N68335-25-R-0280 Amendment 01 13 Nov 2025.pdf
PDF 1 MB Posted
- Attached to
- Maintenance Laptops
- Solicitation number
- N68335-25-R-0280-U01
About this file
This is a Request for Proposal (RFP) for the United States Navy Program Office PMA 290, seeking the manufacturing of P-8 Maintenance Laptop Sets. The solicitation is a 100% small business set-aside for a five-year Indefinite Delivery/Indefinite Quantity (IDIQ) fixed-price contract. The contract requires the production and retrofitting of maintenance laptops, specifically including one first article test unit, 118 Panasonic Toughbook laptops, retrofit of 104 legacy laptop sets, and 21 new P-8 Maintenance Laptop Sets. The total quantity across five years is 100 laptop sets, with annual quantities ranging from 21 to 20 sets per year.
Key requirements include using Panasonic Toughbook laptops (Part Number FZ-40CZ-0DAM), complying with export control regulations, and providing a certified DD Form 2345. The government will award the contract to the small business offeror with the lowest price technically acceptable proposal. Proposals must be submitted electronically by 11:00 AM local time on 15 December 2025, with a 180-day proposal validity period. The solicitation emphasizes the need for detailed technical understanding of production requirements, past performance relevance, and compliance with specific manufacturing and retrofit specifications for the P-8 Maintenance Laptop Sets.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N68335-25-R-0280 Pricing Matrix.xlsx | XLSX spreadsheet | |
| N68335-25-R-0280 Amendment 02 12 Dec 2025.pdf | ||
| Section L Attachment L-1 Past Performance Questionnaire.docx | DOCX document | |
| N68335-25-R-0280 Pricing Matrix.xlsx | XLSX spreadsheet | |
| Section L Attachment L-2 Table PP-1 Past Performance Contract Data.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 11:00 AM local time 15 Dec 2025
X
A X B X C X D
EX
X
G F 53 - 61
62 - 73 X H 74 - 78 michael.t.miller7@navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
DO-C9 1 78
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N68335 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
MICHAEL T. MILLER 732.323.7661
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 3 4 - 9
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
10 - 12 13 - 15
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
17 - 18
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 19 - 24 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 25 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
26 - 51
PART II - CONTRACT CLAUSES
NAVAL AIR WARFARE CTR AIRCRAFT DIVISION
CONTRACTS ATTN: 2.5.2.4.2
B120, RM 180, HWY 547
LAKEHURST NJ 08733-5082
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
04 Sep 2025
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N6833525R0280
Section A - Solicitation/Contract Form
SOLICITATION
1. The United States Navy Program Office PMA 290, has a new requirement for the manufacturing of P-8 Maintenance Laptop Sets.
2. The Government owns the Build-to-Print Technical Drawing Package and the drawings are considered Export Controlled. All Offerors must be able to provide a certified DD Form 2345. All requesting Offerors must have a current certified DD2345 to obtain the drawings.
Drawings will be provided to your designated data custodian on your certified DD2345 via the DoD Safe website. All Offerors, other than the successful Offeror, are required to destroy all export control data, regardless of form or the media on which it may be recorded, including CDs, data stored on other computer storage devices and paper documents. Offerors shall provide proof of such destruction via signed letter on corporate letterhead to the PCO via email at Michael.T.Miller248.civ@us.navy.mil.
3. This solicitation is being solicited on a full and open competitive basis issued as a 100%
Small Businesses set aside.
4. The total ceiling amount for this contract will be established at the time of contract award.
5. The Government intends to award a single award five-year Fixed Price (FP), Indefinite Delivery, Indefinite Quantity (IDIQ) contract to the small business offeror whose proposal represents the lowest price, technically acceptable offer to the Government.
6. As stated in NAVAIR Clause BTXT.216-9506 of this contract, the contract minimum guarantees are as follows:
One (1) First Article Test Unit – Panasonic Toughbook, Part Number FZ-40CZ-0DAM.
One hundred eighteen (118) Panasonic Toughbooks, Part Number FZ-40CZ-0DAM. The
Panasonic Toughbooks shall include a Laptop (Part Number FZ-40CZ-0DAM) and Laptop Power Cord (Part Number CF-AA5713A2M).
Retrofit one hundred four (104) Legacy P-8 Maintenance Laptop Sets, Part Number 4091AS1000-1 to Part Number 4091AS1000-2 in accordance with Government Export Controlled drawings.
