QASP_for_Engility_follow-On.pdf
PDF 202 KB Posted
- Attached to
- NAWC-AD 4. 8. 1 Engineering and Technical Support Services Federal contract opportunity
- Solicitation number
- N68335-15-R-0178
About this file
Quality Assurance Surveillance Plan
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI_24_Nov_2015.pdf | ||
| N68335-15-R-0178-0001_Solicitation.pdf | ||
| RFI_16_Nov_2015.pdf | ||
| Attachment_P2_Wokforce_Hour_Matrix.xls | XLS spreadsheet | |
| N68335-15-R-0178_Solicitation.pdf | ||
| Attachment_P3_Past_Performance_Questionnaire.doc | DOC document | |
| CDRLs_A001_through_A004_for_Engility_follow-On_b.pdf | ||
| Attachment_P1_Wokforce_Qualifications.xls | XLS spreadsheet | |
| DD_254_signed_N68335-15-R-0178.pdf | ||
| Attachment_P4_Cost-Price_Spreadsheet.xls | XLS spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP# N68335-15-R-0178
Source Selection Information
See FAR 3.104 and 2.101
For Official Use Only
Quality Assurance Surveillance Plan
Engineering and Technical Services for Support of
NAWCAD Lakehurst 4.8.1 Competency
1. Purpose
This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure the systematic quality assurance methods are used in the administration of the performance based service order. The intent is to ensure that the contractor performs in accordance with the performance metrics and the Government receives the quality of services called for in the order.
The contract requirement is for Engineering and Technical Services to assist the 4.8.1
Systems Engineering Competency in support design, development, integration, test, evaluation and maintenance of SE and ALRE products associated with the Aircraft
Platform Interface (API) which covers launch, recovery, visual landing aids, and with maintenance of aircraft aboard Navy ships and Marine Corps airfields.. These programs are being developed and supported at the Naval Air Warfare Center Aircraft Division
Lakehurst, New Jersey. The engineering and technical services shall encompass efforts in the following functional areas (at a minimum):
Systems Engineering throughout all or portions of the product life cycle, including developing and managing requirements, performing trade studies, and supporting the NAVAIR Systems
Engineering Technical Review (SETR) processes.
ALRE Hardware Engineering including electrical and mechanical design, in-service, and drawing support for aircraft launcher systems, recovery systems, Expeditionary Air Fields, Visual Landing
Aids, and ship information systems.
ALRE Software Engineering following structured processes such as required by the Capability
Maturity Model Integrated (CMMI), and following Cyber Security mandates needed for DoD systems and laboratory accreditations.
Aviation Ship Integration to address aircraft and ship compatibilities affecting operability, supportability, and maintainability of aircraft in the ship environment.
Circuit Board requirements, diagnostics, and repair to support component repair in accordance with the NAVSEA Module Test and Repair program.
Integrated Diagnostics and Automated Test Systems (IDATS) for developing an environment for aircraft testability.
Integrated Support Environment, developing an information system linking diagnostics, maintenance, supply, training, and manufacturing to improve SE and ALRE equipment readiness.
The resulting vehicle will be a Cost Plus Fixed Fee (CPFF) Indefinite Delivery Indefinite
Quantity (IDIQ) contract with a twelve (12) month base period and four (4) twelve (12) month ordering periods. The performance-based agreement will contain Contract Line
Item Numbers (CLINs) for labor, travel, and material costs for the five (5) year performance period. A properly executed QASP will assist the Government in achieving the objectives of this procurement.
2. Authority
Authority for issuance of this QASP is provided under Contract Section E – Inspection and Acceptance, which provides for inspections and acceptance of the services and documentation called for in task orders, to be executed by the Contracting Officer or a duly authorized representative.
3. Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the Quality
Assurance Surveillance Plan. The contractor, and not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth by task orders. The QASP on the other hand, is put in place to provide Government surveillance oversight of the contractor’s efforts to assure that they are timely, effective and are delivering the results specified in a task order.
4. Government Resources
The following definitions for Government resources are applicable to this plan:
Contracting Officer - A person duly appointed with the authority to enter into
(Procuring Contracting Officer (PCO)) or administer (Administrative Contracting Officer
(ACO)) contracts and make related determination and findings on behalf of the
Government. The PCO for this contract is Patrick W Smith, Code 2.5.2. The ACO will be designated in the resulting contract. Contracting Officers are designated via a written warrant, which sets forth limitations of authority.
Contracting Officer’s Representative (COR) - An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract.
The COR will be appointed in the resulting contract, and additional CORs may be appointed for individual task orders. Limitations of authority are contained in a written letter of appointment.
5. Responsibilities
The following Government resources shall have responsibility for the implementation of this QASP:
Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the
Contracting Officer that assures the contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the Contracting Officer for action.
6. Methods of QA Surveillance
a. Contractor Performance Assessment Reporting System (CPARS) – The market place for services is very competitive. As such, the successful offeror has a vested interest in the Government-generated CPARS ratings under this contract.
Additionally, the CPARS ratings will be the determinant in exercising an option or award term. For this procurement the Government will address the quality of product or service, schedule, cost control, business relations, management, and other important areas. As this information may affect future source selections throughout
DoD, and the continuation of the order, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the QASP.
b. QASP – The below listed methods of surveillance will be used by the COR in the technical administration of this QASP. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the
Surveillance Activity Checklist.
7. Surveillance
Enclosures (1) and (2) set forth the performance standards and surveillance methods for the contractor and COR while enclosure (3) provides the checklist and means for the
COR to document the results of the surveillance. Enclosure (3) will be provided to the
Contracting Officer on a quarterly basis
8. Documentation
In addition to providing quarterly reports to the Contracting Officer, the COR will maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Quality Assurance
Checklists. All such records will be maintained for the life of the contract. The COR shall forward these records to the Contracting Officer at termination or completion of the contract.
9. Enclosures
Enclosure (1) –Performance Based Quality Standards Engineering and Technical
Services
Enclosure (2) - Data Performance Standards
Enclosure (3) - Surveillance Activity Checklist
Enclosure (1)
PERFORMANCE-BASED QUALITY STANDARDS
ENGINEERING AND TECHNICAL SERVICES
Monitoring & Reporting associated with Engineering and Technical Support Services
Description Performance Standards and Acceptance Quality Level (AQL)
Surveillance Method/Measure
Ability to provide input to status briefs and data calls in a timely manner.
Is fully knowledgeable and can execute NAVAIR procedures in the scheduled time 100% of the time with little or no downtime.
Government observation and subject matter expert.
Monthly
Ability to travel and provide support at bi-annual meetings
Is fully knowledgeable and can execute NAVAIR procedures in the scheduled time 100% of the time with little or no downtime.
Government observation and subject matter expert.
Monthly
Ability to prepare Risk Management reports in a timely manner
Is fully knowledgeable and can execute NAVAIR procedures in the scheduled time 100% of the time with little or no downtime.
Government observation and subject matter expert.
Monthly
Ability to prepare and update acquisition documents (i.e. Quad Charts, POA&Ms, SOWs and CDRLs).
Is fully knowledgeable and can execute NAVAIR procedures in the scheduled time 100% of the time with little or no downtime.
Government observation and subject matter expert.
Monthly
Enclosure (2)
DATA PERFORMANCE STANDARDS
Task Performance Evaluation Criteria and Standards
Description Standard Acceptable Quality
Level
Method of
Surveillance
Engineering and
Technical Reports
In accordance with the
DID cited in the CDRL
90% acceptable on first submission to Government;
100% acceptable on subsequent submissions
100% Inspection by
Technical Points of Contact for the effort.
Report, Record of
Meeting / Minutes
Submission is in accordance with the DID cited in the CDRL.
Technical Points of Contact for the effort.
OPSEC Plan submission.
Security Officer.
Contractor’s Progress
Status, and
Management Reports
95% acceptable on first
100% Inspection by COR.
All SOW/CDRL tasks, including SOW/CDRL sub-tasks, will be assessed focusing on the following.
Quality of Product or Service – Assess the contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives.
Assess how successfully the contractor meets program quality.
Schedule – Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events (i.e., design reviews), discuss causes, and assess the effectiveness of contractor corrective actions.
Cost Control – Assess the contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the contractor experiencing cost growth or under run? If so, discuss the causes and contractor-proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon contractor provided person-hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort should be assessed.
Business Relations – Assess the timelines, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction.
Management – Assess the contractor’s success with timely award and management of subcontracts, including whether the contractor met small/small disadvantage and women-owned business participation goals. Discuss the extent to which the contractor discharges its responsibility for integration and coordination of all activity needed to execute the contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the contractor’s risk mitigation plans. If applicable, identify any other management areas that are unique to the contract.
Other areas – Assess additional evaluation areas unique to the contract, or that cannot be captured elsewhere.
The evaluation ratings are as follows:
Exceptional – Performance meets contractual requirements and exceeds many to the
Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good - Performance meets contractual requirements and exceeds some to the
Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory - Performance meets contractual requirements. The contractual performance of the task and sub-task contain some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal - Performance does not meet contractual requirements. The contractual performance of the task and sub-task being assessed reflect a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the task or sub-task contains a serious problem(s) for which the contractor’s actions appear or were ineffective.
Attachment 1
Enclosure (3)
SURVEILLANCE ACTIVITY CHECKLIST
Monthly Surveillance:
The COR will perform a monthly assessment of Quality, Schedule, Cost Control, Business Relations, Management, and Other Areas as applicable utilizing the CPARS evaluation rating definitions listed in enclosure (2).
Surveillance
Method/Measure
Prepare monthly reports correctly and on time.
Government COR monthly
TBD
TBD
Schedule Cost
Control
Business
Relations
Mgmt.Description Date
Planned
Date
Complete d
Quality
Plan, attend, and contribute to engineering and technical meetings consistently.
Government observation, monthly
N683315-R-XXXX
Monthly Summary of Ratings:
Quality
Number of Exceptional ____ ____________________________
Number of Very Good ____ ____________________________
Number of Satisfactory ____ ____________________________
Number of Marginal ____ ____________________________
Number of Unsatisfactory ____ ____________________________
Schedule
Number of Very Good ____ ____________________________
Number of Satisfactory ____ ____________________________
Cost control
Number of Very Good ____ ____________________________
Number of Satisfactory ____ ____________________________
Business Relations
Number of Very Good ____ ____________________________
Number of Satisfactory ____ ____________________________
Management
Number of Very Good ____ ____________________________
Number of Satisfactory ____ ____________________________
Other Areas
Number of Very Good ____ ____________________________
Number of Satisfactory ____ ____________________________
N683315-R-XXXX
Annual Surveillance:
The COR will perform an annual assessment of overall contract performance utilizing the
CPARS evaluation rating definitions (listed in enclosure (2)) and the monthly summary of ratings.
Description Surveillance Method/
Measure
Date Planned Date Completed Summary
Rating/Results
Quality of Product or
Service
Review of Monthly
Ratings.
TBD
Schedule
Ratings.
Cost Control
Ratings
Business Relations
Management
Other Areas
File details come from the government source that posted it. Updated .