About this file

Solicitation N68335-18-R-0026

View the file

Other files

File Type Posted
N68335-18-R-0024_Amendment_0004.docx DOCX document
N68335-18-R-0024_Amendment_0003.docx DOCX document
N68335-18-R-0024_Amendment_0002.docx DOCX document
N68335-18-R-0024_Amendment_0001.docx DOCX document
N68335-18-R-0024_Solicitation_FINAL.docx DOCX document
N68335-18-R-0024_CDRL's.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6833518R0024

Section A - Solicitation/Contract Form

SECTION A

ALL SUBMITTED PROPOSALS SHALL BE VALID FOR 90 DAYS.

PROPOSALS ARE TO BE MAILED TO THE ADDRESS LISTED IN BLOCK 7 OF PAGE 1. ALL PROPOSALS SHALL BE MAILED TO THE ATTENTION OF MS. MELISSA BUCCI, CODE 2.5.2.5.2, (732) 323-1578 AND SHALL BE RECEIVED IN ACCORDANCE WITH BLOCK 9 ON PAGE 1 OF THIS SOLICITATION. LATE PROPOSALS WILL BE ACCEPTED, HOWEVER, ALL EFFORTS SHALL BE TAKEN TO SUBMIT YOUR PROPOSALS ON TIME AS THERE WILL BE NO GUARANTEE THAT YOU WILL BE INCLUDED AS A BOA HOLDER FOR THE FIRST TASK ORDER COMPETITION.

THE GOVERNMENT WILL NOT ACCEPT ELECTRONIC SUBMISSIONS OF ANY PROPOSALS.

POINTS OF CONTACT

The Contract Specialist for this solicitation is Melissa Bucci, CODE 2.5.2.5.2, phone (732) 323-1578, e-mail melissa.bucci@navy.mil

The Contracting Officer for this solicitation is Kevin Smith, CODE 2.5.2.5, phone (732) 323-7789, e-mail kevin.smith11@navy.mil

The Contracting Officer Representative (COR) will be determined at time of Task Order award.

The Technical Point of Contact (TPOC)/Wide Area Work Flow (WAWF) Acceptor will be determined at time of Task Order Award.

AGREEMENT INFORMATION:

AGREEMENT CEILING AMOUNT
To Be Determined (TBD)
AGREEMENT PERIOD START DATE
Date of Award
AGREEMENT PERIOD END DATE
5 Years after Date of Award

AGREEMENT

A-01 DESCRIPTION OF AGREEMENT

This Basic Ordering Agreement, as defined in FAR 16.703, provides the terms and conditions under which the contractor is required to provide supplies/services as identified in section B. This "Agreement" is primarily used as means of expediting procurement and is neither intended to restrict competition nor imply that the Government may place future orders for materials.

A-02 AUTHORIZED ORDERING ACTIVITIES

The Contracting Offices of the following Government Activities may place orders under this agreement:

Naval Air Warfare Center Aircraft Division Highway 547 Lakehurst, NJ 08733-5082 DoDAAC: N68335

A-03 REQUIRING ACTIVITIES

The cognizant requiring activity designated below will determine appropriate requirements to be set forth in priced or unpriced orders issued in accordance with Section H:

Naval Air Warfare Center Aircraft Division

HWY 547

Lakehurst, NJ 08733-5082

A-04 CONDITIONS FOR MAINTENANCE OF AGREEMENT

This agreement may be modified by mutual agreement of the parties only. This agreement may be terminated upon 30 day written notice by either party to the other, except that the Government may immediately terminate this agreement at any time after the parties fail to agree upon any deletion, modification or addition to this agreement which is required by statute, Executive Order or the Federal Acquisition Regulation. No deletion, modification, addition to, or termination of this agreement shall affect any orders previously implemented under the provisions of this BOA.

The PCO shall issue a bilateral modification annually revising the terms and conditions of the BOA to conform with the applicable current requirements of the Federal Acquisition Regulation (FAR), the Department of Defense Federal Acquisition Regulation Supplement (DFARS), the Navy Acquisition Procedures Supplement (NAPS), statutes, Executive Orders, or other regulations. Any revised terms and conditions of the BOA shall not apply to orders placed prior to the date of the bilateral modification incorporating such revisions.

A-05 ORDERING AND TYPES OF ORDERS

This Agreement does not by itself order supplies or services. To bring this Agreement in operation, the Contracting Officer of the Authorized ordering activities shall issue the types of orders outlined below.

(a) Priced Orders, Priced orders are defined as orders for which the parties have agreed upon price, delivery and all other terms and conditions of the order prior to issuance.

(b) Unpriced Orders. Unpriced orders are defined as orders issued prior to agreement upon price and delivery for the articles listed on such orders. When the Contracting Officer considers that the urgency of the requirements so warrants, he may issue an unpriced order containing a monetary limitation for all the articles listed therein (this monetary limitation shall be deleted upon establishment of contract prices). Such unpriced orders authorize and require immediate commencement by the contractor except as provided in paragraphs A-07 and A-08 of this Section.

A-06 CONTENT OF TASK ORDERS

Orders placed under this Agreement shall be in accordance with paragraph H-04, Section "H" herein.

A-07 MAXIMUM LIABILITY OF THE GOVERNMENT

Pending establishment of firm fixed prices, as provided in A-05 above, the maximum liability of the Government under any Unpriced Order shall not exceed the monetary limitation set forth therein, as may be adjusted in writing by the Procuring Contracting Officer. Pending the establishment of firm prices, the contractor shall not be obligated to incur cost or deliver material, which exceeds the monetary limitation of the order.

A-08 UTILIZATION OF CEILING PRICES

Due to funding limitations, certain procurements may require the establishment of a “not to exceed ceiling.” These requirements will be identified prior to the placement of an Unpriced Task Order. The resultant Unpriced Task Order will contain a ceiling price which may not be exceeded under any circumstances and is subject to downward revision only, as a result of negotiations conducted pursuant to Clause H-05.

A-09 AUTHORIZED REPRESENTATIVE OF THE PROCURING CONTRACTING OFFICER (PCO)

The authorized representative of the PCO for the purpose of definitizing unpriced orders issued under this agreement is TBD. Such authority of the DCMA includes allowing the representative to exercise judgment under the terms of the “Disputes” provisions of this Agreement.

A-10 PROCEDURES FOR PRICING UNPRICED ORDERS

Procedures for pricing unpriced orders shall be in accordance with paragraph H-05, Section “H” herein.

A-11 DATA/PROVISIONING

Any data requirements under this Agreement shall be identified separately in each applicable Task Order. All items of Data Order will be set forth on a DD form 1423.

A-12 SPECIFICATIONS

(a) Material provided on orders under this agreement shall be in accordance with the applicable drawing revision such that fit, form and function is maintained.

(b) ORDER OF PRECEDENCE: Any inconsistency in this BOA shall be resolved by giving precedence in the following order (1) the schedule (excluding the specifications); (2) representations and other instructions; (3) contract clauses; (4) other documents, exhibits, and attachments; and (5) the specifications.

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

Labor

CPFF

Alteration/Installation Support Services FOB: Destination

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

Material

COST

Material necessary for Alteration/Installation Support Services

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

Travel

COST

Travel necessary for Alteration/Installation Support Services

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

Labor

FFP

Alteration/Installation Support Services

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

Material

Material necessary for Alteration/Installation Support Services

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

Travel

Travel necessary for Alteration/Installation Support Services

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

CDRLs

Data for Alteration/Installation Support Services

NET AMT

Section C - Descriptions and Specifications

STATEMENT OF WORK

STATEMENT OF WORK

1.0 SCOPE

The Alteration Installation Team (AIT) Contractor shall provide qualified personnel to perform shipboard alterations for removal and installation services for the NAVAIR Aircraft Launch and Recovery Equipment (ALRE) Systems.

Carrier availability and yard periods are subject to change. Once NAVAIR is notified of a change the AIT will be notified. Work performed shall be done in accordance with the applicable Ship Installation Drawings associated with each ALRE system and the Ship that system will be installed on. These services shall include work in the following areas:

· Quality Assurance (QA)

· System Removal

· Packaging and Shipping

· Debris/Hazardous Material Disposition

· Structural Work

· Welding

· Non-Destructive Testing

· Electrical/Electronics

· Piping/Plumbing

· Fire Watch

· Painting

· Pre-Installation Checkout

2.0 APPLICABLE DOCUMENTS and GUIDANCE.

The following documents and guidance shall be applicable to the extent specified herein.

2.1 General

2.1.1 Shipboard. All shipboard work shall be performed in accordance with the requirements of the “General Specification for Overhaul of Surface Ships (GSO)” (NAVSEA S9AA0-AB-GOS-010); NAVSEA Technical Specification 9090-310(F (or current series)); and all NAVSEA Standard Items.

2.1.1.1 Shipboard Quality System. An approved NAVSEA “Quality System” shall be maintained in accordance with NAVSEA Technical Specification 9090-310(F (or current series)); and all NAVSEA Standard Items.

2.1.1.2 Welding and Non-Destructive Testing (NDT). All welding and NDT of welding shall be performed in accordance with MIL-STD-1689A, “Requirements for Fabrication Welding and Inspection”.

2.1.1.3 Fire Watch. Fire Watches shall be utilized for all Hot Work. All Fire Watches shall be certified in accordance with the requirements of NAVSEA Technical Specification 9090-310(F (or current series)) and applicable NAVSEA Standard Items.

2.1.2.1 Welding and Non-Destructive Testing (NDT). All welding and NDT of welding shall be performed in accordance with applicable American Welding Society (AWS) Structural Welding Codes.

2.1.2.2 Fire Watch. Fire Watches shall be utilized for all Hot Work. All Fire Watches shall be certified in accordance with local Fire Code requirements.

3.0 REQUIREMENTS

3.1 General. All work shall be accomplished in accordance with the technical documentation provided by the government in Attachment 1. The Contractor shall document all installation activities by Attachment 1in a Integrate Program Management Report, CDRL D004. Installation requirements documentation will typically be provided in the form of Installation Control Drawings (ICDs), Ship Installation Drawings (SIDs) and specifications. The contractor shall provide to the Government any changes to the SIDs per CDRL A001, “SIDS”.

3.1.1 Access and Clearance. The Contractor shall be responsible for obtaining personnel clearance and access to all work areas both shipboard and ashore.

3.1.2 Working Hours. Working hours shall be Monday through Saturday, 10 hours/day, with a 1 hour lunch period (For a total working day of 11 hours). Due to ship availability and possible schedule delays the contractor may be required to work Sundays and/or double shifts. Any overtime requests must be preapproved by the Contracting Officers Representative (COR).

3.1.3 Tools and Equipment. The Contractor shall be responsible for providing all tools and equipment required to perform the work.

3.1.4 Quality Assurance (QA). The Contractor shall be responsible for the quality of all work performed in accordance with this SOW. QA verification shall be performed by a qualified specialist from the list submitted per CDRL C001, “Contactor’s Personnel Roster”. The Contractor shall submit a copy of their program certification per CDRL D001 “QA Program Certification”. The Contractor shall submit a copy of their approved QA manual per CDRL D005 “Quality Assurance Manual.

