CDRL 369 PH 2 asbestos.pdf
PDF 255 KB Posted
- Attached to
- Bldg. 369-Removal Of Asbestos Phase II
- Solicitation number
- N68335-22-Q-0098
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N68335-22-Q-0098 Amendment 1.docx | DOCX document | |
| Site Visit Sign in asbestos removal phase 2.xlsx | XLSX spreadsheet | |
| Question and Response Form_3.1.22.docx | DOCX document | |
| Question and Response Form.docx | DOCX document | |
| Past_Performance_Information_Form.pdf | ||
| Base Access Form.pdf | ||
| Lead Eval Report.pdf | ||
| CPAQ.docx | DOCX document | |
| N68335-22-Q-0098 solicitation.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G. PREPARED BY: David Thesing
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
REMARKS:
2.1.7 Contractor shall have an accredited laboratory - third Party NJ certified testing lab perform before, during and after air testing.
2.1.8 The contractor shall provide a signed report from a valid NJ certified testing lab that all asbestos in this document has been fully removed and disposed of in accordance with all applicable regulatory requirements. It shall denote in writing and on a map the locations, quantities and description of materials removed. This report shall also include and delineate Any and all asbestos found that was not listed in the SoW.
Contractor shall provide a report after all work is completed to ensure all asbestos has been removed and that the interior is clean and free from all asbestos.
2.1.9 The contractor shall perform all required testing, removing and proper disposal of any and all asbestos materials from this building interior in accordance with OSHA, HUD, NJDEP and JBMDL guidelines and procedures for asbestos removal and disposal. Testing of materials shall be by an accredited laboratory - third Party NJ certified testing lab.
C. CATEGORY:
TDP ________ TM _______ OTHER ____X_____________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM - 3. SUBTITLE -
4. AUTHORITY (Data Acquisition Document No - See Block
5. CONTRACT REFERENCE - SoW Para 2.1.7, 2.1.8, 2.1.9
6. REQUIRING OFFICE- NAWCAD Fac. Mrg.
7. DD 250 REQ
8. APP CODE-N/A
9. DIST STATEMENT
REQUIRED-N/A
10. FREQUENCY- See Block
11. AS OF DATE- N/A
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION- As req.
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE: Dec.
8, 2021
J. DATE
I. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Designed using Perform Pro, WHS/DIOR, Aug 96
Asbestos Report TBD TBD
Asbestos Report Removal Confirmation
DD FORM 1423-1, AUG 96
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor’s performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s right to use the data shall be governed by the pertinent provisions of the contract.
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4;
Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
File details come from the government source that posted it. Updated .