This document is a contract amendment (Amendment 0003) to Solicitation N6660424R0251 for Construction - B1302 Second Floor Renovation for the Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT).

The key details are:

  • The amendment inserts a new clause, C-228-H002 MINIMUM INSURANCE REQUIREMENTS, and provides answers to 11 questions submitted as Request for Information (RFI) 0002. The RFI responses clarify details about the kitchen/furniture, bid bond, proposal submission, fire protection, HVAC, Builder's Risk Insurance, door frames, wood veneer, door hardware finishes, and government-furnished door cores.
  • The original solicitation is for a construction requirement to renovate the second floor of Building 1302 for NUWCDIVNPT. Contractors must have an active CAGE code to receive the solicitation documents.
  • The amendment does not modify any other terms and conditions of the original solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Construction - B1302 Second floor renovation, newest first.
File Type Posted
N6660424R0251 Amendment 0005.pdf PDF
N6660424R0251 Amendment 0004.pdf PDF
N6660424R0251 Amendment 0002.pdf PDF
N6660424R0251Amendment0001.pdf PDF
N6660424R0251.pdf PDF
Attachment_3_Davis Bacon Wage Determination 3_8_2024.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1301136959

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Page 2.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Apr-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6660424R0251

X 9B. DATED (SEE ITEM 11)

15-Mar-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Apr-2024

CODE

NAVAL UNDERSEA WARFARE CENTER

MICHAEL NORMAN OUELLETTE , CODE 0221

CONTRACTS DEPARTMENT

1176 HOWELL STREET, BLDG. 1258

NEWPORT RI 02841-1708

N66604 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6660424R0251

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been modified:

GENERAL INFORMATION

Distribution: TBD NUWCDIVNPT Requisition Number: 1301136959 NUWCDIVNPT PID Number: N66604-24-RFPREQ-NPT-10-0176 NUWCDIVNPT POC: Michael Ouellette; Email: Michael.n.ouellette.civ@us.navy.mil

AMENDMENT 0003:

The purpose of this amendment is to:

1. Insert Clause C-228-H002 MINIMUM INSURANCE REQUIREMENTS

2. Provide answers to RFI 0002 as seen below:

RFI 0002

1. What will become of the Kitchen Lunch Tble, coffee table, microwave table, etc?

A: Government will remove prior to Construction start.

2. Please confirm what entity (owner) the bid bond should be addressed to.

A: NUWCDIVNPT, N6660424R0251

3. Please confirm that it is acceptable to e-mail the proposal on the due date as per page 40 of the solicitation and no sealed hard copies are required.

A: Per Page 40

2.0 PROPOSAL FORMAT.

(a) Each Offeror shall submit its entire proposal electronically to the points of contact identified above

4. Will any fire protection modifications be needed to accommodate the new room layout?

A: No changes to the fire protection system are necessary.

5. Will any HVAC modifications be needed to accommodate the new room layout?

A: No changes to the HVAC system are necessary.

6. Is a Builder’s Risk Insurance policy required for the project?

A: Please see C-228-H002 MINIMUM INSURANCE REQUIREMENTS (NAVSEA)

(JAN 2019)

7. Please clarify if the door frames are to be knockdown or welded? There is no specification for the Hollow Metal Frames, and it is not indicated in the drawings.

A: Door frames will be knockdown.

8. What is the required species, cut and assembly for the wood veneer of the flush wood doors? The spec has a paragraph about stile & rail and another about plastic laminate, neither of which applies to the doors needed for this project.

A: Birch veneer finish on all edges and faces, with 2 coats polyurethane.

9. Under the 087100 Door Hardware spec, paragraph 2.3 Finishes, the first paragraph states the finishes should be 600/626/630, but the very next paragraph contradicts this and states the finishes should be 612/639. So, which one is correct?

A: 600/626/630

10. Is the Government supplying the 7-pin Best cores, or are they to be provided by the contractor?

A: The government will provide the cores.

11. If we are to provide them, we need to have the information of exactly which cores are used at this facility.

A: The government will provide the cores.

All other solicitation terms and conditions remain unchanged.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been added by full text:

C-228-H002 MINIMUM INSURANCE REQUIREMENTS (NAVSEA) (JAN 2019)

(a) In accordance with the clause(s) of this contract entitled "Insurance--Work On a Government Installation" (FAR 52.228-5) and “Liability and Insurance” (DFARS 252.217-7012), as applicable, the Contractor shall procure and maintain insurance, of at least the kinds and minimum amounts set forth below:

(i) Workers' compensation and employer’s liability coverage shall be at least $100,000, except as provided in FAR 28.307-2(a), if applicable

(ii) Bodily injury liability insurance coverage shall be written on the comprehensive form of policy of at least $500,000 per occurrence.

(iii) Automobile liability policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.

(b) To be approved by the Contracting Officer, insurance certificates must include the following cancellation policy statement: Prior to cancellation or material change in coverage, the contractor shall give 30 days written notice to the Contracting Officer.

(c) Physical work cannot begin until the insurance certificate has been approved by the Contracting Officer. Failure to provide an acceptable insurance certificate will not remove the contractor’s responsibility to meet the delivery requirements outlined in Section F and FAR 52.211-11, Liquidated Damages – Supplies, Services, or Research and Development, if applicable.

(End of text)