This document is a solicitation for a Cost Plus Fixed Fee (CPFF) Indefinite Quantity/Indefinite Delivery (ID/IQ) contract to provide Submerged Acoustic Navigation System (SANS) Beacons and associated engineering services. The Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) intends to award this sole source contract to Mikel, Inc. under the authority of 10 U.S.C. 2304(c)(5) and 15 U.S.C. 638(r)(1). The contract is a follow-on to a previous contract with Mikel, Inc. and is estimated to require 196,800 man-hours over a five-year period of performance. The North American Industry Classification System (NAICS) code is 541330 with a $47 million size standard. The solicitation provides details on the scope of work, applicable documents, technical requirements, deliverables, security requirements, and other standard contract clauses. Offeror inquiries should be directed to the point of contact, Zachary Silveira.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N6660424R05850002.pdf | ||
| N6660424R05850001.pdf | ||
| Att 2 GFP.pdf | ||
| Att 3 PRST_SANS PUTR 20240917.pdf | ||
| Exh A CDRLs.pdf | ||
| Att 1-DD 254.pdf | ||
| Att 4 Cost Spreadsheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 28 Oct 2024
X
A X B X C X D
EX
X
G F 94 - 106
107 - 124 X H 125 - 127 christina.m.sherron2.civ@us.navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
DO-C9 1 127
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N66604 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
NOT AUTHORIZED
conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
CHRISTINA M. SHERRON (401)832-6462
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 2 3 - 8
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
9 - 52 53 - 55
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
56 - 58 59 - 60
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 61 - 68 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 69 - 72 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
73 - 92
PART II - CONTRACT CLAUSES
NAVAL UNDERSEA WARFARE CENTER DIV. NPT.
ZACHARY SILVEIRA, CODE 0232
CONTRACTS DEPARTMENT
1176 HOWELL STREET, BLDG. 1258
NEWPORT RI 02841-1708
401-832-5760
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
24 Sep 2024
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N6660424R0585
Section A - Solicitation/Contract Form
GENERAL INFORMATION
Distribution: FILE, KR, NUWC 0121, DCMA, DFAS, COR PID Number: N66604-24-RFPREQ-NPT-70-0010 NUWCDIVNPT POC: Zachary Silveira, Zachary.g.silveira.civ@us.navy.mil
Note 1: For all clauses where no CLIN applicability is called out, that clause is applicable to all CLINs.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Engineering Services Completion Type
CPFF
Services in accordance with the Statement of Work sections 4.1-4.3, 4.5-4.7, and 4.9-4.11 Estimated Level of Effort 174,060 FOB: Destination
PSC CD: H258
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
0002 22,740 Labor
Hours
Engineering Services Level of Effort
CPFF
Services in accordance with the Statement of Work sections 4.4 and 4.8.
0003 1 Lot Hardware
CPFF
SANS Beacons; PUTR Processors; and Subcomponents of Beacons, Processors and other associated hardware.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
PSC CD: 5840
0004 1 Lot Other Direct Costs (ODCs)
COST
ODCs associated with travel, shipping and tariffs.
0005 1 Lot Contractor Data Requirements List
FFP
Contractor Data Requirements List (CDRLs)
Data in support of the Statement of Work tasking. Specific applicable CDRLs will be attached to individual delivery and task orders as required.
NOT SEPARATELY PRICED
NET AMT
0006 1 Lot Contractor Acquired Property (CAP)
FFP
Contractor Acquired Property (CAP)
NOT SEPARATELY PRICED
NET AMT
MARK FOR INFORMATION
The following Clauses are incorporated by Full Text:
The contractor shall include the following “Mark For” information clearly marked on all packages (or items themselves if they are not packaged) delivered under this task order:
Mark For:
Receiving Officer, Naval Station Newport, 47 Chandler Street Newport, RI 02841-1716 NUWC Division, Newport, Code: TBD Task Order#: TBD
CLAUSES INCORPORATED BY FULL TEXT
B-216-H006 FEE TABLE (NAVSEA) (MAR 2019)
Labor CLIN Labor Hours Cost Per Hour*
Fee Rate Per Hour*
Loaded Hourly Rate
0002 22,740
*The offeror shall divide the proposed fee for each CLIN by the quantity of labor hours indicated to complete the table. Fee is calculated based on cost less FCCOM; if FCCOM is proposed, necessary columns may be added.
In the event of any inconsistency between the above table and the CLIN pricing, the CLIN pricing shall take precedence.
(End of text)
Applicable CLINs: 0002
B-231-H001 TRAVEL COSTS (NAVSEA) (OCT 2018)
(a) Except as otherwise provided herein, the Contractor shall be reimbursed for its actual travel costs in accordance with FAR 31.205-46. The travel costs to be reimbursed shall be those costs for which the Contractor has maintained appropriate documentation and which have been determined to be allowable, allocable, and reasonable by the Procuring Contracting Officer, Administrative Contracting Officer, or their duly authorized representative.
(b) Reimbursable travel costs include only that travel performed from the Contractor's facility to the worksite, in and around the worksite, and from the worksite to the Contractor's facility.
(c) Relocation costs and travel costs incidental to relocation are allowable to the extent provided in FAR 31.205-35;
however, Procuring Contracting Officer approval shall be required prior to incurring relocation expenses and travel costs incidental to relocation.
(d) The Contractor shall not be reimbursed for the following daily local travel costs:
(i) travel at U.S. Military Installations where Government transportation is available,
(ii) travel performed for personal convenience/errands, including commuting to and from work, and
(iii) travel costs incurred in the replacement of personnel when such replacement is accomplished for the Contractor's or employee's convenience.
B-232-H003 PAYMENTS OF FEE (S) (COMPLETION) (NAVSEA) (OCT 2018)
(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, or "fixed fee" in cost-plus-fixed-fee type contracts.
