: End of Contract.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 4 of 17 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A004 Maintenance Test and Support Equipment List
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-SESS-80294B
SOW paragraphs 3.8.8, 3.10.5, 3.10.6a
FRCSW
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
OTIME EOC b. COPIES
SUBMISSION
a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repr o
16. REMARKS TPOC 1
Block 4: Electronic format requested. Contract Format Acceptable.
Block 7: No source inspection, final inspection at destination; acceptance at destination.
Block 8: No approval required.
Block 9: Approved for public release; distribution is unlimited.
Block 10: One time submission.
Block 12: End of Contract.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 5 of 17 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A005 Test Procedure
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-NDTI-80603A
SOW paragraphs 3.8.9.1.4, FRCSW
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD A
See block 16
1TIME EOC b. COPIES
8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repr o
16. REMARKS TPOC 2
Block 4: Electronic format requested. Contract Format Acceptable.
Block 7: No source inspection, final inspection at destination; acceptance at destination.
Block 8: No approval required.
Block 9: Approved for public release; distribution is unlimited.
Block 10: One time submission.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 6 of 17 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A006 Calibration System Description
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-QCIC-80906
SOW paragraphs 3.10.2, 3.10.6 FRCSW
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD A
See block 16
OTIME 90 days before delivery of equipment
b. COPIES
8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repr o
16. REMARKS TPOC 2
Block 4: Electronic format requested. Contract Format Acceptable.
Block 7: No source inspection, final inspection at destination; acceptance at destination.
Block 8: No approval required.
Block 9: Approved for public release; distribution is unlimited.
Block 10: One time submission.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 7 of 17 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A007 Training Equipment Summary
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MISC-81184A
SOW paragraph 3.10.4 FRCSW
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
OTIME 90 days before delivery of equipment
b. COPIES
8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repr o
16. REMARKS TPOC 2
Block 4: Electronic format requested. Contract Format Acceptable.
Block 7: No source inspection, final inspection at destination; acceptance at destination.
Block 8: No approval required.
Block 9: Approved for public release; distribution is unlimited.
Block 10: One time submission.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 8 of 17 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A008 Maintenance Support Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-ILSS-81225
SOW paragraph 3.10.5 FRCSW
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
b. COPIES
8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repr o
16. REMARKS TPOC 2
Block 4: Electronic format requested. Contract Format Acceptable.
Block 7: No source inspection, final inspection at destination; acceptance at destination.
Block 8: A draft is NOT required.
Block 9: Approved for public release; distribution is unlimited.
Block 10: One time submission.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.
Operation manual shall be provided to the TPOC in two (2) hard copies ninety (90) days before delivery of equipment.
All documentation shall be written in the English language and be grammatically correct.
All technical data shall identify manufacturer’s name, model number, serial number and contact number.
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 9 of 17 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A009 Computer Programming Manual
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-IPSC-81447A
SOW paragraphs 3.18, 4.3.6 FRCSW
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
b. COPIES
8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repr o
16. REMARKS TPOC 2
Block 4: Electronic format requested. Contract Format Acceptable.
Block 7: No source inspection, final inspection at destination; acceptance at destination.
Block 8: A draft is NOT required.
Block 9: Approved for public release; distribution is unlimited.
Block 10: One time submission.
Block 12: 90 days after contract start
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 10 of 17 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A00A Key Events Schedule
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-81791
SOW paragraphs 4.0, 4.1, 4.2 FRCSW
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
1TIME 7DAC b. COPIES
SUBMISSION
a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repr o
16. REMARKS TPOC 2
Block 4: Electronic format requested. Contract Format Acceptable.
Block 7: No source inspection, final inspection at destination; acceptance at destination.
Block 8: A draft is NOT required.
Block 9: Approved for public release; distribution is unlimited.
Block 12: Seven (7) days from after contract start.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 11 of 17 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
LM2500 Test Cells #19 & #20 FRCSW
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A00B Engineering Documentation Information
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-EDRS-8410
SOW paragraph 4.3.1 FRCSW
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD A ONE/R 7DAC b. COPIES
8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repr o
16. REMARKS TPOC 1
Block 4: Electronic format requested. Contract Format Acceptable.
Block 7: No source inspection, final inspection at destination; acceptance at destination.
Block 8: A draft is NOT required.
Block 9: Approved for public release; distribution is unlimited.
Block 10: One time submission.
Block 12: Seven (7) days from contract award.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 12 of 17 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A00C Computer Software System Document
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-IPSC-80942
SOW paragraph 4.3.2 FRCSW
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD A ONE/R 7DAC b. COPIES
8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repr o
16. REMARKS TPOC 1
Block 4: Electronic format requested. Contract Format Acceptable.
Block 7: No source inspection, final inspection at destination; acceptance at destination.
Block 8: A draft is NOT required.
Block 9: Approved for public release; distribution is unlimited.