Twenty-one (21) P-8 Maintenance Laptop Sets, Part Number 4091AS1000-2.
7. THE CONTRACTOR SHALL NOT BEGIN WORK ON ANY CLIN OTHER THAN
CLIN 0001 (FIRST ARTICLE TEST) UNTIL THE GOVERNMENT HAS TESTED
AND APPROVED THIS FIRST ARTICLE TEST UNIT (CLN 0001).
8. The guaranteed minimum will be satisfied with the award of the first delivery order, which will be awarded with the basic contract.
9. The Offeror shall include the price of shipping in each unit price proposed.
10. The maximum quantity detailed on the individual Contract Line Item Numbers (CLINs) in Section B do not represent an absolute quantity and dollar value of each CLIN. These values are listed as a result of system constraints. The offeror who receives the award will have their range pricing input into the CLINs. The minimum and maximum quantities can be found in NAVAIR Clause BTXT.216-9506 “Minimum and Maximum Quantities” in Section B.
11. The maximum quantities identified for each CLIN represent the Government's best estimate of the maximum quantities of anticipated order(s) during that specified ordering period. The CLIN quantities maximums do not impose absolute quantity limits for each ordering period.
The maximum quantities for each items of support equipment are not defined on an annual ordering period basis, but rather are defined by the sum of the quantities across all five annual ordering periods.
11. Year One (1) is from the date of contract award through 365 days after contract award.
Year Two (2) is from 366 days after contract award through 731 days after contract award. Year Three (3) is from 732 days after contract award through 1,097 days after contract award.
Year Four (4) is from 1,098 days after contract award through 1,463 days after contract award.
Year Five (5) is from 1,464 days after contract award through 1,829 days after contract award.
12. The Point of Contact for this solicitation is Michael Miller, 240-587-1407, Michael.T.Miller248.civ@us.navy.mil
13. Proposal shall be valid for 180 days from the date specified in Block 9.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each FAT: Maintenance Laptop Set
FFP
First Article Test: The Contractor shall provide First Article Review of the 4091AS1000-2 to the Government. The Contractor shall ship the First Article Test Unit to Lakehurst, NJ for inspection and approval. Once the inspection and approval is within compliance per Drawing Number 4091AS1000-2 and in concurrence with Lakehurst engineering approval, the Contractor can then fulfill the execution of the contract.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PSC CD: 7E20
NET AMT
0002 118 Each Panasonic Toughbook
FFP
Panasonic Laptop Part Number FZ-40CZ-0DAM, and Laptop Power Cord Part Number CF-AA5713A2M. The Panasonic Toughbook comes with the Power Cord as a one unit. 104 each of these Panasonic Laptops shall be inserted in its designated case location identified in SOW paragraph 3.1.1 only. The contractor shall deliver the remaining 22 each Standalone Panasonic Laptops to Lakehurst, NJ.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0003 104 Each Retrofit Legacy P-8 Maintenance Laptops
FFP
IAW SOW 3.1.2 Retrofit Legacy P-8 Maintenance Laptop Sets, Part Number 4091AS1000-1 to Part Number 4091AS1000-2 in accordance with Government (Export Controlled) drawings.
