N6833520R0230-0001.docx

DOCX document 77 KB Posted

Attached to
Depot Level Repair of T56-A Series III Engines
Solicitation number
N6833520R0230
Issued by

About this file

This document summarizes changes to a request for proposal for depot level repair of T56-A series III engines. The solicitation seeks firm fixed price proposals for repair of power sections, reduction gear assemblies, and torquemeter modules. Estimated quantities, turnaround times, and delivery requirements are provided for each item. The performance work statement details repair processes and quality assurance requirements. Offerors must demonstrate facilities, equipment, staffing plans, and repair cycle times. Past performance and price proposals are also required elements. The pre-proposal conference date is set and questions may be submitted by a specified date. Proposals are due on the date listed in block 9 of the standard form 33.

View the file

Other files

File Type Posted
N6833520R0230-0002.docx DOCX document
Exhibit A CDRL A006.docx DOCX document
Exhibit A CDRL A005.docx DOCX document
Attachment 2 CPARS UPDATE QUESTIONNAIRE.docx DOCX document
Exhibit A CDRL A008.docx DOCX document
Exhibit A CDRL A009.docx DOCX document
N6833520R0230.docx DOCX document
Exhibit A CDRL A010.docx DOCX document
Attachment 1 PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
Exhibit A CDRL A004.docx DOCX document
Exhibit A CDRL A003.docx DOCX document
Exhibit A CDRL A002.docx DOCX document
Exhibit A CDRL A007.docx DOCX document
Exhibit A CDRL A001.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6833520R0230

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been added by full text:

AMENDMENT 0001

The purpose of this amendment is:

1. Extend the proposal delivery date

2. Update the proposal delivery instructions

3. Answer the following bidders question:

Q1. Would the Government clarify the Turn Around times requirements?

A1. Turn Around times have been revised throughout the proposal to reflect the schedule shown below.

· Power Section Module - 95 days

· Reduction Gear Assembly - 90 days

· Torquemeter Modules – 45 days

Q2. Would the Government consider implementing a hold on the Turn Times for OEM parts delays over 5-days resulting is a shop hold?

A2. No; the Government will not consider implementing a hold on the Turn Times for OEM parts delays over 5-days resulting is a shop hold.

Q3. Would the Government consider removing the 5% penalty for delays of over 15 days (recurring)?

A3. The Government agrees to remove the 5% penalty for delays of over 15 days (recurring).

Q4. Can the offeror indicate travel as not separately priced (NSP) on the CLIN?

A4. Please propose each CLIN in accordance with the RFP.

Q5. How will repairs over $1500 but below $2500 be addressed?

A5. PWS was incorrect and has been updated anything over $2500 is turned-in to NAVSUP.

Q6. Would the Government consider using the Over & Above CLIN for the Power Section Overspeed (3.6.1.5-Over-Speed Power Sections)?

A6. Government concurs with the language below:

The high cost associated with an over-speed condition increases the proposal risk and the planned to repair. This will increase the proposal price due to the uncertainty as it is disproportionally high as compared to the average repair cost.

Q7. Would the Government provide the historical frequency (by year) of Power Section Over-Speed events by engine type?

A7. The Government can provide this data; the estimate is 1 every 5 years.

Q8. What is the planned T/M/S engine inductions by year?

A8. The planned T/M/S inductions per year are as follows:

FY21 (base year) -14 is 10 units 425 is 25 units -16 is 37 units

FY22 (OY 1)

-14 is 10 units 425 is 20 units -16 is 35 units

FY23 (OY 2)

-14 is 8 units 425 is 20 units -16 is 36 units

FY24 (OY 3)

-14 is 5 units 425 is 10 units -16 is 36 units

FY25 (OY 4)

-14 is 5 units 425 is 5 units -16 is 36 units

These are totals between the three modules (combination of power sections, reduction gearboxes and torquemeters). These are also estimated projections.

Q9. Can the Government clarify whether the Past Performance is due 21 calendar or business days prior to the RFP due date.

A9. The Past Performance section is not due 21 calendar or business days prior to the RFP due date.

Q10. Would the Government confirm SCA rates will be applicable to this program? If so, will the applicable wage determination be incorporated into the contract?

A10. Yes, SCA rates will be aplicable to this contract. The applicable wage determination will be incorporated into the contract.

Q11. Section C states “Item 0X07 – The Contractor shall provide Over and Above work in accordance with Section H Clause 5252.217-9507 “Over and Above Work Requests”; however, Clause 5252.217-9507 is not included. Clause 252.217-7028 “ Over and Above Work” is included. Can the Government confirm which clause is applicable?

A11. Section C item 0X07 has been updated to reflect the appplicable Clause 252.217-7028.

Q12. Section C states “Item 0X10 – The Contractor shall travel in support of Items 0X05 and 0X06, as required. The Contractor shall be reimbursed in accordance with Section H Clause 5252.232-9509 “Reimbursement of Travel, Per Diem, and Special Material Costs”; however, Clause 5252.232-9509 is not included. Can the Government please provide clause.

A12. Clause 5252.232-9509 has been added to the Solicitation.

Q13. Section I, FAR 52.230-2 and 52.230-6 was included for CAS contract. If this contract will be based on adequate price competition without the submission of certified cost or pricing data, will CAS be applicable to this program?

A13. Applicability of CAS will be determined at the time of award.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

DESCRIPTIONS AND SPECIFICATION

The descriptions set forth below shall apply to the basic contract period CLINs and all corresponding ordering year CLINs, if and when ordered.

Items 0X01, 0X02, and 0X03– The Contractor shall repair the T56-A-14, T56-A-16, T56-A-423 and T56-A-425 (T56-A-425G) RGA; the T56-A-14, T56-A-16 and T56-A-425 Power Section; the T56-A-14, T56-A-16 and T56-A-425TN Torquemeter; Attachment 3 Performance Work Statement, Section 3.3.

Item 0X04 – The Contractor shall teardown and inspect QECA in accordance with, Attachment 3 Performance Work Statement, Section 3.3 Item 0X05 – The Contractor shall provide T56 Engine Depot Field Team support in accordance with Attachment 3, Performance Work Statement, Section 3.3.

Item 0X06 – The Contractor shall provide Engineering and Technical Support for the T56 Engine repair program in accordance with Attachment 3, Performance Work Statement, Section 3.3.

Item 0X07 – The Contractor shall provide Over and Above work in accordance with Section H Clause 5252.217-7028 “Over and Above Work”.

Item 0X08 – The Contractor shall conduct Product Quality Deficiency Report (PQDR) procedures in accordance with Attachment 3, Performance Work Statement, Section 3.6. PQDR procedures resulting in deficiencies found to be of no fault of the Contractor shall be reimbursed under this CLIN. Subsequent repairs of PQDR exhibits found to be of no fault of the Contractor shall be reimbursed separately under applicable CLINs (i.e. 0X07 and 0X11).

Item 0X09 – The Contractor shall inspect, clean and repair the T56 Power Section Container in accordance with Appendix B and the repair manuals listed in this PWS, T56 power section shipping and storage containers repair requirements.

Item 0X10 – The Contractor shall travel in support of Items 0X05 and 0X06, as required. The Contractor shall be reimbursed in accordance with Section H Clause 5252.232-9509 “Reimbursement of Travel, Per Diem, and Special Material Costs”.

Item 0X11 – The Contractor shall procure materials in support of Items 0X05, 0X06, 0X07, 0X08, 0X09, 0X14, 0X15, and 0X16.

Item 0X12- The Contractor shall be responsible for the replacement of all MOR/MOI material up to, but not to exceed $2,500.00 per module. Items that exceed the cumulative value of $2,500.00 will be provided by the Government. The contractor shall procure any material not to exceed a total cost of $2,500 per module.

Item 0X13 - The Contractor shall provide technical and administrative data in accordance with Items 0X01, 0X02, 0X03, 0X04, 0X05, 0X06, 0X07, 0X08, 0X09, 0X14, 0X15, 0X16 and Exhibit A, CDRLs A001 through A010. Supplement 2 to Exhibit A provides the addresses to those listed in the distribution section of the CDRLs. This item shall not be separately priced.

Item 0X14 - The Contractor shall inspect, clean and repair the T56 Reduction Gearbox Container in accordance with Appendix B and the repair manuals listed in this PWS, T56 Reduction Gearbox shipping and storage containers repair requirements.

Item 0X15 - The Contractor shall inspect, clean and repair the T56 Torque meter Container in accordance with Appendix B and the repair manuals listed in this PWS, T56 torque meter shipping and storage containers repair requirements.

Item 0X16 - The Contractor shall inspect, clean and repair the T56 Engine assembly container (3&1) in accordance with Appendix B and the repair manuals listed in this PWS, T56 Engine Assembly (3&1) shipping and storage containers repair requirements.

C1. EFFECTIVE DATES FOR SPECIFICATIONS AND STANDARDS

Unless otherwise specified, the revision level and date for each specification and standard cited within this solicitation/contract (including any specifications or standards cited in any drawings, handbook or referenced specification or standard contained within this solicitation) shall be that listed in the Department of Defense (DoD) Index of Specifications and Standards (DoDISS) dated 01 July 2012.

C2. INCORPORATION OF THE CONTRACTOR’S TAT AND WARRANTY PROVISIONS

The Contractor’s proposed Turnaround Time (TAT) and Warranty provisions shall be incorporated into the contract at time of award.

SECTION F - DELIVERIES OR PERFORMANCE

SCHEDULE AND PERFORMANCE

The Contractor shall deliver repaired and modified items in accordance with the following schedule:

CLINTURN AROUND TIME* (TAT) DELIVERY
0X0195 Calendar Days
0X0290 Calendar Days
0X0345 Calendar Days
0X0960 Calendar Days
0X1445 Calendar Days
0X1530 Calendar Days
0X1670 Calendar Days

*To be revised at contract award to reflect the successful offeror’s proposed TAT.

Turn Around Time (TAT): Calculated based on the number of calendar days from the induction of a T56 Series III Propulsion System (QECA) or module by the Contractor to the signature date of the DD250 providing final acceptance of the RFI assets by the Navy, as documented in CDRL A001.

Items 0X05, 0X06, 0X08 —The TAT delivery for services ordered under these items shall be set forth as negotiated in individual task orders.

Item 0X07—Over and Above work performed in conjunction with ordered repairs shall be within the TAT allotted for repairs under Items 0X01, 0X02, and 0X03.

Item 0X13—Delivery of technical and administrative data shall be in accordance with Exhibit A, CDRLs A001-A010.

F-2 DELIVERY REQUIREMENTS

Deliveries under this Contract shall be F.O.B. Origin. The Navy Inventory Control Point (NAVICP) will issue monthly source lists for the Commander, Naval Air Forces (COMNAVAIRFOR) allocation. The Contractor shall contact COMNAVAIRFOR to obtain the ship-to points for those units allocated to them that month.

F-3 TRANSITION PERIOD

The Contractor will be allowed 30 calendar days start-up time from the time of contract award, at end of which time the contractor shall be ready to commence induction in accordance with Section B. Inductions will be directed via task orders issued by the contracting officer.

