Attachment 1- CDRL - LM2500.docx
DOCX document 138 KB Posted
- Attached to
- LM2500 Test Cell #19 and #20 Federal contract opportunity
- Solicitation number
- N6852022R0017
About this file
This document contains a Contract Data Requirements List (CDRL) and Statement of Work for the overhaul of two LM2500 engine test cells at Naval Air Station North Island in California. The contractor will be responsible for overhaul, upgrade, design, installation, integration, and testing of the two test cells. Deliverables include an acceptance test plan, engineering documentation, calibration certificates, equipment lists, procedures, descriptions, manuals, and reports. All documentation must be delivered electronically in editable PDF and Word formats. Key dates include a test plan due 90 days before installation, drawings due 5 days after testing, and other documents due 90 days before or at equipment delivery or end of contract. Pricing is firm fixed price for a 24 month period of performance. The solicitation is designated as a 100% small business set-aside.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| LM2500_RFP_N6852022R0017_28JUL22.docx | DOCX document | |
| CDRL - LM2500.pdf | ||
| CDRL - LM2500.pdf | ||
| Attachment 2 - Price Matrix LM2500.xlsx | XLSX spreadsheet | |
| RFP Question Submittal Form.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) Contract Data Requirements List (DD 1423s)
Overhaul of LM2500 Test Cells #19 & 20
FRCSW, North Island, Building 397
May 2022
CONTRACT DATA REQUIREMENTS LIST
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
LM2500 Test Cells #19 & #20
TBD
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A001 |
| Acceptance Test Plan |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-QCIC-80553A |
| SOW paragraphs 3.8, 3.8.9.2.6 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
ONE/R
90 days prior to installation
b. COPIES
8. APP CODE
| 11. ASN/A OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
A
| N/A |
| 7DARC |
| Reg |
| Repro |
| 16. REMARKS |
| TPOC |
| 1 |
| 1 |
| 0 |
Block 4: Electronic format requested. Contract Format Acceptable.
Block 7: No source inspection, final inspection at destination; acceptance at destination.
Block 8: Requires written approval before distribution of final data. Government will require 30 days to review and approve/disapprove for final submission.
Block 9: Approved for public release; distribution is unlimited.
Block 10: One time with revisions (Draft to Final).
Block 12: 90 days prior to installation.
Block 13: 7 days after receipt of comments (Final).
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of a hard copy to the TPOC via overnight mail.
| 15. Total |
| 1 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Heidi Murillo |
| 05/25/2022 |
| William K. Fields |
| 05/25/2022 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 2 |
| of |
| 17 |
| Pages |
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
| TM |
| X |
| OTHER |
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
LM2500 Test Cells #19 & #20
TBD
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A002 |
| Engineering Documentation Product Drawings, Modified and Sanitized |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-DRPR-81679A |
| SOW paragraphs 3.10.3, 3.18 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
| OTIME |
| 5DATC |
b. COPIES
8. APP CODE
| 11. ASN/A OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
N/A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| TPOC |
Block 4: Electronic format requested. Contract Format Acceptable.
Block 7: No source inspection, final inspection at destination; acceptance at destination.
Block 8: No approval required.
Block 9: Approved for public release; distribution is unlimited.
Block 10: One time submission.
Block 12: 5 working days after test completion.
Block 14: Prints and/or Drawings shall be provided in three (2) electronic sets in CD/DVD format and three (2) hard copy sets to FRCSW TPOC before the final completion date.
Electronic copies shall be provided in PDF, SolidWorks 18 and AutoCAD 16 editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Heidi Murillo |
| 5/25/2022 |
| William K. Fields |
| 5/25/2022 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 3 |
| of |
| 17 |
| Pages |
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
LM2500 Test Cells #19 & #20
TBD
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A003 |
| Calibration Certificate |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-QCIC-80798 |
| SOW paragraphs 3.8.8, 4.3.4 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
| OTIME |
| EOC |
b. COPIES
8. APP CODE
| 11. ASN/A OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
N/A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| TPOC |
Block 4: Electronic format requested. Contract Format Acceptable.
Block 8: No approval required.
Block 9: Approved for public release; distribution is unlimited.
Block 10: One time submission.
Block 12: End of Contract.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Heidi Murillo |
| 5/25/2022 |
| William K. Fields |
| 5/25/2022 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 4 |
| of |
| 17 |
| Pages |
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
LM2500 Test Cells #19 & #20
TBD
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A004 |
| Maintenance Test and Support Equipment List |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-SESS-80294B |
| SOW paragraphs 3.8.8, 3.10.5, 3.10.6a |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
| OTIME |
| EOC |
b. COPIES
8. APP CODE
| 11. ASN/A OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
N/A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| TPOC |
Block 4: Electronic format requested. Contract Format Acceptable.
Block 8: No approval required.
Block 9: Approved for public release; distribution is unlimited.
Block 10: One time submission.
