Attachment 1- CDRL - LM2500.docx

DOCX document 138 KB Posted

Attached to
LM2500 Test Cell #19 and #20 Federal contract opportunity
Solicitation number
N6852022R0017
Issued by
Department of the Navy Naval Air Systems Command

About this file

This document contains a Contract Data Requirements List (CDRL) and Statement of Work for the overhaul of two LM2500 engine test cells at Naval Air Station North Island in California. The contractor will be responsible for overhaul, upgrade, design, installation, integration, and testing of the two test cells. Deliverables include an acceptance test plan, engineering documentation, calibration certificates, equipment lists, procedures, descriptions, manuals, and reports. All documentation must be delivered electronically in editable PDF and Word formats. Key dates include a test plan due 90 days before installation, drawings due 5 days after testing, and other documents due 90 days before or at equipment delivery or end of contract. Pricing is firm fixed price for a 24 month period of performance. The solicitation is designated as a 100% small business set-aside.

View the file

Other files for this federal contract opportunity

Other files attached to LM2500 Test Cell #19 and #20, newest first.
File Type Posted
LM2500_RFP_N6852022R0017_28JUL22.docx DOCX document
CDRL - LM2500.pdf PDF
CDRL - LM2500.pdf PDF
Attachment 2 - Price Matrix LM2500.xlsx XLSX spreadsheet
RFP Question Submittal Form.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) Contract Data Requirements List (DD 1423s)

Overhaul of LM2500 Test Cells #19 & 20

FRCSW, North Island, Building 397

May 2022

CONTRACT DATA REQUIREMENTS LIST

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP

TM

OTHER

X

D. SYSTEM|ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

LM2500 Test Cells #19 & #20

TBD

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A001
Acceptance Test Plan
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-QCIC-80553A
SOW paragraphs 3.8, 3.8.9.2.6
FRCSW
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
DD
A

ONE/R

90 days prior to installation

b. COPIES

8. APP CODE

11. ASN/A OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

A

N/A
7DARC
Reg
Repro
16. REMARKS
TPOC
1
1
0

Block 4: Electronic format requested. Contract Format Acceptable.

Block 7: No source inspection, final inspection at destination; acceptance at destination.

Block 8: Requires written approval before distribution of final data. Government will require 30 days to review and approve/disapprove for final submission.

Block 9: Approved for public release; distribution is unlimited.

Block 10: One time with revisions (Draft to Final).

Block 12: 90 days prior to installation.

Block 13: 7 days after receipt of comments (Final).

Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of a hard copy to the TPOC via overnight mail.

15. Total
1
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Heidi Murillo
05/25/2022
William K. Fields
05/25/2022
DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
2
of
17
Pages

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP
TM
X
OTHER

X

D. SYSTEM|ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

LM2500 Test Cells #19 & #20

TBD

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A002
Engineering Documentation Product Drawings, Modified and Sanitized
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-DRPR-81679A
SOW paragraphs 3.10.3, 3.18
FRCSW
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
DD
A
OTIME
5DATC

b. COPIES

8. APP CODE

11. ASN/A OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

N/A

N/A
N/A
Reg
Repro
16. REMARKS
TPOC

Block 4: Electronic format requested. Contract Format Acceptable.

Block 7: No source inspection, final inspection at destination; acceptance at destination.

Block 8: No approval required.

Block 9: Approved for public release; distribution is unlimited.

Block 10: One time submission.

Block 12: 5 working days after test completion.

Block 14: Prints and/or Drawings shall be provided in three (2) electronic sets in CD/DVD format and three (2) hard copy sets to FRCSW TPOC before the final completion date.

Electronic copies shall be provided in PDF, SolidWorks 18 and AutoCAD 16 editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.

15. Total

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Heidi Murillo
5/25/2022
William K. Fields
5/25/2022
DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
3
of
17
Pages

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP

TM

OTHER

X

D. SYSTEM|ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

LM2500 Test Cells #19 & #20

TBD

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A003
Calibration Certificate
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-QCIC-80798
SOW paragraphs 3.8.8, 4.3.4
FRCSW
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
DD
A
OTIME
EOC

b. COPIES

8. APP CODE

11. ASN/A OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

N/A

N/A
N/A
Reg
Repro
16. REMARKS
TPOC

Block 4: Electronic format requested. Contract Format Acceptable.

Block 8: No approval required.

Block 9: Approved for public release; distribution is unlimited.

Block 10: One time submission.

Block 12: End of Contract.

Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.

15. Total

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Heidi Murillo
5/25/2022
William K. Fields
5/25/2022
DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
4
of
17
Pages

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP

TM

OTHER

X

D. SYSTEM|ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

LM2500 Test Cells #19 & #20

TBD

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A004
Maintenance Test and Support Equipment List
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-SESS-80294B
SOW paragraphs 3.8.8, 3.10.5, 3.10.6a
FRCSW
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
DD
A
OTIME
EOC

b. COPIES

8. APP CODE

11. ASN/A OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

N/A

N/A
N/A
Reg
Repro
16. REMARKS
TPOC

Block 4: Electronic format requested. Contract Format Acceptable.

Block 8: No approval required.

Block 9: Approved for public release; distribution is unlimited.

Block 10: One time submission.

Block 12: End of Contract.

Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.

15. Total

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Heidi Murillo
5/25/2022
William K. Fields
5/25/2022
DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
5
of
17
Pages

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP

TM

OTHER

X

D. SYSTEM|ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

LM2500 Test Cells #19 & #20

TBD

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A005
Test Procedure
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-NDTI-80603A
SOW paragraphs 3.8.9.1.4,
FRCSW
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
DD
A

See block 16

1TIME
EOC

b. COPIES

8. APP CODE

11. ASN/A OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

N/A

N/A
N/A
Reg
Repro
16. REMARKS
TPOC

Block 4: Electronic format requested. Contract Format Acceptable.

Block 8: No approval required.

Block 9: Approved for public release; distribution is unlimited.

Block 10: One time submission.

Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.

15. Total

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Heidi Murillo
5/25/2022
William K. Fields
5/25/2022
DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
6
of
17
Pages

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP

TM

OTHER

X

D. SYSTEM|ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

LM2500 Test Cells #19 & #20

TBD

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A006
Calibration System Description
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-QCIC-80906
SOW paragraphs 3.10.2, 3.10.6
FRCSW
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
DD
A

See block 16

OTIME
90 days before delivery of equipment

b. COPIES

8. APP CODE

11. ASN/A OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

N/A

N/A
N/A
Reg
Repro
16. REMARKS
TPOC

Block 4: Electronic format requested. Contract Format Acceptable.

Block 8: No approval required.

Block 9: Approved for public release; distribution is unlimited.

Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.

15. Total

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Heidi Murillo
5/25/2022
William K. Fields
5/25/2022
DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
7
of
17
Pages

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP

TM

OTHER

X

D. SYSTEM|ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

LM2500 Test Cells #19 & #20

TBD

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A007
Training Equipment Summary
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-MISC-81184A
SOW paragraph 3.10.4
FRCSW
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
DD
A
OTIME
90 days before delivery of equipment

b. COPIES

8. APP CODE

11. ASN/A OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

N/A

N/A
N/A
Reg
Repro
16. REMARKS
TPOC

Block 4: Electronic format requested. Contract Format Acceptable.

Block 8: No approval required.

Block 9: Approved for public release; distribution is unlimited.

Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.

15. Total

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Heidi Murillo
5/25/2022
William K. Fields
5/25/2022
DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
8
of
17
Pages

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP

TM

OTHER

X

D. SYSTEM|ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

LM2500 Test Cells #19 & #20

TBD

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A008
Maintenance Support Plan
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-ILSS-81225
SOW paragraph 3.10.5
FRCSW
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
DD
A
OTIME
90 days before delivery of equipment

b. COPIES

8. APP CODE

11. ASN/A OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

N/A

N/A
N/A
Reg
Repro
16. REMARKS
TPOC

Block 4: Electronic format requested. Contract Format Acceptable.

Block 8: A draft is NOT required.

Block 9: Approved for public release; distribution is unlimited.

Block 10: One time submission.

Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.

Operation manual shall be provided to the TPOC in two (2) hard copies ninety (90) days before delivery of equipment.

All documentation shall be written in the English language and be grammatically correct. All technical data shall identify manufacturer’s name, model number, serial number and contact number.

15. Total

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Heidi Murillo
5/25/2022
William K. Fields
5/25/2022
DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
9
of
17
Pages

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP
TM
X
OTHER

X

D. SYSTEM|ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

LM2500 Test Cells #19 & #20

TBD

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A009
Computer Programming Manual
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-IPSC-81447A
SOW paragraphs 3.18, 4.3.6
FRCSW
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
DD
A
OTIME
90 days before delivery of equipment

b. COPIES

8. APP CODE

11. ASN/A OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

N/A

N/A
N/A
Reg
Repro
16. REMARKS
TPOC

Block 4: Electronic format requested. Contract Format Acceptable.

Block 8: A draft is NOT required.

Block 9: Approved for public release; distribution is unlimited.

Block 10: One time submission.

Block 12: 90 days after contract start

Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.

15. Total

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Heidi Murillo
5/25/2022
William K. Fields
5/25/2022
DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
10
of
17
Pages

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP
TM
X
OTHER

X

D. SYSTEM|ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

LM2500 Test Cells #19 & #20

TBD

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A00A
Key Events Schedule
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-MGMT-81791
SOW paragraphs 4.0, 4.1, 4.2
FRCSW
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
DD
A
1TIME
7DAC

b. COPIES

8. APP CODE

11. ASN/A OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

N/A

N/A
N/A
Reg
Repro
16. REMARKS
TPOC

Block 4: Electronic format requested. Contract Format Acceptable.

Block 8: A draft is NOT required.

Block 9: Approved for public release; distribution is unlimited.

Block 12: Seven (7) days from after contract start.

Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.

15. Total

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Heidi Murillo
5/25/2022
William K. Fields
5/25/2022
DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
11
of
17
Pages

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP
TM
X
OTHER

X

D. SYSTEM|ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

LM2500 Test Cells #19 & #20

FRCSW

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A00B
Engineering Documentation Information
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-EDRS-8410
SOW paragraph 4.3.1
FRCSW
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
DD
A
ONE/R
7DAC

b. COPIES

8. APP CODE

11. ASN/A OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

N/A

N/A
N/A
Reg
Repro
16. REMARKS
TPOC

Block 4: Electronic format requested. Contract Format Acceptable.

Block 8: A draft is NOT required.

Block 9: Approved for public release; distribution is unlimited.

Block 10: One time submission.

Block 12: Seven (7) days from contract award.

Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.

15. Total

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Heidi Murillo
5/25/2022
William K. Fields
5/25/2022
DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
12
of
17
Pages

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP
TM
X
OTHER

X

D. SYSTEM|ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

LM2500 Test Cells #19 & #20

FRCSW

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A00C
Computer Software System Document
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-IPSC-80942
SOW paragraph 4.3.2
FRCSW
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
DD
A
ONE/R
7DAC

b. COPIES

8. APP CODE

11. ASN/A OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

N/A

N/A
N/A
Reg
Repro
16. REMARKS
TPOC

Block 4: Electronic format requested. Contract Format Acceptable.

Block 8: A draft is NOT required.

Block 9: Approved for public release; distribution is unlimited.

Block 10: One time submission.

Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.

15. Total

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Heidi Murillo
5/25/2022
William K. Fields
5/25/2022
DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
13
of
17
Pages

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP
TM
X
OTHER

X

D. SYSTEM|ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

LM2500 Test Cells #19 & #20

FRCSW

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A00D
Contractor Validation Plan
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-MISC-80759A
SOW paragraph 4.3.3
FRCSW
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
DD
A
ONE/R
7DAC

b. COPIES

8. APP CODE

11. ASN/A OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

N/A

N/A
N/A
Reg
Repro
16. REMARKS
TPOC

Block 4: Electronic format requested. Contract Format Acceptable.

Block 8: A draft is NOT required.

Block 9: Approved for public release; distribution is unlimited.

Block 10: One time submission.

Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.

15. Total

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Heidi Murillo
5/25/2022
William K. Fields
5/25/2022
DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
14
of
17
Pages

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP
TM
X
OTHER

X

D. SYSTEM|ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

LM2500 Test Cells #19 & #20

FRCSW

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A00E
Validation Report
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-SESS-80792B
SOW paragraph 4.3.5
FRCSW
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
DD
A
ONE/R
7DAC

b. COPIES

8. APP CODE

11. ASN/A OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

N/A

N/A
N/A
Reg
Repro
16. REMARKS
TPOC

Block 4: Electronic format requested. Contract Format Acceptable.

Block 8: A draft is NOT required.

Block 9: Approved for public release; distribution is unlimited.

Block 10: One time submission.

Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.

15. Total

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Heidi Murillo
5/25/2022
William K. Fields
5/25/2022
DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
15
of
17
Pages

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP
TM
X
OTHER

X

D. SYSTEM|ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

LM2500 Test Cells #19 & #20

FRCSW

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A00F
Provisioning Technical Documentation Report
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-PSSS-82301
SOW paragraph 4.3.9
FRCSW
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
DD
A
ONE/R
7DAC

b. COPIES

8. APP CODE

11. ASN/A OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

N/A

N/A
N/A
Reg
Repro
16. REMARKS
TPOC

Block 4: Electronic format requested. Contract Format Acceptable.

Block 8: A draft is NOT required.

Block 9: Approved for public release; distribution is unlimited.

Block 10: One time submission.

Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.

15. Total

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Heidi Murillo
5/25/2022
William K. Fields
5/25/2022
DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
16
of
17
Pages

DISTRIBUTION STATEMENT ON TECHNICAL DOCUMENTS

The purpose of this supplement attachment is to establish procedures for marking technical documents, including production, engineering and logistics information, to denote the extent to which they are available for distribution, release, and dissemination without additional approvals or authorizations.

Distribution covers all engineering drawings, standards, specifications, technical manuals, blueprints, drawings, plans, instructions, computer software and documentation, and other technical information that can be used or be adapted for use to design, engineer, produce, manufacture, operate, repair, overhaul, or reproduce any military or space equipment or technology concerning such equipment.

The distribution statement markings shall be mandatory for all technical documents, including such informal documents as working papers, memoranda, and preliminary reports if those documents are not already in the public domain and if they are likely to be disseminated outside of the Department of Defense.

The distribution statement shall be displayed conspicuously on technical documents so as to be recognized readily by recipients.

The following shall apply for standard written or printed material:

1. The distribution statement shall appear on each front cover, title page, and DD Form 298 “Report Documentation Page”.

2. When practicable, the abstract of the document, the DD Form 1423 and bibliographic citations shall be written in such a way that the information will not be subject to distribution statement B.

If the technical information is not prepared in the form of an ordinary document and does not have a cover or title page (such as forms and charts), the applicable distribution statement shall be stamped, printed, written, or affixed by other means in a conspicuous position.

A distribution statement marking is distinct from and in addition to a security classification marking.

DISTRIBUTION STATEMENT DEFINITIONS:

1. DISTRIBUTION STATEMENT A. Approved for public release, distribution is unlimited.

2. DISTRIBUTION STATEMENT B Distribution authorized to Department of Defense (DoD) and U.S. DoD contractors only. Other requests for this document shall be referred to FRCSE Counsel via Process Engineer and the Contracting Office.