(b) The Government shall make payments to the Contractor, subject to and per the clause in this contract entitled "Fixed Fee" (FAR 52.216-8) or "Incentive Fee", (FAR 52.216-10), as applicable. Such payments shall be equal to TO BE PROPOSED BY OFFEROR percent (TO BE PROPOSED BY OFFEROR) of the allowable cost of each invoice submitted by and payable to the Contractor pursuant to the clause of this contract entitled "Allowable Cost And Payment" (FAR 52.216-7), subject to the withholding terms and conditions of the "Fixed Fee" or "Incentive Fee" clause, as applicable (percentage of fee payable is based on fee dollars divided by estimated cost dollars including facilities capital cost of money). Fee shall not be applied on Facilities Capital Cost of Money per FAR 15.404-4(c)(3) and DFARS 215-404-71-4. Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract.
(c) In the event of discontinuance of the work under this contract, or any specified phase of the contract, per the clause of this contract entitled "Limitation of Funds" (FAR 52.232-22) or "Limitation of Cost" (FAR 52.232-20), as applicable, the fee shall be equitably adjusted by mutual agreement to reflect the diminution of work. If the adjusted fee is less than the sum of all fee payments made to the Contractor under this contract, the Contractor shall repay the excess amount to the Government. If the adjusted fee exceeds all payments made to the Contractor under this contract, the Contractor shall be paid the additional amount, subject to the availability of funds. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract at the time of the discontinuance of work.
(d) Fee(s) withheld pursuant to the terms and conditions of this contract shall not be paid until the contract has been modified to reduce the fee(s) per paragraph (c) above, or until the Procuring Contracting Officer has advised the paying office in writing that no fee adjustment is required.
(End of Text)
Applicable CLINs: 0001, 0003
B-232-H005 PAYMENTS OF FEE(S) (LEVEL OF EFFORT)--ALTERNATE I (NAVSEA) (OCT 2018)
(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, or "fixed fee" in cost-plus-fixed-fee type contracts.
(b) The Government shall make payments to the Contractor, subject to and per the clause in this contract entitled "Fixed Fee" (FAR 52.216-8) or "Incentive Fee", (FAR 52.216-10), as applicable. Such payments shall be submitted by and payable to the Contractor pursuant to the clause of this contract entitled "Allowable Cost and Payment" (FAR 52.216-7), subject to the withholding terms and conditions of the "Fixed Fee" or "Incentive Fee" clause, as applicable. Fee paid per hour shall be based on total fee dollars divided by total hours to be provided. Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract.
Applicable CLINs: 0002
B-232-H006 LIMITATION OF COST OR LIMITATION OF FUNDS CLARIFICATION (NAVSEA) (OCT 2018)
The clause entitled "Limitation of Cost" (FAR 52.232-20) or "Limitation of Funds" (FAR 52.232-22), as appropriate, shall apply separately and independently to each separately identified estimated cost.
Section C - Descriptions and Specifications
STATEMENT OF WORK
STATEMENT OF WORK (SOW)
SUBMERGED ACOUSTIC NAVIGATION SYSTEM (SANS) SUSTAINMENT
1.0 Background
The Naval Sea (NAVSEA) Systems Command Virginia Class Program Office, PMS 450, has tasked the Naval Undersea Warfare Center (NUWC), Division Newport (NUWCDIVNPT) Code 259 with Virginia Class Test and Evaluation (T&E) planning, execution and coordination responsibilities. This includes identifying the systems, environments and conditions that will support collecting and analyzing the data needed to meet critical test requirements, such as Developmental Test and Evaluation (DT&E) and Operational Test and Evaluation (OT&E).
Virginia Class Block III submarine-on-submarine T&E requires that submarines be tracked with Global Positioning Satellite (GPS)-like geodetic accuracy, while remaining submerged and acoustically passive. Similar acoustically- passive underwater tracking requirements for minefield training led the Commander, Submarine Force, U.S. Pacific Fleet (CSP) N7 to fund a submarine acoustic-passive self-track initiative via PEO-SUB, Submarine Combat and Weapons Control Office, PMS 425. This minefield training occurred in the Kahoolawe, Hawaii, and Tanner Bank, California, geographic areas. The Commander, U.S. Pacific Fleet (CPF) N7 tasked the Pacific Missile Range Facility (PMRF), Kauai, to provide affordable portable underwater multilateration active-acoustic tracking at other locations as well.
To support these test and training requirements, a cost-effective combined multi-lateration and self-track underwater tracking solution was developed by Mikel, Inc. During a series of sequential Phase II and Phase III Small Business Innovation Research (SBIR) actions, Mikel, Inc. developed a combined acoustic multi-lateration and passive- acoustic self-track tracking technology; under Phase II and Phase III SBIR Topics N02-025 and N05-149, respectively.
These topics resulted in Contract(s) N00024-03-C-4144 (Period of Performance 2005-2010) and N00024-05-C-6263 (Period of Performance 2010-2017).
This technology was implemented in hardware and software and consisted of an ocean-floor anchored acoustic beacon and application software hosted on the submarine’s AN/BQQ-10 A- RCI system. The bottom-anchored acoustic beacon and the submarine-hosted application software communicate via acoustic signals. The software onboard the submarine consists of innovative positioning algorithms called Range Only Motion Analysis (ROMA) software. The overall system is called the Submerged Acoustic Navigation System (SANS). Under these SBIRs, SANS was evolved and tested extensively at sea. The SANS capability was further developed to support the Portable Undersea Training Range (PUTR) II and include the use of an autonomous wave glider for unmanned operations.
1.1 Places of Performance
The primary place of performance is the Contractor’s facility. Performance will also take place at Government facilities and onboard Government vessels. Travel will be required to both Continental United States (CONUS) and Outside the Continental United States (OCONUS) locations.