F-4 TERM OF CONTRACT

(a) Contract Term—This contract will be effective for 60 months from the date of contract award.

(b) Performance Periods— The performance period for the transition, base period, and ordering periods are as follows:

ITEMDELIVERABLE OR PERFORMANCE
Transition Period30 days after contract award
Base Period335 days after transition period
Year 1After contract award through 730 days after contract award
Year 2After contract award through 1,095 days after contract award
Year 3After contract award through 1,461 days after contract award
Year 4After contract award through 1,827 days after contract award

SECTION H - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

5252.232-9509TRAVEL APPROVAL AND REIMBURSEMENT PROCEDURES (NAVAIR)(OCT 2013)
(a) General. Performance under this contract may require travel by Contractor personnel. If travel, domestic or overseas, is required, the Contractor is responsible for making all necessary arrangements for its personnel. These include but are not limited to: medical examinations, immunizations, passports/visas/etc., and security clearances.
(b) Travel Approval Process. Prior approval is required for all travel under this contract. Travel shall be reviewed and approved/disapproved as follows:
(1) The Contractor shall provide the [Insert Procuring Contracting Officer (PCO) or Contracting Officer's Representative (COR)] a written request for authorization to travel at least 30 days in advance of the required travel date, when possible. The request should include: purpose of travel, location, travel dates, number of individuals traveling, and all estimated costs associated with the travel (e.g., lodging, meals, transportation costs, incidental expenses, etc.).
(2) The [Insert PCO or COR] will review the travel request and provide, in writing, an approval or disapproval of the travel request to the Contractor [Insert "and the Procuring Contracting Officer." if the COR is reviewing and approving the request.]
(c) Travel Policy.
(1) Travel arrangements shall be planned in accordance with the Federal Travel regulations, prescribed by the General Services Administration for travel in the conterminous 48 United States, (hereinafter the FTR) and the Joint Travel Regulation, Volume 2, DoD Civilian Personnel, Appendix A, prescribed by the Department of Defense (hereinafter the JTR).
(2) The Government will reimburse the Contractor for allowable travel costs incurred by the Contractor in performance of the contract in accordance with FAR Subpart 31.2.
(3) For purposes of reimbursement of travel expenses, the Contractor's official station is defined as within 50 miles of the Contractor's regular work site. (If Contractor has more than one regular work site, the official station is defined as within 50 miles of each of its regular work sites.)
(4) The Contractors documentation for the reimbursement of travel costs (e.g., receipts) shall be governed as set forth in FAR Subpart 31.2, the FTR, and the JTR.
(5) Car Rental for a team on temporary duty (TDY) at one site will be allowed provided that only one car is rented for every four (4) members of the TDY team. In the event that less than four (4) persons comprise the TDY team, car rental will be allowed if necessary to complete the mission required.
(6) Whenever work assignments require TDY aboard a Government ship, the Contractor will be reimbursed at the per diem identified in the JTR.

PERFORMANCE MEASUREMENT

H-1

H-1 PERFORMANCE MEASUREMENT FRAMEWORK

In order to maintain readiness and ensure timely deliveries of high quality repaired T56 engine modules, the Government has established two areas critical to performance (Performance and Quality). These areas are established in the performance measurement framework (PMF). For each area of the PMF, the Government has defined Contract Minimum thresholds that must be met. The Government will evaluate the contractor’s performance and make decrements, as applicable, IAW the criteria in this clause. The Government reserves the right to utilize any other remedies available under this contract.

1. Contract Minimum thresholds:

1.1. Performance. The contractor shall deliver repaired and modified engine modules in accordance with the Turn Around Time (TAT) for each engine module delivery established in F-1, Schedule and Performance, of this contract.

1.2. Quality. The contractor shall meet all quality assurance requirements as defined in this contract.

2. Performance Measurement Framework Decrement:

2.1. If the contractor is more than 15 days late in meeting the contract TAT for an engine module repair or modification, the applicable firm fixed price (FFP) invoice shall be decremented by 5%.

3. Performance Metric (PM) Calculation for PMF:

3.1. The PM component of the PMF is defined as meeting the TAT for each engine module delivery. The calculated TAT is based on the number of calendar days between the physical induction of a T56 Series III Propulsion System, module, QECK, Power System, Gearbox, or Torquemeter by the Contractor and the signature date of the DD250 providing final acceptance of the RFI asset by the Navy, as documented in the report required by CDRL A001.

4. Quality Metric (QM) Calculation for PMF:

The QM component of the PMF is defined as meeting all quality assurance requirements as defined in this contract. The Government will verify Fleet reported QDRs quarterly utilizing Government data bases. Should a QDR document discrepancy of workmanship on a particular engine module repaired or modified by the contractor, the Government will notify the contractor of failure to meet the engine module QM metrics.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

INSTRUCTIONS AND CONDITIONS

PART A GENERAL INSTRUCTIONS

1.0 GENERAL

The Offeror is required to submit sufficient information concerning the following areas to enable Government personnel to fully ascertain capabilities of the Offeror to perform the requirements. The proposal must be sufficient in detail and scope to permit evaluation and provide the evaluators a clear understanding of the Offeror’s capability to meet or exceed the defined elements as required by the solicitation. All proposals must clearly and convincingly demonstrate that the Offeror has a thorough understanding of the requirements and associated risks. Offeror must respond to all requirements of the solicitation and not alter or rearrange the solicitation. The Offeror is advised that the Government may incorporate any portions of the Offerors proposal deemed beneficial to the Government. With the exception of the Price/Cost volume, no cost or pricing information should appear in any volume.

