N6852020R01240001.docx.pdf
PDF 25 KB Posted
- Solicitation number
- N6852020R0124
About this file
This document contains a solicitation and amendment for logistics and technical support services. The United States Navy Fleet Readiness Center East seeks proposals for logistics and technical support services including planning, analysis, development, training, support equipment management, facilities execution. Support may be provided to Fleet Support Teams, Sustainment Group, PEO(A), PEO(T), PEO(U&W), PEO(JSF), U.S. Air Force, and Foreign Military Sales customers. The resultant contract will be a single award IDIQ with cost plus fixed fee CLINs for services and cost reimbursable CLINs for travel and materials. The ordering period is five years with an option to extend services. Proposals are due by August 6, 2020 through DoD SAFE. The amendment updates attachments including past performance forms and schedules government property and DD254 information as of July 6, 2020.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_P1_Past_Performance_Matrix (rev.1).doc | DOC document | |
| N6852020R0124 RFP Questions Answers 7.23.2020.pdf | ||
| P6 N6852020R0124.xlsx | XLSX spreadsheet | |
| Attachment_P1_Past_Performance_Matrix.doc | DOC document | |
| Attachment 3 Craven NC WD 15-5782.pdf | ||
| N6852020R0124 RFP Final.pdf | ||
| Exhibit A N6852020R0124 CDRLs A001 through A006.pdf | ||
| N6852020R0124 RFP Draft Questions Answers-7.6.2020.pdf | ||
| Attachment 4 Local Security System.xlsx | XLSX spreadsheet | |
| P7 Annual Fully Burdened Labor Attachment -N6852020R0124.xlsx | XLSX spreadsheet | |
| Attachment 2 Scheduled Government Furnished Property (SGF).xlsx | XLSX spreadsheet | |
| Attachment P2 CPAQ.pdf | ||
| Attachment 1 N6852020R0124 DD254 signed.pdf | ||
| Attachment B-1 N6852020R0124.xlsx | XLSX spreadsheet |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0001:
The purpose of this amendment is to update/revise:
1. Attachment P1 in Section J.
1. CONTRACT ID CODE PAGE OF PAGES
S 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Jul-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6852020R0124
X 9B. DATED (SEE ITEM 11)
06-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Jul-2020
CODE
COMFRC PROCUREMENT GROUP
47038 MCLEOD ROAD; BUILDING 448
PATUXENT RIVER MD 20670
N68520 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6852020R0124
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit A CDRLs 7 03-JUN-2020
Attachment 1 DD254 4
Attachment 2 Scheduled Government
Property
Attachment 3 Craven NC WD 15-5782 1
Attachment 4 Locator Form 5252.204-
Attachment B-1 Streamlined Labor Rates 1
Attachment P1 Past Performance
Information Form (rev. 1)
Attachment P2 Contractor Performance
Questionnaire
Attachment P6 Cost Summary 7
Attachment P7 Fully Burdened Labor
Rates to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit A CDRLs 7 03-JUN-2020
Attachment 1 DD254 4 06-JUL-2020
Attachment 2 Scheduled Government
Property
1 06-JUL-2020
Attachment 3 Craven NC WD 15-5782 1 06-JUL-2020
Attachment 4 Locator Form 5252.204-
1 06-JUL-2020
Attachment B-1 Streamlined Labor Rates 1 06-JUL-2020
Attachment P1 Past Performance
Information Form-
REVISED
2 30-JUL-2020
Attachment P2 Contractor Performance
Questionnaire
15 06-JUL-2020
Attachment P6 Cost Summary 7 06-JUL-2020
Attachment P7 Fully Burdened Labor
Rates
2 06-JUL-2020
(End of Summary of Changes)
N6852020R0124
File details come from the government source that posted it. Updated .