Block 12: End of Contract.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Heidi Murillo |
| 5/25/2022 |
| William K. Fields |
| 5/25/2022 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 5 |
| of |
| 17 |
| Pages |
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
LM2500 Test Cells #19 & #20
TBD
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A005 |
| Test Procedure |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-NDTI-80603A |
| SOW paragraphs 3.8.9.1.4, |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
See block 16
| 1TIME |
| EOC |
b. COPIES
8. APP CODE
| 11. ASN/A OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
N/A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| TPOC |
Block 4: Electronic format requested. Contract Format Acceptable.
Block 8: No approval required.
Block 9: Approved for public release; distribution is unlimited.
Block 10: One time submission.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Heidi Murillo |
| 5/25/2022 |
| William K. Fields |
| 5/25/2022 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 6 |
| of |
| 17 |
| Pages |
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
LM2500 Test Cells #19 & #20
TBD
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A006 |
| Calibration System Description |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-QCIC-80906 |
| SOW paragraphs 3.10.2, 3.10.6 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
See block 16
| OTIME |
| 90 days before delivery of equipment |
b. COPIES
8. APP CODE
| 11. ASN/A OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
N/A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| TPOC |
Block 4: Electronic format requested. Contract Format Acceptable.
Block 8: No approval required.
Block 9: Approved for public release; distribution is unlimited.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Heidi Murillo |
| 5/25/2022 |
| William K. Fields |
| 5/25/2022 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 7 |
| of |
| 17 |
| Pages |
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
LM2500 Test Cells #19 & #20
TBD
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A007 |
| Training Equipment Summary |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MISC-81184A |
| SOW paragraph 3.10.4 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
| OTIME |
| 90 days before delivery of equipment |
b. COPIES
8. APP CODE
| 11. ASN/A OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
N/A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| TPOC |
Block 4: Electronic format requested. Contract Format Acceptable.
Block 8: No approval required.
Block 9: Approved for public release; distribution is unlimited.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Heidi Murillo |
| 5/25/2022 |
| William K. Fields |
| 5/25/2022 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 8 |
| of |
| 17 |
| Pages |
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
LM2500 Test Cells #19 & #20
TBD
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A008 |
| Maintenance Support Plan |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-ILSS-81225 |
| SOW paragraph 3.10.5 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
| OTIME |
| 90 days before delivery of equipment |
b. COPIES
8. APP CODE
| 11. ASN/A OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
N/A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| TPOC |
Block 4: Electronic format requested. Contract Format Acceptable.
Block 8: A draft is NOT required.
Block 9: Approved for public release; distribution is unlimited.
Block 10: One time submission.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.
Operation manual shall be provided to the TPOC in two (2) hard copies ninety (90) days before delivery of equipment.
All documentation shall be written in the English language and be grammatically correct. All technical data shall identify manufacturer’s name, model number, serial number and contact number.
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Heidi Murillo |
| 5/25/2022 |
| William K. Fields |
| 5/25/2022 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 9 |
| of |
| 17 |
| Pages |
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
| TM |
| X |
| OTHER |
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
LM2500 Test Cells #19 & #20
TBD
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A009 |
| Computer Programming Manual |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-IPSC-81447A |
| SOW paragraphs 3.18, 4.3.6 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
| OTIME |
| 90 days before delivery of equipment |
b. COPIES
8. APP CODE
| 11. ASN/A OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
N/A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| TPOC |
Block 4: Electronic format requested. Contract Format Acceptable.
Block 8: A draft is NOT required.
Block 9: Approved for public release; distribution is unlimited.
Block 10: One time submission.
Block 12: 90 days after contract start
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Heidi Murillo |
| 5/25/2022 |
| William K. Fields |
| 5/25/2022 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 10 |
| of |
| 17 |
| Pages |
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
| TM |
| X |
| OTHER |
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
LM2500 Test Cells #19 & #20
TBD
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A00A |
| Key Events Schedule |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-81791 |
| SOW paragraphs 4.0, 4.1, 4.2 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
| 1TIME |
| 7DAC |
b. COPIES
8. APP CODE
| 11. ASN/A OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
N/A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| TPOC |
Block 4: Electronic format requested. Contract Format Acceptable.
Block 8: A draft is NOT required.
Block 9: Approved for public release; distribution is unlimited.
Block 12: Seven (7) days from after contract start.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Heidi Murillo |
| 5/25/2022 |
| William K. Fields |
| 5/25/2022 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 11 |
| of |
| 17 |
| Pages |
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
| TM |
| X |
| OTHER |
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
LM2500 Test Cells #19 & #20
FRCSW
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A00B |
| Engineering Documentation Information |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-EDRS-8410 |
| SOW paragraph 4.3.1 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
| ONE/R |
| 7DAC |
b. COPIES
8. APP CODE
| 11. ASN/A OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
N/A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| TPOC |
Block 4: Electronic format requested. Contract Format Acceptable.