Specific travel locations will be identified in individual task orders and may include the following:
• Newport, RI
• Pearl Harbor, HI
• Norfolk, VA
• Pacific Missile Range Facility (PMRF), Kauai, Hawaii, Kihei and Kahoolawe areas, Maui
• South Florida Ocean Measurement Facility (SFOMF), Ft. Lauderdale, FL
• Atlantic Undersea Test and Evaluation Center (AUTEC), Andros Island, Bahamas, the
U.S. Navy Pacific Northwest Ranges
• Southern California Offshore Range (SCORE)
• Naval Air Warfare Center Aircraft Division, Patuxent River, MD
• North Atlantic Treaty Organization (NATO)and other OCONUS ranges and test facilities
• Lockheed Martin, Manassas, VA
• Dodge Pond, CT
• Seneca Lake, NY
• Guam
• Yokosuka, Japan
1.2 Authorized Users
NUWCDIVNPT Departments 70, 25, and 15 are authorized users under this contract.
1.3 Sponsors
• Defense Advanced Research Projects Agency (DARPA)
• NUWC, Keyport, other Warfare Centers
• United States Naval War College
• Office of Naval Research (ONR)
• PEO IWS 5, PEO IWS 5A
• Naval Sea (NAVSEA) Systems Command (PMS 450, 425, 404, 401, 399, 397, 394)
• Naval Air (NAVAIR) Systems Command (PMA-205)
• United States Army Strategic Missile Defense Command (USASMDC)
• United States Air Force
• United States Space Force
1.4 Types of Funding
• Other Procurement, Navy (OPN),
• Operation & Maintenance, Navy (OMN),
• Research, Development, Test & Evaluation (RDT&E),
• Shipbuilding and Conversion, Navy (SCN),
• Service Cost Center (SCC),
• Foreign Military Sales (FMS)
• National Sea Based Deterrence Funds (NSBDF)
• Special Deposits (SPDP)
2.0 Scope
The Contractor shall continue to develop, upgrade, adapt, produce, and deliver the SANS technology to keep the system up to date with emerging Fleet requirements. The Contractor shall also provide field and at-sea engineering services as detailed in Section 4.0 below and prepare documentation for system operation and system modifications. SANS/PUTR technology includes beacons, beacon launch systems, beacon survey systems, beacon recovery systems, beacon tracking systems, surface-ship support equipment (to include acoustic uplink receivers and station-keeping-buoys or systems) and interfaces with underwater vehicles, such as autonomous wave gliders. Underwater vehicles to which SANS will interface include U.S. and foreign submarines, Unmanned Undersea Vehicles (UUVs), torpedoes, mobile targets, and experimental vehicles.
2.1 Program or Systems Supported
Applicable systems are any systems that make use of any part or the entirety of SANS technology, including new or innovative applications of the ROMA software. Applicable systems may be located on-board an undersea vehicle; such as when integrated into the submarine AN/BQQ10 A-RCI system; a surface vehicle; an air vehicle (fixed or rotary wing); a portable temporary ocean system; a permanent ocean system; or a shore facility.
Examples of undersea vehicles and systems include:
• All classes of current and in-development U.S. submarines, UUVs, weapons and mobile targets
• Unmanned Surface Vehicles
• Fixed ocean systems such as the SFOMF Training Minefield and electromagnetic test sites
• Hawaiian Shallow Water Training Minefield (HSWTM)
• Southern California Tanner Bank Training Minefield (TBTM)
• Pacific Missile Range Facility (PMRF) Portable Undersea Tracking Range (PUTR)
• Naval Surface Warfare Center (NSWC) Carderock South Tongue of the Ocean (TOTO)
Acoustic Measurement Facility (STAFAC)
• Atlantic Undersea Test and Evaluation Center (AUTEC)
• Southern California Offshore Range (SCORE)
• NUWC Keyport test ranges to include Dabob Bay Range Complex, Bay and the joint
U.S. – Canadian range Nanoose Bay facility
3.0 Applicable Documents
The contractor shall perform the tasking required in Section 4.0 in accordance with (IAW) the below Applicable Documents (ADs). Specific Applicable Documents will be identified at the task order level.
NUMBER TITLE
REVISION
/DATE
NUMBER
3.1 PUTR II OISP Performance Specification
with Errata 2
8-Aug-
ALL
3.2 NUWCDIVNPTINST 5090.3E Hazardous
Material Control Program
07-Jan-16 4.1.1, 4.1.2, 4.2.5, all tasks in 4.3, 4.4, 4.7, and 4.8
3.3 MIL-HDBK-189C, Notice 1, Reliability
Growth Management 18-Mar-16 4.3.2
3.4 MIL-HDBK-251, Reliability/Design
Thermal Applications
19-Jan-21 4.3.1, 4.3.2 4.3.3
3.5 MIL-HDBK-338B, Notice 2, Electronic Reliability Design Handbook
11-May-
4.3.1, 4.3.2, 4.3.3
3.6 MIL-HDBK-344A, Notice 2, Environmental Stress Screening (ESS) of Electronic Equipment
11-May-
4.3.1, 4.3.2, 4.3.3
3.7 MIL-HDBK-419A, Grounding, Bonding and Shielding for Electronic Equipment and Facilities, Volumes 1 and 2
20-Feb-
4.3.2
3.8 MIL-HDBK-454B, General Guidelines for
Electronic Equipment
21-Sep-
4.3.2
3.9 MIL-HDBK-472, Notice 1, Maintainability
Prediction
26-May-
4.2.1, 4.3.3
3.10 MIL-HDBK-781A, Reliability Test
Methods, Plans, and Environments for Engineering Development, Qualification, and Production
30-Jan-
4.3.2, 4.4.2
3.11 MIL-STD-881A, Work Breakdown
Structures for Defense Material Items.
