4.02a J-1 Price Breakdown.xlsx
XLSX spreadsheet 29 KB Posted
- Attached to
- Ship Repair
- Solicitation number
- N6817127QN013
About this file
This is a price breakdown spreadsheet for a ship repair solicitation (N6817127QN013) issued by the Department of the Navy Naval Supply Systems Command for work to be performed in Malaga, Spain on a U.S. Navy ship. The spreadsheet appears to be a pricing template designated as "4.02a J-1 Price Breakdown," which typically serves as the format for contractors to submit detailed cost proposals in response to the solicitation. The file functions as a structured tool for bidders to itemize labor, materials, overhead, profit, and other cost elements associated with the ship repair work, ensuring consistent and comparable proposal submissions across all responding contractors. Without access to the specific cell contents and line items within the spreadsheet, the precise scope of repair services, labor rates, material costs, or other detailed pricing components cannot be determined from the filename alone. Contractors responding to this solicitation would be required to complete this price breakdown template according to the instructions provided in the full RFP to ensure their proposals meet the government's evaluation criteria.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J-1 PRICE BREAKDOWN
| N6817127QN013 - USS LEWIS B. PULLER Voyage Repair (VR), MALAGA, SPAIN | ||||||||||||
| Work Item # | Title | Labor Hours | Labor Rate | Direct Labor Total Price | CFM/Equipment & Material Total Price | Travel | Other Direct Costs | Sub Contractor Direct Man Hours | Sub Contractor Labor Rate | Sub Contractor Direct Labor Total Price | SUB Contractor Equipment & Material Total Price | WORK ITEM TOTAL |
| 516-10-001 | Twenty-Foot Equivalent Reefer Unit (TEU) Install; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 516-10-002 | Walk-In Reefer Door Replacement; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 631-13-001 | Aircraft Electrical Service Station (AESS) Replacement; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 651-11-001 | Dishwasher Replacement; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 671-00-001 | Safes, Remove and Replace; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 991-12-001 | Scaffolding for Ship's Force Use; provide | $ - 0 | $ - 0 | $ - 0 | ||||||||
| CLIN 0001 – Voyage Repair Category A Work Items | $ - 0 |
| Indirect Rates |
| General & Administrative (G&A) |
| Overhead |
| Profit |
| 1. Only insert information in the highlighted cells: blue for prime, yellow for subcontractor |
| 2. For AGR rates, provide proposed labor rate for LABOR HOURS requirement and proposed burdened percentage for SUBCONTRACTOR / MATERIAL requirement. |
| 3. Provide indirect rates. Rates are for information purposes only and will not be evaluated separately from Total Evaluated Price. |
| 4. WORK ITEM TOTAL COLUMNS ARE FORMULAS. DO NOT ENTER INFORMATION OR ALTER THIS FORMULA. |
| 5. Proposal Total Price, gray shaded at bottom of sheet, is also a FORMULA - DO NOT ENTER INFORMATION or ALTER THIS FORMULA. |
| 6. ODC-Defined as anything not directly attributable to a final cost or production objective (i.e., labor, subcontracts, and/or material). Examples include rental charges, special tooling, testing equipment, etc. |
| 7. Travel costs should sum to total provided in 'TRAVEL EXPENSE BREAKDOWN' tab. |
J-1 TRAVEL EXPENSES BREAKDOWN
J-1 Travel Expenses Breakdown Prices in USD
| DESCRIPTION | NO. OF PERSONNEL | NO. OF DAYS | TRAVEL HRS | HOURLY RATE | TOTAL TRAVEL LABOR PRICE |
| TRAVEL EXPENSES | $ - 0 | $ - 0 |
| AIRFARE | LODGING | MEALS and INCIDENTALS | RENTAL CAR / TRANSPORTATION | TOTAL PER DIEM PRICE |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
TOTAL TRAVEL PRICE $ - 0
File details come from the government source that posted it. Updated .