In presenting material in the proposal, the Offeror is advised that quality of information is more important than quantity. Clarity, brevity, and logical organization should be emphasized during proposal preparation. The Offeror shall present sufficient information to allow the Government to evaluate the proposed work effort, support, and approach, as well as the price/cost proposal without opening discussions. Statements that the prospective Offeror understands, can comply with or will comply with, the specifications, and paraphrasing the requirements or parts thereof without supporting information are considered inadequate by the Government, and may result in a rating of unacceptable.

The Offeror must include any data that illustrates the adequacy of the various assumptions, approaches, and solutions to problems. Failure to address a specific factor or subfactor clearly may be considered a deficiency. Unnecessarily elaborate brochures or other presentation materials beyond that sufficient to present a complete and effective proposal is neither necessary nor desired.

Offeror is expected to comply with all requirements of the RFP. The Government advises the Offeror that taking exception or deviating from any term or condition of the RFP may make an offer unacceptable, and the proposal unawardable, unless the RFP expressly authorizes such an exception or deviation with regard to that specific term or condition. The Government may consider any exception or deviation to any term or condition of the RFP that is not expressly authorized by the RFP to be a deficiency.

Throughout these instructions, a “principal subcontractor” is defined as a subcontractor who provides at least 10% of the proposed total price/cost (excluding the Offerors profit/fee), for the contract. “Team member” is defined one of the entities that make up a joint venture (JV) or any other partnership or teaming arrangement formed for the purpose of responding to this solicitation. “Critical team member” is defined as one of the entities of the Offeror that perform a critical function in the performance of the resulting contract, whether it is technical or financial, and/or that have important roles in any high- or medium- risk areas identified in the Offeror’s proposal.

Questions: Offerors may submit questions requesting clarification of solicitation requirements by emailing the contract specialist at robert.megill@navy.mil and the Procuring Contracting Officer at colleen.reilly1@navy.mil. It is requested that all questions be received within 10 calendar days of the date this solicitation is issued.

2.0 PROPOSAL FORMAT

Written proposals must be formatted using a Times New Roman 12 pt normal font (no reduction permitted), single-spaced with 1-inch margins all around, and formatted for standard 8.5 x 11 inch paper. All pages should be numbered with section and page numbers. When foldout pages are used they must not exceed 11 x 17 inches and will be counted as 1 page. Drawings may be provided separately and may be any size but should be folded to approximately 8.5 x 11 inch standard size and will count as 1 page. Graphs shall be presented in no smaller than a 10 pt font and should contain a grid, which allows values to be read directly from the graph to the same accuracy that a 10 x 10 to the ½ inch grid provides. Graphic resolution, including such data as tables or charts, should be consistent with the purpose of the data presented.

The Offeror will provide one complete copy of the proposal to the Procuring Contracting Officer (PCO) as electronic files fully compatible with Microsoft Office 2010 and for information not supported by MS Office products, with the latest Adobe Acrobat reader on a CD-ROM. The Offeror will ensure that the Price/Cost Volume is provided on a separate CD-ROM. Each CD-ROM is to be labeled for content and the Offerors name. If a discrepancy exists between the original paper copy of the proposal and the disk copy, the paper copy will take precedence.

3.0 PROPOSAL CONTENT AND VOLUMES

The Offeror must present proposal information in a manner that facilitates a one-to-one comparison between the information presented and this Proposal Instruction. Proposal information must be structured such that its paragraph number/letter is identical to the Proposal Instructions paragraph number to which it is responding, although the Offeror may add lower tier subparagraphs. The Offeror must provide reasons it will not provide information for a particular paragraph. The proposal information instructions are structured by paragraph numbers where first, second, third, and fourth parts correspond to the volume, book, section, and element, etc., in Offer's proposal.

Each volume of the proposal shall be submitted as one original and additional copies as specified in the table below. The table below supersedes the copies requested in Block 9 of the Standard Form (SF) 33. All volumes of the original proposal shall be delivered to the address provided in Section 4.0 prior to the closing date/time stated in this solicitation Page limitations for each volume if any, are also specified in the table below; title and table of contents pages do not count towards page limit. Any pages submitted exceeding the page limit shall be disregarded and NOT evaluated.

Volume Number
Volume Title
Page Limit
Copies Required
1
EXECUTIVE SUMMARY
5
1 Original/2 Copies/1 CD-ROM
2
TECHNICAL
50
1 Original/2 Copies/1 CD-ROM
3
PAST PERFORMANCE
Not Applicable
1 Original/2 Copies/1 CD-ROM
5
PRICE/COST
25
1 Original/2 Copies/1 CD-ROM
6
EXCEPTIONS, DEVIATIONS
5
1 Original/2 Copies/1 CD-ROM

AND WAIVERS

Each volume shall contain the following information:

- Cover and title page

- Title of proposal and proposal number as applicable

- Offeror's name, address and POC

- RFP number

- Proposal volume/book number

- Copy number

- Table of Contents (The table of contents must provide sufficient detail to enable easy location of important elements)

- Use tabs and dividers

The Offeror shall submit a Cross Reference Matrix (CRM) for the Technical Volume, similar to the example below, to help ensure that all solicitation requirements are addressed and to facilitate the evaluators' review of the Offeror's proposal. The CRM should be a single integrated matrix and cross-reference the proposal volumes and paragraphs to specific RFP requirements, as well as other parts of the proposal that contain relevant information. The Offeror's CRM may be identical to the example below or revised such as to add columns to indicate the page number on which information may be found, identify where other relevant information in the proposal is located, or provide other comments. The CRM does not count against any of the proposal page limitations.