13-May-
5.0
3.12 MIL-HDBK-2097A, Acquisition of
Support Equipment and Associated Integrated Logistics Support
19-Jul-19 4.2.1, 4.2.2, 4.2.3, 4.2.5, 4.3.3, 4.4.1
4.4.2
3.13 MIL-HDBK-2155, Failure Reporting, Analysis and Corrective Action Taken 19-Jul-19 4.8
3.14 MIL-PRF-29612A, Performance
Specification Training Data Products
31-Dec-
4.6
3.15 MIL-STD-461G, Requirements for the
Control of Electromagnetic Characteristics of Subsystems and Equipment
11-Dec-15 4.3.2
3.16 MIL-STD-464C, - Electromagnetic
Environmental Effects Requirements For Systems
24-Dec-
4.3.1, 4.3.2 4.3.3,
3.17 MIL-STD-810H, Environmental
Engineering Considerations and Laboratory Tests
18-May-
4.3.1, 4.3.2 4.3.3,
3.18 MIL-STD-882E, System Safety 10-Feb-
4.3.2
3.19 MIL-STD-889C, Dissimilar Metals 21-Jul-
4.3.2
3.20 MIL-STD-1472G, Human Engineering 15-Sep-
4.3.1, 4.3.2 4.3.3
3.21 MIL-STD-2073-1E, Standard Practice for
Military Packaging
22-Apr-19 4.8
3.22 MIL-STD-31000, Technical Data Packages 21-Aug-
4.3.1, 4.3.2 4.8
3.23 DoD 5000.4-M-1 Cost and Software Data
Reporting (CSDR) Manual
4.3.1, 4.3.2, 5.0
3.24 NAVFAC P-307, Management of Weight
Handling Equipment
June 2016 4.4.1 4.4.2
3.25 NAVAIRINST 4355.19E, Systems
Engineering Technical Review Process
06-Feb-15 4.3.2
3.26 NAVAIRINST 5000.21B, Risk
Management Guide
24-Jan-08 5.0
3.27 NAVAIR Cyber Security Plan (CSP)
Version 4.0
01-Jan-17 All
3.28 ANSI S1.20, Standard Procedures for
Calibration of Underwater Electro- Acoustic Transducers
17-Feb-12 4.3.2
3.29 ANSI/EIA 632, Processes for Engineering
a System
14-Sep-15 4.3.2
3.30 EIA 649C, -National Consensus Standard
for Configuration Management
20-Nov-14 4.3.2, 4.3.4
3.31 EIA RS310, Racks, Panels, and Associated
Equipment
9-Apr-12 4.3.2
3.32 EIA 836B, -Configuration Management
Data Exchange and Interoperability
26-Sep-15 4.3.1, 4.3.2, 4.3.4
3.33 IEEE/EIA 12207.1, Software Life Cycle
Processes-Life Cycle Data
19-Apr-12 4.2.1, 4.2.2, 4.2.3, 4.2.5, 4.3.1, 4.3.2, 4.3.4
3.34 IEEE/EIA 12207.2, Standard for
Information Technology – Software Life Cycle Processes – Implementation Considerations
16-Apr-12 4.2.1, 4.2.2, 4.2.3, 4.2.5, 4.3.1, 4.3.2, 4.3.4
3.35 OSHA (Cranes) - Occupational Safety and
Health Administration (OSHA) for General Industry (29 CFR Part 1926) S9086- T4-STM-010/CH-589 (Cranes) Rev 7, section 589-3.7https://www.osha.gov/cranes-derricks/standards
30-Jul-18 4.4.1 4.4.2
3.36 Telcordia SR-332, )- Reliability Prediction
Procedure for Electronic Equipment
Mar-2016 4.3.1, 4.3.2 4.3.3
3.37 National Institute of Standards and
Technologies (NIST) Special Publication 800-171, Rev 2, Protecting Controlled Unclassified Information
Feb-2020 All
(CUI) in Non-Federal Information Systems and Organizations
3.38 NIST Special Publication 800-53, Rev
5, Security and Privacy Controls for Federal Information Systems and Organizations
Apr-2013 All
3.39 DOD Instruction 8510.01: Risk
Management Framework for DOD Systems
Jul-2022 4.3.2, 4.7.1, 4.10, 5.2.4
3.40 NAVSEA FAO Business Rules 6.1 Nov-2023 4.3.2, 4.7.1, 4.10, 5.2.4
3.41 SECNAV Instruction 5239.25, Department Of The Navy Cyberspace Workforce Qualification And Management Program
10-Oct-
4.3.2, 4.7.1, 4.10, 5.2.4
3.42 DoDM 5200.01, Vol 1, DoD
Information Security Program
Change 2, 28 July
All
3.43 DoDM 5200.01, Vol 2, DoD
Information Security Program
Change 4, 28 July
All
3.44 DoDM 5200.01, Vol 3, DoD
Information Security Program
Change 3, 28 July
All
3.45 DoDM 5200.48 Controlled
Unclassified Information
06 March
All
3.46 Defense Transportation Regulation, Cargo Movement (Part II)
24 June
All
3.47 NAVSEA M-5510.1, NAVESA
Security Program Manual
July 2022 All
3.48 NUWCDIVNPT 5500.4,
NUWCDIVNPT Command Security Manual
19 April
All
3.49 OPNAVINST 3960.16C, Navy Test, Measurement and Diagnostic Equipment, Automatic Test Systems and Metrology and Calibration
29 April
4.2.1, 4.2.2, 4.2.3, 4.2.5, 4.3.3, 4.4.1
4.4.2
3.50 NAVSEAINST 4734.1B, NAVSEA
Test, Measurement and Diagnostic Equipment (TMDE) and Calibration
September
4.2.1, 4.2.2, 4.2.3, 4.2.5, 4.3.3, 4.4.1
Program 4.4.2
3.51 OSHA 29 CFR 1910, General Industry
Regulation Standards (https://www.osha.gov/laws-regs/regulations/standardnumber/1910
All
3.52 SECNAV M-5239.2, Cyberspace
Information Technology And Cybersecurity Workforce Management And Qualification Manual, (As amended 20 May 2020 by DoN CIO Memorandum)
June 2016 4.2, 4.7 , 4.11
3.53 DoD Directive 8140.01, Cyberspace
Workforce Management
5 October
4.2, 4.7, 4.11
3.54 DoD Instruction 8140.02, Identification, Tracking, And Reporting Of Cyberspace Workforce Requirements
December
4.2, 4.7, 4.11
3.55 DoD Manual 8140.03, Cyberspace
Workforce Qualification And Management Program
February
4.2, 4.7, 4.11
3.56 Maintenance Support Plan NUWC
WP A01H v6
September
4.1.5, 4.4.1
3.57 MIKEL Operation & Maintenance
(O&M) Plan CDRL A016 vA006
24 June
4.1.5, 4.4.1
3.58 DoD 8570.01-M, Information Assurance
Workforce Improvement Program, Change 4
November
4.3.2, 4.7.1, 4.10, 5.2.4
4.0 Technical Requirements
The Contractor shall perform the below tasks in accordance with Applicable Documents (3.0) and using Government Furnished information (GFI) (6.0) as specified at the Task Order (TO) level issued under this contract.
4.0.1 Contractor Acquired Property (CAP)
All Contractor acquired property under $1,000.00 per line item purchased for a specific sponsor shall be used for any task order for that specific sponsor issued under this Indefinite Delivery/Indefinite Quantity (IDIQ) contract. Any CAP over $1,000.00 per line item shall only be used on the original task orders that the material was purchased under.
4.1 SANS Beacons
4.1.1 Beacons
In accordance with ADs in Section 3.0, as provided at the task order level, and using GFI in Section 6.0, the contractor shall propose updates or re-designs to the specifications, documents, and drawings via Engineering Change Proposal (ECP) to modernize the beacons. Upon Government approval of the ECP, the contractor shall fabricate or update the SANS beacons.
The contractor shall update any existing system and subsystem requirement specifications and associated design documentation based on the recommended update or re-design. If the update or re-design requires an update to the active manufacturing plan, the contractor shall update the manufacturing plan and provide to Government for review.
The contractor shall develop test plans for Government review. Upon Government approval of the test plans, the contractor shall test the updated or re-designed beacons to verify that all meet the SANS updated beacon requirements. The contractor shall provide test and inspection report and identify any failures that occurred during testing as well as recommendations on corrective actions. Upon receipt of GFI, which identifies the equipment and shipment location, the contractor shall ship equipment for beacons to a Government identified location.
Deliverables:
a. System and Subsystem Requirements Specification CDRL A00C
b. Software Requirements Specification CDRL A00F
c. Interface Control Document CDRL A00G
d. Subsystem Design Description CDRL A00J
e. Software Design Description CDRL A00H
f. Product Drawings and Models and Associated Lists CDRL A00K
g. Test Plan CDRL A00Y
h. Test Procedures CDRL A00Z
i. Test/Inspection Report CDRL A010
j. Failure Summary and Analysis Reports (FSARs) CDRL A011
k. Manufacturing Plan CDRL A00R.
l. Engineering Change Proposal (ECP) A00X
4.1.2 Re-Design Beacon Packaging to Allow for Launch from Submarines, UUVs, or Aircraft
In accordance with ADs in Section 3.0, as provided at the task order level, and using GFI in Section 6.0, contractor shall propose updates or re-designs to the specifications, documents, and drawings via Engineering Change Proposal (ECP). The contractor shall re-design the beacon packaging to be compatible for launch from a submerged submarine, UUV or an aircraft. The contractor shall update any existing system or subsystem requirements and associated drawings to reflect the re-design of the beacon packaging. The re-designed package shall be physically compatible with the launcher identified in the TI Deliverables:
a. System/Subsystem Requirements Specification CDRL A00C
b. Product Drawings and Models and Associated Lists CDRL A00K
c. ECP CDRL A00X
4.1.3 Upgrade Beacon Hardware and Software to Satisfy Emerging Requirements for Portable Ranges, Aids to Navigation, Array Calibration and Tactical Applications
In accordance with ADs in Section 3.0, as provided at the task order level, and using GFI in Section 6.0, contractor shall propose updates or re-designs to the specifications, documents, and drawings via Engineering Change Proposal (ECP). Upon Government approval of the update or re-design, the Contractor shall fabricate the beacon hardware and/or software for portable ranges, Aids to Navigation, Array Calibration and Tactical Applications. The contractor shall update any existing system or subsystem specifications and associated drawings to reflect the updates or re-design of the beacons. The Contractor shall interface SANS/PUTR beacons and SANS/PUTR control systems to a deployed Persistent Autonomous Uplink (PAU) system (e.g., wave gliders) to support ocean operations. The contractor shall develop test plans for Government review based on the updated specifications. Upon Government approval of the test plans, the Contractor shall test the upgraded beacons to verify that all beacon requirements related to the updated specifications and drawings are met. The contractor shall provide the test and inspection report and identify any failures that occurred during testing as well as recommendations on corrective actions.
Deliverables:
a. System and Subsystem Requirements Specification CDRL A00C
b. Software Requirements Specification CDRL A00F
c. Interface Control Document CDRL A00G
d. Subsystem Design Description CDRL A00J
e. Software Design Description CDRL A00H
f. Product Drawings/Models and Associated Lists CDRL A00K
g. Test and Evaluation Program Plan CDRL A00Y
h. Test Procedures CDRL A00Z
i. Test/Inspection Report CDRL A010
j. Failure Summary and Analysis Reports (FSARs) CDRL A011
k. Software Version Description CDRL A00W
l. ECP CDRL A00X
4.1.4 Installation, Position Survey and Recovery of SANS Beacons
In accordance with ADs in Section 3.0, as provided at the task order level, and using GFI in Section 6.0, the contractor shall develop an installation plan to deploy, recover, and test beacons.
Upon Government approval of the installation plan, the contractor shall install the updated or re-designed beacons and provide a report of the installation upon completion.
The contractor shall develop test plans and procedures to validate the operability and functionality of the beacons after installation. The contractor shall deploy, recover, and test beacons, perform position surveys, and operate the system as part of the specialized recovery of SANS beacons and with SANS beacon operational use.
Deliverables:
a. Technical Report CDRL A00A
b. Installation Plan A01J
b. Installation Report CDRL A013
c. Trip/Travel Reports CDRL A01A
d. Test Plans CDRL A00Y
f. Test Procedures CDRL A00Z
4.1.5 Depot Maintenance
The contractor shall clean the beacon, update software and firmware, repair broken parts, replace any defective components and document all actions in a technical report.
Deliverables
a. Maintenance Service Report CDRL A01D
b. Software Version Description CDRL A00W
4.2 SANS Self-Track Processor
4.2.1 Install and Maintain SANS Software into the Submarines AN/BQQ-10 Acoustic Rapid COTS Insertion (ARCI) System.
In accordance with ADs in Section 3.0, as provided at the task order level, and using GFI in Section 6.0, the Contractor shall maintain version control and performance of the Contractor-developed SANS ROMA software hosted on AN/BQQ-10 Advanced Rapid COTS Insertion (A- RCI) Advanced Processor Build (APB) program systems on the applicable submarine class as specified at the order level. The Contractor shall provide technical SANS expertise during A-RCI
Program Reviews, participate in teleconferences, Web-meeting and in-person technical planning meetings pertaining to A- RCI APB software and hardware integration and testing.
The contractor shall develop Performance Verification Test (PVT) procedures to test the software changes to the ARCI system. The contractor shall install and test all software changes (including TEMPALT changes) in the AN/BQQ-10 integration facility at Lockheed, Manassas, VA prior to ship installation. Upon Government approval, the contractor shall update the Computer Software Product End Items. The Contractor shall travel to the integration facility or facilities to conduct interface integration and testing. The contractor shall make software end items available to support Functional Configuration Audit/Physical Configuration Audit (FCA/PCAs).
Deliverables:
a. Trip/Travel Reports CDRL A01A
b. Test Procedures CDRL A00Z
c. Test Reports CDRL A010
d. Software Version Description CDRL A00W
e. Computer Software Product End Items CDRL A01B
4.2.2 Upgrade SANS Software for the AN/BQQ-10 (ARCI) to Satisfy Emerging Requirements
The contractor shall modify the Contractor-developed SANS ROMA software hosted on AN/BQQ-10 A–RCI systems on the applicable submarine class, identified at the order level, in response to changes in requirements, as identified in the Applicable Documents at the task order level, driven by PEO SUB APP processes. The Contractor shall test modifications at the AN/BQQ-10 integration facility. The contractor shall make software end items available to support FCA/PCAs.
Deliverables:
a. Test/Inspection Report CDRL A010
b. Trip/Travel Reports CDRL A01A
c. Software Version Description CDRL A00W
d. Computer Software Product End Items CDRL A01B
4.2.3 Maintain and Upgrade SANS Self-Track Software within the T&E Data Collection System
TEMPALT
In accordance with ADs in Section 3.0, as provided at the task order level, and using GFI in Section 6.0 and utilizing the SANS beacon, the Contractor shall maintain and/or upgrade SANS ROMA software onboard the T&E Data Collection System Temporary Alteration (TEMPALT).
The contractor shall ensure the software is compatible with changes, modifications, and upgrades related to the AN/BQQ-10 A–RCI systems on the applicable submarine class which will be identified at the order level. The contractor shall test all software changes (including TEMPALT changes) in the AN/BQQ-10 integration facility at Lockheed, Manassas, VA prior to ship installation and provide a test inspection report. The contractor shall provide the test/inspection report.
The contractor shall make software end items available to support FCA/PCAs.
Deliverables:
a. Test/Inspection Report CDRL A010
b. Software Version Description CDRL A00W
c. Computer Software Product End Items CDRL A01B
4.2.4 Integrate SANS Self-Track Capability into Platforms not Equipped with AN/BQQ-10 A-
RCI
In accordance with ADs in Section 3.0, as provided at the task order level, and using GFI in Section 6.0, the Contractor shall integrate the SANS ROMA software to meet platform mission capability requirements on platforms other than those equipped with AN/BQQ-10 A–RCI systems as listed in Section 2.2. The contractor shall test all software changes (including TEMPALT changes) in the AN/BQQ-10 integration facility at Lockheed, Manassas, VA prior to ship installation.
The contractor shall make software end items available to support FCA/PCAs.
Deliverables:
a. Test/Inspection Report CDRL A010
b. Software Version Description CDRL A00W
c. Computer Software Product End Items CDRL A01B
4.3 Portable Undersea Tracking Range (PUTR) Processor
4.3.1 Build PUTR Processor
In accordance with ADs in Section 3.0, identified in TO, as provided at the task order level, and using GFI in Section 6.0, contractor shall propose engineering baseline updates or re-designs to the PUTR Processors via a Class I (major) ECP. Upon Government approval of the ECP, the Contractor shall update, re-design and fabricate PUTR Processors. The PUTR Processor consists of an acoustic transducer assembly (Dunking Head), Signal Processing Unit that processes SANS beacon uplink signals and transmits acoustic signals, and related software.
The contractor shall develop test procedures for Government review to ensure the update or re-design of the PUTR Processors are functional. Upon Government approval of the test procedures, the Contractor shall conduct tests to verify that the requirements identified in Applicable Document 3.1 are satisfied.
The Contractor shall perform and document a failure mode and effects criticality analysis with recommended resolutions for identified failures for Government review. Upon Government approval, the contractor shall apply the recommended resolutions and note all changes in the user manual, software version description, test procedures, and ECP documents. The Contractor shall document and provide quality assessment reports, and test and inspection reports. For each software delivery provided as part of the update or re-design of the PUTR Processors, the Contractor shall document the Software contents in a software version description document.
The contractor shall provide a reliability critical items list for any items that have changed based upon the re-design of the PUTR Processor.
Deliverables:
a. Test Procedures CDRL A00Z
b. Test/Inspection Reports CDRL A010
c. Failure Modes and Effects Criticality Analysis (FMECA) results CDRL A00N
d. Reliability Critical Items List CDRL A00P
f. Quality Assessment Reports CDRL A00S
g. Software Version Description CDRL A00W
h. Failure Summary and Analysis Report (FSARs) CDRL A011
i. Engineering Change Proposals (ECPs) CDRL A00X
j. User Manual CDRL A01E
4.3.2 Upgrade PUTR Processor Hardware and Software to Meet Emerging Requirements
In accordance with ADs in Section 3.0, as provided at the task order level, and using GFI in Section 6.0, the Contractor shall analyze, design and implement hardware, software, and cybersecurity changes required to address impacts of newly emerging requirements. Required changes include, for example, the design and implementation of additional signal processor Doppler channels, timing system changes, transmit or receive frequency changes. The contractor shall use a request for variance (RFV) to propose a departure from the approved product definition requirements information, for a specific quantity of units, or for a specified period of time. The contractor shall submit an RFV immediately upon recognition of non-conformance with updated technical data packages as identified in 4.3.1. The Contractor shall perform configuration audits prior to delivery and installation and document results in configuration audit summary reports. The contractor shall develop test procedures for Government review to ensure the update or upgrade of the PUTR Processors are functional. Upon Government approval of the test procedures, the Contractor shall conduct tests to verify that the requirements identified in Applicable Document 3.1 are satisfied. The contractor shall report all formal test failures and analysis results. Changes to drawings after final drawing approval shall be processed via Engineering Change Proposals (ECP).
Deliverables:
a. Interface Control Document CDRL A00G
b. Engineering Design Drawings CDRL A00K
c. Configuration Audit Summary Report CDRL A017
d. Request for Variance CDRL A016
e. Test Procedures CDRL A00Z
f. Test Reports CDRL A010
g. Failure Summary and Analysis Reports (FSARs) CDRL A011
h. ECP CDRL A00X
4.4 Operation and Maintenance of PUTR Processor and SANS Beacons
4.4.1 Maintenance of the PUTR Processor and SANS Beacons
Upon receipt of a TI and in accordance with AD in Section 3.0, the Contractor shall perform maintenance of the PUTR processor and SANS beacons. Upon completion of the maintenance, the contractor shall generate a maintenance report, which includes cybersecurity updates. The Contractor shall install and remove the processors for operational use for the purpose of testing and verifying the maintenance outcome. The Contractor shall clean PUTR processor units, update firmware, and repair broken parts as required. The contractor shall develop test procedures for implementation after maintenance to confirm full operational capability in accordance with the requirements documents which will be provided at task order level.
Deliverables:
a. Maintenance Service Report CDRL A01D
b. Installation Report CDRL A013
c. Trip/Travel Reports CDRL A01A
d. Test Plans CDRL A00Y.
e. Software Version Description CDRL A00W
f. Test Procedures CDRL A00Z
4.4.2 Configuration Status Accounting
In accordance with ADs in Section 3.0, as provided at the task order level, and using GFI in Section 6.0, the Contractor shall maintain and deliver regular exports of the configuration status accounting (CSA) database throughout the program life cycle, which completely documents the evolving baselines.
a. Configuration Status Accounting Information CDRL A00E
4.5 Training and Dock-Side Testing Support
4.5.1 Perform Training
Upon receipt of GFI in Section 6.0, the Contractor shall update the training materials for Government review. Upon Government approval of the updated materials, the contractor shall perform training in classroom, hands-on dockside and in an operational (at-sea) environment.
The Contractor shall train Navy personnel in the operation of SANS beacons, wave gliders, and surface ship equipment, as well as SANS submarine-based ROMA software.
Deliverables:
a. Training Materials CDRL A014
b. Trip/Travel Reports CDRL A01A
4.5.2 Dockside Field Support
Upon receipt of GFI in Section 6.0, the Contractor shall support dockside mobilization and demobilization to install or operate SANS equipment to verify the system performs according to specifications as identified at the task order level. The required support will be specified at the Task Order level. The Contractor shall draft test plans and procedures for Government review.
Upon Government approval of the test plans and procedures, the contractor shall provide and test the equipment which includes field checks of all required material, spares, repairs, support and test equipment at the necessary sites for each testing event. The Contractor shall set up a mobile test lab/office to process classified data in a secure manner.
Deliverables:
a. Test Plan CDRL A00Y
b. Test Procedures CDRL A00Z
c. Test Reports CDRL A010
d. Trip/Travel Reports CDRL A01A
4.6 Provide Track Reconstruction and Analysis
4.6.1 Provide Area Tracking and Calculations
The contractor shall perform tracking area calculations. The Contractor shall track and calculate theoretical acoustic hearing range distances and project beacon performance for these tracking area locations.
a. Technical Report CDRL A00A
4.6.2 Track Smoothing and Error Analysis
Upon discovery of invalid or missing data for the beacon, the Contractor shall update SANS software to allow for event reconstruction. For each software update, the Contractor shall document the Software contents in a software version description document. The contractor shall make software end items available to support FCA/PCAs.
Deliverables:
a. Technical Report CDRL A00A
b. Software Version Description CDRL A00W
c. Computer Software Product End Items CDRL A01B
4.7 Develop and Install the SANS Capabilities for Fixed Cabled Ranges
4.7.1 Submerged Self-Track
The Contractor shall generate the SANS synchronized self-tracking signal for transmission from a bi-directional cabled node or a cabled Underwater Communications (as an example, WQC-2) transducer. The contractor shall make software end items available to support FCA/PCAs and provide the software version description.
The contractor shall build and deliver SANS hardware components, identified in TOs, in support of the Underwater Communications as provided by the specifications at task order level.
