RIR_QAP_W05241.pdf

PDF 3 MB Posted

Attached to
Tension Belt Drogue Deployer Parts
Solicitation number
N6660426Q0089
Issued by

About this file

This is a TAHE Facility Quality Provisions Receipt Inspection Report template (Form No. 008 Rev C) used by the TAHE Facility at NUWC Building 6 in Newport, Rhode Island to document and verify the quality of purchased items and outside services upon receipt.

The form captures essential procurement and inspection data including part numbers, nomenclature, drawing numbers, work orders, sales orders, and serial numbers. Vendors must provide specific quality documentation and certifications with all deliveries, including: Certificate of Compliance confirming items were manufactured per applicable instructions and specifications; Mercury Free Statement (with ROHS requirement for electronic components); Certificate of Analysis for raw materials meeting identified specifications; Domestically Sourced Material certification per DFARS Part 225; Product Identification on external surfaces with associated tags; Process Certification documenting special manufacturing processes; Test Data with NDT reports identifying specific weld pass/fail results and certified inspector information; and Special Packaging Requirements to prevent damage during handling and transportation. The form also references multiple enclosures including material certificates (QQ-N-281, Class A, Form 6, Hot Finished), welding rod certifications, WPS and PQR approvals on Welding Cert Form 105, NDT reports, and various technical standards and drawings. The inspection section is restricted to TAHEF QA personnel only, with fields for source, purchase order, purchase request, quantity received, total accepted/rejected, inspector name, and date.

View the file

Other files

File Type Posted
VIR_W05241.pdf PDF
II.D.ii. Attachment SAM Synopsis N6660426Q0089.pdf PDF
II.D.iii. CLIN Breakdown N660426Q0089.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TAHEF-Form-No. 008 Rev C

8/29/2025

TAHE FACILITY NUWC, BLDG. 6

NEWPORT, RI 02841

TAHE FACILITY QUALITY PROVISIONS

RECEIPT INSPECTION REPORT

1. PART NUMBER 2. PART NOMENCLATURE

3. DRAWING NUMBER REV

4. WORK ORDER: 5. S/N:

6. STATEMENT OF WORK: 7. SALES ORDER: 8. UNIT THE ORDER IS FOR: 9. ORDER IS FOR INVENTORY:

10. PURCHASE/OUTSIDE SERVICE 11. PURCHASER/OSS COORDINATOR SIGNATURE

12. CHARACTERISTIC MEASURED / VERIFIED DISPOSITION-REMARKS

THE FOLLOWING QUALITY DOCUMENTATION / INFORMATION /

INSTRUCTIONS MUST BE PROVIDED / ADHERED TO:

13. GFI: DOCUMENTATION PROVIDED

VENDOR DO NOT WRITE BELOW. FOR TAHEF QA ONLY.

14. SOURCE: 15. PURCHASE ORDER: 16. PURCHASE REQUEST: 17. QTY RECEIVED:

18. TOTAL ACCEPTED 19. TOTAL REJECTED 20. INSPECTOR 21. DATE

8/29/2025

22. Enclosure

8/29/2025

TAHE FACILITY NUWC, BLDG. 6

NEWPORT, RI 02841

TAHE FACILITY QUALITY PROVISIONS

RECEIPT INSPECTION REPORT

1. PART NUMBER 2. PART NOMENCLATURE

3. DRAWING NUMBER REV

4. WORK ORDER: 5. S/N:

6. STATEMENT OF WORK: 7. SALES ORDER: 8. UNIT THE ORDER IS FOR: 9. ORDER IS FOR INVENTORY:

10. PURCHASE/OUTSIDE SERVICE 11. PURCHASER/OSS COORDINATOR SIGNATURE

12. CHARACTERISTIC MEASURED / VERIFIED DISPOSITION-REMARKS

THE FOLLOWING QUALITY DOCUMENTATION / INFORMATION /

INSTRUCTIONS MUST BE PROVIDED / ADHERED TO:

13. GFI: DOCUMENTATION PROVIDED

VENDOR DO NOT WRITE BELOW. FOR TAHEF QA ONLY.

8/29/2025

TAHE FACILITY NUWC, BLDG. 6

NEWPORT, RI 02841

TAHE FACILITY QUALITY PROVISIONS

RECEIPT INSPECTION REPORT

1. PART NUMBER 2. PART NOMENCLATURE

3. DRAWING NUMBER REV

4. WORK ORDER: 5. S/N:

6. STATEMENT OF WORK: 7. SALES ORDER: 8. UNIT THE ORDER IS FOR: 9. ORDER IS FOR INVENTORY:

10. PURCHASE/OUTSIDE SERVICE 11. PURCHASER/OSS COORDINATOR SIGNATURE

12. CHARACTERISTIC MEASURED / VERIFIED DISPOSITION-REMARKS

THE FOLLOWING QUALITY DOCUMENTATION / INFORMATION /

INSTRUCTIONS MUST BE PROVIDED / ADHERED TO:

13. GFI: DOCUMENTATION PROVIDED

VENDOR DO NOT WRITE BELOW. FOR TAHEF QA ONLY.

8/29/2025

TAHE FACILITY NUWC, BLDG. 6

NEWPORT, RI 02841

TAHE FACILITY QUALITY PROVISIONS

RECEIPT INSPECTION REPORT

1. PART NUMBER 2. PART NOMENCLATURE

3. DRAWING NUMBER REV

4. WORK ORDER: 5. S/N:

6. STATEMENT OF WORK: 7. SALES ORDER: 8. UNIT THE ORDER IS FOR: 9. ORDER IS FOR INVENTORY:

10. PURCHASE/OUTSIDE SERVICE 11. PURCHASER/OSS COORDINATOR SIGNATURE

12. CHARACTERISTIC MEASURED / VERIFIED DISPOSITION-REMARKS

THE FOLLOWING QUALITY DOCUMENTATION / INFORMATION /

INSTRUCTIONS MUST BE PROVIDED / ADHERED TO:

13. GFI: DOCUMENTATION PROVIDED

VENDOR DO NOT WRITE BELOW. FOR TAHEF QA ONLY.

8/29/2025

TAHE FACILITY NUWC, BLDG. 6

NEWPORT, RI 02841

TAHE FACILITY QUALITY PROVISIONS

RECEIPT INSPECTION REPORT

1. PART NUMBER 2. PART NOMENCLATURE

3. DRAWING NUMBER REV

4. WORK ORDER: 5. S/N:

6. STATEMENT OF WORK: 7. SALES ORDER: 8. UNIT THE ORDER IS FOR: 9. ORDER IS FOR INVENTORY:

10. PURCHASE/OUTSIDE SERVICE 11. PURCHASER/OSS COORDINATOR SIGNATURE

12. CHARACTERISTIC MEASURED / VERIFIED DISPOSITION-REMARKS

THE FOLLOWING QUALITY DOCUMENTATION / INFORMATION /

INSTRUCTIONS MUST BE PROVIDED / ADHERED TO:

13. GFI: DOCUMENTATION PROVIDED

VENDOR DO NOT WRITE BELOW. FOR TAHEF QA ONLY.

8/29/2025

TAHE FACILITY NUWC, BLDG. 6

NEWPORT, RI 02841

TAHE FACILITY QUALITY PROVISIONS

RECEIPT INSPECTION REPORT

1. PART NUMBER 2. PART NOMENCLATURE

3. DRAWING NUMBER REV

4. WORK ORDER: 5. S/N:

6. STATEMENT OF WORK: 7. SALES ORDER: 8. UNIT THE ORDER IS FOR: 9. ORDER IS FOR INVENTORY:

10. PURCHASE/OUTSIDE SERVICE 11. PURCHASER/OSS COORDINATOR SIGNATURE

12. CHARACTERISTIC MEASURED / VERIFIED DISPOSITION-REMARKS

THE FOLLOWING QUALITY DOCUMENTATION / INFORMATION /

INSTRUCTIONS MUST BE PROVIDED / ADHERED TO:

13. GFI: DOCUMENTATION PROVIDED

VENDOR DO NOT WRITE BELOW. FOR TAHEF QA ONLY.

RIR_QAP_W05241_ Welding.pdf
RIR_test_iii.pdf
Enclosure Page.pdf
Untitled
Untitled
RIR_QAP_W05241_ Polymer.pdf
RIR_test_iii.pdf
Enclosure Page.pdf
Untitled
Untitled
RIR_QAP_W05241_ Iconel.pdf
RIR_test_iii.pdf
Enclosure Page.pdf
Untitled
Untitled
RIR_QAP_W05241_ Machine With Coating.pdf
RIR_test_iii.pdf
Enclosure Page.pdf
Untitled
Untitled
RIR_QAP_W05241_ QQN286.pdf
RIR_test_iii.pdf
Enclosure Page.pdf
Untitled
Untitled
RIR_QAP_W05241_ QQN281.pdf
RIR_test_iii.pdf
Enclosure Page.pdf
Untitled
Untitled
PART NUMBER: 8827931 and 8827932
DRAWING NUMBER: 8827931_53711_FN_- and 8827932_53711_FN_-
REV: -
PART NOMENCLATURE: Lower Mounting Bracket and Upper Mounting Bracket, Tensioned Belt Drogue Deployer
WORK ORDER: W05241
SN: N/A
STATEMENT OF WORK: N/A
SALES ORDER: FUTURE BUILDS
UNIT THE ORDER IS FOR: TBDD
DISPOSITIONREMARKSTHE FOLLOWING QUALITY DOCUMENTATION INFORMATION INSTRUCTIONS MUST BE PROVIDED ADHERED TO: QTY: 2
Text1: Certificate of Compliance: that items were manufactured in accordance with all applicable instructions and specifications.
Req1: Required
Text2: Mercury Free Statement: A signed document from the supplying vendor certifying that mercury and mercury containing compounds were not intentionally added to nor came in contact with hardware or supplies furnished under this work order.
Text3: Certificate of Analysis of raw material stating that it meets the specifications identified.
Req3: Required - See Enclosure Note 1
Text4: Domestically Sourced Material: all raw material must be sourced domestically or from a qualified country per DFARS Part 225: Foreign Acquisition.
Req4: Required
Text5: Product Identification: identification must appear on external surfaces of items or packages. Parts must be returned with associated tags. (Military specifications will be provided upon request) Parts must be returned with associated tags.
Req5: Required
Text6: Process Certification: that items were manufactured in accordance with special processes identified.
Req6: Required - See Enclosure Note 2
Text7: Test Data: to be provided
Req7: Required - See Enclosure Note 3
Text8: Special Packaging Requirements: protect parts to prevent damage during handling and transportation.
Req8:
Text9:
Req9:
Req2: Required - ROHS is only acceptable for the procument of electronic components.
Text14:
Text16:
Text17:
Text18:
Text19:
Text20:
Text21:
Text22:
Text23:
Text24:
Text25:
Text13: See Enclosure.
Dropdown1: [Purchasing - New Man w/ Welding]
Check Box1: Off
Text26: Note 1 - Certificate of Analysis: Required - Provide material certificates for base material (QQ-N-281, Class A, Form 6, Hot Finished) and welding rods used.

Note 2 - Process Certification: Required – WPS and PQR must be on file with the TAHEF prior to performing welding.

Document the WPS and PQR on Welding Cert Form 105.

Note 3 - Test Data: Required - Provide NDT report. Report shall identify specific weld pass/fail and associated remarks (if required). Ensure report includes certified inspector's name and NDT date.

Documentation Provided:

8827931_53711_FN_-

8827932_53711_FN_-

0551A0006_54497_FN_D_D07-066

8827956_53711_FN_-

AWS A2.4-2020_2020-01-09

MIL-STD-130N_with_Change-1_2012-11-16

MIL-STD-2035A(SH)_1995-05-15

QQ-N-281D_with_Amendment-2_1985-10-23

QQ-N-286G_2000-12-07

RIR_QAP_W05241

S9074-AR-GIB-010-278_CHG-A_2013-02-14 (MIL-STD-278)

TT-C-490H_2021-09-16

8827957_53711_FN_-

8827952_53711_FN_A

8827949_53711_FN_-

8827950_53711_FN_-

8827940_53711_FN_-

8827944_53711_FN_-

8827946_53711_FN_-

8827937_53711_FN_-

8827938_53711_FN_-

8827939_53711_FN_-

8827941_53711_FN_-

8827942_53711_FN_-

8827943_53711_FN_-

8827947_53711_FN_A

8827948_53711_FN_A

8827953_53711_FN_-

8827954_53711_FN_-

VIR_W05241

W05241 WPS & PQR Approval Form

CDRLs - COC (A001), Mercury Free Certification (A002), Certificate of Analysis (A003), Domestically Sourced (A004), Process Certification (A005), and Test Data (A006).

File details come from the government source that posted it. Updated .