EXAMPLE OF A CROSS REFERENCE MATRIX (CRM)

Section L – Proposal Instructions
Government PWS/SOW
Section M – Evaluation Factor
Offeror's Proposal Reference
CLIN Reference

Volume 2 Technical Example: Para 3.1 Note: This column shall address all paragraphs in Sections xx and xy of the Performance Specification

2.A
Provide reference to Offeror's Proposal Volume I – Technical. Example: Refer to appropriate page number in Offeror's written proposal

Volume 2 Technical

Volume 2 Technical

4.0 PROPOSAL SUBMISSION:

It is requested that all Proposals be delivered via E-Mail to Robert.Megill@Navy.com. Due to proposal size it is recommended to contact Robert Megill to receive a DoD Safe request number for the Proposal to be submitted through.

Clearly mark all packages with the solicitation number. The submission date for all Volumes shall be no later than the date and time specified in Block 9 of Standard Form 33 of the RFP.

Offeror shall submit proposals via United States Postal Service or through a commercial carrier using the address provided below.

Naval Air Warfare Center Aircraft Division Lakehurst Procurement Division – Bldg 562-3 Attn: Robert Megill or Colleen Reilly Joint Base McGuire-Dix-Lakehurst, NJ 08734 Solicitation Number: N6833520R0230

Hand carried proposals may be delivered to the address above, attention Robert Megill and/or Colleen Reilly

5.0 PROPOSAL PACKAGING:

The Offeror shall package the proposal volumes in cartons or equivalent packaging containers in the most efficient manner possible grouping like volumes to the maximum extent possible. Each container shall be single person portable. One container shall include all Original Proposal volumes including the original/signed documents submitted as part of Volume 1 Executive Summary.

Each box should include a packing slip detailing the contents to include the volume number, title, and copy number. Also, each box should be stamped or marked “For Official Use Only” and “Source Selection Information - See FAR-2.101 and 3.104.”

6.0 CLASSIFIED DATA

All proposals must be UNCLASSIFIED .

7.0 SOLICITATION CHANGES

For any changes and additional information provided by the Government for the solicitation, please go to www.beta.sam.gov

PART B SPECIFIC INSTRUCTIONS

Cost or pricing information shall only appear in the Price/Cost Volume.

1.0: EXECUTIVE SUMMARY VOLUME

Note: This volume shall not contain any reference to cost or price aspects of the offer.

The purpose of the Executive Summary is to provide the evaluators with an overview of the Offeror's proposal and strategy. The Offeror shall include the following in this volume:

i. A concise abstract of the Offeror's strategy for each non-cost evaluation factor/subfactor contained in the solicitation.

ii. Offeror Summary Table: The Offeror shall complete the table below. The Offeror shall include all subcontractors and team members who will be involved with the performance or management of the contract and list all sites where the work will be performed. If a teaming or subcontracting arrangement is proposed, identify the work share, distribution elements, and ratios that each contractor will perform using the table below. Also provide a definition of the legal relationship between the entities if it is other than a Prime/subcontractor relationship.

Contractor Name (Indicate Prime, Team Member or Sub)

Place of Performance/DUNS # if applicable
Brief Work Description and/or Program Responsibility
% of Total Proposed Price

iii. Signed SF33 or SF1449 for basic solicitation and acknowledgment of each amendment, including completion of any RFP clause or provision that requires a fill-in or response.

iv. Signed Representations, Certifications and Acknowledgements or System for Award Management (SAM) reference.

v. Affirmation of no Exceptions, Deviations or Waivers if Volume 5.0 is not being submitted as part of the proposal.

vi. Guarantee the length of proposal validity (for at least 270 days after proposal submission).

vii. Written consent from principal subcontractors and critical team members that will allow the Government to coordinate potential past performance and/or cost/price issues with the Offeror.

2.0 VOLUME 2: TECHNICAL

Note: This volume shall not contain any reference to cost or price aspects of the offer.

The Offeror shall provide all information and data required to conduct a thorough and complete technical evaluation.

The Offeror shall address the following in the proposal:

2.1Resources
2.1.1Facilities/Equipment – The Offeror shall describe the facilities, including space and equipment, to be utilized to meet the requirements of this solicitation and the total monthly capacity of items processed for each shop in support of this solicitation. The description of the facilities shall address storage of units prior to and after repair. The Offeror shall provide a listing of all equipment to be utilized, including but not limited to: welding, plating, cleaning and Non-Destructive Inspection (NDI) process requirements. If facilities or equipment are not currently available, the Offeror shall provide a plan to obtain the necessary facilities or equipment to meet the schedule and capacity requirements of this Contract. The plan shall include information on dates and lead times for each item or process that the Offeror does not currently possess. The plan shall also outline other projected workload.

2.1.2 Manpower/Management – The Offeror shall describe the projected manpower requirements, including management, engineering, artisan, and administrative support to be utilized to meet the requirements of this solicitation and the plan to meet those requirements. The plan shall also include other projected workload for the business unit. The manpower description shall address monthly capacity requirements projected for the estimated RFP quantities as well as the other projected workload. For evaluation purposes only, assume level loading of projected workload over a 12-month period.

2.1.3 Workload Fluctuation – The Offeror shall address its ability to meet workload fluctuations taking into account other projected workload for the business unit. Specifically, the Offeror shall address the ability, including projected lead-time requirements, to grow total monthly capacity for the Power Section and Reduction Gear Assembly. For evaluation purposes only, provide a plan to go from 3 Power Sections and 2 Reduction Gear Assemblies per month to 6 Power Sections and 4 Reduction Gear Assemblies per month for each module (Power Section and Reduction Gear Assembly) within a period of less than 6 months.

2.1.4 Material – The Offeror shall provide a material requirements plan for supporting the contractor furnished material requirements of the solicitation. The plan shall include information on projected parts utilization by module substantiated by data/analysis and strategies to address parts constraints. In addition, the plan shall also provide a strategy on how its vendors, subcontractors and remanufacturing capability will support the estimated quantities identified in Section B of the solicitation.

2.1.5 Technical Processes – The Offeror shall demonstrate how the repair processes (plating, coating, heat treatment, welding, NDI, rotor balancing, and bearing processing inspection capability) will be accomplished. Illustrate each repair process by means of a flow or block diagram. For each repair process, identify how the process is monitored to ensure compliance with quality requirements. Identify any process, or portion of a process, which will be accomplished at a vendor or satellite facility. Describe the quality measures taken to ensure the integrity of the effort or service performed by the vendor or satellite facility. Include a description of the documentation and controls at the point in the process where a part is sent to a vendor or satellite facility for additional work or inspection, and at the point in the process where these parts are returned to the in-house manufacturing process. The Offeror shall provide a list of all vendors or satellite facilities to be used for each repair process.

2.2 Turn Around Time (TAT)

The Offeror shall provide the projected TAT for each firm fixed price repair Item in Section B of this solicitation. The Offeror's proposed TAT shall be substantiated by data/analysis and supported by an accounting of projected TAT for each of the major repair steps, including Disassembly, Cleaning, Awaiting Parts (AWP), Inspection, Assembly, and Final Acceptance test. The Offeror's proposed TAT, if less than the Not To Exceed turnaround, will be incorporated into the resultant contract in Section F. TATs shall not exceed the following:

•Power Section Module - 95 days
•Reduction Gear Assembly - 90 days
•Torquemeter Modules- 45 days
2.3Warranty

No warranty is required, however any warranty proposed will be evaluated and may be considered a strength. Any warranty proposed may be incorporated into the contract.

3.0 PAST PERFORMANCE VOLUME

3.1 General

The Offeror shall identify on the Past Performance Matrix (as identified in 3.1(a) below) any contracts performed within five years of the RFP release date which contains efforts similar to those performed by the Offeror, the Offeror's principal subcontractors, and the Offeror's critical team members in solicitation. E.g., tasks, complexity, contract type, contract dollar value, etc. Offerors shall not reference an Indefinite Delivery/Indefinite Quantity contract without referencing the appropriate task orders containing the effort similar in nature to this requirement. Commercial contracts may be included. In general, recent performance will be considered more relevant than older performance. When possible, the Past Performance Matrix should include at least five of the most relevant contracts for the prime contractor, five of the most relevant contracts for each critical team member, and two of the most relevant contracts for each principal subcontractor. If fewer than five past performance references are available for team members (i.e., entities that make up a JV or any other partnership or teaming arrangement), each member should submit five references individually in addition to their team member references.

For each contract identified, provide contract data, relevancy, past performance, and systemic improvement information as described below. Demonstrate the relevancy of the Offeror's, and if applicable, the Offeror's principal subcontractors' or critical team members' past performance, as well as demonstrated systemic improvements with respect to the solicitation requirements. For each past performance problem identified, describe the status of the demonstrated systemic improvement efforts and, where applicable, demonstrate the impact that the demonstrated systemic improvement effort had on resolving the problem such that it would not reoccur.

The Past Performance Information Application (PPIA) will be used to evaluate Past Performance. For contracts that have CPARS Reports or similar reports that are more than six months old, e.g., the completion date is more than six months before the due date for this Past Performance Volume, the Offeror will forward a copy of the CPARS Update Questionnaire (Attachment((2)) to that contract customer's Program Manager. For all contracts identified which do not have CPARS Reports, the Offeror will forward a copy of the Past Performance Questionnaire (Attachment (1)) to that contract customer's PCO, Administrative Contracting Officer, and Program Manager. All questionnaires shall be forwarded within two weeks from the RFP release date with enough lead-time so that responses can be received by the Government concurrently with the Government's receipt of the Offeror's Past Performance information submitted as per paragraph 4.1 and 4.2 The Offeror shall include instructions for the customers to send completed questionnaires within two weeks of its receipt via e-mail to Colleen Reilly, PCO, at Email colleen.reilly1@navy.mil, and to Robert Megill, Contract Specialist, at Email. robert.megill@navy.mil thereby allowing the customer approximately two weeks to complete their response. This submittal information is provided at the top of the questionnaires to facilitate the Offeror's effort in meeting these instructions. The Offeror shall not conduct follow-up actions with regard to this questionnaire. The Government may send any other questionnaires as necessary.

The Offeror shall provide written consent from their principal subcontractors and critical team members that will allow the Government to coordinate their Past Performance issue(s) with the Offeror. If the Offeror does not submit such written consent, then the Government will address any past performance issues directly with the principal subcontractor or critical team member and the Offeror will forfeit the opportunity to participate in any related discussions. Consequently, for any principal subcontractors and critical team members that do not provide such written consent, provide a point of contact (name, address, phone number, and email address) with whom the Government may coordinate these issues and obtain any responses as needed.

The Government may use information other than that provided by the Offeror in their proposals to evaluate past performance. The Government may use Past Performance information obtained from sources other than those identified by the Offeror. It is incumbent upon the Offeror to explain the relevancy of the data provided by the Offeror. The Government has no duty to search for data to cure the problems it finds in the information provided by the Offeror. The Offeror has the burden of providing thorough and complete past performance information.

