Attachment_7_Generator usage log.pdf
PDF 107 KB Posted
- Attached to
- Construction-NUWCDIVNPT-Interior Renovations
- Solicitation number
- N6660427Q0033
About this file
This is a Contractor Monthly Fuel Usage Log form issued by NUWC Division Newport for tracking generator fuel consumption.
The form requires contractors to submit monthly fuel usage data no later than the 10th day of the following month or upon project completion, whichever occurs first. Contractors must provide company name, submitter contact information, generator location, make and model number, capacity in kilowatts, fuel rate in gallons per hour, and fuel type (gasoline, diesel, or propane). The form includes a table for recording hour meter readings at the start and end of each month from January through December, with an alternative column for total monthly fuel usage in gallons if the generator lacks an hour meter. The purpose of the generator must also be documented. Three notes clarify that recordkeeping is mandatory under NUWC's Air Emissions Cap Permit issued by the Department of Environmental Management's Office of Air Resources; that non-road engines on-site for longer than 12 months are classified as stationary and require a permit if exceeding 50 horsepower; and that the log does not apply to self-propelled mobile non-road engines. The form is designated NUWCDIVNPT 5090/8 (NOV-2024) and is marked UNCLASSIFIED.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .