Question and Response Form_3.1.22.docx
DOCX document 29 KB Posted
- Attached to
- Bldg. 369-Removal Of Asbestos Phase II
- Solicitation number
- N68335-22-Q-0098
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CDRL 369 PH 2 asbestos.pdf | ||
| N68335-22-Q-0098 Amendment 1.docx | DOCX document | |
| Site Visit Sign in asbestos removal phase 2.xlsx | XLSX spreadsheet | |
| Question and Response Form.docx | DOCX document | |
| Past_Performance_Information_Form.pdf | ||
| Base Access Form.pdf | ||
| Lead Eval Report.pdf | ||
| CPAQ.docx | DOCX document | |
| N68335-22-Q-0098 solicitation.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION QUESTION/RESPONSE FORM
N68335-22-Q-0098, Attachment 3
OFFEROR: Penns Contracting DATE:
CONTRACTOR QUESTION
SUBJECT:
SPECIFIC QUESTION:
Is chemical removal for the mastic an acceptable method of Removal?
REFERENCE: (SOW, SCHEDULE, ETC.)
PAGE NUMBER: PARAGRAPH:
GOVERNMENT RESPONSE
Yes, you can use chemical methods for removal as long as they are controlled, vented, and properly disposed/removed.
FOR GOVERNMENT USE ONLY: CONTROL NUMBER:
PREPARED BY: DATE:
| SOLICITATION QUESTION/RESPONSE FORM | |
| N68335-22-Q-0098, Attachment 3 |
OFFEROR: Modulus DATE:
CONTRACTOR QUESTION
SUBJECT:
SPECIFIC QUESTION:
I am writing to ask for clarification on the following part of the solicitation, 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within [10] calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than [90 days after notice to proceed]. The time stated for completion shall include final cleanup of the premises.
Will the Notice to Proceed be issued directly after award? What is the timing for issuing the award and start of work?
REFERENCE: (SOW, SCHEDULE, ETC.)
PAGE NUMBER: PARAGRAPH:
GOVERNMENT RESPONSE
If you are accepted as the lowest price technically acceptable, there will be a pre-construction meeting to go over the project in more depth. At the end of that meeting, we usually provide the notice to proceed to the contractor barring any major problems. The contractor then has 10 days to start the work and 90 days to complete the work.