(a) Contract Data - Provide all the information identified below separately for each contract. Additionally, provide this information electronically as a separate file on CD-ROM, which contains Offeror's Past Performance proposal in a Word Table in the format depicted below:

Past Performance Matrix

Relevant Contract Data

Prime (P), or Sub (S)

1.
Contractor Name
P1
P2
P3
P4
PX
S1
SX
2.
Title of contract
3.
Contract number/type
4.
Procuring agency
5.
Description of product or service
6.
Period of performance
7.
Place of performance 1 and CAGE Code/ DUNs #
8.
Dollar value of contract
9.
Acquisition Phase(s) of Contract, e.g., SDD, Production
10.
CPARs? - CPARS completion date - on DOD PPIRS?2
11.
Recency 3
12.
Relevancy 4

1Place of Performance should be the same as being proposed in this solicitation. If different please include an explanation.

2CPARS (yes/no) - CPARS completion date - on DOD PPAIS (yes/no) (Indicate whether or not any CPARS have been completed and identify the last CPARS completion date and if it is currently on DoD PPAIS) 3Recency - See definition in Section M. Only list efforts performed within five years of the date of the RFP release.

4Relevancy - Provide a concise assessment of the degree of relevancy (using the relevancy ratings below) that each contract identified has to the solicitation; identifying tasks and/or aspects of the effort undertaken on the contract that are relevant to the program.

(b) Past Performance Information - The Offeror shall provide a brief description of performance in delivering quality services in each of the following areas: 1) meeting technical requirements, i.e., the quality of technical performance, e.g., performing analysis, design, testing, etc., 2) meeting schedule requirements, i.e., schedule performance, e.g., on time or late delivery, modification of original schedules and reasons for any changes, etc., 3) controlling contract cost, i.e., cost performance, e.g., on time or late delivery, modification of original schedules and reasons for any changes, etc., and 4) managing the contracted effort, i.e., program management, e.g., cooperation with customer, subcontract management.

(c) Demonstrated Systemic improvement Information - Identify those demonstrated systemic improvement actions taken to resolve past problems. Describe the techniques, elements, and tools used to correct problems and, if applicable, how these techniques, elements, and tools will be used during this contract.

(d) Award Fee (If applicable): Provide a summary of the award fee available and earned for each evaluation period over the past three years of an on-going contract, or last three years of a completed contract (both in dollars earned and percentage of available award fee received).

3.2. Past Performance Data Requirements

Provide all the information identified below separately for each contract. Provide a summary of the Customer's Points of Contact in a MS Word Table using the format below which is illustrated with an example. Include an electronic copy of this table in MS Word on a CD. Offerors are advised that they should contact the points of contact prior to sending a questionnaire or CPARS update to ensure they are current and willing to accommodate the request. Failure to ensure that points of contact are current may prevent the Government from obtaining sufficient information to fully assess the Offeror's performance, which could result in an “Unknown Confidence (Neutral)” or less that “Substantial Confidence” Performance Confidence Assessment Rating as defined in Section M of this solicitation.

Offeror's Name (Prime, Principal Sub, or Critical Team Member, or Team Member)

1. Contract #,

2. Offeror's Role (e.g., prime or sub)

Customer's Name
1. CPARS? Recent?

2. Questionnaire # __ Sent?

3. For Subs - Agreement to allow Coordination with Prime?

Point of Contact Information; Name;

Phone Number, Fax Number and E-mail address

AB (prime)
1. N009,

2. Prime

RYP
1. CPARS: No

2. Questionnaire #1: - Sent 2/23/12

3. N/A

Al (PM) 444-444-4444, fax 555-555-5555, Al@RYP

1. CPARS: No

2. Questionnaire #2: - Sent 5/4/12

3. N/A Sue (PCO) 333-333-3333 fax 222-222-2222 Sue@RTP

1. CPARS: No

2. Questionnaire #3: - Sent 5/4/12

3. N/A Joe (ACO) 111-111-1111 fax 888-888-8888 Joe@ RYP

AB (prime)
1. N008,

2. Sub

L&M
1. CPARS: Yes/No

2. Questionnaire # 1: - Sent 5/4/12

3. N/A Sue (PCO) 333-333-3333 fax 222-222-2222 Sue@AB

NNB (sub)
1. N007,

2. Prime

RST
1. CPARS: Yes/Yes

2. Questionnaire: - Not Sent

3. Agreement: Yes Sue (PCO) 333-333-3333 fax 222-222-2222 Sue@NNB

4.0 PRICE/COST PROPOSAL VOLUME

4.1 Volume Content:

(a) This Volume shall contain the information requested below and shall include a copy of Section B with the Contract Line Item (CLIN) Unit Prices and, for evaluation purposes, the Total Prices filled in using the estimated quantities value in the solicitation and the instructions below. If applicable, Offeror's labor classifications should cross-reference to Department of Labor (DOL) wage determination classifications as much as possible. In addition, the Offeror shall provide a percentage breakdown of the Offeror's indirect costs and burdens added to the Government estimates for any and all Cost Reimbursable CLINs in Section B. Section B prices shall be provided separately in one digital data copy in MS Office 2010 Excel format on CD-ROM media. Within all Excel spreadsheets, the Offeror shall use formulas and functions to the maximum extent possible and avoid using output type “value only” cells. If links are utilized, supply those referenced files. Spreadsheets shall not be protected.

(b) All price/cost and price/cost supporting information shall be contained in section B and the price/cost proposal. No price or pricing information shall be included in any other technical volume including cover letters. Offerors are responsible for submitting sufficient information to enable the Government to fully evaluate their price/cost proposal.

4.2 Ground Rules and Assumptions:

(a) As this is a competitive acquisition with adequate price competition anticipated, any price/cost documentation requested shall not be certified cost or pricing data in accordance with FAR 15.403-1. However, in the event that adequate price competition does not exist after receipt of proposals, the Government reserves the right to request additional cost or pricing data as necessary from both the Offeror and subcontractors and may conduct negotiations with the Offeror, pursuant to FAR Part 15.403-4, in order to ensure a reasonable and realistic price/cost. Further, the Offeror may be required to provide a Certificate of Current Cost or Pricing Data prior to award, pursuant to FAR 15.406-2. Offeror shall acknowledge the requirement to provide additional cost or pricing information and certify the data prior to award if/when requested by the Government.

(b) The Offeror shall provide sufficient information to support its price/cost as well as an explanation of all ground rules and assumptions that affect the price/cost estimates.

4.3 Price Information:

4.3.1 Firm Fixed Price CLINs

The Offeror shall provide the proposed price for each CLIN. The offeror shall provide an explanation of all ground rules and assumptions that affect price.

4.3.2 Labor Hour CLINs

4.3.2.1 The Offeror shall provide the proposed price for each CLIN. The offeror shall provide an explanation of all ground rules and assumptions that affect the price estimates.

Example calculation for Labor Hour CLINs 0X06 (Engineering, Technical Services)

ITEM
SUPPLIES / SERVICES
Estimated Quantity
Unit of Issue
Unit Price
Estimated Amount
0X06
Engineering, Technical Services
1,000 Hours
LH
$X
$X *1,000

CLIN Estimated Amount = Evaluated Price = Unit Price multiplied by Estimated Quantity (QTY)

4.3.3 Cost Reimbursable CLINs

4.3.3.1 The Offeror shall provide an explanation of all ground rules and assumptions that affect the price estimates. The proposed cost shall be the Government estimated amount plus any Offeror burdens applied. The Offeror shall not add any additional direct costs to the Government Estimated Amount. The Offeror shall clearly show the total burden rate, and the individual cost elements that make up the total burden rate. If the Offeror chooses not to burden the Government estimated amount, then the Offeror shall propose an H-clause to identify this special term and condition. Fee or profit are not allowable on Cost Reimbursable CLINs and will not be included as part of the burden rate.

For CLINs 0X10, travel, the Government will reimburse the Contractor for travel and per diem costs on the basis of maximum allowable actual costs incurred up to the daily equivalent allowed for a Government employee IAW the Department of Defense (DOD) Civilian Personnel Joint Travel Regulations and the Federal Travel Regulations, prescribed by the General Services Administration, and the Standardized Regulations (Government Civilians, Foreign Areas), as prescribed by the Department of State.

4.3.3.2 Example Evaluated Price and Calculation

Example calculation for Cost Reimbursable CLINs 0X11 (Material in Support of Minor Repair)

ITEM
SUPPLIES / SERVICES
Government Estimated Amount
Indirect Costs & Burdens
Estimated Amount
0X11
Material in Support of Minor Repair
$ 200,000
$ A
$A + $200,000

Example calculation for Cost Reimbursable CLINs 0X10 (Travel)

ITEM
SUPPLIES / SERVICES
Government Estimated Amount
Indirect Costs & Burdens
Estimated Amount
0X10
Travel
$ 50,000
$ A
$A + $50,000

CLIN Estimated Amount = Evaluated Price = Government Estimated Amount plus the Indirect Costs and Burdens

4.4 Use of Government Furnished Property:

If the Offeror proposes/requires the use of Government Furnished Equipment (GFE) or Government Furnished Information (GFI), then the Offeror shall provide:

- A complete description of the required GFE/GFI including part number and serial number, if applicable.

- Where the GFE/GFI is to be located.

- The name, organization, complete address and telephone number of a cognizant Government point of contact.

- In the case of GFE/GFI accountable to other Government contracts, a copy of the correspondence authorizing use of such GFE/GFI on this contract.

- The monetary impact to the Offeror's proposal if the proposed GFE/GFI is not provided as GFE/GFI.

Attachment (4), “Scheduled Government-Furnished Property (SGFP)”, specifies the Government Property to be furnished. If no GFE/GFI/GFP is required, the Offeror shall so state.

4.5 Other Costs

The Offeror shall identify additional costs that would be incurred that have not been identified in the solicitation and describe in detail the performance that would cause these costs. Also, describe any assumptions with regard to Government actions (e.g., providing resources whether it be equipment or people) that enabled the proposed price/cost to be lower and identify the amount by which it is lower.

5.0 EXCEPTIONS, DEVIATIONS AND WAIVERS VOLUME:

In this Volume, the Offeror must state that its offer contains all exceptions, deviations, and waivers that the Offeror takes from the provisions of the solicitation and its applicable documents. An “exception” is where an Offeror states it will not comply with a requirement, usually involving contract terms and conditions. A “deviation” is where an Offeror states it will not comply with a requirement but proposes an alternative to meet the intent of the requirement, usually involving a specification. A “waiver” is where an Offeror requests authorization for the Government to accept an item, which will depart from, specified requirements, but would nevertheless be considered suitable. Exceptions, deviations, and requests for waivers may cause proposals to be considered deficient.

Provide a detailed description for each exception, deviation, or request for waiver, as applicable. The Offeror shall indicate the Offerors difficulty with the applicable requirement and the Offeror's proposed solution. The Offeror shall specifically identify the portion of the solicitation and the Offeror's proposal which are affected. If there are no exceptions, deviations or waivers, the Offeror shall provide a one-page Volume 5.0 in the Executive Summary stating so.

(End of Summary of Changes) image1.wmf