N6660424Q0274 Amendment 0001.pdf

PDF 399 KB Posted

Attached to
Construction- Gate 23 Emergency Generator Project Federal contract opportunity
Solicitation number
N6660424Q0274
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document is a contract amendment (Amendment 0001) for a federal solicitation (N6660424Q0274) issued by the Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) for a construction project to provide an Emergency Generator for Gate 23.

The key changes in this amendment include: 1) replacing the previous Davis Bacon Wage Determination with a new one, 2) adding a Spec Sheet for the Kohler generator model, and 3) providing responses to various Requests for Information (RFIs) related to the project, such as the temporary soil stockpile location, startup and programming services for the government-furnished generator and automatic transfer switch, and clarification on the concrete requirements. The amendment also indicates that the government will move the generator and automatic transfer switch to the job site prior to the contractor setting them in place. The original solicitation attachments, drawings, and specifications remain in effect, except for the changes noted in this amendment.

View the file

Other files for this federal contract opportunity

Other files attached to Construction- Gate 23 Emergency Generator Project, newest first.
File Type Posted
Davis Bacon Wage Determination RI20240001 20240405.pdf PDF
II. H. Spec Sheet Generator – Kohler.pdf PDF
Attachment_2_ Davis Bacon Wage Determination.pdf PDF
N6660424Q0274.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1301139989

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Section A.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Apr-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6660424Q0274

X 9B. DATED (SEE ITEM 11)

20-Mar-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Apr-2024

CODE

NAVAL UNDERSEA WARFARE CENTER

JAY PARKER, CODE 0221

CONTRACTS DEPARTMENT

1176 HOWELL STREET

NEWPORT RI 02841

N66604 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6660424Q0274

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been modified:

GENERAL INFORMATION

Distribution: To be provided at award NUWCDIVNPT PR number: To be provided at award

NUWCDIVNPT PID: N66604-24-SIMACQ-NPT-10-0198

NUWCDIVNPT Point of Contact: Jay Parker, jay.a.parker2.civ@us.navy.mil and Micheal Ouellette Michael.N.Ouellette.civ@us.navy.mil

Amendment 0001: The purpose of this amendment it to:

1. Remove Attachment 2 Davis Bacon Wage Determination Wage Determination dated 08-Mar-2024 and replace with Davis Bacon Wage Determination RI20240001 dated 22-Dec-2023.

2. Add attchment 3 Spec Sheet Generator – Kohler

3. Provide answers to RFI 0001

1. Where will the temporary soil stockpile area be located at the job site for the excess excavated material generated from the excavation of the new duct banks? This soil will remain on-site until the soil can be tested, landfill approval received and then scheduled to be removed and properly disposed of at the landfill facility.

Response: The Contractor shall propose a temporary soil stockpile laydown area prior to the start of the project, for approval by the Project Engineer. The laydown area shall be clear of the roadway, and not interfere with gate traffic.

2. The Generator and transfer switch is being provided by the Government. Do we have to provide start up and programing services from the manufacturer for both generator and ATS?

Response: Yes, manufacturer start up and programming services for the generator and ATS (both GFE) are required.

3. Would the items provided by the Government be set in place? If not where will they be?

Response: Response: The generator and ATS (both GFE) will be moved by the Government from their current location at NUWC to the job site. Prior to movement of GFE, the Government and the Contractor will determine the exact placement at the job site.

4. Please provide the contact information for the supplier and the manufacturer make and model number of both the generator and the ATS so that start up and programing services can obtain from factory-authorized personnel.

Response:

Power Products 81 Bay State Road Wakefield, MA 01880 Tel 781-246-1811 Fax 781-246-5321

Generator – Kohler Model # 80REOZJF ATS – Kohler Model # KSS-AMTF-0225S

5. Detail P1 on sheet C/E-1 for the generator pad calls out 4,000 PSI concrete and the duct banks details D1 and D2 on the same sheet call out concrete but do not specify a PSI. What PSI concrete will be required for the concrete encasement of the duct banks?

Response: The concrete used for the concrete encasement of the duct banks shall be a minimum of 3,000 PSI.

6. Sheet 2, Detail E2 shows (2) existing 2 in conduits with cabling coming into the bottom of the junction box.

Where do these conduits and cabling terminate? Work Note 17 specifies new feeder cabling for the entire system.

Response: Refer to the Gate 23 Area Site Plan on sheet 2 for conduit and cable routing. Work note 17 indicates the new parallel feeders (second set of 4-#1/0 + 1-#6 GND) required, from the transformer 827 secondary to the normal line-side of the ATS, and from the load-side of the safety switch to the main lugs of panelboard PP1.

7. Is there a specification available for the purchased generator? Typically, (1) 20A/1P circuit is not enough to power the battery charger and block heater.

Response: Generator specifications attached. Note: the originally purchased NEMA-1 ATS indicated in the specifications was exchanged for a NEMA-4X ATS.

The generator and NEMA-4X ATS are in storage here at NUWC.

8. Would the government provide additional POV photos of the required trenching and their associated approximate lengths? Specifically, handholes 1 through 4.

Response: Existing and new trenches, as well as conduit and conductor quantities and lengths, are all accurately/approximately indicated to scale on the Gate 23 Area Site Plan, on sheet 2 of the drawing set. The government will not provide additional photos.

9. REF: DWG# 23-065A Work Note 8: Will the contractor be responsible for the L&H evolutions and/or the forklift handling required to set the NEW EMERGENCY DIESEL GENERATOR (government provided) in place?

Response: The government will move GFE (generator and ATS) to the work area prior to installation by the contractor. It is the contractor’s responsibility for the L&H evolutions and/or forklift handling required to set the new emergency diesel generator in place on the new concrete pad.

All other terms and conditions remain unchanged.

The following have been deleted:

SITE VISIT INSTRUCTIONS

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Specs & Drawings 23-

065A G23 GATE

GENERATOR

143 19-MAR-2024

Attachment 2 Davis Bacon Wage Determination

15 08-MAR-2024

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Specs & Drawings 23-

065A G23 GATE

GENERATOR

143 19-MAR-2024

Attachment 2 Davis Bacon Wage Determination

RI20240001

15 05-APR-2024

Attachment 3 Spec Sheet Generator – Kohler

(End of Summary of Changes)

File details come from the government source that posted it. Updated .