N6660426Q0240 SOW_Redacted.pdf
PDF 220 KB Posted
- Attached to
- High-Speed Water Entry Measures
- Solicitation number
- N6660426Q0240
About this file
This is a Statement of Work (SOW)/Performance Work Statement (PWS) for an analytical modeling project focused on high-speed water entry physics, issued by Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT).
The contractor shall develop three primary deliverables: (1) an analytical model describing structural response of a simplified two-mass compliant body during water impact that accommodates arbitrary nose shapes, expressed as mathematical equations implementable in MATLAB without requiring CFD or FEA simulations (CDRL A001); (2) experimental validation of the two-mass model through testing at 1-4 m/s impact velocities with minimum requirements of 3 distinct velocities, 4 repeats per velocity (12 total tests), on-board accelerometer measurements, and high-speed camera documentation (CDRL A002); and (3) an analytical model for structural response of a continuous elastic body during water impact, similarly expressed as MATLAB-implementable equations without CFD/FEA (CDRL A003). Work shall be performed at the contractor's facilities with biweekly progress communication through phone calls, emails, and test reports. Government quality surveillance includes evaluation of technical quality through subject matter expert review, schedule/timeliness adherence to negotiated milestones, management and coordination capabilities, and regulatory compliance. The contract includes standard security compliance requirements per 32 CFR Part 117 (NISPOM), handling of Controlled Unclassified Information per DoD Instruction 5200.48, Operations Security (OPSEC) program development per NSDD 298, and CUI incident reporting protocols.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6660426Q0240.pdf | ||
| N6660426Q0240 CDRLs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
v3.5_December2023
STATEMENT OF WORK (SOW)/PERFORMANCE WORK STATEMENT (PWS)
( Impact Modeling)
1.0 Background
Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT), is being funded by the to execute a 6.1 basic research project investigating the physics of high-speed water entry. One sub-task of this effort involves modeling the water impact forces and associated structural response. This Statement of Work (SOW) describes the need for analytical modeling that enables analysis without the need for computational fluid dynamics (CFD) and finite element analysis (FEA) simulations.
1.1 Places of Performance
The work shall be performed at the Contractor’s facilities
1.2 Authorized Users
1.3 Sponsors
1.4 Types of Funding
2.0 Scope
The Contractor shall perform analytical modeling to describe the structural response of a simplified two-body compliant body during water impact. The analysis should accommodate arbitrary nose shapes. The Contractor shall validate this model against experiments performed by the contractor in their laboratory. The Contractor shall also perform analytical modeling to describe the structural response of a continuous elastic body during water impact. By analytical modeling, we mean a modeling approach that yields a set of equations that can be evaluated in Matlab over a range of parameters, without requiring the use of CFD and/or FEA.
3.0 Applicable Documents
None.
4.0 Technical Requirements
4.1 Generation of model documentation
The contractor shall:
4.1.1 Derive and document an analytical model to describe the structural response of a simplified two-mass compliant body during water impact. The analysis should accommodate arbitrary nose shapes. The contractor shall express the resulting model in a set of mathematical equations that can be implemented in MATLAB software. A computational fluid dynamics (CFD) finite element/finite volume model is not an acceptable form of the model.
Deliverable: CDRL A001 – Technical Report.
4.1.2 Perform experiments to validate the model derived in 4.1.1. The experiments must consist of a two-mass compliant body that contains an on-board accelerometer to measure impact accelerations during impact with water at speeds ranging from 1-4 m/s. The water impact must occur with the body velocity vector nominally perpendicular to a flat water surface. The impacts must also be captured with high speed cameras. At least 3 distinct water impact velocities are required, with at least 4 repeats at each velocity (12 tests).
Deliverable: CDRL A002 – Test Report
4.1.3 Derive and document an analytical model to describe the structural response of a continuous elastic body during water impact. The contractor shall express the resulting model in a set of mathematical equations that can be implemented in MATLAB software.
A computational fluid dynamics (CFD) finite element/finite volume model is not an acceptable form of the model.
Deliverable: CDRL A003 – Technical Report
5.0 Progress Reports
The Contractor shall communicate progress to the Government in the form of phone conversations, e-mails, and test reports on a biweekly basis.
6.0 Government Furnished Information
RESERVED
7.0 Government Furnished Property
RESERVED
8.0 Quality Surveillance and Performance Standards
The Government will conduct quality surveillance via various methods including formal and informal meetings, review of technical reports, review of monthly progress reports, and review of deliverables. Contractor performance will be evaluated in the areas of technical quality, schedule/timeliness, management, and regulatory compliance as follows:
• Technical Quality: The government will evaluate technical quality via NUWC SME review;
• Schedule/Timeliness: The government will evaluate the contractor’s ability to meet negotiated milestones and delivery schedules;
• Management: The government will evaluate the contractor’s ability to integrate and coordinate all activities needed to execute the contract;
• Regulatory Compliance: The government shall evaluate the contractor’s compliance with the terms and conditions of the contract relating to applicable regulations and codes.
9.0 Information and Communication Technology (ICT) Accessibility Requirements
The Government has determined that this procurement is not Information and Communication Technology (ICT).
10.0 Security Compliance
10.1 Program Protection
SECURITY: All Contractor personnel shall adhere to the Security provisions of 32 CFR Part 117
– National Industrial Security Program Operating Manual (NISPOM). While performing work associated with NUWCDIVNPT, Contractor personnel shall comply with the NUWCDIVNPT Security Manual and, if at another facility, the security regulations of the host facility.
Applicable FAR, DFARS, NMCARS clauses, and NAVSEA text shall be adhered to in the performance of this contract. Security incidents shall be promptly reported through the companies Facility Security Officer (FSO), to the Contracting Officer’s Representative (COR), Technical Point of Contact (TPOC), and the Cognizant Security Office to NUWCDIVNPT Security.
Controlled Unclassified Information (CUI) including Legacy FOUO and Covered Defense Information (meeting the definition of 48 CFR 252.204–7012(a)) generated and/or provided under this contract shall be marked and safeguarded as specified in DoD Instruction 5200.48, CUI available at:
https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/520048p.PDF. Any product containing Covered Defense Information shall be assigned a distribution statement (distribution statements B through F) in accordance with DoDI 5230.24 (Distribution Statements on Technical Documents); and DoDI 5230.24, Enclosure 3 Procedures, available at https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/523024p.pdf
INFORMATION SECURITY: If the work is performed at the Contractor's facility, the Contractor shall implement and maintain security procedures and controls to prevent unauthorized disclosure of classified information and controlled unclassified information (CUI) and to control distribution of CUI in accordance with National Industrial Security Program Operating Manual (NISPOM) codifying 32 CFR Part 117, NISPOM Rule, and SECNAV M-
5510.36B. If the work is performed at the Government's facility, the Contractor shall comply with facility policy.
CUI INCIDENT REPORTING AND RESPONSE: The Contractor shall promptly report any unauthorized, inadvertent, or illegal release or disclosure of CUI to the Contracting Officer’s Representative / Technical Point of Contact (TPOC), Procuring Contracting Officer, and the Security Office. Contractor personnel shall coordinate this effort through the relevant industry site FSO.
PUBLIC RELEASE: Any controlled unclassified information pertaining to this contract shall not be released for public dissemination, including posting to any social media sites such as Facebook or Twitter, unless it has been approved for public release by appropriate U.S.
Government authority. Proposed public releases shall be submitted for approval prior to release through Commander, Naval Undersea Warfare Center, Division Newport, Newport, RI 02841.
10.2 Operations Security (OPSEC)
OPSEC is a process that identifies critical information to determine if friendly actions can be observed by adversary intelligence systems, determines if information obtained by adversaries could be interpreted to be useful to them, and then executes selected measures that eliminate or reduce adversary exploitation of friendly critical information.
The Contractor shall develop and implement, and update and maintain an OPSEC program to protect controlled unclassified and classified activities, information, equipment, and material used or developed by the Contractor and any subcontractor during performance of the contract.
The Contractor shall be responsible for the subcontractor implementation of the OPSEC requirements. The Contractor developed OPSEC program may include Information Assurance and Communications Security (COMSEC). The OPSEC program shall be in accordance with National Security Decision Directive (NSDD) 298, and at a minimum shall include:
1) Assignment of responsibility for OPSEC direction and implementation.
2) Issuance of procedures and planning guidance for the use of OPSEC techniques to identify vulnerabilities and apply applicable countermeasures.
3) Establishment of OPSEC education and awareness training.
4) Provisions for management, annual review, and evaluation of OPSEC programs.
5) Flow down of OPSEC requirements to subcontractors when applicable.
While performing aboard NUWC or NUWC sites, the contractor shall: comply with all OPSEC instructions and policies detailed in the NUWCDIVNPT Security Manual; Include OPSEC as part of its ongoing security awareness program and take all required Agency training;
Be responsive to the Supporting OPSEC Manager on a non-interference basis; and Protect sensitive unclassified information and activities, which could compromise classified information or operations, or degrade the planning and execution of operations performed by the Requiring Organization and contractor in support of the mission.
File details come from the government source that posted it. Updated .