CDRLs_A001_through_A004_for_Engility_follow-On_b.pdf
PDF 215 KB Posted
- Attached to
- NAWC-AD 4. 8. 1 Engineering and Technical Support Services Federal contract opportunity
- Solicitation number
- N68335-15-R-0178
About this file
CDRLs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI_24_Nov_2015.pdf | ||
| RFI_16_Nov_2015.pdf | ||
| N68335-15-R-0178-0001_Solicitation.pdf | ||
| DD_254_signed_N68335-15-R-0178.pdf | ||
| Attachment_P4_Cost-Price_Spreadsheet.xls | XLS spreadsheet | |
| Attachment_P1_Wokforce_Qualifications.xls | XLS spreadsheet | |
| Attachment_P2_Wokforce_Hour_Matrix.xls | XLS spreadsheet | |
| N68335-15-R-0178_Solicitation.pdf | ||
| QASP_for_Engility_follow-On.pdf | ||
| Attachment_P3_Past_Performance_Questionnaire.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved
CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN:
B. EXHIBIT
A
C. CATEGORY
TDP ____ TM _____ OTHER _X____
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
RFP# N68335-15-R-0178
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM:
Engineering and Technical Report
3. SUBTITLE:
Analysis and Technical Study
4. AUTHORITY (DATA IDENTIFICATION NO.)
DI-MGMT-81508B (See Block 16)
5. CONTRACT REFERENCE
SOW para 5.1, and para 9.1
6. REQUIRING OFFICE
NAVAIR 4.8.1
7. DD 250 REQ
LT
9. DIST STATEMENT REQD.
See Block 16
10. FREQUENCY
As required
12. DATE OF FIRST
SUBMISSION
See Block 16
14. DISTRIBUTION
See Block 16
a. Addressee
b. Copies
8. APP CODE
AD
11. AS OF DATE
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
Draft Final
Reg Repro
16. REMARKS COR
Block 4: Contractor format is acceptable, but content shall be in accordance with the Data Item Number.
Block 9: Apply and use distribution statements in accordance with the Distribution Statement Attachment to this contract.
Blocks 11, 12, 13, 14: Technical Reports should be provided for any formal technical analysis or study. Requirement should be included in the Integrated Master Schedule.
Electronic Submissions required in Microsoft Word format and submitted via e-mail.
Block 14: Electronic copies of all data submittals shall be provided and accessible via secure on-line access. A Letter of Transmittal (LT) shall be provided by email to the listed Addressees.
TPOC 1
15. TOTAL 0 1 0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN:
B. EXHIBIT
A
C. CATEGORY
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM:
Report, Record of Meeting / Minutes
3. SUBTITLE:
Trip Report / Meeting Report
4. AUTHORITY (DATA IDENTIFICATION NO.)
DI-ADMN-81505 (See Block 16)
5. CONTRACT REFERENCE
SOW para 3.3
6. REQUIRING OFFICE
NAVAIR 4.8.1
7. DD 250 REQ
As required
12. DATE OF FIRST
SUBMISSION
See Block 16
14. DISTRIBUTION
See Block 16
a. Addressee
b. Copies
8. APP CODE
AD
11. AS OF DATE
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
Draft Final
Reg Repr o
Block 9: Apply and use distribution statements in accordance with the Distribution Statement Attachment to this contract.
Blocks 11, 12, 13, 14: Trip reports and meeting minutes should each be provided within 1 week after return from trip, or within 1 week after completion of the meeting.
Electronic Submissions required in Microsoft Word format and submitted via e-mail.
Block 14: Electronic copies of all data submittals shall be provided and accessible via
TPOC 1
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN:
B. EXHIBIT
A
C. CATEGORY
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM:
Operations Security (OPSEC) Plan
3. SUBTITLE:
4. AUTHORITY (DATA IDENTIFICATION NO.)
5. CONTRACT REFERENCE
SOW para 4.3
6. REQUIRING OFFICE
AIR 7.4.4
7. DD 250 REQ
See Block
ONE/R
12. DATE OF FIRST
SUBMISSION
90 DAC
14. DISTRIBUTION
See Block 16
a. Addressee
b. Copies
8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
Draft Final
Reg Repro
16. REMARKS COR 0 1 0
Blk 4 – Contractor Format. The OPSEC plan shall be developed in accordance with the requirements set forth in NAWCINST 3432.1 and OPNAVINST 3432.1. Use the definition of sensitive information given in Public Law 100-235. Use National Security Decision Directive (NSDD) 298 for the concept of Operations of AIR 7.4.4 Operations Security.
BLK 7 – Acceptance will be via memorandum from AIR 7.4.4
Blk 9 – Apply and use distribution statements in accordance with the Distribution Statement Shown in BLK 13 of DD Form 254 and the guidance of SECNAVINST 5510.36
Blks 10, 12 & 13 – Draft OPSEC Plan due 90 days after Contract award. Revisions as required after approval of final plan to comply with Government Data Protection Policy Documents.
Blk 14 – Provide reproducible copy in electronic media format.
AIR 7.4.4 1 1 0
15. TOTAL 1 2 0
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN
B. EXHIBIT
A
C. CATEGORY
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM:
Contractor's Progress, Status, and Management Report
3. SUBTITLE:
4. AUTHORITY (DATA IDENTIFICATION NO.)
DI-MGMT-80368A (See Block 16)
5. CONTRACT REFERENCE
SOW para 3.2
6. REQUIRING OFFICE
NAVAIR 4.8.1
7. DD 250 REQ
MTHLY
12. DATE OF FIRST
SUBMISSION
See Block 16
14. DISTRIBUTION
See Block 16
a. Addressee
b. Copies
8. APP CODE
AD
11. AS OF DATE
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16 Draft
Final
Reg Repro
Block 9: Apply and use distribution statements in accordance with the Distribution Statement Attachment to this contract.
Blocks 11, 12, 13: Progress reports are to be delivered by the 15th of each month beginning two months ARO. Electronic Submissions required in Microsoft Word format and submitted via e-mail.
Block 14: Electronic copies of all data submittals shall be provided and accessible via
| CONTRACT DATA REQUIREMENTS LIST |
| A |
| TDP ____ TM _____ OTHER _X____ |
| A001 |
| Engineering and Technical Report |
| Analysis and Technical Study |
| SOW para 5.1, and para 9.1 |
| NAVAIR 4.8.1 |
| LT |
| See Block 16 |
| See Block 16 |
| AD |
| COR |
| 1 |
| TPOC |
| 1 |
| 0 |
| 1 |
| 0 |
| CONTRACT DATA REQUIREMENTS LIST |
| A |
| TDP ____ TM _____ OTHER _X____ |
| A002 |
| Report, Record of Meeting / Minutes |
| Trip Report / Meeting Report |
| SOW para 3.3 |
| NAVAIR 4.8.1 |
| LT |
| See Block 16 |
| See Block 16 |
| AD |
| COR |
| 1 |
| TPOC |
| 1 |
| 0 |
| 1 |
| 0 |
| CONTRACT DATA REQUIREMENTS LIST |
| A |
| TDP ____ TM _____ OTHER _X____ |
| A003 |
| Operations Security (OPSEC) Plan |
| SOW para 4.3 |
| AIR 7.4.4 |
| See Block 16 |
| See Block 16 |
| See Block 16 |
| A |
| COR |
| 0 |
| 1 |
| 0 |
| 1 |
| 2 |
| 0 |
| CONTRACT DATA REQUIREMENTS LIST |
| A |
| TDP ____ TM _____ OTHER _X____ |
| A004 |
| Contractor's Progress, Status, and Management Report |
| SOW para 3.2 |
| NAVAIR 4.8.1 |
| LT |
| See Block 16 |
| See Block 16 |
| See Block 16 |
| AD |
| See Block 16 |
| See Block 16 |
| COR |
| 1 |
| 0 |
| 1 |
| 0 |
| 2015-08-05T11:22:49-0400 | |
| GONZALEZ.JAMES.M.1231165963 |
| 2015-08-06T10:02:27-0400 | |
| ROSSI.ROBERT.1228928409 |
| 2015-08-05T11:23:01-0400 | |
| GONZALEZ.JAMES.M.1231165963 |
| 2015-08-06T10:02:41-0400 | |
| ROSSI.ROBERT.1228928409 |
| 2015-08-05T11:23:15-0400 | |
| GONZALEZ.JAMES.M.1231165963 |
| 2015-08-06T10:02:52-0400 | |
| ROSSI.ROBERT.1228928409 |
| 2015-08-05T11:26:01-0400 | |
| GONZALEZ.JAMES.M.1231165963 |
| 2015-08-06T10:03:02-0400 | |
| ROSSI.ROBERT.1228928409 |
File details come from the government source that posted it. Updated .