Block 8: A draft is NOT required.
Block 9: Approved for public release; distribution is unlimited.
Block 10: One time submission.
Block 12: Seven (7) days from contract award.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Heidi Murillo |
| 5/25/2022 |
| William K. Fields |
| 5/25/2022 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 12 |
| of |
| 17 |
| Pages |
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
| TM |
| X |
| OTHER |
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
LM2500 Test Cells #19 & #20
FRCSW
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A00C |
| Computer Software System Document |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-IPSC-80942 |
| SOW paragraph 4.3.2 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
| ONE/R |
| 7DAC |
b. COPIES
8. APP CODE
| 11. ASN/A OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
N/A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| TPOC |
Block 4: Electronic format requested. Contract Format Acceptable.
Block 8: A draft is NOT required.
Block 9: Approved for public release; distribution is unlimited.
Block 10: One time submission.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Heidi Murillo |
| 5/25/2022 |
| William K. Fields |
| 5/25/2022 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 13 |
| of |
| 17 |
| Pages |
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
| TM |
| X |
| OTHER |
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
LM2500 Test Cells #19 & #20
FRCSW
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A00D |
| Contractor Validation Plan |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MISC-80759A |
| SOW paragraph 4.3.3 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
| ONE/R |
| 7DAC |
b. COPIES
8. APP CODE
| 11. ASN/A OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
N/A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| TPOC |
Block 4: Electronic format requested. Contract Format Acceptable.
Block 8: A draft is NOT required.
Block 9: Approved for public release; distribution is unlimited.
Block 10: One time submission.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Heidi Murillo |
| 5/25/2022 |
| William K. Fields |
| 5/25/2022 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 14 |
| of |
| 17 |
| Pages |
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
| TM |
| X |
| OTHER |
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
LM2500 Test Cells #19 & #20
FRCSW
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A00E |
| Validation Report |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-SESS-80792B |
| SOW paragraph 4.3.5 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
| ONE/R |
| 7DAC |
b. COPIES
8. APP CODE
| 11. ASN/A OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
N/A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| TPOC |
Block 4: Electronic format requested. Contract Format Acceptable.
Block 8: A draft is NOT required.
Block 9: Approved for public release; distribution is unlimited.
Block 10: One time submission.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Heidi Murillo |
| 5/25/2022 |
| William K. Fields |
| 5/25/2022 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 15 |
| of |
| 17 |
| Pages |
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
| TM |
| X |
| OTHER |
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
LM2500 Test Cells #19 & #20
FRCSW
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A00F |
| Provisioning Technical Documentation Report |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-PSSS-82301 |
| SOW paragraph 4.3.9 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
| ONE/R |
| 7DAC |
b. COPIES
8. APP CODE
| 11. ASN/A OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
N/A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| TPOC |
Block 4: Electronic format requested. Contract Format Acceptable.
Block 8: A draft is NOT required.
Block 9: Approved for public release; distribution is unlimited.
Block 10: One time submission.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Heidi Murillo |
| 5/25/2022 |
| William K. Fields |
| 5/25/2022 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 16 |
| of |
| 17 |
| Pages |
DISTRIBUTION STATEMENT ON TECHNICAL DOCUMENTS
The purpose of this supplement attachment is to establish procedures for marking technical documents, including production, engineering and logistics information, to denote the extent to which they are available for distribution, release, and dissemination without additional approvals or authorizations.
Distribution covers all engineering drawings, standards, specifications, technical manuals, blueprints, drawings, plans, instructions, computer software and documentation, and other technical information that can be used or be adapted for use to design, engineer, produce, manufacture, operate, repair, overhaul, or reproduce any military or space equipment or technology concerning such equipment.
The distribution statement markings shall be mandatory for all technical documents, including such informal documents as working papers, memoranda, and preliminary reports if those documents are not already in the public domain and if they are likely to be disseminated outside of the Department of Defense.
The distribution statement shall be displayed conspicuously on technical documents so as to be recognized readily by recipients.
The following shall apply for standard written or printed material:
1. The distribution statement shall appear on each front cover, title page, and DD Form 298 “Report Documentation Page”.
2. When practicable, the abstract of the document, the DD Form 1423 and bibliographic citations shall be written in such a way that the information will not be subject to distribution statement B.
If the technical information is not prepared in the form of an ordinary document and does not have a cover or title page (such as forms and charts), the applicable distribution statement shall be stamped, printed, written, or affixed by other means in a conspicuous position.
A distribution statement marking is distinct from and in addition to a security classification marking.
DISTRIBUTION STATEMENT DEFINITIONS:
1. DISTRIBUTION STATEMENT A. Approved for public release, distribution is unlimited.
2. DISTRIBUTION STATEMENT B Distribution authorized to Department of Defense (DoD) and U.S. DoD contractors only. Other requests for this document shall be referred to FRCSE Counsel via Process Engineer and the Contracting Office.
File details come from the government source that posted it. Updated .