J-1 Price USS PULLER.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
U.S. NAVY VESSEL - CASREPS - AC AND REEFER PLANT REPAIR
Solicitation number
N6817127QN009
Issued by

About this file

This is a J-1 Price Breakdown template for a U.S. Navy vessel repair contract (Solicitation N6817127QN009) covering AC and reefer plant repairs for the USS Lewis B. Puller across three CASREPs (2026030, 2026031, and 2025058). The template is designed to capture pricing for Work Item 0532 under CLIN 0001 (Voyage Repair Category A Work Items), with all pricing currently showing zero values as this is an unfilled template.

The pricing template requires contractors to input labor hours, labor rates, direct labor costs, equipment and material costs, travel expenses, other direct costs (ODCs), and subcontractor information in designated cells (blue for prime contractor, yellow for subcontractor). Contractors must provide proposed labor rates for labor hour requirements and burdened percentages for subcontractor/material requirements, along with indirect rates for General & Administrative (G&A), overhead, and profit. The template includes a separate Travel Expenses Breakdown tab for itemizing per diem costs including airfare, lodging, meals and incidentals, and rental car/transportation for personnel. All work item totals and the proposal total price are formula-driven and cannot be altered. ODCs are defined as costs not directly attributable to labor, subcontracts, or material, such as rental charges, special tooling, and testing equipment.

View the file

Other files

File Type Posted
SF 30 AMENDMENT CANCELLATION RFQ.pdf PDF
RFQ N6817127QN009.pdf PDF
J-2 Work Specification Package.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J-1 PRICE BREAKDOWN

N6817127QN009 - USS LEWIS B. PULLER - CASREPS 2026030, 2026031, and 2025058 AC AND REEFER PLANT REPAIR
Work Item #TitleLabor HoursLabor RateDirect Labor Total PriceCFM/Equipment & Material Total PriceTravelOther Direct CostsSub Contractor Direct Man HoursSub Contractor Labor RateSub Contractor Direct Labor Total PriceSUB Contractor Equipment & Material Total PriceWORK ITEM TOTAL
0532ESB AC AND REEFER PLANT REPAIRS$ - 0$ - 0$ - 0
CLIN 0001 – Voyage Repair Category A Work Items$ - 0
Indirect Rates
General & Administrative (G&A)
Overhead
Profit
1. Only insert information in the highlighted cells: blue for prime, yellow for subcontractor
2. For AGR rates, provide proposed labor rate for LABOR HOURS requirement and proposed burdened percentage for SUBCONTRACTOR / MATERIAL requirement.
3. Provide indirect rates. Rates are for information purposes only and will not be evaluated separately from Total Evaluated Price.
4. WORK ITEM TOTAL COLUMNS ARE FORMULAS. DO NOT ENTER INFORMATION OR ALTER THIS FORMULA.
5. Proposal Total Price, gray shaded at bottom of sheet, is also a FORMULA - DO NOT ENTER INFORMATION or ALTER THIS FORMULA.
6. ODC-Defined as anything not directly attributable to a final cost or production objective (i.e., labor, subcontracts, and/or material). Examples include rental charges, special tooling, testing equipment, etc.
7. Travel costs should sum to total provided in 'TRAVEL EXPENSE BREAKDOWN' tab.

&"Aptos"&14&K000000 CUI&1#_x000D_

_x000D_&1#&"Aptos"&14&K000000 CUI

J-1 TRAVEL EXPENSES BREAKDOWN

J-1 Travel Expenses Breakdown Prices in USD

DESCRIPTIONNO. OF PERSONNELNO. OF DAYSTRAVEL HRSHOURLY RATETOTAL TRAVEL LABOR PRICE
TRAVEL EXPENSES$ - 0$ - 0
AIRFARELODGINGMEALS and INCIDENTALSRENTAL CAR / TRANSPORTATIONTOTAL PER DIEM PRICE
$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL TRAVEL PRICE $ - 0

&"Aptos"&14&K000000 CUI&1#_x000D_

_x000D_&1#&"Aptos"&14&K000000 CUI

File details come from the government source that posted it. Updated .