AMD_0008.docx
DOCX document 53 KB Posted
- Attached to
- dry-docking and overhaul of a USNS Ship
- Solicitation number
- N6817118131C1
About this file
AMD_0008.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0007.pdf | ||
| Amendment_0006.docx | DOCX document | |
| Amend_0005.pdf | ||
| Amend_0004.pdf | ||
| Amend_0003.docx | DOCX document | |
| Amendment_0002.pdf | ||
| 402_A__EPF_Annual_Antenna_preservation_SOW_rev_2.doc | DOC document | |
| N6817118R0008_AMEND_0001.docx | DOCX document | |
| 0401_A_SPERRY_IBS_ANNUAL_PM_-_REV_B.DOC | DOC document | |
| 0704_A_TSCIF_ELECTRICAL_UPGRADE.DOCX | DOCX document | |
| N6817118131C1_Pre-sol_Notice.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6817118R0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The following have been modified:
GENERAL INFORMATION
This acquisition is for the dry-docking and overhaul of the USNS SHIP (EPF-X). All repair work is to be accomplished at the successful contractor’s facility. In order to support the current U.S. Navy mission under this solicitation, the place of performance shall be located in the Mediterranean west of 20 degrees east longitude, including the Adriatic Sea and locations outside the Mediterranean (Cadiz, Portugal, Northern Spain). The prospective contractor must also be located in a country that mantains an International Agreement that addresses primary jurisdiction procedures for US Military personnel.
PRICING
Prices shall be submitted in the format specified in Section B “Supplies/Services and Price” of this solicitation. Prices must be stated in euros.
A) WORK ITEMS CATEGORIES
The work items are grouped into three distinct categories: Category A, B and Not Separately Priced (NSP).
Category A includes definitized work items for which a firm fixed price has been established and will be executed during the period of performance and included in the base contract.
Category B includes definitized, “optional” work items earmarked for potential additional repairs, labor, materials or services, whereby a unitized price or total price has been established and may be invoked during the period of performance. They are identified under “Optional CLIN/SubCLIN” and can be invoked exercising the option.
Category NSP identifies work items without an associated fixed price that provide a detailed description for work items as part of their technical proposal. Procedure/regulations are also included that must be followed by the contractors and subcontractors in the accomplishment of all work requirements.
B) PRICING INFORMATION
Additional pricing information for the following work items:
· Work Item #011 GENERAL SERVICES FOR THE SHIP – CATEGORY A (SubClin 0001AB) The services included in Work Item #011 must be priced based on an estimated number indicated in the work item for each service.
J-1 (Tab 2) SubCLIN (0001AB) – Work Item #011 must be filled with the unit price for each service.
The unit price will be used for adjustments to the award price for lesser or greater total consumption. Any required adjustments shall be made via a contract modification.
· Work Item # 023 HAZARDOUS WASTE DISPOSAL – CATEGORY A (SubClin 0001AO) The total price for this work item shall include management and handling fees and an estimated cost of hazardous waste disposal (including any other costs associated, such as laboratory tests) of 70,000 euros to be reimbursed to the contractor. The contractor will be reimbursed for the actual cost of hazardous waste disposal based on the disposal/subcontractors invoices. If the actual cost of hazardous waste disposal is higher than 70,000 euros, a change order will be issued for the additional costs and for a pro-rata management and handling fee. If the actual cost of hazardous waste disposal is lower than Euro 70,000, a change order will be issued for definitizing the estimated value below Euro 70,000.
· Work Item # 030 CONTINUATION OF SERVICES – CATEGORY B ( SubClin 0003AA, 003AB, 0003AC AND 0003AD)
Work Item #030 includes optional work items that allows the government to extend the period of performance and maintain the services described in the parent work items.
One of the work item is #011. For WI #011, the Attachment J-1 (Tab 3) CLIN 0003AB- WI011 shall be filled with the unit price for each service. The unit price will be used for final adjustments based on the actual consumption.
Attachment J-1 (Tab 1) Contractor’s Price Breakdown shall be completed by providing the number of labor hours, labor rate, total labor cost, and subcontractor/material and any other costs for the items that are priced in Section B based on quantity “1” and Unit “Lot”. For all other work items that have been grayed out, the offerors shall insert the total price only. The labor rate indicated will be applied for any subsequent repairs identified as growth work of the parent work item.
SUBSEQUENT REPAIRS – SCOPE OF THE CONTRACT
If additional work is discovered during performance, the Contracting Officer will determine if it can be considered growth or new work, after following required contracting procedure.
GROWTH WORK
Growth work is defined as additional work discovered during performance that is associated with an existing work item and determined necessary to accomplish the original scope of that work item successfully. All growth work must be associated with an existing work item. The Contractor shall not perform any growth work without the Contracting Officer's pre-authorization. Growth work is work determined by the Government to be within the scope of the original contract. The contractor labor rate proposed for that work item shall be utilized in the pricing of any growth work associated with that work item (subject to approval by the Government prior to commencement of the growth work). Nonetheless, the Contracting Officer reserves the right to contract for growth work on the basis of a negotiated, firm-fixed price, when it is in the best interest of the Government to do so.
The Contractor shall furnish a price breakdown in preparation for each contract modification, as required. All price breakdowns should be furnished directly to the Contracting Officer, and any proposed subcontracting shall be supported by a separate price breakdown. If the proposal includes a request for a time extension, justification shall be furnished with the proposal. However, the labor rate for the growth work is the same proposed for the parent work item and indicated in Attachment J-1 (Tab 1) Contractor’s Price Breakdown.
The Contracting Officer may require the contractor to proceed to accomplish growth work before a firm-fixed price can be mutually agreed upon. In these cases, the work will be directed under the authority of contract clause 252.217-7003 CHANGES and a final price will be mutually agreed upon at a later date in accordance with the timetable described in that clause. However, even in these cases, performance of authorized growth work shall not commence until after the contractor receives a unilateral contract modification from the Contracting Officer.
The Government considers 5000 man hours of Anticipated Growth Requirement (AGR) to be able to accomplish this available. The contractor must be able to absorb this amount of growth within the performance period of 01 Nov 2018 – 29 January 2019.
NEW WORK
New work is defined as additional work cannot be reasonably tied to an existing work item in the specification package, but is still essential for the satisfactory completion of the vessel overhaul effort. New work will comply with the procedures covered in DFARS 252.217-7028 OVER AND ABOVE WORK. (DEC 1991)..
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
L-1 L-1 ADDENDUM TO 52.215-1 Instructions to Offerors—Competitive Acquisition.
Submission of Offers and Other Information At the time of the solicitation closing date specified in Block 9 of the SF-33, Offerors shall submit the information specified in paragraphs (1), (2) (3) and (4) to the following persons:
1) Primary Point of contact: Mrs. Maria di Lieto, Contract Specialist, email: maria.dilieto.it@eu.navy.mil
2) Secondary Point of contact: Mr. Roman Bech, Contract Specilaist, email : roman.bech@eu.navy.mil
Submission time is in local Naples, Italy time. The deadline / closing time receipt of proposals will be strictly adhered to and enforced.
Be advised that the size limit per email is 10 MB. If your proposal is in excess of 10 MB, submit additional emails as necessary.
Each Offeror must: (1) submit an offer in English, and (2) submit the technical proposal, past performance and price information as three separate volumes. No pricing information is to be included with the technical or past performance volumes.
1. Offer: The Offer consists of and shall include the items listed below:
(a) Standard Form 33/Completed Solicitation, “Solicitation/Offer/Award with blocks 12-18 completed by the Offeror. If amendments to the solicitation are issued, each Standard Form 30 “Amendment of Solicitation/Modification of Contract” shall be included with blocks 8 and 15 (a) through (c) completed by the Offeror.
(b) RFP Section B “Supplies/Services and Price”: Offeror is required to submit pricing information on all CLINs/SubCLINs in Section B- Supplies/Services. Price must be in Euro (€) and in compliance with Section A.
Additional pricing information is detailed in paragraph 4.
(c) Completed Representations and Certifications – Located in Section K of this solicitation. The Offeror shall fill them out and include them with his/her offer. Signed Representations and Certifications available through the SAM database are an acceptable form of documentation, but written notification must be provided to the Contracting Officer.
Per the terms of the solicitation provision 52.204-8 and contract clause 252.204-7004 (Alternate A), the contractor must have an active registration in the System for Award Management in order to be awarded a contract by the US Government. This registration need not be active at the time of proposal submission; however, the registration must be active before a contract award can be made to the contractor.
This RFP does not authorize alternate proposals with respect to specific terms or conditions of this RFP. Any objection to any of the terms and conditions of this RFP will make the offer unacceptable and not considered for award on initial offers. Failure to submit any of the documentation or information required for proposals may cause the Offeror to be ineligible for award on their initial offer.
2. Technical Proposal
Each technical proposal shall enable Government evaluating personnel to make a thorough evaluation and arrive at a sound determination as to whether or not the proposal will meet the requirements of the solicitation. To this end, each technical proposal shall be specific, detailed and complete enough to clearly demonstrate that the prospective contractor has sufficiently answered each sub-factor at the level of detail required based on the information listed in the solicitation for that particular sub-factor. Offeror’s are required to clearly separate and mark each sub-factor section within its Technical Proposal .
Technical Capability is comprised of the following technical sub-factors:
2.1 FACILITIES REQUIREMENTS
2.2 MILESTONE SCHEDULE
2.3 QUALITY CONTROL PLAN
2.4 MATERIAL CONTROL AND STORAGE
2.5 HEAVY WEATHER PLAN
2.6 COLD WEATHER PLAN
2.7 SHIPBOARD ACCESS & SECURITY
2.8 ALUMINUM WELDING REQUIREMENT
The page limit is a maximum of 7 pages of narrative per technical sub-factor (49 pages total). This page limit does not apply to charts, graphs, pictures or certificates included with the technical proposal, for which there is no page limit. Technical deliverables listed in the specification package work items, but not listed in this section of the solicitation, are not considered to be necessary components of the offeror’s technical proposal volume for contract award purposes. Therefore, any deliverables that are covered only in the specification package work items can be provided following contract award. Any page limitations applicable to the technical proposal volume do not apply to these additional subsequent submissions.
The required technical sub-factors are covered below:
2.1 FACILITIES REQUIREMENTS
Complete and submit the provided MSC Ship Repair Facility Survey Form (MSC Form 4330/26) (Refer to RFP Attachment J-4). Forms must be signed and dated.
Note the following special instructions when completing this Form:
a. On sheet 2 of 5, the “Services Available” block shall include only those services which are permanently installed. Temporary service capability shall be listed on sheet 5 of 5.
b. Photocopies of crane certification data shall be supplied. All certification data must be current and not expired.
c. The following instructions apply to the required submittals list located on sheet 5 of 5.
(i) Submittal number 1: submit as instructed.
(ii) Submittal number 2: submit as instructed.
(iii) Submittal number 3: submit as instructed; list only capital equipment. Do not list portable hand-held tools.
(iv) Submittal number 4: submit as instructed
(v) Submittal number 5: submit as instructed
(vi) Submittal number 6: submit as instructed. Do not list subcontractor locations.
(vii) Submittal number 7: submit as instructed.
d. In addition to the data supplied on RFP Attachment J-2; submit the following:
(i) A Berth Chart that complies with the requirements set forth in Specification Package of Not Separately Priced (NSP) Work Item 0003 “APPROACH BERTHING AND MOORING”.
(ii) An Approach Chart that complies with the requirements set forth in Specification Package NSP Work Item 0003 “APPROACH BERTHING AND MOORING.”
(iii) A Mooring Chart that complies with the requirements set forth in Specification Package NSP Work Item 0003 “APPROACH BERTHING AND MOORING
(iv) A Docking Plan, Certificate of the Dry Dock, and Certificate of the Dock Master that complies with the requirements set forth in Specification Package Work Item 0901 “Dry Docking and Undocking Vessel”.
(v) Offerors must submit with their proposals copies of all the latest National Oceanographic and Atmospheric Administration (NOAA) (or US Army Corps of Engineers) waterway approach charts to their facility. Charts are to show the entire route of transit from the sea buoy to the Contractor's facility, including any for proposed inter/intra facility transits. Charts must provide adequate demonstration that the Offeror has positively determined the route(s) providing safe vessel transit set forth in Specification Package NSP Work Item 0003 “APPROACH BERTHING AND MOORING.”
(vi) Offeror must confirm that they have available pier space to accommodate the vessel for all days of the performance period that the contractor has not scheduled the vessel to be in the dry-dock.
(vi) The offeror must confirm that they shall provide a reliable source of electrical shore power that conforms with Section 7.0 of Work Item 0011, Furnish General Services (T-EPF Class)
2.2 MILESTONE SCHEDULE
Provide a time phased progress chart which includes every work item in the specification package including “Category B” Optional Work Items. In addition, include a Critical Path Analysis by Work Item considering the ability to absorb Anticipated Growth Requirement (AGR)
The analysis shall clearly identify the primary Critical Path at each point of the availability. Offeror shall base their milestone schedule on a ship arrival date of 1 November 2018 and a ship redelivery date of 29 January 2019.
In addition to including every work item in the specification package, the time phased progress chart must specifically identify the following additional milestones for technical acceptability purposes:
1. MSC Overhaul Management Team (OMT) office start and end dates.
2. Crew move off date.
3. Work items scheduled to be accomplished pier side prior to dry-docking
4. Dry-dock date
5. Completion of tanks gas-freeing date.
6. Turnover of the Engine Room date.
7. Undock date from Dry-dock
8. Work items accomplished pier side post dry-docking
9. Crew move aboard date
10. Dock trial date.
11. Sea trial date.
2.3 QUALITY CONTROL PLAN
Provide the Quality Control (QC) Program to be used during this availability. The QC Program must address the method by which the contractor will comply with Section 7.0 of specification package Work Item 0004 - Testing and Quality Assurance, and include a preliminary "Schedule for Key Inspection Events" within the contractor’s proposal.
Provide Point of Contact (POC) information for the individual(s) who will perform the QC function during contract performance. POC information must provide a means for the Government to reach a contractor QC representative at any time of the day or night and on weekends or holidays in the event of an emergency.
2.4 MATERIAL CONTROL AND STORAGE
Provide the location, number and total square footage of all storage areas including those proposed for the receipt and inspection of material under this contract. Storage areas proposed for use must meet the requirements of Work Item #015 Section 7.3.2 - STORAGE.
Identify the system to be used for Material Control by addressing the following areas:
1. Advanced CFM material ordering.
2. Receipt, inspection, and identification of GFM and CFM
3. Control of pilferable and sensitive material.
4. Control of damage and reporting system.
5. Turn-in material, including equipment shipped to subcontractors for work.
6. Scrap material and relative accounting system.
7. Rip out material which is to be reinstalled
8. Procedure for critical material decisions such as substitution.
9. Temporary issue of storeroom repair parts to support overhaul/availability.
2.5 HEAVY WEATHER PLAN
The contractor shall provide a Heavy Weather Plan as part of theTechnical Proposal.
The plan shall include a description of the protection arrangements available and the preventive measures that will be taken to ensure the safety of the ship from heavy weather conditions for a Beaufort Wind Scale Number 7 or higher.
The plan shall demonstrate daily monitoring and tracking operations of heavy weather conditions and contractor actions relative to deteriorating weather conditions for Beaufort Wind Scale (enclosure 2.2.1) Number 7 and higher in preparation to protect the vessel from damage.
2.6 COLD WEATHER PLAN
The contractor shall provide a Cold Weather Plan as part of theTechnical Proposal.
The plan shall include a description of the cold weather precautions and protection arrangements available and the preventive measures that will be taken to ensure the safety of the vessel and to prevent damage to the ship during cold weather.
The plan shall demonstrate daily monitoring and tracking operations of cold weather conditions, changing weather conditions as the cold weather season approaches, unusual cold spells for the geographic location of the contractor's facility, and winter precipitation patterns for snow, sleet and ice conditions.
2.7 SHIPBOARD ACCESS & SECURITY
1) The offeror shall have and demonstrate for approval at the time of submitting his proposal, an employee identification badge/pass and security system in accordance with Work Item #019 paragraph 7.2.3
2) The offeror shall submit a Security Plan to be implemented for the protection of personnel, the Ship, the material and equipment to be installed, and the dry dock at the Contractor's facility, which addresses the requirements of above paragraph 7.2.
2.8 ALUMINUM WELDING REQUIREMENT
All welding shall be performed in accordance with American Bureau of Shipping (ABS) Naval Craft Code for High Speed Vessels. Offerors shall submit current ABS or International Equivalent welder’s certificates with their technical proposal. Current welder certificates that have been issued by other approved members of the International Association of Classification Societies (IACS) will be accepted in lieu of ABS certification.
The contractor must also be certified, or propose to use a subcontractor who is certified, in the following three specific aluminum welding technologies. Evidence of current certification (with an English translation if necessary) must be provided for each of the three technologies listed below:
(a) PULSED GAS METAL ARC WELDING
(b) ULTRASONIC IMPACT TECHNOLOGY
(c) ASTM G-67 MASS LOSS TESTING
3. Past Performance
Description of Past Performance: Offeror shall describe its past performance on directly related or similar Federal, State and local government, and private contracts and subcontracts which were ongoing or completed within the last three (3) years from the closing date of this RFP, which are of same or similar scope, magnitude or complexity to that which is detailed in the RFP. The information must be clear whether the work by the Offeror was done as a prime contractor or a subcontractor. Offeror who describe similar contracts and subcontracts shall provide a detailed explanation demonstrating the similarity of the contracts to the requirements of the RFP. Specifically, Offeror shall use the J-5 Past Performance Information Sheet to provide the required information regarding its past performance on no more than three (3) recommended relevant (“same or similar”) contracts obtained from the Government and/or commercial sources. The Past Performance Information Sheet is a mandatory document that the Offeror must complete and return with their quote.
J-6 Past Performance Questionnaire is provided for informational purposes only. Offerors are not required to submit this form. The questionnaire will be completed by the past performance references (who the Offeror performed the work for) cited in Attachment J-5 Past Performance Information Sheet, and may be incorporated into the Offeror’s past performance information. The sole reason for providing this attachment is so the Offerors can see the types of questions that their past performance references will be asked.
The Government reserves the right to obtain information for use in the evaluation of past performance from any or all sources including sources outside of the Government.
4. Price
1. Offerors shall submit prices in the format specified in Section B “Supplies/Services and Price” of this solicitation. Price must be in Euro.
2. Offerors shall complete the following Tabs of the Attachment J-1 Pricing Information:
· (Tab 1) Contractor’s Price Breakdown providing the number of man hours, labor rate, total labor cost, and subcontractor/material and any other costs for the items that are priced in Section B based on quantity “1” and Unit “Lot”. For all other work items that have been grayed out, the offerors shall insert the total price only.
· (Tab 2) SubCLIN 0001AB – Work Item #011 General Services for Ship and (Tab 3) and (Tab 3) SubCLIN 0003AB – Work Item #011 General Services for Ship (Continuation Services). Offeror shall also complete the Tabs in order to provide a unit price for the services that are grouped in the correspondent CLIN/SubCLIN of Section B “Supplies/Services and Price:
L-2 SHIP CHECK
Ship check will be held after issuing the RFP. An amendment will provide the date, time and place. Ship checks are not mandatory. However, it will be the best interest of the offerors to conduct a ship check prior to submission of their proposal. In the event if an offeror conducts a ship check, the U.S. Government will not reimburse the offeror for any cost involved with the ship check.
L-3 QUESTIONS/SPECIFICATION CLARIFICATION
Offerors may request clarification of any work item specification or contract term. No verbal requests for information will be accepted by the Contracting Officer or the technical representative. Offeror’s questions must be submitted to the Contract Specialist in writing no later than 9 July 2018.
(End of Summary of Changes) image1.wmf