N6660425Q0084 Amendment 0002.pdf

PDF 579 KB Posted

Attached to
Construction - NUWCDIVNPT Facilities Stairwell Renovation Project Federal contract opportunity
Solicitation number
N6660425Q0084
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This is Amendment 0002 to solicitation N6660425Q0084 for a Facilities Stairwell Renovation Project at the Naval Undersea Warfare Center Division Newport. The amendment extends the proposal due date from November 25, 2024 to December 13, 2024 at 2:00 PM EST.

The amendment provides answers to contractor questions, clarifying that: ceilings are not in scope for painting, B1171 handrails do not require complete paint stripping but must meet finish standards, contractors are responsible for wall-hanging materials not removed by the government, skylight walls do not need painting, contractors won't be held responsible for pre-existing water damage, lead paint abatement will be done through encapsulation, and SSPC QP 1 Certification is not required. This is a 100% small business set-aside under NAICS 236220 with an estimated value between $100,000-$250,000. The project requires bid guarantees and SAM registration. Electronic payment will be made through Wide Area Workflow (WAWF).

View the file

Other files for this federal contract opportunity

Other files attached to Construction - NUWCDIVNPT Facilities Stairwell Renovation Project, newest first.
File Type Posted
N6660425Q0084 Amendment 0001.pdf PDF
Attachment_4_Davis Bacon RI WD 10_11_2024.pdf PDF
N6660425Q0084.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1301166646

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See page 2.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Dec-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6660425Q0084

X 9B. DATED (SEE ITEM 11)

23-Oct-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Dec-2024

CODE

NAVAL UNDERSEA WARFARE CENTER

MICHAEL NORMAN OUELLETTE , CODE 0221

CONTRACTS DEPARTMENT

1176 HOWELL STREET, BLDG. 1258

NEWPORT RI 02841-1708

N66604 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6660425Q0084

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 25-Nov-2024 02:00 PM to 13-Dec-2024 02:00 PM.

The required performance has changed from PROJECT TITLE AND DESCRIPTION: Facilities Stairwell Renovation Project.Proposal Due: November 25, 2024 at 2:00PM EST, Email proposals to the following points of Contact; Michael.N.Ouellette.civ@us.navy.mil and alexander.olarte.civ@us.navy.mil NOTE: Offeror MUST be registered in the System for Award Management (SAM) to be considered for award. Bid Guarantee is also required to be considered for award.Magnitude per FAR 36.204: Between $100,000 and $250,000.Method of Payment:

Electronic Payment through Wide Area Workflow (WAWF) will be used.This requirement is 100% small business set aside, NAICS 236220; $45 millionSITE VISIT DATE and TIME: 06 NOVEMBER 2024 at 10:00AM EST, Meet at Building 80 NUWC Division Newport. Please allow for sufficient time to process site visit request. See Section A for complete Site Visit details.IMPORTANT: PLEASE NOTE THAT TECHNICAL INFORMATION IS

REQUIRED WITH SUBMISSION OF OFFER. PLEASE SEE SECTIONS L AND M FOR SPECIFIC

REQUIRMENTS. OFFERORS NOT SUBMITTING THIS INFORMATION RISK BEING EXCLUDED FROM

CONSIDERATION FOR AWARD. to PROJECT TITLE AND DESCRIPTION: Facilities Stairwell Renovation Project.Proposal Due: December 13, 2024 at 2:00PM EST, Email proposals to the following points of Contact;

Michael.N.Ouellette.civ@us.navy.mil and alexander.olarte.civ@us.navy.mil NOTE: Offeror MUST be registered in the System for Award Management (SAM) to be considered for award. Bid Guarantee is also required to be considered for award.Magnitude per FAR 36.204: Between $100,000 and $250,000.Method of Payment: Electronic Payment through Wide Area Workflow (WAWF) will be used.This requirement is 100% small business set aside, NAICS 236220; $45 millionSITE VISIT DATE and TIME: 06 NOVEMBER 2024 at 10:00AM EST, Meet at Building 80 NUWC Division Newport. Please allow for sufficient time to process site visit request. See Section A for complete Site Visit details.IMPORTANT: PLEASE NOTE THAT TECHNICAL INFORMATION IS

REQUIRED WITH SUBMISSION OF OFFER. PLEASE SEE SECTIONS L AND M FOR SPECIFIC

REQUIRMENTS. OFFERORS NOT SUBMITTING THIS INFORMATION RISK BEING EXCLUDED FROM

CONSIDERATION FOR AWARD..

The following have been modified:

GENERAL INFORMATION

Distribution: To be provided at award NUWCDIVNPT PR Number: To be provided at award

NUWCDIVNPT PID: N66604-25-SIMACQ-NPT-10-0024

NUWCDIVNPT Points of Contact: Michael Ouellette Michael.N.Ouellette.civ@us.navy.mil and Alexander Olarte alexander.olarte.civ@us.navy.mil

This is a DO-C2 rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700)

AMENDMENT 0002

The Purpose of Amendment 0001 is to :

1. Extend the soliciation due date to 13 December 2024.

2. Provide answers to RFI 001 as seen below.

RFI 0001

1. Please confirm that only walls require patch and paint, and no ceilings are included.

N6660425Q0084

1A. Confirming that the ceilings are out of scope for this project and do not need to be painted.

2. B1171 handrails existing conditions have multiple layers of paint, which were poorly prepped and painted over in previous applications. Will these handrails require complete strip and remove of old paint, or will fine sanding be adequate?

2A. A complete strip is not necessary but contractor will be held to same finish standards on the B1171 handrails as all other handrails.

3. B1246 contains multiple wall hangings. Is the contractor responsible for removal, storage, and reinstallation?

3A. Building managers may be asked to remove wall-hung materials but contractor will be responsible for any wall-hung material not removed by government prior to start of work.

4. B1258 contains an upper skylight. Are the walls in the skylight cavity included in the wall paint scope? Or is this considered part of the ceiling, which does not appear to be included in the scope.

4A. Skylights are not in scope for this project and the skylight walls do not need to be painted.

5. B1258, in N and W stairwells, there is existing water damage on walls. Has the water intrusion been corrected? If not, what is the extent of the contractor’s responsibility?

5A. Contractor will not be held responsible for water damage to new work in areas identified to contain pre-existing damage.

6. B1259 contains lead paint, scheduled to be abated, by drawings. Please confirm if this is a full abatement or if encapsulation will be accepted?

6A. The abatement method will be encapsulation.

7. Specification Section 09 90 00; para 1.5.3 states that SSPC QP 1 Certification is required for the painting subcontractor. This certification is held by large companies only, and typically cannot be competitive on smaller projects, such as this renovation. Please confirm if this requirement will be enforced during the submittal process.

7A. SSPC QP 1 Certification is not required for this project.

All other solicitation terms and conditions remain unchanged

(End of Summary of Changes)