Contractor shall populate the newly installed foam with the GFE components, originally received with the legacy P-8 Maintenance Laptop Sets, in their designated locations. Populate 104 each Laptop foam slot with Panasonic Part Number FZ-40CZ-0DAM, and Laptop Power Cord Part Number CF-AA5713A2M from CLIN 0002. Remove old ID Plates and Usage Placards and replace with new ID Plates and Usage Placards IAW 4091AS1000-2. The vendor will buy the FZ- 40 laptops from Panasonic. Lakehurst is not sending any laptops to the vendor.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0011 21 Each P-8 Maintenance Laptop Sets 4091AS1000-2
FFP
Year One: Part Number 4091AS1000-2
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
UNIT UNIT PRICE MAX AMOUNT
0012 20 Each P-8 Maintenance Laptop Sets 4091AS1000-2
FFP
Year Two: Part Number 4091AS1000-2
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
UNIT UNIT PRICE MAX AMOUNT
0013 20 Each P-8 Maintenance Laptop Sets 4091AS1000-2
FFP
Year Three: Part Number 4091AS1000-2
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
UNIT UNIT PRICE MAX AMOUNT
0014 20 Each P-8 Maintenance Laptop Sets 4091AS1000-2
FFP
Year Four: Part Number 4091AS1000-2
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
UNIT UNIT PRICE MAX AMOUNT
0015 20 Each P-8 Maintenance Laptop Sets 4091AS1000-2
FFP
Year Five: Part Number 4091AS1000-2
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
CLAUSES INCORPORATED BY FULL TEXT
BTXT.216-9506 MINIMUM AND MAXIMUM QUANTITIES (NAVAIR)(MAR 1999)
As referred to in paragraph (b) of FAR 52.216-22 " Indefinite Quantity" of this contract, the contract minimum quantity is:
Nomenclature Part Number Quantity
First Article Test:
Panasonic Toughbook
FZ-40CZ-0DAM 1
Panasonic Toughbook FZ-40CZ-0DAM 118
Retrofit Legacy P-8 Laptop Sets 4091AS1000-1 to 4091AS1000-2 104
P-8 Maintenance Laptop Sets 4091AS1000-2 21 the maximum quantity is:
Nomenclature Part Number Quantity
First Article Test:
Panasonic Toughbook
FZ-40CZ-0DAM 1
Panasonic Toughbook FZ-40CZ-0DAM 118
Retrofit Legacy P-8 Laptop Sets 4091AS1000-1 to 4091AS1000-2 104
P-8 Maintenance Laptop Sets 4091AS1000-2 100
Section C - Descriptions and Specifications
STATEMENT OF WORK
Statement of Work: P-8 Maintenance Laptop Set
1.0 SCOPE
This Statement of Work (SOW) addresses the requirements and tasks associated with the production and delivery of Peculiar Support Equipment (PSE) end item for the P-8A Poseidon Program for the United States Navy (USN), Royal Australian Air Force (RAAF) and Foreign Military Sales (FMS) customers to include Germany, United Kingdom (UK), New Zealand (NZ), Norway, South Korea (SK), Canada and any potential future FMS customers.
This will be a 5 Year IDIQ Contract.
The PSE end item is used to support hardware/software maintenance to meet the P-8 Aircraft Maintenance Manuals (AMM), A1-P8AAA-AMM at both the Organizational Level, Intermediate Level and Depot Level of maintenance.
2.0 APPLICABLE DOCUMENTS
a) 4091AS1000-2 – Maintenance Laptop Set Drawing Package – Drawings are Export Controlled
3.0 REQUIREMENTS
3.1 General
The contractor shall provide materials and services as required to manufacture, assemble, and deliver the support equipment listed below:
Maintenance Laptop Sets (complete), Part Number 4091AS1000-2
Contractor shall use Panasonic Toughbook Laptop part number FZ-40CZ-0DAM, and laptop power cord part number CF-AA5713A2M.
The contractor shall procure subcomponent INMARSAT Maintenance Cable, p/n GSE809-8090201572-STE-1, CAGE CODE 81205, through Boeing’s Spares Procurement email address (sparessolicitations@boeing.com) to request a quote and procure this part.
CLIN 0001: The Contractor shall provide First Article Review of the 4091AS1000-2 to the Government. The Contractor shall ship the First Article Test Unit to Lakehurst, NJ for inspection and approval. Once the inspection and approval is within compliance per Drawing Number 4091AS1000-2 and in concurrence with Lakehurst engineering approval, the Contractor can then fulfill the execution of the contract.
3.1.1 (CLIN 0002)
One hundred-eighteen (118) Panasonic Toughbook Laptop (Part Number FZ-40CZ-0DAM), and Laptop Power Cord (Part Number CF-AA5713A2M) in support of USN, RAAF and all P-8 FMS Countries. The Panasonic Toughbook Laptop comes with the Power Cord as one (1) unit. One hundred-four (104) each of these Panasonic Toughbook Laptops shall be inserted in its designated case location identified in SOW paragraph 3.1.2 only. The contractor shall deliver the remaining fourteen (14) each Standalone Panasonic Laptops to Lakehurst, NJ.
3.1.2 (CLIN 0003)
The contractor shall retrofit a quantity of one hundred-four (104) each legacy P-8 Maintenance Laptop Sets, Part Number 4091AS1000-1. The legacy P-8 Maintenance Laptop Sets will be provided as Government Furnished Equipment (GFE), however the GFE will not include the original CF-31 laptop. The contractor shall remove the bottom foam from its case and replace with new foam fitting IAW Drawing Number 4091AS1000-2. Contractor shall populate the newly installed foam with the GFE components, originally received with the legacy P-8
Maintenance Laptop Sets, in their designated locations. Populate 104 each Laptop foam slot with Panasonic Part Number FZ-40CZ-0DAM, and Laptop Power Cord Part Number CF-AA5713A2M from CLIN 0002. Remove old ID Plates and Usage Placards and replace with new ID Plates and Usage Placards IAW 4091AS1000-2. The vendor will buy the FZ-40 laptops from Panasonic. Lakehurst is not sending any laptops to the vendor.