Deliverables:
a. Software Version Description CDRL A00W
b. Computer Software Product End Items CDRL A01B
4.7.2 SANS Data Telemetry
In accordance with ADs in Section 3.0, as identified at the task order level, and using GFI in Section 6.0, the contractor shall propose updates or re-designs to the specifications, documents, and drawings via Engineering Change Proposal (ECP) related to full duplex data telemetry capabilities based on emergent requirement identified at the task order level. Upon Government approval of the updates or re-design, the contractor shall develop and integrate SANS full duplex data telemetry capabilities into the SANS beacon.
Deliverables:
a. System/Subsystem Requirements Specification CDRL A00C
b. Software Requirements Specification CDRL A00F
c. Interface Control Document CDRL A00G
d. Subsystem Design Description with CDRL A00J
e. Software Design Description CDRL A00H
f. Product Drawings and Models and Associated Lists CDRL A00K
4.8 On-Call Support
The purpose of this task is for term type rapid response remote support to troubleshoot issues related to the beacons and PUTR processor as identified by the Government. If remote solutions are not possible, subsequent completion type task orders may be issued. Upon receipt of trouble call or electronic request from the Government, the contractor shall provide remote troubleshooting to support maintenance and repair of the beacons and PUTR processor. The contractor shall provide initial response to all trouble calls or electronic requests related to the beacons and PUTR Processor within 3 business days of receipt. The contractor shall provide proposed solutions to resolve the issue identified as GFI. The contractor shall provide red lined drawings, revised software, and other supporting documentation as part of the proposed solution.
Deliverables:
a. Technical Report: Troubleshoot Recommendation Report IAW CDRL A00A
b. Revisions to Existing Government Documents IAW CDRL A01C
c. Computer Software Product End Items IAW CDRL A01B
4.9 SANS Beacons and PUTR System Production
The Contractor shall fabricate SANS beacons, associated components, PUTR systems, array calibration beacons, and system components. The Contractor shall test the systems to verify that all specified requirements are met. The Contractor shall provide all associated test procedures, reports, failure reports and corrective actions, quality reports, engineering change proposals and engineering design drawings.
The contractor shall develop a baseline parts list. A request for variance (RFV) shall be used to propose a departure from the approved product definition requirements information, for a specific quantity of units, or for a specified period of time. The contractor shall submit an RFV immediately upon recognition of non-conformance with contract requirements. The Contractor shall also provide a list of critical item spares. The contractor shall submit ECPs to update the associated drawing.
Deliverables:
a. Test Procedures CDRL A00Z
b. Test Reports CDRL A010
c. Failure Summary and Analysis Reports (FSARs) CDRL A011
d. ECP CDRL A00X
e. Quality Assessment Reports CDRL A00S
f. Engineering Design Drawings CDRL A00K
g. Proposed Parts List CDRL A012
h. Request for Variance CDRL A016
4.10 Project Management and System Engineering
Prior to attending program reviews and as updates occur, the Contractor shall develop, update, and deliver project management and system engineering plans listed below . If an update to a management plan is identified by the contractor, the contractor shall submit an updated plan, with Government approved updates, no later than 30 calendar days after Government authorization for the update. The Contractor shall annotate changed material via change bars.
The contractor shall also prepare presentation materials and participate in Government scheduled meetings including System Engineering Technical Reviews (SETR), System Requirements Review (SRR), Preliminary Design Review (PDR), Critical Design Review (CDR), Test Readiness Reviews (TRRs), Functional and Physical Configuration Audits. The contractor shall record meeting minutes.
a. Management Plan CDRL A001
b. Systems Engineering Management Plan CDRL A007
c. Risk Management Plan CDRL A015
d. Configuration Management Plan CDRL A008
e. Test and Evaluation Program Plan CDRL A00Y
f. Configuration Audit Plan CDRL A00V
g. Reliability & Maintainability Program Plan CDRL A00M
h. Corrosion Prevention and Control Plan CDRL A00T
i. Manufacturing Plan CDRL A00R
j. Software Development Plan CDRL A009
The Contractor shall prepare and deliver the following documentation associated with the engineering development, production, and integration of SANS:
k. Subsystems Requirements Specification CDRL A00C
l. Software Requirements Specification CDRL A00F
m. Interface Control Document CDRL A00G
n. Subsystem Design Description CDRL A00J
o. Software Design Description CDRL A00H
p. Engineering Design Drawings CDRL A00K
q. System Safety Hazard Analysis Report CDRL A00L
r. Electromagnetic Environmental Effects (E3) Integration and Analysis Report CDRL A00Q
s. Program Management Reviews (PMRs) and Systems Engineering Technical Reviews (SETRs) agendas and presentation materials CDRL A003
t. Meeting(s) minutes, and Action Item Responses CDRL A004
u. Configuration Audit Summary Report CDRL A017
v. Data Accession List (as necessary) CDRL A00D
w. Maintainability Predictions Report CDRL A018
x. Work Breakdown Structure CDRL A006
y. Integrated Master Schedule CDRL A002
4.11 CYBERSECURITY/Cyber Workforce (CWF)
4.11.1 CWF Qualifications
Per DFARS 252.239-7001 ‘Information Assurance Contracting Training and Certification,’ all personnel performing cyber functions must be trained and qualified. In addition, personnel shall maintain the appropriate security clearance per SECNAV M-5510.30C to perform the tasks associated with their assigned positions.
Note: DFARS uses the term Information Assurance (IA), which is the old title and acronym; it has been replaced by Cyberspace/Cyber Workforce (CWF).
The contractor is required to earn and maintain appropriate baseline certification as identified in DOD 8570.01-M for the position and tasking being performed.
If privileged access is required, the contractor shall complete a privileged access agreement, SECNAV 5239/1, and submit it to the COR. Contractors have up to 6 months to obtain applicable operating system and computing environment training or the account(s) will be suspended. The contractor shall provide a copy of the certificate(s) of completion to the COR.
4.11.2 Cyberspace Reporting
The contractor shall provide a list of all personnel assigned to the contract/task order performing cyber functions as a part of the monthly CWF Report. The report shall include employee name, contract/task order number, list of applicable CWF category and level, required certifications and fulfillment…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .