N6852022R0001 LOGEN Capabilities.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Commander, Fleet Readiness Center Engineering and Logistics Technical Support Services
Solicitation number
N6852022R0001
Issued by

About this file

This sources sought notice requests capability statements from interested parties to provide engineering and logistics technical support services to the Commander, Fleet Readiness Center. The services include engineering support, logistics and technical support, and production support across sites in Jacksonville, Florida, Cherry Point, North Carolina, and North Island, California. The applicable NAICS code is 541330 with a size standard of $41.5 million. The requirement will be awarded as a single-source IDIQ contract with cost-plus-fixed-fee line items and term CPFF task orders over five years, with an estimated 2.8 million man-hours of non-performance based level of effort. Interested parties should respond to the attached questionnaire by March 26, 2021. The notice provides incumbent contract information and the intent to consolidate existing requirements. The Department of the Navy Naval Air Systems Command will evaluate responses to determine competitive opportunities and acquisition method.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questionnaire Tab 1

LOGEN CAPABILITIES QUESTIONAIRE
COMPANY NAME:
COMPANY CAGE CODE:
N6852022R0001
QuestionProvide Details
1Describe your current and past experience (within last five years) of Naval Aircraft and supporting systems/equipment engineering and logistics support that your company has performed similar to the SOW task areas listed and on Tab 2, at a minimum respond to the yellow highlighted sections, feel free to address other non-highlighted tasking areas. Please provide the following overarching information for any referenced contract identified: number of man-hours performed per year, types of aircraft and systems supported, and the number of locations and sites where work was performed.Please Complete Tab 2
2To supplement your answer to #1 Include contract number, organization supported, indication of whether as a prime or subcontractor, contract values (value of the prime contract and if applicable, the value of your subcontract if you were not the prime), Government point of contact with current telephone number, and a brief description of how the referenced contract relates to the services described herein.
3Can, or has your company managed a team of subcontractors before? If so, please cite contracts and teaming arrangement.
4If your company is a Small Business under NAICS 541330, and the requirement be an approved small business set-aside with Subcontracting Limitations, would you be capable to submit as a Prime Contractor (explain your company’s ability to perform at least 50%, in accordance with FAR Clause 52.219-14 (Dev. 2020-O0008), of the tasking described in this draft SOW for the 5 year period). If your company would submit as a subcontractor, indicate the Prime Contractor you may team with.
5The Government is trying to identify barriers to small business Prime participation for this potentially consolidated requirement. Are there changes that your company would recommend be made to the SOW or included in the RFP that would increase small business participation as a prime for this requirement? If the requirement were to be solicitated as a full and open competition to include large businesses, please explain your general plans for Small Business Utilization if your company is a Large Business under NAICS 541330.
6Are there any comments and/or recommendations for the SOW to improve, understanding of the requirements or contractibility?
7Respondents to this notice must also indicate whether they are a large business or qualify as a Small, Small Disadvantaged, Small Disadvantaged Veteran Owned Small Business, Women-Owned, 8(a), Hub Zone or Service Disabled Veteran-Owned Small Business Concern.
8Does your company have the ability to begin performance thirty days following a contract award?
9The intended security classification will be "up to Top Secret," which will be dependent at the Task Order level. Does your company/team have capability to obtain the required (Top Secret) security clearances for personnel upon proposal submission or will time be needed to obtain Top Secret personnel security clearances after award?
10Describe any limitations your company may have for responding to these requirements. Include limitations and courses of action necessary to overcome the limitation. Identify whether the limitation is based on cost, schedule or technical performance issues you feel should be considered.

Tasking Tab 2

3.3.1 Engineering SupportResponses
Sub-Service Areas
3.3.1.1 Engineering Data
3.3.1.2 System and Support Equipment Installation
3.3.1.3 Engineering Investigations, Health/Hazard Material and Quality Deficiency Reports of New and Existing Production Systems and Components
3.3.1.4 Reliability and Affordable Readiness Tasks (RAAT)
3.3.1.5 Computer Aided Design and Manufacturing
3.3.1.6 Technical Writing/Editing Tasks
3.3.1.7 Engineering Data Library
3.3.1.8 System Delivery Services
3.3.1.9 Analyses and Technical Studies
3.3.1.10 On-site Production Support
3.3.1.11 Analysis of Existing Engineering Investigations, Hazard Material Reports (HMR) and Quality Deficiency Reports (QDR):
3.3.1.12 Prototype Development Systems
3.3.1.13 Prototype Support Equipment Systems
3.3.1.14 Weapon Systems Engineering Services
3.3.1.15 Quality Engineering Services
3.3.1.16 Production Analysis and Trade Studies
3.3.1.17 Depot System Design Deficiency Report
3.3.2 Logistics and Technical SupportResponses
Sub-Service Areas
3.3.2.1 Level of Repair Analysis (LORA)
3.3.2.2 Design Interface (DI)
3.3.2.3 Maintenance Planning (MP)
3.3.2.4 Logistics Support Analysis (LSA) Database and Reports
3.3.2.5 Environmental Logistics
3.3.2.6 Aviation/Ship Integration
3.3.2.7 Supply Support
3.3.2.8 Facilities
3.3.2.9 Naval Aviation Maintenance Program (NAMP)
3.3.2.10 Maintenance Scheduling/Management
3.3.2.11 Supportability Test and Evaluation (ST&E)
3.3.2.12 Integrated Warfighter Support Community (IWSC) /Warfighter Response Center (WRC)
3.3.2.13 Training/Training Support
3.3.2.14 Support Equipment (SE)
3.3.2.15 Metrology and Calibration
3.3.2.16 Joint Underservice
3.3.2.17 CORE/Title 10
3.3.2.18 Industrial Business Ops
3.3.2.19 Diminishing Manufacturing Sources and Material Shortages (DMSMS)
3.3.2.20 Packaging, Handling, Storage, and Transportation (PHS&T)

File details come from the government source that posted it. Updated .