Block 10: One time submission.
Block 12: Seven (7) days from contract award.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 13 of 17 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A00D Contractor Validation Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MISC-80759A
SOW paragraph 4.3.3 FRCSW
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD A ONE/R 7DAC b. COPIES
8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repr o
16. REMARKS TPOC 1
Block 4: Electronic format requested. Contract Format Acceptable.
Block 7: No source inspection, final inspection at destination; acceptance at destination.
Block 8: A draft is NOT required.
Block 9: Approved for public release; distribution is unlimited.
Block 10: One time submission.
Block 12: Seven (7) days from contract award.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 14 of 17 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A00E Validation Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-SESS-80792B
SOW paragraph 4.3.5 FRCSW
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD A ONE/R 7DAC b. COPIES
8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repr o
16. REMARKS TPOC 1
Block 4: Electronic format requested. Contract Format Acceptable.
Block 7: No source inspection, final inspection at destination; acceptance at destination.
Block 8: A draft is NOT required.
Block 9: Approved for public release; distribution is unlimited.
Block 10: One time submission.
Block 12: Seven (7) days from contract award.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 15 of 17 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A00F Provisioning Technical Documentation Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-PSSS-82301
SOW paragraph 4.3.9 FRCSW
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD A ONE/R 7DAC b. COPIES
8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repr o
16. REMARKS TPOC 1
Block 4: Electronic format requested. Contract Format Acceptable.
Block 7: No source inspection, final inspection at destination; acceptance at destination.
Block 8: A draft is NOT required.
Block 9: Approved for public release; distribution is unlimited.
Block 10: One time submission.
Block 12: Seven (7) days from contract award.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 16 of 17 Pages
DISTRIBUTION STATEMENT ON TECHNICAL DOCUMENTS
The purpose of this supplement attachment is to establish procedures for marking technical documents, including production, engineering and logistics information, to denote the extent to which they are available for distribution, release, and dissemination without additional approvals or authorizations.
Distribution covers all engineering drawings, standards, specifications, technical manuals, blueprints, drawings, plans, instructions, computer software and documentation, and other technical information that can be used or be adapted for use to design, engineer, produce, manufacture, operate, repair, overhaul, or reproduce any military or space equipment or technology concerning such equipment.
The distribution statement markings shall be mandatory for all technical documents, including such informal documents as working papers, memoranda, and preliminary reports if those documents are not already in the public domain and if they are likely to be disseminated outside of the Department of Defense.
The distribution statement shall be displayed conspicuously on technical documents so as to be recognized readily by recipients.
The following shall apply for standard written or printed material:
1. The distribution statement shall appear on each front cover, title page, and DD Form 298 “Report Documentation Page”.
2. When practicable, the abstract of the document, the DD Form 1423 and bibliographic citations shall be written in such a way that the information will not be subject to distribution statement B.
If the technical information is not prepared in the form of an ordinary document and does not have a cover or title page (such as forms and charts), the applicable distribution statement shall be stamped, printed, written, or affixed by other means in a conspicuous position.
A distribution statement marking is distinct from and in addition to a security classification marking.
DISTRIBUTION STATEMENT DEFINITIONS:
1. DISTRIBUTION STATEMENT A. Approved for public release, distribution is unlimited.
2. DISTRIBUTION STATEMENT B Distribution authorized to Department of Defense (DoD) and U.S.
DoD contractors only. Other requests for this document shall be referred to FRCSE Counsel via Process Engineer and the Contracting Office.
| May 2022 |
| DI-QCIC-80553A |
| 90 days prior to installation |
| TPOC |
| DI-DRPR-81679A |
| 5DATC |
| TPOC |
| DI-QCIC-80798 |
| EOC |
| N/A |
| TPOC |
| DI-SESS-80294B |
| EOC |
| N/A |
| TPOC |
| DI-NDTI-80603A |
| EOC |
| N/A |
| TPOC |
| DI-QCIC-80906 |
| 90 days before delivery of equipment |
| N/A |
| TPOC |
| DI-MISC-81184A |
| 90 days before delivery of equipment |
| N/A |
| TPOC |
| DI-ILSS-81225 |
| 90 days before delivery of equipment |
| N/A |
| TPOC |
| DI-IPSC-81447A |
| N/A |
| TPOC |
| DI-MGMT-81791 |
| 7DAC |
| N/A |
| TPOC |
| DI-EDRS-8410 |
| 7DAC |
| N/A |
| TPOC |
| DI-IPSC-80942 |
| 7DAC |
| N/A |
| TPOC |
| DI-MISC-80759A |
| 7DAC |
| N/A |
| TPOC |
| DI-SESS-80792B |
| 7DAC |
| N/A |
| TPOC |
| DI-PSSS-82301 |
| 7DAC |
| N/A |
| TPOC |
File details come from the government source that posted it. Updated .