3.1.3 (CLIN 0011 - 0015)
The contractor shall manufacture and deliver IAW Drawing Number 4091AS1000-2 in support of USN, RAAF and all P-8 FMS Countries
3.2 Quality Assurance
The Contractor shall have in place a production quality assurance (QA) system approved with ISO 9001:2015 or better. This QA system shall be able to ensure that manufactured configuration items are built to print, functional, and reliably made IAW controlling technical drawings, specifications and standards. Each item manufactured as part of this ID/IQ contract shall have passed final inspection at NAWCAD Lakehurst prior to DD-250.
3.3 Government Inspection and Acceptance
NAWCAD Lakehurst DoDAAC N68335 shall oversee Inspection & Acceptance at destination.
52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)
(a) The Contractor shall test one (1) unit(s) of Lot/Item CLIN 0001 as specified in this contract. At least thirty (30) calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
(b) The Contractor shall submit the first article test report within sixty (60) calendar days from the date of this contract to TBD marked "FIRST ARTICLE TEST REPORT: Contract No. TBD , Lot/ Item No. ".
Within thirty (30) calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.
(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.
CTXT.211-9510 CONTRACTOR EMPLOYEES (NAVAIR) (MAY 2011)
(a) In all situations where contractor personnel status is not obvious, all contractor personnel are required to identify themselves to avoid creating an impression to the public, agency officials, or Congress that such contractor personnel are Government officials. This can occur during meeting attendance, through written (letter or email) correspondence or verbal discussions (in person or telephonic), when making presentations, or in other situations where their contractor status is not obvious to third parties. This list is not exhaustive. Therefore, the contractor employee(s) shall:
(1) Not by word or deed give the impression or appearance of being a Government employee;
(2) Wear appropriate badges visible above the waist that identify them as contractor employees when in Government spaces, at a Government-sponsored event, or an event outside normal work spaces in support of the contract/order;
(3) Clearly identify themselves as contractor employees in telephone conversations and in all formal and informal written and electronic correspondence. Identification shall include the name of the company for whom they work;
(4) Identify themselves by name, their company name, if they are a subcontractor the name of the prime contractor their company is supporting, as well as the Government office they are supporting when participating in meetings, conferences, and other interactions in which all parties are not in daily contact with the individual contractor employee; and
(5) Be able to provide, when asked, the full number of the contract/order under which they are performing, and the name of the Contracting Officer’s Representative.
(b) If wearing a badge is a risk to safety and/or security, then an alternative means of identification maybe utilized if endorsed by the Contracting Officer’s Representative and approved by the Contracting Officer.
(c) The Contracting Officer will make final determination of compliance with regulations with regard to proper identification of contractor employees.
Section D - Packaging and Marking
PACKAGING AND MARKINGS
Packaging and Preservation
Packaging
The contractor shall preserve and pack materiel in accordance with ASTM D3951-18 (excluding paragraphs 4.2-4.3) and require same by vendors and subcontractors (for materiel being shipped to the government).
The use of loose fill materials, asbestos, excelsior, newspaper and shredded paper (all types) are prohibited. In addition, all Wood Packaging Materials (WPM) shall be heat treated or chemically treated in accordance with the requirements of the International Standards for Phytosanitary Measures (ISPM) 15:2009, "Regulation of Wood Packaging Material in International Trade."
Marking Marking shall be in accordance with MIL-STD-129R.
Additionally, special marking labels (fragile, delicate, etc.) shall be applied to all unit, intermediate and shipping containers as an integral part of the total pack. The contractor shall select the appropriate special marking label (s) as additional means to protect the items during packaging, handling, storage, transit and removal from the pack.