3.1.5 Proof Load Testing. The Contractor shall be responsible for all proof load testing. This includes provisioning of properly calibrated and certified instruments and equipment. When applicable, NDT of welds shall be performed before and after proofload testing. The Contractor shall provide a Certificate of Conformance to the NAVAIR 4.8 On-Site Installation Coordinator (OSIC), including applicable NDT records, upon successful completion of proof load testing.

3.1.6 System Checkout. When applicable, the Contractor shall conduct a system checkout of all the installed infrastructure and equipment. The Contractor shall support the NAVAIR System Operational Verification Team (SOVT) during the verification of all installed equipment.

3.1.7 Packaging and shipping. The Contractor shall be responsible for uncrating/un-packaging any Government Furnished Material/Equipment (GFM/GFE). The Contractor shall also be responsible for the packaging, shipping and storage of any removed equipment. Packaging will be sufficient to provide protection from damage during shipping and handling. The Contractor shall ship any removed and packaged equipment in accordance with the resulting Task Order.

3.1.8 Debris/Hazardous Material Disposition. The Contractor shall be responsible for the removal and proper disposition of any debris and scrap material resulting from the work performed. The Contractor shall provide only qualified personnel to perform the removal and disposition of Hazardous Material. All Hazardous Material shall be disposed of in accordance with Federal and State requirements.

3.1.9 Expenditure Report. The Contractor shall submit a report of actual AIT expenditures per CDRL B001 “Funds and Man-Hours Expenditure Report”.

3.1.10 Condition Report. The Contractor shall submit, as required, a change in scope of work per CDRL C002 “Condition Report”.

3.1.11 Liaison Action Request (LAR). The Contractor shall submit, as required, a deviation report per CDRL C003 “Liaison Action Request”.

3.1.12 Progress Report. The Contractor shall submit a detailed progress report per CDRL C004 “Contractor’s Progress, Status and management Report”.

3.1.13 Final Report. The Contractor shall provide a summary of tasks performed per CDRL D002 “Final Report”.

3.1.14 Plan of Actions and Milestones (POA&M). The POA&M submittal shall be in accordance with Naval Sea System Command Technical Specification 9090-310F (or current series) para 3.5.1. and submitted 14 DAC per CDRL D004. The POA&M submittal shall be in Microsoft Project and in the format of the applicable shipyard. Following completion of the POA&M, the Government will meet with the Contractor at the Contractor’s facility to review the POA&M. The Government will direct the contractor to expand on the level of detail within the POA&M if the Government on-site representative determines the scope of work is not accurately captured in the POA&M for accurate tracking. Additionally, the POA&M shall comply with the following: All tasks (except the first task) shall have at least one predecessor task and all tasks (except the last task) shall have at least one successor task, exceptions must be approved by the Government Program Manager. The POA&M must be updated weekly and discussed with the Government during the weekly status teleconference.

3.2 Shipboard

3.2.1 Regional Maintenance and Modernization Office (RMMCO) Check-In/ Check Out The contractor shall be required to perform all the requirements for RMMCO Check-in and Check-out prior to and at the conclusion of all alterations and installations.

3.2.2 Work Authorization Forms (WAFs). The Contractor shall be responsible for WAF submissions. The NAVAIR 4.8 OSIC shall verify all WAF approvals prior to the commencement of hot work and work on electrical systems.

3.2.3 Structural Work. The Contractor shall be responsible for on-site layout, grinding, cutting and fabrication. All bulkheads, deck, and the overhead shall be “clean walled” any extemporaneous welds, protrusions, and cable stand-offs shall be ground flush. Dimensions and tolerances shall be in accordance with the SID’s and ICD’s. WAFs shall be submitted, and approval obtained, prior to the commencement of any operation which produces hot sparks, e.g., grinding, sanding, chipping, etc.

3.2.4 Welding. The Contractor shall be responsible for the performance and quality of all welds. The Contractor shall ensure welders and welding procedures are certified in accordance with the requirements of NAVSEA S9074-AQ-GIB-010/248, “Requirements for Welding and Brazing: Procedure and Performance Qualification”. The Contractor shall be responsible for properly venting all fumes produced during welding and/or thermal cutting operations. The Contractor shall obtain an approved hot work WAF, daily, prior to the commencement of welding operations.

3.2.5 Non-Destructive Testing (NDT). The Contractor shall be responsible for performing NDT in accordance with applicable drawing requirements. NDT procedures and personnel qualifications shall be certified in accordance with NAVSEA T9074-AS-GIB-010/271, “Requirements for Non-Destructive Testing Methods”.

3.2.6 Electrical/Electronics. The Contractor shall be responsible for identifying and performing connections to shipboard power sources to provide electrical power for tools and equipment required to perform work. The Contractor shall be responsible for the removal/installation of all electrical equipment, power panels, cabling, transformers, receptacles, lighting, junction boxes, and switches as specified in the ICD’s and SID’s. Circuits removed from a power panel shall be relabeled as a “spare”. New circuits shall be labeled in accordance with applicable NAVSEA Standard Items. Remnant cable stand-offs will be removed and residual welds ground flush. Personnel shall be properly grounded while handling Printed Circuit Boards (PCB). Electrical systems shall be de-energized prior to, and during the performance of work. WAF’s shall be submitted, and approval obtained, prior to the commencement of work on electrical systems.

3.2.7 Piping/Plumbing. The Contractor shall provide qualified personnel for the performance of work required on plumbing/piping systems. WAF’s shall be submitted, and approval obtained, prior to the commencement of work on plumbing/piping system.

3.2.8 Fire Watch. The Contractor shall provide Fire Watches for the performance of all hot work, i.e., welding, cutting, and grinding. Two (2) certified Fire Watches shall be provided during each day of hot work. Fire Watching duties shall include adjacent boundary compartments. The Fire Watches shall be responsible for providing all fire suppression devices/equipment required for the performance of their duties. WAF’s shall be submitted, and approval obtained, prior to the commencement of hot work operations.

3.2.9 Painting. Painting shall be performed in accordance with GSO-2000, Section 631 and the ICD/SID requirements. At a minimum, all surfaces disturbed during work shall be painted. This includes opposing boundary surfaces affected by hot work. WAF’s shall be submitted, and approval obtained, prior to the commencement of any painting.

3.2.10 Pre-Installation Checkout (PICO) The Contractor shall perform a PICO on any and all equipment that is part of an external system prior to performing work on that equipment. This includes existing equipment that is to be removed and relocated incidental to this alteration or equipment that is being connected to as an interface by another alteration. The Contractor shall submit a PICO, completion Report and test requirements, per CDRL D003 “Pre-Installation Check-Out (PICO) Test Documents”.

3.3 Shore Site.

3.3.1 Structural Work. The Contractor shall be responsible for on-site layout, grinding, cutting and fabrication. All surfaces shall be “clean walled” – any extemporaneous welds, protrusions, and cable stand-offs shall be ground flush. Dimensions and tolerances shall be in accordance with Public Works Code (PWC) and ICD’s. Approved hot work permits must be obtained from the local Fire Department prior to the commencement of any operation which produces hot sparks, e.g., grinding, sanding, chipping, etc.

3.3.2 Welding. The Contractor shall be responsible for the performance and quality of all welds. The Contractor shall ensure welders and welding procedures are certified in accordance with the requirements of applicable AWS Structural Welding Codes, e.g., AWS D1.1-Steel; AWS D1.2-Aluminum; AWS D1.6-Stainless Steel. The Contractor shall be responsible for properly venting fumes produced during welding and/or thermal cutting operations. The Contractor shall obtain an approved hot work permit, daily, from the local Fire Department prior to the commencement of hot work.

3.3.3 Non-Destructive Testing (NDT). The Contractor shall be responsible for performing NDT in accordance with applicable drawing requirements. NDT personnel qualifications shall be certified in accordance with American Society for Nondestructive Testing (ASNT), SNT-TC-1A, NDT Level II or III “Recommend Practice for Nondestructive Testing – Personnel Qualification and Certification”.

3.3.4 Electrical/Electronics. The Contractor shall be responsible for identifying and performing connections to power sources to provide electrical power for tools and equipment required to perform work. The Contractor shall be responsible for the removal/installation of electrical equipment, power panels, cabling, transformers, receptacles, lighting, junction boxes, and switches as specified in the ICDs. Circuits removed from a power panel shall be relabeled as a “spare”. New circuits shall be installed and labeled in accordance with the National Electrical Code (NEC) and local requirements. Personnel shall be properly grounded while handling Printed Circuit Boards (PCB). All electrical systems shall be de-energized prior to, and during the performance of work. The Contractor shall obtain explicit approval from the local PWC Electrical Engineering Branch prior the commencement of any electrical operation.

3.3.5 Piping/Plumbing. The Contractor shall provide qualified personnel for the performance of work required on plumbing/piping systems. The Contractor shall obtain approval from the local PWC Engineering Branch prior to the commencement of work on plumbing/piping systems.

3.3.6 Fire Watch. The Contractor shall provide Fire Watches for the performance of all hot work, i.e., welding, cutting, and grinding. Two (2) certified Fire Watches shall be provided during each day of hot work. Fire Watching duties shall include adjacent boundary areas. The Fire Watches shall be responsible for providing all fire suppression devices/equipment required for the performance of their duties. The Contractor shall obtain an approved hot work permit, daily, from the local Fire Department prior to the commencement of hot work.

3.3.7 Painting. Painting shall be performed in accordance with the ICD’s and with approval from the local PWC Engineering Branch. At a minimum, all surfaces disturbed during work shall be painted. This includes boundary surfaces affected by hot work.

3.3.8 Pre-Installation Checkout (PICO) The Contractor shall perform a PICO on any and all equipment that is part of an external system prior to performing work on that equipment. This includes existing equipment that is to be removed and relocated incidental to this alteration or equipment that is being connected to as an interface by another alteration. The Contractor shall submit PICO test requirements per CDRL D003 “Pre-Installation Check-Out (PICO) Test Documents”.

3.3 DELIVERABLES

The contractor shall provide the following Contract Data Requirement Lines (CDRLs) as requested:

A001 Engineering Drawings
B001 Funds and Man-Hours Expenditure Report
C001 Contractor’s Personnel Roster
C002 Condition Found Report
C003 Liaison Action Request (LAR)
C004 Progress Report
D001 Quality Control Program
D002 Status Report
D003 Site Survey
D004 Integrated Program Management Report (IPMR)
D005 Alteration Installation Team Quality Assurance Workbook

4.0 MATERIALS:

4.1 Contractor Furnished Material/Equipment: The Contractor shall procure all material in the Bill of Material provided in Ship Installation Drawings per applicable Ship Alteration and Ship Change Documents. The Contractor shall provide all consumable material to support the installation.

5.0 OTHER

5.1 Security: Work performed under this contract is “UNCLASSIFIED” with the exception that contractor personnel entering “CLASSIFIED” spaces will require a SECRET clearance.

5.2 Other Direct Costs (ODCs): The Contractor shall provide the materials and travel to manage and perform tasks contained within each task order. COR approval shall be obtained prior to the purchase of any material or travel expenses. All material purchased by the contractor under this contract becomes the property of the Federal Government. Travel will be provided only when it is essential to perform the tasks detailed above and will be reimbursed at cost in accordance with the Joint Travel Regulation.

5.3 Place of Performance

5.3.1 Ships: Contractor’s facilities and onboard US Navy Ships including all CVNs and L Class Ships. Primarily the ship will be pier side located at various ports on the continental United States east and west coasts and Ship Repair Facility, Yokosuka Japan.

Section D - Packaging and Marking

CLAUSES INCORPORATED BY FULL TEXT

5252.247-9507PACKAGING AND MARKING OF REPORTS (NAVAIR)(OCT 2005)
(a) All unclassified data shall be prepared for shipment in accordance with best commercial practice. Classified reports, data and documentation, if any, shall be prepared for shipment in accordance with the National Industry Security Program Operating Manual, DoD 5220.22-M.
(b) The contractor shall prominently display on the cover of each report the following information:
(1) Name and business address of contractor.
(2) Contract Number/Delivery/Task order number.
(3) Contract/Delivery/Task order dollar amount.
(4) Whether the contract was competitively or non-competitively awarded.
(5) Name of sponsoring individual.
(6) Name and address of requiring activity.
5252.247-9508PROHIBITED PACKING MATERIALS (NAVAIR)(JUN 1998)
The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hydroscopic or non-neutral material) is prohibited. In addition, loose fill polystyrene is prohibited for shipboard use.
5252.247-9514TECHNICAL DATA PACKING INSTRUCTIONS (NAVAIR)(SEP 1999)
Technical Data and Information shall be packed and packaged for domestic shipment in accordance with best commercial practices. The package or envelope should be clearly marked with any special markings specified in this contract (or delivery/task order), e.g., Contract Number, CLIN, Device No., and document title must be on the outside of the package. Classified reports, data and documentation, if applicable, shall be prepared for shipment in accordance with Defense Industrial Manual for Safeguarding Classified Information, DoD 5220.22M.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Destination
Government
Destination
Government
0002
Destination
Government
Destination
Government
0003
Destination
Government
Destination
Government
0004
Destination
Government
Destination
Government
0005
Destination
Government
Destination
Government
0006
Destination
Government
Destination
Government
0007
Destination
Government
Destination
Government

CLAUSES INCORPORATED BY REFERENCE

52.246-2
Inspection Of Supplies--Fixed Price
AUG 1996
52.246-3
Inspection Of Supplies Cost-Reimbursement
MAY 2001
52.246-4
Inspection Of Services--Fixed Price
AUG 1996
52.246-5
Inspection Of Services Cost-Reimbursement
APR 1984
52.246-16
Responsibility For Supplies
APR 1984
5252.246-9512INSPECTION AND ACCEPTANCE (NAVAIR)(OCT 2005)
(a) Inspection and acceptance of the supplies or services to be furnished hereunder shall be performed by [TBD at the Task Order level].
(b) Acceptance of all Contract Line Items/Sub Line Items (CLINs/SLINs) shall be made by signature of the accepting authority on a DD 250 submitted through the WAWF system. Acceptance will only occur when the accepting authority is sure that inspections performed demonstrate compliance with contract requirements.
5252.246-9514INSPECTION AND ACCEPTANCE OF TECHNICAL DATA AND INFORMATION (NAVAIR)(FEB 1995)
Inspection and acceptance of technical data and information will be performed by the Procuring Contracting Officer (PCO) or his duly authorized representative. Inspection of technical data and information will be performed by ensuring successful completion of the requirements set forth in the DD Form 1423, Contract Data Requirements List (CDRL) and incorporation/resolution of Government review comments on the data items. Acceptance will be evidenced by execution of an unconditional DD Form 250, Material Inspection and Receiving Report, as appropriate, and/or upon receipt of a second endorsement acceptance by the PCO on the attachment to this contract entitled [TBD at the Task Order level]. The attached form will not be used for high cost data such as drawings, specifications, and technical manuals.
5252.246-9517CONSTRUCTIVE ACCEPTANCE PERIOD (NAVAIR) (MAR 1999)
For the purpose of FAR Clause 52.232-25, "Prompt Payment", paragraph (a)(5)(i), Government acceptance shall be deemed to have occurred constructively on the [30th] day after the contractor delivered the supplies or performed the services.

Section F - Deliveries or Performance

DELIVERIES

F-01 DELIVERIES

Unless otherwise specified, the services shall be initiated within 5 working days after the task order is negotiated. However, the contractor does have the option to reject the order per Clause H-04.

The data shall be shipped by the Contractor F.O.B. Destination in accordance with FAR 52.247-34 (Jan 1991), unless otherwise specified.

F-02 TIME OF DELIVERY

The items to be furnished hereunder shall be delivered by the Contractor within the time set forth in each task order or as otherwise specified in applicable modifications or supplements.

F-03 ACCELERATED DELIVERY

Accelerated delivery to the greatest extent possible in advance of the specified delivery schedule is desired. Any accelerated delivery will be at no additional expense to the Government, unless specifically authorized by the Procuring or Administrative Contracting Officer.

NOTE:

Delivery information will be provided on each task order.

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE
0001
POP 01-FEB-2018 TO

31-JAN-2023

N/A
N/A
0002
POP 01-FEB-2018 TO

31-JAN-2023

N/A
N/A
0003
POP 01-FEB-2018 TO

31-JAN-2023

N/A
N/A
0004
POP 01-FEB-2018 TO

31-JAN-2023

N/A
N/A
0005
POP 01-FEB-2018 TO

31-JAN-2023

N/A
N/A
0006
POP 01-FEB-2018 TO

31-JAN-2023

N/A
N/A
0007
POP 01-FEB-2018 TO

31-JAN-2023

N/A
N/A
52.242-15
Stop-Work Order
AUG 1989
52.242-15 Alt I
Stop-Work Order (Aug 1989) - Alternate I
APR 1984
52.247-34
F.O.B. Destination
NOV 1991
5252.211-9507PERIOD OF PERFORMANCE (NAVAIR)(SEP 2013)
(a) The contract shall commence on [DATE OF BOA AWARD] and shall continue [THROUGH 60 MONTHS]. However, the period of performance may be extended in accordance with the option provisions contained herein.
(b) If DFAR Clause 252.216-7006, "Ordering", is incorporated into this contract, then the period in which the Government can issue orders under the contract will be extended at the exercise of an option, and extended to the end of that option period.
5252.247-9505TECHNICAL DATA AND INFORMATION (NAVAIR)(FEB 1995)
Technical Data and Information shall be delivered in accordance with the requirements of the Contract Data Requirements List, DD Form 1423, Exhibit [TDB at the Task Order Level], attached hereto, and the following:
(a) The contractor shall concurrently deliver technical data and information per DD Form 1423, Blocks 12 and 13 (date of first/subsequent submission) to all activities listed in Block 14 of the DD Form 1423 (distribution and addresses) for each item. Complete addresses for the abbreviations in Block 14 are shown in paragraph (g) below. Additionally, the technical data shall be delivered to the following cognizant codes, who are listed in Block 6 of the DD Form 1423.
(1) PCO, Code [TDB at the Task Order Level].
(2) ACO, Code [TDB at the Task Order Level].
[insert additional code addresses, as necessary]
(b) Partial delivery of data is not acceptable unless specifically authorized on the DD Form 1423, or unless approved in writing by the PCO.
(c) The Government review period provided on the DD Form 1423 for each item commences upon receipt of all required data by the technical activity designated in Block 6.
(d) A copy of all other correspondence addressed to the Contracting Officer relating to data item requirements (i.e., status of delivery) shall also be provided to the codes reflected above and the technical activity responsible for the data item per Block 6, if not one of the activities listed above.
(e) The PCO reserves the right to issue unilateral modifications to change the destination codes and addresses for all technical data and information at no additional cost to the Government.
(f) Unless otherwise specified in writing, rejected data items shall be resubmitted within thirty (30) days after receipt of notice of rejection.
(g) DD Form 1423, Block 14 Mailing Addresses: [TDB at the Task Order Level]

Section G - Contract Administration Data

252.204-0001
Line Item Specific: Single Funding
SEP 2009
252.204-0002
Line Item Specific: Sequential ACRN Order
SEP 2009
252.204-0003
Line Item Specific: Contracting Officer Specified ACRN Order
SEP 2009
252.204-0004
Line Item Specific: by Fiscal Year
SEP 2009
252.204-0005
Line Item Specific: by Cancellation Date
SEP 2009
252.204-0006
Line Item Specific: Proration
SEP 2009
252.204-0007
Contract-wide: Sequential ACRN Order
SEP 2009
252.204-0008
Contract-wide: Contracting Officer Specified ACRN Order
SEP 2009
252.204-0009
Contract-wide: by Fiscal Year
SEP 2009
252.204-0010
Contract-wide: by Cancellation Date
SEP 2009
252.204-0011
Contract-wide: Proration
SEP 2009
252.232-7003ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (JUN 2012)
(a) Definitions. As used in this clause--
(1) Contract financing payment and invoice payment have the meanings given in section 32.001 of the Federal Acquisition Regulation.
(2) Electronic form means any automated system that transmits information electronically from the initiating system to all affected systems. Facsimile, e-mail, and scanned documents are not acceptable electronic forms for submission of payment requests. However, scanned documents are acceptable when they are part of a submission of a payment request made using Wide Area WorkFlow (WAWF) or another electronic form authorized by the Contracting Officer.
(3) Payment request means any request for contract financing payment or invoice payment submitted by the Contractor under this contract.
(4) Receiving report means the data required by the clause at 252.246-7000, Material Inspection and Receiving Report.
(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests and receiving reports using WAWF, in one of the following electronic formats that WAWF accepts: Electronic Data Interchange, Secure File Transfer Protocol, or World Wide Web input. Information regarding WAWF is available on the Internet at https://wawf.eb.mil/ .
(c) The Contractor may submit a payment request and receiving report using other than WAWF only when--
(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor. In such cases, the Contractor shall include a copy of the Contracting Officer's determination with each request for payment;
(2) DoD makes payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and Billing System);
(3) DoD makes payment for rendered health care services using TRICARE Encounter Data System (TEDS) as the electronic format; or
(4) When the Governmentwide commercial purchase card is used as the method of payment, only submission of the receiving report in electronic form is required.
(d) The Contractor shall submit any non-electronic payment requests using the method or methods specified in Section G of the contract.
(e) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payments requests.
5252.201-9501DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE (COR) (NAVAIR)(SEP 2012)
(a) The Contracting Officer has designated [TBD at the Task Order level] as the authorized Contracting Officer's Representative (COR) to perform the following functions, duties, and/or responsibilities:[TBD at the Task Order level].
(b) The effective period of the COR designation is [TBD at the Task Order level]
5252.232-9510PAYMENT OF FIXED FEE (NAVAIR) (OCT 2005)
(a) The fixed fee, as specified in Section B of this contract, subject to any adjustment required by other provisions of this contract, will be paid in installments. The fixed fee will be paid not more frequently than [bi-weekly] based on the allowable cost. The amount of each such installment shall be in the same ratio to the total fixed fee as the [dollars per hour (based on the fixed fee divided by the level of effort in hours]. Payment shall be made in accordance with FAR Clauses 52.216-7, "Allowable Cost and Payment," and 52.216-8, "Fixed Fee."
(b) In the event of termination of the work in accordance with the FAR Clause 52.232-22, "Limitation of Funds," the fixed fee shall be redetermined by mutual agreement equitably to reflect the reduction of the work performed. The amount by which such fixed fee is less than or exceeds payments previously made on account of fee, shall be paid to (or repaid by) the contractor.
(c) The balance of the fixed fee shall be payable in accordance with other clauses of this contract.
(d) For indefinite delivery type contracts the terms of this clause apply to each delivery/task order there under.
5252.232-9524ALLOTMENT OF FUNDS (NAVAIR)(OCT 2005)
(a) This contract is incrementally funded with respect to both cost and fee.
(b) The amounts presently available and allotted to this contract for payment of fee, as provided in the Section I clause of this contract entitled “FIXED FEE”, are as follows:
ITEM(S)ALLOTTED TO FIXED FEE
[TBD at the Task Order level]$[TBD at the Task Order level]
(c) The amounts presently available and allotted to this contract for payment of cost, subject to the Section I “LIMITATION OF FUNDS” clause, the items covered thereby and the period of performance which it is estimated the allotted amount will cover are as follows:
PERIOD OF
ITEM(S)ALLOTTED TO COSTPERFORMANCE
[TBD at the Task Order level]$[TBD at the Task Order level][TBD at the Task Order level]
(d) The parties contemplate that the Government will allot additional amounts to this contract from time to time by unilateral contract modification, and any such modification shall state separately the amounts allotted for cost and for fee, the items covered thereby, and the period of performance the amounts are expected to cover.
5252.242-9511CONTRACT ADMINISTRATION DATA (NAVAIR)(SEP 2012)
(a) Contract Administration Office.
(1) Contract administration functions (see FAR 42.302(a) and DFARS 242.302(a)) are assigned to: See the ADMINISTERED BY Block on the face page of the contract, modification, or order.
(2) Contract administration functions withheld, additional contract administration functions assigned, or special instructions (see FAR 42.202) are: [TBD at BOA award] or as delineated by Procuring Contracting Officer (PCO) correspondence.

(b) Inquiries regarding payment should be referred to: MyInvoice at https://myinvoice.csd.disa.mil//index.html.

Section H - Special Contract Requirements

ADDITIONAL REQUIREMENTS

H-01 Government Furnished Property

Government Furnished Property, when authorized will be indicated on each order issued hereunder.

H-02 Discount Terms

Discount Terms, if applicable, will be shown on each order issued hereunder.

H-03 Terms of Agreement

This agreement shall remain in full force and effect for a period not to exceed 5 years from the effective date shown on cover page thereof.

H-04 Orders

Orders will be issued by the Government in the form and manner set forth in this agreement. It is agreed between the parties that there is no obligation upon the Government under the terms therefore to issue any such order and that the Government shall not incur any liability to the Contractor if no such order is issued.

The Government contemplates issuance of:

a. Firm fixed price mutually established orders consistent with NAVAIR clause 5252.216-9533 Orders Under BOAs (Fixed-Price)(NAVAIR)(Oct 2005);

b. Cost reimbursement mutually established orders consistent with NAVAIR clause 5252.216-9536 Orders Under BOA’s (Cost-Reimbursement)(NAVAIR)(SEP 2003);

c. When required to meet emergency requirements, unpriced orders may be utilized and price to be negotiated;

d. Supplemental agreements definitizing orders after negotiation and agreement by the parties on consideration, delivery schedules and all other terms; and

e. Any other modifications to individual orders as may be required during the life of this Agreement.

Orders issued hereunder will include, as applicable, but will not be limited to the following:

a. Cite basic ordering agreement

b. Cite negotiation authority

c. Cite order number

d. Cite order rating

e. Cite Government point of contact

f. Provide a general description of the work to be performed, including the equipment and/or components in accordance with the Statement of Work contained herein.

g. Cite man-hour rates, per diem rates and travel rates (time and Material Contracts) (if appropriate)

h. Specify criteria for acceptance

i. Cite F.O.B. point and applicable F.O.B. clause(s)

j. Specify the point of final inspection and acceptance of services or supplies ordered.

k. Cite applicable inspection clause(s)

l. Specify required delivery schedule or period of performance and the effective date from when billing shall begin.

m. Cite packing and marking requirements.

n. Indicate if applicable, what data, drawings, specifications, or other source material including the end items equipment or applicable component, if any, is to be furnished by the Government and dates which contractor may expect to receive the data or equipment.

o. If applicable, furnish security handling requirements (DD Form 254)

p. Show citation of funds, office of payment, and other instructions or information, pertinent to the specific order hereunder.

q. Cite, when applicable, estimated amount for travel, per diem and materials.

r. Cite "As Required" clauses from Section I applicable to that order by FAR Reference No., Title and Date.

The Contractor agrees to accept or reject each order within fifteen (15) working days after it has been received. Rejection of an order shall be by telephonic notice from the Contractor to the Contracting Officer, followed by written confirmation. If the Contracting officer does not receive notice of rejection of an order within fifteen (15) days after the order has been received by the Contractor, the order shall be deemed to have been accepted.

H-05 Ordering Procedure

a. The Government will issue orders under this BOA by utilizing the forms as designated below:

ORDERS AT AN

ESTIMATED AND/OR CEILING PRICE

ORDERS AT

FIXED TERMS

Step I

DD 1155 or Standard Form 26 Citing maximum price or ceiling Limitation

DD Form 1155 or SF 26

Step II

SF 30 definitizing DD 1155 or SF 26 negotiation of consideration, delivery and all terms and conditions

N/A

b. All orders issued by the Government hereunder shall incorporate by reference the terms of this Basic Ordering Agreement.

c. The Government contemplates issuance of the following types of orders:

(i) Priced order

Upon request of the Contracting Officer, the Contractor shall furnish a proposal for the required supplies and/or services, enter into negotiation as soon thereafter as practicable and establish price, firm delivery schedules and all other terms applicable to this requirement. When prices, delivery schedules and all other terms pertinent to the requirement have been agreed upon, the issuance, acceptance and execution of a bilateral priced order, via Standard Form 26, shall be the point at which contract becomes effective. Procedurally, a Priced Order will be executed by the Contractor, and, thereafter, the Government will make acceptance via execution, whereupon a binding contract will be in force. Priced Orders may be issued unilaterally by Government, via DD Form 1155, where the Contractor's written offer is accepted by the Government precisely as offered.

(ii) Unpriced Order.

(1) Upon acceptance of an Unpriced Order the Contractor shall immediately commence performance of the work specified therein, to the end that the supplies or services specified may be delivered or completed at the earliest date practicable. The Contractor is required to convey a rejection believed to be outside the scope of work of an Order by written notice to the Contracting Officer within 30 days after the date of the receipt of the order. Acceptance of an order must be acknowledged immediately using the format set forth below.

CONTRACTOR'S RECEIPT: (Orders at estimated consideration):

"The Contractor hereby acknowledges receipt of this order"

(Name of Contractor) (Date)

(Signature) (Title)

(2) The Unpriced Orders issued pursuant to this Agreement will authorize the contractor to proceed with performance (if accepted) and will set forth the desired or required delivery schedules, a limitation of obligation for cost on the part of the Government and any other special terms and conditions. Procedurally, an Unpriced Order will be executed by the Government and, thereafter; the Contractor will make acceptance by letter, whereupon a binding contract will be in force. The effective date of the contract may, by agreement, be other than the date executed.

(3) The Contractor shall submit to the Government within sixty (60) days from the date of receipt of an Unpriced Order a signed proposal containing firm delivery dates (where delivery is negotiable) and any cost or pricing data required by the provisions of this Agreement or as requested by the Contracting Officer in accordance with the guidelines established by FAR 15.403-4. After receipt of the proposal, negotiations will be entered into and Order Modification executed by the Government and the Contractor within 120 days (180 days if field pricing support is required) or before 40% of the work is completed, whichever occurs first. The Contractor may submit a written request for an extension of time for submission of his proposal; if the circumstances detailed so warrant, the Contractor Officer may grant the request. In the event of failure by the Contractor to timely submit a proposal (or present mitigation), the Contracting Officer may withhold progress payments or disallow provisional billing or both, until the situation is corrected. The Contractor shall not make delivery of any supplies and/or services prior to the execution of a definitizing bilateral Order Modification unless the Contractor has the express written approval of the Contracting Officer.

Failure of the parties to agree on any term or provision applicable to any Unpriced Order or Order Modification shall constitute a dispute concerning a question of fact within the meaning of the clause entitled "Disputes" of the Contract Clause of this Agreement and be subject to the procedures of said clause. Pending settlement of to the procedures of said clause or such dispute, the Contracting Officer shall establish prices that are considered fair and reasonable and shall set them forth in a priced modification to the order indicating thereon that such prices are based on the final decision of the Contracting Officer, which decision is subject to appeal in accordance with the Disputes Clause.

(4) The Contractor agrees, promptly upon receipt of an order hereunder, to furnish directly to the issuing Contracting Officer:

a. Reason, if any, why the delivery schedule in such order cannot be met;

b. Identification of any item in the order which is obsolete;

c. Recommendation of appropriate superseding or substitute interchangeable items;

d. Report of any discrepancies or inaccuracies in the order;

(5) The Contractor shall not exceed this monetary limitation without the prior written Approval of the Contracting Officer.

(6) In addition to a monetary limitation, unpriced orders to be definitized on a fixed price basis may contain a ceiling price subject to DOWNWARD NEGOTIATION ONLY. Upon acceptance of an unpriced order citing a ceiling price, the Contractor will negotiate a fixed price. If the order contains a specific Economic Price Adjustment provision, the ceiling price will limit the original order and not the escalation for cost increases occurring subsequent to definitization of the unpriced order.

(7) The parties may, when deemed necessary to the Contracting Officer to support program objectives, negotiate a firm delivery schedule prior to issuance of an unpriced order. The Order will reflect that the delivery schedule is firm and that the parties have agreed thereto. The Contractor's acceptance of the Order shall constitute acknowledgment of such agreement.

d. Order Modifications will be issued on Standard form 30 where it is necessary to:

(i) Definitize orders after negotiation;

(ii) Modify orders to correct procedural or typographical errors, or effect changes of an administrative nature;

(iii) Make any written alteration of the specifications, delivery point, rate and delivery, contract period, price, quantity, or other provisions of an existing order.

Authority to Issue Orders

All Contracting Officers within the Government Activities identified in Paragraph A-02 are authorized to issue orders under this Basic Ordering Agreement.

The Contractor agrees to accept or reject each order within fifteen (15) working days after it has been received.