Transportation Transportability issues shall be identified and addressed to ensure all shipments can be transported with unrestricted movement via over-the-road transport. Transportability problem items shall be identified in accordance with MIL-STD-1366E criteria. Requirements for shipment of DOD materiel shall meet, as a minimum, the requirements of the following rules and regulations, as applicable to the mode of transportation in the Defense Transportation Regulation, DTR DOD 4500.9-R, Part II, Uniform Freight Classification Rules, National Motor Freight Classification Rules, and American Trucker’s Association Rules Packaging and preservation for shipping shall be in accordance with best commercial practices for long term preservation. Shipments shall be packaged and transported (FOB Destination for Domestic units; FOB Origin for FMS units) via safe, secure, reliable, and traceable means of transportation and provide protection from normal climatic/weather conditions and incidental mishandling during shipping to prevent any damage or loss during shipment.
Identification Plate and Markings Each unit shall be marked in accordance with the manufacturing drawings.
UID Location and Marking The locations and marking methods selected should bear no impact on the performance of the part and minimal configuration change(s) to the part. The UID (including 2D Matrix) should be incorporated onto the data plate in accordance with Drawing 3909AS9999 Rev C (Identification Plate/UID Markings). If the 2D matrix can't be incorporated onto the data plate, a 2D matrix sticker can be applied onto the main data plate provided it can be done without covering any critical data. When the 2D Data Matrix is placed directly onto the data plate, the Part Number, Serial Number and CAGE human readable characters are not required. If the above cannot be accomplished, a separate data plate can be attached which contains the 2D Matrix plus the human readable characters for the Part Number, Serial Number and CAGE. This added data plate should be attached in close proximity to the main data plate.
Permanency and Legibility The UID marking and identification plates, tags, or labels when used on equipment, parts, assemblies, subassemblies, units, sets, or groups shall be permanent during the normal life expectancy of the item and be capable of withstanding the environmental test and cleaning procedures specified for the item. Legibility shall be as required for ready readability as per
MILSTD-130N.
UID Registration The prime Contractor has the responsibility to furnish Item Unique Identification (IUID) data to the IUID registry. Data submission of IUID data and acquisition cost should be via Wide Area Work Flow (WAWF), IUID XML file, IUID flat file or web entry. Additional information regarding data submission as well as the actual marking can be found at http://www.acq.osd.mil/dpap/pdi/uid/index.html
Records The Contractor shall maintain an accurate, current list of UIDs for all manufactured items on this contract and supply to the Government upon request. The list shall include P/N, Serial #, CAGE, UID Location, Construct used, how it was marked, and the registration method used.
DTXT.204-9501 NATIONAL STOCK NUMBERS (NAVAIR) (MAR 2007)
(a) This clause applies to supplies that are stock numbered under Federal Catalog System procedures.
(b) Unless otherwise authorized by the Contracting Officer, in writing, the Contractor shall not deliver any supplies until the supplies have been marked with a National Stock Number. All available National Stock Numbers will be furnished by the Government. If National Stock Numbers are not furnished by the Government in time to meet the delivery schedule for the supplies, the Contractor may present the supplies that are scheduled for delivery to the Contracting Officer for acceptance. The Contracting Officer may accept such supplies without National Stock Numbers and the Government will pay the Contractor, provided that title to the supplies is vested in the Government.
(c) The term "Federal Stock Number" (FSN), which may be referred to in the specifications of this contract or elsewhere in this contract, shall mean "National Stock Number" (NSN), and the term "Federal Item Identification Number", wherever it appears, shall mean "National Item Identification Number".
(As used in the foregoing clause, the term "Contracting Officer" shall mean the "Administrative Contracting Officer" (ACO) with respect to provisioned items and other supplies ordered by the ACO.)
DTXT.247-9508 PROHIBITION AND LIMITATIONS FOR PACKAGING MATERIALS
(NAVAIR) (AUG 2019)
The use of loose fill materials, asbestos, excelsior, newspaper and shredded paper (all types) are prohibited. In addition, all Wood Packaging Materials (WPM) shall be heat treated or chemically treated in accordance with the requirements of the International Standards for Phytosanitary Measures (ISPM) 15:2009, "Regulation of Wood Packaging Material in International Trade."
DTXT.247-9510 PRESERVATION, PACKAGING, PACKING AND MARKING FOR FOREIGN
MILITARY SALES (FMS) REQUIREMENTS (NAVAIR) (OCT 2005)
(a) Unless specified elsewhere in the contract, packing and packaging shall comply with MIL-STD-129. Packing and packaging materials shall provide protection from abuse during handling and from environmental, magnetic, and electrical damage during handling and subsequent future storage, possibly under less than desirable conditions.
(b) Marking: All unit and exterior containers/packs shall as a minimum be marked as follows:
(1) FMS Case Number.
(2) Part Number (with CAGE Code).
(3) For - the organization/address the material is shipped to.
(4) The applicable MILSTRIP number (identified separately for each line item of the contract/delivery order)
(5) Project Code number.
(6) Project Directive Line Item (PDLI) Number.
(7) Requisition Serial Number (RSN).
(8) Quantity.
(9) From - the contractor’s address shipped from.
(10) Ship to - the shipping address provided in the contract.
(11) Transportation Priority
(12) Required Delivery Date
(c) The contractor shall affix labels to the outside of each external pack warning all handlers that fragile, delicate, etc., equipment is contained within and to warn against particular improper handling and storage procedures/conditions as may be applicable to the item(s) ordered.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0011 Destination Government Destination Government 0012 Destination Government Destination Government 0013 Destination Government Destination Government 0014 Destination Government Destination Government 0015 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-2 Inspection Of Supplies--Fixed Price AUG 1996 52.246-16 Responsibility For Supplies APR 1984
ETXT.246-9512 INSPECTION AND ACCEPTANCE (NAVAIR)(OCT 2005)
(a) Inspection and acceptance of the supplies or services to be furnished hereunder shall be performed by N68335.
(b) Acceptance of all Contract Line Items/Sub Line Items (CLINs/SLINs) shall be made by signature of the accepting authority on a DD 250 submitted through the WAWF system. Acceptance will only occur when the accepting authority is sure that inspections performed demonstrate compliance with contract requirements.
Section F - Deliveries or Performance
ADDITIONAL INFORMATION
ADC = After Date of Contract ANP = After Notice to Proceed
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 6 mths. ADC 1 NAVAL AIR WARFARE CENTER AD
(LKE)
LUIS SALINAS
HWY 547, BUILDING 562
LAKEHURST NJ 08733
732-323-1245
N68335
0002 6 mths. ANP 118 (SAME AS PREVIOUS LOCATION)
0003 6 mths. ANP 104 (SAME AS PREVIOUS LOCATION)
0011 6 mths. ANP 21 (SAME AS PREVIOUS LOCATION)
0012 6 mths. ANP 20 (SAME AS PREVIOUS LOCATION)
0013 6 mths. ANP 20 (SAME AS PREVIOUS LOCATION)
0014 6 mths. ANP 20 (SAME AS PREVIOUS LOCATION)
0015 6 mths. ANP 20 (SAME AS PREVIOUS LOCATION)
52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.247-34 F.O.B. Destination JAN 1991
FTXT.211-9507 PERIOD OF PERFORMANCE (NAVAIR) (MAR 1999)
(a) The contract shall commence on effective date issued in Block 5 on page one and shall continue for a period of five years. However, the period of performance may be extended in accordance with the option provisions contained herein.
(b) If FAR Clause 52.216-18, “Ordering”, is incorporated into this contract, then the period in which the Government can issue orders under the contract will be extended at the exercise of an option, and extended to the end of that option period.
Section G - Contract Administration Data
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
COMBO
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC To be updated at time of contract award.
Issue By DoDAAC N68335
Admin DoDAAC** To be updated at time of contract award.
Inspect By DoDAAC N68335
Ship To Code N68335
Ship From Code To be updated at time of contract award.
Mark For Code ____
Service Approver (DoDAAC) ____
Service Acceptor (DoDAAC) ____
Accept at Other DoDAAC ____
LPO DoDAAC ____
DCAA Auditor DoDAAC ____
Other DoDAAC(s) ____
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”)
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
_______TO BE PROVIDED UPON CONTRACT AWARD ________________________________________
(Contracting Officer: Insert applicable information or “Not applicable.”)
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
GTXT.232-0001 PAYMENT INSTRUCTIONS (NAVAIR) (MAY 2023)
For Government Use Only
Contract/Order Payment Clause
Type of Payment Request
Su pp ly
Se rv ic e
C on st ru ct io n
Payment Office Allocation Method
52.212-4 (Alt I), Cost Voucher X X N/A Line item specific proration.
Contract Terms and If there is more than one ACRN Conditions— within a deliverable contract line Commercial Products item, the funds will be allocated in and Commercial the same proportion as the Services; amount of funding currently 52.216-7, Allowable unliquidated for each ACRN on Cost and Payment; the line item billed.
52.232-7, Payments
Under Time-and- Materials and Labor- Hour Contracts
52.232-1, Payments, Navy X X N/A Line item specific by fiscal year.
252.217-7007, Shipbuilding If there is more than one ACRN Payments Invoice (Fixed within a deliverable line or (vessel repair and alterations) Price) deliverable subline item, the funds will be allocated using the oldest funds first. In the event of a deliverable line or deliverable subline item with two or more ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.
52.232-1, Payments; Invoice X X N/A Line item specific proration.
52.232-2, Payments If there is more than one ACRN Under Fixed-Price within a deliverable line item or Research and deliverable subline item, the Development funds will be allocated in the Contracts; same proportion as the amount 52.232-3, Payments of funding currently unliquidated Under Personal for each ACRN on the deliverable Services Contracts; line or deliverable subline item for 52.232-4, Payments which payment is requested.
Under Transportation Contracts and Transportation-Related Services Contracts; and 52.232-6, Payments Under Communication Service Contracts With Common Carriers st ru ct
52.232-5, Payments Under Fixed-Price Construction Contracts
Construction Payment Invoice
N/A N/A X Line item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds first. In the event of a deliverable line or deliverable subline item with two or more ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.
52.232-16, Progress Progress X X N/A Contract-wide proration.
Payments Payment* Funds shall be allocated in the (excluding contracts same proportion as the amount with multiple lot of funding currently unliquidated progress payments) for each ACRN. Progress payments are considered contract level financing, and the “contract price” shall reflect the fixed-price portion of the contract per FAR 32.501-3.
52.232-16, Progress Payments;
252.232-7018, Progress Payments— Multiple Lots
Progress Payment*
X X N/A Lot-wide proration (applies to lots specifically identified in the contract).
If there is more than one ACRN within a lot, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN on the lot for which payment is requested.
See PGI 204.7108 paragraph (c) for multiple lot CLIN structure.
st ru ct
52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial Services;
52.232-30, Installment Payments for Commercial Products and Commercial Services
Commercial Product and Commercial Service Financing*
X X N/A Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2).
52.232-32, Performance-Based Payments
Performance- Based Payments*
X X N/A Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.1007(b)(2).
252.232-7002, Progress Payments for Foreign Military Sales Acquisitions
Progress Payment*
X X N/A Allocate costs among line items and countries in a manner acceptable to the administrative contracting officer.
*Liquidation of Financing Payments. Liquidation will be applied by the payment office against those ACRNs which are identified by the payment instructions for the delivery payment and in keeping with the liquidation provision of the applicable contract financing clause (i.e., progress payment, performance-based payment, or commercial product and commercial service financing).
GTXT.242-9511 CONTRACT ADMINISTRATION DATA (NAVAIR)(NOV 2017)
(a) Contract Administration Office.
(1) Contract administration functions (see FAR 42.302(a) and DFARS 242.302(a)) are assigned to: See the ADMINISTERED BY Block on the face page of the contract, modification, or order.
(b) Special Instructions (see FAR 42.202(b) and (c)):
(1) The following contract administration functions are retained (see FAR 42.302(a) and DFARS 242.302(a)):
Functions Retained Retained for Performance By:
Not applicable
(2) The following additional contract administration functions are assigned (see FAR 42.302(b)):
Additional Functions Retained for Performance By:
Inspection of Supplies N68335
(c) Inquiries regarding payment should be referred to: MyInvoice through the Wide Area Workflow eBusiness Suite: https://wawf.eb.mil.
Section H - Special Contract Requirements
HTXT.216-9512 PAPERLESS CONTRACTING (NAVAIR)(JUN 2009)
(a) Orders and requests for proposals are hereby authorized to be issued by facsimile or by electronic commerce (including e-mail and paperless methods of delivery). Nothing in this contract should be read to prohibit these types of orders. In the event of a conflict with any other provision of this contract, this clause shall govern.
(b) To the extent the terms "written", "mailed", or "physically delivered" appear in other provisions of this contract, these terms are hereby defined to explicitly include electronic commerce, email, or paperless delivery methods.
Section I - Contract Clauses
52.202-1 Definitions JUN 2020 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government JUN 2020 52.203-7 Anti-Kickback Procedures JUN 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-11 Certification and Disclosure Regarding Payments to Influence
Certain Federal Transactions
SEP 2024
52.203-12 Limitation On Payments To Influence Certain Federal Transactions
JUN 2020
52.203-13 Contractor Code of Business Ethics and Conduct NOV 2021 52.203-14 Display of Hotline Poster(s) NOV 2021 52.203-17 Contractor Employee Whistleblower Rights NOV 2023 52.204-2 Security Requirements MAR 2021 52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
JUN 2020
52.204-13 System for Award Management Maintenance OCT 2018 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-21 Basic Safeguarding of Covered Contractor Information Systems
NOV 2021
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
NOV 2021
52.204-27 Prohibition on a ByteDance Covered Application JUN 2023 52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for Debarment
NOV 2021
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters
OCT 2018
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.215-2 Audit and Records--Negotiation JUN 2020 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data AUG 2011 52.215-12 Subcontractor Certified Cost or Pricing Data JUN 2020 52.215-13 Subcontractor Certified Cost or Pricing Data--Modifications JUN 2020 52.215-14 Integrity of Unit Prices NOV 2021 52.215-15 Pension Adjustments and Asset Reversions OCT 2010 52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits
(PRB) Other than Pensions
JUL 2005
52.215-19 Notification of Ownership Changes OCT 1997 52.215-23 Limitations on Pass-Through Charges JUN 2020 52.219-8 Utilization of Small Business Concerns FEB 2024 52.219-9 Small Business Subcontracting Plan JAN 2025 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards - Overtime
Compensation
MAY 2018
52.222-35 Equal Opportunity for Veterans JUN 2020 52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020 52.222-37 Employment Reports on Veterans JUN 2020 52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DEC 2010
52.222-50 Combating Trafficking in Persons NOV 2021 52.222-54 Employment Eligibility Verification MAY 2022 52.223-3 Hazardous Material Identification And Material Safety Data FEB 2021 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2024 52.225-13 Restrictions on Certain Foreign Purchases FEB 2021 52.227-1 Authorization and Consent JUN 2020 52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement
JUN 2020
52.229-3 Federal, State And Local Taxes FEB 2013 52.229-4 Federal, State, And Local Taxes (State and Local
Adjustments)
FEB 2013
52.230-2 Cost Accounting Standards JUN 2020 52.230-6 Administration of Cost Accounting Standards JUN 2010 52.232-1 Payments APR 1984 52.232-8 Discounts For Prompt Payment FEB 2002 52.232-11 Extras APR 1984 52.232-17 Interest MAY 2014 52.232-25 Prompt Payment JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
OCT 2018
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
MAR 2023
52.232-40 Providing Accelerated Payments to Small Business Subcontractors
MAR 2023
52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.240-1 Prohibition on Unmanned Aircraft Systems Manufactured or
Assembled by American Security Drone Act--Covered Foreign Entities
NOV 2024
52.240-1 Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act--Covered Foreign Entities
NOV 2024
52.242-13 Bankruptcy JUL 1995 52.243-1 Changes--Fixed Price AUG 1987 52.244-2 Subcontracts JUN 2020 52.244-5 Competition In Subcontracting AUG 2024 52.244-6 Subcontracts for Commercial Products and Commercial
Services
FEB 2024
52.245-1 Government Property SEP 2021 52.245-9 Use And Charges APR 2012 52.249-2 Termination For Convenience Of The Government (Fixed-
Price)
APR 2012
52.249-8 Default (Fixed-Price Supply & Service) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies
JAN 2023
252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.204-7000 Disclosure Of Information OCT 2016 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
MAY 2024
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
JAN 2023
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
JAN 2023
252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements NOV 2023 252.204-7020 NIST SP 800-171 DoD Assessment Requirements NOV 2023 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of Terrorism
MAY 2019
252.209-7009 Organizational Conflict of Interest--Major Defense Acquisition Program
MAY 2019
252.219-7003 Alt II Small Business Subcontracting Plan (DoD Contracts)(DEC 2019) Alternate II
DEC 2019
252.225-7001 Buy American and Balance of Payments Program FEB 2024 252.225-7007 Prohibition on Acquisition of Certain Items from Communist
Chinese Military Companies
DEC 2018
252.225-7012 Preference For Certain Domestic Commodities APR 2022 252.225-7013 Duty-Free Entry--Basic NOV 2023 252.225-7028 Exclusionary Policies And Practices Of Foreign Government APR 2003 252.225-7048 Export-Controlled Items JUN 2013 252.226-7001 Utilization of Indian Organizations, Indian-Owned Economic
Enterprises, and Native Hawaiian Small Business Concerns
JAN 2023
252.227-7013…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .