N6660423R0112.pdf
PDF 1 MB Posted
- Attached to
- TR-364A Projectors Federal contract opportunity
- Solicitation number
- N6660423R0112
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0002 - N6660423R01120002.pdf | ||
| Amendment 0001 - Solicitation N6660423R0112.pdf | ||
| Attachment 2 - Performance Based Milestone Payments.pdf | ||
| Exhibit A - Contract Data Requirements List.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 27 Feb 2023
X
A X B X C X D
EX
X
G F 74 - 94
95 - 106 X H 107 - 115
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
DO-C9 1 115
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N66604 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 0 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
NOT AUTHORIZED
conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 13
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
14 - 30 31 - 33
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
34 - 36 37 - 38
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 39 - 47 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 48 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
49 - 72
PART II - CONTRACT CLAUSES
NAVAL UNDERSEA WARFARE CENTER
TAYLOR CURTIS, , CODE 0222,
CONTRACTS DEPARTMENT
1176 HOWELL STREET, BLDG. 1258
NEWPORT RI 02841-1708
401-832-2161
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
23 Jan 2023
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N6660423R0112
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 2 Each
FIRST ARTICLE TR-364A PROJECTOR UNITS
FFP
First Article VLF Transducers, in accordance with the Statement of Work in Section C.
See Section M NAVSEA text M-209-H001 and M-209-H003.
All Offers must include a price for First Article Units.
Mark For:
Receiving Officer Naval Station Newport 47 Chandler St.
Newport, RI 02841-1716 NUWC Division, Newport
POC: DETAIL PROVIDED AT AWARD
Contract #: DETAIL PROVIDED AT AWARD
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
NET AMT
PRODUCTION TR-364A PROJECTORS
FFP
TR-364A Projector Production in accordance with the Statement of Work in Section C.
OFFEROR TO FILL IN SECTION B PRICING TABLES.
Mark For:
NAVSUP FLCN CHEATHAM ANNEX
1 C Street Williamsburg, VA 23185 757-887-7113
POC: DETAIL PROVIDED AT AWARD
Contract #: DETAIL PROVIDED AT AWARD
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD
BLADDER ASSEMBLY VOLUME COMPENSATOR
FFP
Part Number: 8192788-1
OFFEROR TO FILL IN SECTION B PRICING TABLES.
Mark For:
Receiving Officer Naval Station Newport 47 Chandler St.
Newport, RI 02841-1716 NUWC Division, Newport
POC: DETAIL PROVIDED AT AWARD
Contract #: DETAIL PROVIDED AT AWARD
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD
ARRAY WINDOW, PROJECTOR
FFP
Part Number: 8192811-1
OFFEROR TO FILL IN SECTION B PRICING TABLES.
Mark For:
Receiving Officer Naval Station Newport 47 Chandler St.
Newport, RI 02841-1716 NUWC Division, Newport
POC: DETAIL PROVIDED AT AWARD
Contract #: DETAIL PROVIDED AT AWARD
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD
CONNECTOR, M24217/4-006 TITANIUM (MOD)
FFP
Part Number: 7615483-1
OFFEROR TO FILL IN SECTION B PRICING TABLES.
Mark For:
Receiving Officer Naval Station Newport 47 Chandler St.
Newport, RI 02841-1716 NUWC Division, Newport
POC: DETAIL PROVIDED AT AWARD
Contract #: DETAIL PROVIDED AT AWARD
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD
SHIELD, ARRAY WINDOW, PROJECTOR
FFP
Part Number: 8192806-2
OFFEROR TO FILL IN SECTION B PRICING TABLES.
Mark For:
Receiving Officer Naval Station Newport 47 Chandler St.
Newport, RI 02841-1716 NUWC Division, Newport
POC: DETAIL PROVIDED AT AWARD
Contract #: DETAIL PROVIDED AT AWARD
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD
NODAL RING GROMMET
FFP
Part Number: 8192798-1
OFFEROR TO FILL IN SECTION B PRICING TABLES.
Mark For:
Receiving Officer Naval Station Newport 47 Chandler St.
Newport, RI 02841-1716 NUWC Division, Newport
POC: DETAIL PROVIDED AT AWARD
Contract #: DETAIL PROVIDED AT AWARD
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD
WELD ASSEM. HOUSING 24 CHANNEL PROJECTOR
FFP
Part Number: 8192777-1
OFFEROR TO FILL IN SECTION B PRICING TABLES.
Mark For:
Receiving Officer Naval Station Newport 47 Chandler St.
Newport, RI 02841-1716 NUWC Division, Newport
POC: DETAIL PROVIDED AT AWARD
Contract #: DETAIL PROVIDED AT AWARD
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD
ARRAY MODULE ASSEMBLY PROJECTOR
FFP
Part Number: 8192777-1
OFFEROR TO FILL IN SECTION B PRICING TABLES.
Mark For:
Receiving Officer Naval Station Newport 47 Chandler St.
Newport, RI 02841-1716 NUWC Division, Newport
POC: DETAIL PROVIDED AT AWARD
Contract #: DETAIL PROVIDED AT AWARD
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD
0010 Lot
DATA
FFP
DATA in accordance with Exhibit "A," Contract Data Requirements List (CDRL), DD Form 1423. Specific applicable CDRL’s will be attached to individual delivery orders, as required.
NOT SEPARATELY PRICED
Mark For:
Receiving Officer, Naval Station Newport 47 Chandler Street Newport, RI 02841-1716 NUWC Division, Newport
POC: DETAIL PROVIDED AT AWARD
Contract #: DETAIL PROVIDED AT AWARD
PRICING TABLES
(a) This is an indefinite delivery/indefinite quantity contract with firm fixed price Contract Line Items (CLINs). The Contractor shall deliver items according to the orders issued hereunder, using the prices for the individual CLINs as identified in the pricing tables below.
(b) The tables below contain pricing according to each ordering period (year) and quantity range. The Government will determine each quantity to be purchased by issuing a delivery order. Multiple items may be purchased multiple times via individual orders.
(Offeror to fill in the tables below for each CLIN with the price for each quantity range for each year.)
CLIN 0002 Production TR-364A Projectors Quantity 1 Each 2 Each 3-5 Each 6-8 Each
Year 1 $ $ $ $ Year 2 $ $ $ $ Year 3 $ $ $ $ Year 4 $ $ $ $ Year 5 $ $ $ $
CLIN 0003 Bladder Assembly Volume (P/N: DN 8192788-1) Quantity 3-5 Each 6-10 Each 11-20 Each
Year 1 $ $ $ Year 2 $ $ $ Year 3 $ $ $ Year 4 $ $ $ Year 5 $ $ $
CLIN 0004 Array Window, Projector (P/N:DN 8192811-1) Quantity 3-5 Each 6-10 Each 11-20 Each
Year 1 $ $ $ Year 2 $ $ $ Year 3 $ $ $
CLIN 0005 Connector, M24217/4-006 Titanium (MOD) (P/N:DN 7615483-1) Quantity 1-2 Each 3-5 Each 6-10 Each
Year 1 $ $ $ Year 2 $ $ $ Year 3 $ $ $
CLIN 0006 Shield, Array Window, Projector (P/N:DN 8192806-2) Quantity 1-2 Each 3-5 Each 6-10 Each
Year 1 $ $ $ Year 2 $ $ $ Year 3 $ $ $
CLIN 0007 Nodal Ring Grommet (P/N:DN 8192798-1) Quantity 25-75 Each 76-350 Each 351-700 Each
Year 1 $ $ $ Year 2 $ $ $ Year 3 $ $ $
CLIN 0008 Weld Assembly Housing 24 Channel Projector (P/N:DN 8192804-2) Quantity 1 Each 2-3 Each 4-5 Each
Year 1 $ $ $ Year 2 $ $ $ Year 3 $ $ $
CLIN 0009 Array Module Assembly Projector (P/N:DN 8192777-1) Quantity 2-5 Each 6-11 Each 12-18 Each
Year 1 $ $ $ Year 2 $ $ $ Year 3 $ $ $
Section C - Descriptions and Specifications
STATEMENT OF WORK
TR-364A Projectors
1.0 Background
The Fleet and Sensors & Cables Engineering Branch (Code 1535) of the Sensors and Arrays Division (Code 153) of the Naval Undersea Warfare Center Divisions Newport serves as the Navy’s Technical Design Agent (TDA), and In-Service Engineering Agent (ISEA) and assists with all Acquisition Engineering Agent (AEA) activities for all surface ship and submarine transducers, hydrophones, and sensor assemblies (collectively referred to as transducers). Code 1535 maintains the Navy's transducer inventory in large part by establishing contract vehicles to procure transducers that are delivered both to the stock system to support emergent fleet needs and to new construction shipyards for initial outfitting.
1.1 Places of Performance
All work will be performed at the contractor’s facility.
1.2 Authorized Users
This contract is applicable to the Sensors and SONAR Department, Code 15, of the Naval Undersea Warfare Center Division Newport, RI.
1.3 Sponsors
• PMS 401 Submarine Acoustic Systems
• PMS 450 Virginia Class Program Office
• PMS 397 Columbia Class Program Office
• FMS Foreign Military Sales Office
• Type Commanders
• Naval Shipyards
1.4 Types of Funding
• Operation & Maintenance, Navy (O&MN)
• Other Procurement, Navy (OPN)
• Shipbuilding and Conversion, Navy (SCN)
• National Sea-Based Deterrence Fund (NSBDF)
• Foreign Military Sales (FMS)
2.0 Scope
This SOW reflects a build-to-performance specification approach. The contractor shall document, manufacture, inspect, test, package, and deliver TR-364A First Article and Production Projectors that meet the performance requirements of the TR-364A Projector Critical Item Performance Specification (CIPS). The contractor shall provide build-to-print spare parts.
3.0 Applicable Documents
The contractor shall perform the tasking required in Section 4.0 in accordance with the below Applicable Documents.
3.1 NAVSEA Drawing No. 53711-7545925D Critical Item Performance Specification (CIPS) for the TR-364A Projector
3.2 NUWC Drawing 50225-00267RD Configuration Management Engineering Drawing Requirements
3.3 NUWC Drawing 50225-00266MN Configuration Management Engineering Change Document Manual
3.4 NAVSEA Drawing No. 53711-8192788 Bladder Assembly
3.5 NAVSEA Drawing No. 53711-8192811 Array Window, Projector
3.6 NAVSEA Drawing No. 53711-7615483 Connector, M24217/4-006
3.7 NAVSEA Drawing No. 53711-8192806 Shield, Array, Window, Projector
3.8 NAVSEA Drawing No. 53711-8192798 Nodal Ring Grommet
3.9 NAVSEA Drawing No. 53711-8192804 Weld Assembly Housing 24 Channel Projector
3.10 NAVSEA Drawing No. 53711-8192777 Array Module Assembly Projector
4.0 Technical Requirements
The contractor shall document, manufacture, inspect, test, package, and deliver First Article and Production TR- 364A Projectors that meet the requirements of Applicable Document (AD) 3.1.
The following terms apply throughout this requirements section:
Configuration Item The configuration items (CI) for this contract is the TR-364 Projector.
Functional Baseline The Functional Baseline is established at contract award and is defined by
AD 3.1.
First Article Baseline The First Article Baseline is established prior to First Article testing and consists of the engineering drawings and applicable revisions that define the CI.
Product Baseline The Product Baseline is established upon completion of the Functional and Physical Configuration Audits (FCA and PCA) and consists of the engineering drawings and applicable revisions that define the CI.
Table 1. Requirements
Task Task Description Contract
Timeframe CDRL Deliverable
4.1 GENERAL
4.1.1 Contract Kick-Off
Meeting
The contractor shall conduct a Contract Kick-Off meeting at its facility. The contractor shall prepare the kick-off meeting agenda. The contractor shall present its planned configuration and present a Program Objectives and Milestone Schedule (POAMS) for the First Article and Production phases to include:
- tasks and milestones
- requirements review
- data submittals
- schedule The contractor shall prepare conference minutes and shall submit POAMS with the conference minutes.
Within 45 days after contract award
CDRL A001
DI-ADMN-81249C (Meeting Agenda)
CDRL A002
DI-ADMN-81250C
(Meeting Minutes)
4.1.2 Progress Reports The contractor shall prepare and submit Progress Reports using Government Furnished Information (GFI) item 5.1.
Monthly over the life of the contract
CDRL A003
DI-MGMT-81867 (Production Report)
4.1.3 Failure Reports The contractor shall have a system to handle all material it determines to be non-conforming. This system shall also handle all projectors that fail a First Article or Production Acceptance test. The contractor shall submit Failure Summary and Analysis reports that identify the nature of the failure, and identify remedial and corrective action for preventing future occurrences.
Monthly over the life of the contract
Initial draft due 10 Days after failure is identified
CDRL A004
DI-SESS-80255B (Failure Summary and Analysis Report)
4.2 TR-364A PROJECTOR FIRST ARTICLE PHASE
4.2.1 TR-364A Projector
First Article Hardware
The contractor shall document, inspect, fabricate, test, package and deliver First Article TR-364A Projectors. The contractor shall sequentially serialize the First Article projectors starting with FA001. The contractor shall fabricate the First Article TR-364A Projectors to meet the performance requirements of applicable document 3.1.
Prior to fabrication, the contractor shall perform 100% inspection of all incoming parts for First Article projectors. The contractor shall record variable data for all dimensions specified on the drawings for all first article parts. The contractor shall have this information available at the First Article Physical Configuration Audit (see section 4.2.4).
Defined in Delivery Orders (DO)
Applicable Deliverables identified in subsequent sections.
4.2.2 TR-364A Projector
Preliminary Configuration Review (PCR)
The contractor shall conduct a PCR via Video Teleconference (VTC), conference call, or other remotely enabled delivery system. The purpose of the PCR is to evaluate the technical adequacy of the contractor's preliminary build configuration in meeting the Functional Baseline requirements.
Prior to the PCR, the contractor shall submit Engineering Change Notices (ECNs) which document changes to the Reference Baseline (GFI 5.2) and which reflect its build configuration at the PCR. The contractor shall develop the drawing changes via ECNs and any drawing changes shall conform to NAVSEA requirements in accordance with applicable document 3.2.
Within 90 days after First Article projectors delivery order award.
CDRL A005
NUWC DRAWING 50225-
00266MN (Engineering Change Notice
4.2.3 TR-364A Projector
Final Configuration Review (FCR)
The contractor shall conduct an FCR at its facility.
The purpose of the FCR is to evaluate the technical adequacy of the contractor's final build configuration in meeting the Functional Baseline requirements. At the FCR, the contractor shall be prepared to review:
- the drawing package (GFI 5.2 and all ECNs previously submitted for PCR and
FCR)
- manufacturing flow chart which identifies the manufacturing build steps, in-process steps and inspection points and final production acceptance tests
- POAMS
- Any risks and mitigation plans, if applicable
Prior to the FCR, the contractor shall submit ECNs which document any additional changes to the Reference Baseline (GFI 5.2) since the PCR and which reflect the final build configuration. The contractor shall develop the drawing changes via ECNs so that any drawing changes conform to NAVSEA requirements in accordance with applicable document 3.2.
The contractor shall provide to the Government ECNs which document any additional changes subsequent to the FCR.
The contractor shall resolve all technical discrepancies noted at the PCR and FCR and subsequent to the FCR, prior to delivering First Article projectors.
After PCR and prior to delivering First Article projectors
CDRL A005
NUWC DRAWING 50225-
00266MN (Engineering Change Notice)
4.2.4 TR-364A Projector
First Article Physical Configuration Audit (FA-
PCA)
The contractor shall conduct an FA-PCA. The purpose is for the Government to validate that the components that comprise the First Article projectors match the technical documentation and that all key processes are properly documented.
The contractor shall have copies of the reference drawing package and all ECNs from the PCR, and the FCR available for audit team members at the FA-PCA. The contractor shall have all First Article piece parts available and shall provide the incoming inspection variables data for all the parts.
The contractor shall deliver any drawings that have changed since the FCR (which includes changes resulting from discrepancies identified at the PCR and FCR).
Prior to First Article projector fabrication
CDRL A005
NUWC DRAWING 50225-
00266MN (Engineering Change Notice)
4.2.5 TR-364A Projector
First Article Test Procedures
The contractor shall develop First Article test procedures, for review and approval by the Government, for contractor-performed tests and inspections in accordance with applicable document 3.1. The contractor shall include applicable acceptance and rejection criteria for First Article tests and inspections to ensure that the CI meets the requirements.
Prior to First Article testing
CDRL A006
DI-NDTI-80603A (Test Procedure-First Article Acceptance Test Procedures)
4.2.6 TR-364A Projector
First Article Baseline Configuration
The contractor shall document changes to the CI that occur between FA-PCA and First Article (FA) testing and include that information in the First Article Baseline Report.
The contractor shall submit ECNs which document any changes to the First Article Baseline since the FA-PCA and which reflect the final build configuration. The contractor shall develop the drawing changes via ECNs so that any drawing changes conform to NAVSEA requirements in accordance with applicable document 3.2.
Upon successful FA- PCA and prior to commencing First Article testing
CDRL A007
DI-MISC-80508B (Technical Report – Study/Services - First Article Baseline Report)
CDRL A005
NUWC DRAWING 50225-
00266MN Engineering Change Notice)
4.2.7 TR-364A Projector
First Article Test and Inspection
The contractor shall verify that the First Article projectors meet the CIPS requirements by performing First Article tests and inspections using the test procedures developed in SOW section
4.2.5. In the event that any First Article unit fails
to meet CIPS requirements, the contractor shall be responsible for redesign, rework, retest, and First Article unit replacement. The contractor shall submit a First Article Test Report detailing the contractor-performed First Article tests and corresponding test results for each First Article projector identified by serial number.
Test Report upon completion of contractor-performed First Article testing
CDRL A008
DI-NDTI-80809B
(Test/Inspection Report- Contractor First Article Testing)
CDRL A004
DI-SESS-80255B (Failure Summary and Analysis Report)
4.2.8 TR-364A Projector
Functional Configuration Audit (FCA) and Physical Configuration Audit
(PCA)
The contractor shall conduct a concurrent FCA and PCA at its facility. The FCA is to verify that the CI is compliant with the CIPS; the PCA is to verify that the First Article CI conforms fully to the First Article Baseline. The contractor shall have the following documentation available for auditing at the FCA/PCA:
- The complete drawing package
- Inspection/Test Flow Chart with inspection/test criteria and procedures
- Manufacturing methods and process sheets
- Incoming inspection control procedures
- Production acceptance test procedures
- Test method sheets and standards selection procedures describing operation and calibration of test equipment
- Non-standard parts and parts requiring source control
- Material Review Board (MRB) and Failure Review Board (FRB) process and procedures
The complete drawing package includes the reference baseline drawings and all changes resulting from ECNs and discrepancies identified at the PCR, FCR, FA-PCA, and during FA testing phase.
Upon Government First Article testing completion
CDRL A001
DI-ADMN-81249C (Meeting Agenda)
CDRL A002
DI-ADMN-81250C (Meeting Minutes)
CDRL A005
NUWC DRAWING 50225-
00266MN (Engineering Change Notice)
4.3 TR-364A PROJECTOR PRODUCTION PHASE
4.3.1 TR-364A Projector
Production Hardware
The contractor shall manufacture, test, package and deliver Production projectors to meet the performance requirements of applicable document
3.1 and the Product Baseline provided as GFI 5.3.
The contractor shall serialize the production projectors in accordance with GFI item 5.4. The contractor shall package and deliver spare parts in accordance with applicable drawings of the Product Baseline provided in GFI 5.3.
Defined in Delivery Order
Applicable Deliverables identified in subsequent sections.
4.3.2 TR-364A Projector
Production Test and Inspection
The contractor shall develop Production Acceptance Test Procedures in accordance with applicable document 3.1. The contractor shall perform final acceptance testing of all production hardware items prior to delivery to the Government. Through acceptance testing, the contractor shall ensure that all TR-364A Projectors meet the requirements of applicable document 3.1 and the Product Baseline provided as GFI 5.3.
During active production
CDRL A009
DI-NDTI-80603A (Test Procedure-Production Acceptance Test Procedures)
4.3.3 TR-364A Projector
Production Acceptance Test and Inspection Reports
The contractor shall record actual test results for each production unit by serial number, including date of acceptance by the Government. In the Production Acceptance and Inspection Reports, the contractor shall identify units that failed Production Acceptance Tests or were otherwise accepted only after rework and retest and shall explain the circumstances and corrective actions taken where rework occurred.
During active production
CDRL A00A
DI-NDTI-80809B
(Test/Inspection Report- Production Acceptance Test and Inspection Data)
CDRL A004
DI-SESS-80255B (Failure Summary and Analysis Report)
4.3.4 TR-364A
Transducer Certification Card
The contractor shall complete a Certification Card for each TR-364A Projector to be delivered in accordance with applicable document 3.1.
Certification cards submitted to the Government shall be in electronic format.
During active production
CDRL A00B
NAVSEA DWG. No. 53711- 7545925D Figure 3 (Transducer/Hydrophone Certification Card)
4.3.5 Production Program
Reviews (PPRs)
The contractor shall conduct Production Program Reviews annually. The purpose of the PPRs is to review programmatic and technical issues.
During active production
CDRL A001
DI-ADMN-81249C
(Meeting Agenda)
CDRL A002
DI-ADMN-81250C (Meeting Minutes)
4.3.6 Engineering
Changes
The contractor shall prepare Engineering Change Documents in accordance with applicable document 3.3.
As required during production
CDRL A00C, A00D
DI-SESS-80639E,
DI-SESS-80640E (Engineering Change Proposal (ECP), Request for Variance (RFV))
4.4 TR-364A PROJECTOR BUILD-TO-PRINT ITEMS
4.4.1 TR-364A Projector
Spare Parts
The contractor shall provide the following build-to-print TR-364A Projectors spare parts in accordance with GFI 5.2 and 5.3, for the following: Bladder Assembly Volume Compensator (Part Number: 8192788-1); Array Window, Projector (Part Number: 8192811-1);
Connector, M24217/4-006 Titanium (MOD) (Part Number: 7615483-1); Shield, Array Window, Projector (Part Number: 8192806-2); Nodal Ring Grommet (Part Number: 8192798-1); Weld Assembly Housing 24 Channel Projector (Part Number: 8192804-2); Array Module Assembly Projector (Part Number: 8192777-1).
Defined in Delivery Orders (DO)
No CDRLs
NOTE: In the case of First Article waiver, task (and sub-tasks) 4.2 TR-364A PROJECTOR FIRST ARTICLE PHASE will not be applicable and will be marked ‘RESERVED’ in the resulting contract award.
5.0 Government Furnished Information (GFI)
5.1 DD Form 375
5.2 NAVSEA TR-364A Drawing Package (Reference Baseline)
5.3 NAVSEA TR-364A Drawing Package (Product Baseline)
5.4 Production projector serial numbers
6.0 Exception From Information and Communication Technology Accessibility Requirements
The Government has determined that this procurement is not Information and Communication Technology (ICT) or exempt from Accessibility Standards (36 C.F.R. Part 1194, Appendix A).
CLAUSES INCORPORATED BY FULL TEXT
C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)
(a) Department - means the Department of the Navy.
(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.
(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.
(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.
(End of text)
C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)
(OCT 2018)
(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:
(1) The support contractor not disclose any information;
(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;
(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,
(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.
(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.
(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.
C-209-H001 FIRST ARTICLE (CONTRACTOR TESTING) (NAVSEA) (OCT 2018)
(a) The First Article shall conform in every respect to the requirements of this contract. The First Article shall be manufactured with tools, materials, and methods which are the same as the tools, material and methods which will be used to manufacture the production units. All items delivered under the contract shall be manufactured under the same conditions and quality established by the First Article. Any changes to tools, material, or methods after the first article approval shall be documented by the contractor and approved by the Contracting Officer before they are used.
(b) The Contractor shall make a record of all data obtained during such tests in a form similar to the guidance provided in MIL-HDBK-831A.
(c) Pursuant to paragraph (e) of the clause entitled "First Article Approval--Contractor Testing" (FAR 52.209-3), the First Article shall not be delivered as part of the production quantity.
C-209-H002 FIRST ARTICLE (GOVERNMENT TESTING) (NAVSEA) (OCT 2018)
(a) The First Article shall conform in every respect to the requirements of this contract. The First Article shall be manufactured with tools, materials, and methods which are the same as the tools, material and methods which will be used to manufacture the production units. All items delivered under the contract shall be manufactured under the same conditions and quality established by the First Article. Any changes to tools, material, or methods after the first article approval shall be documented by the contractor and approved by the Contracting Officer before they are used.
The First Article shall not be delivered for first article approval tests as provided for in the clause of this contract entitled "First Article Approval--Government Testing" (FAR 52.209-4) until after the Contractor has fully tested it, at its expense, to determine compliance with said requirements.
(b) The Contractor shall make a record of all data obtained during such tests in a form similar to the guidance provided in MIL-HDBK-831A.
(c) Pursuant to paragraph (e) of the clause entitled "First Article Approval--Government Testing", the First Article shall not be delivered as part of the production quantity.
C-209-H003 WAIVER OF FIRST ARTICLE REQUIREMENTS (NAVSEA) (OCT 2018)
If the First Article is waived by the Government, the Contractor shall deliver supplies that are identical or substantially identical to those previously accepted by the Government under the following contract(s):
(Offeror to fill in contract number(s), as applicable. See Section M)
(End of Text)
C-211-H016 SPECIFICATIONS AND STANDARDS (NAVSEA) (OCT 2018)
(a) Definitions.
(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).
(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.
(b) Requirements. All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only unless specifically identified below.
None
C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018)
The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.
C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)
Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.
C-223-H003 EXCLUSION OF MERCURY (NAVSEA) (MAR 2019)
(a) Definitions. As used in this text:
Article means a manufactured item other than a fluid or particle: (i) which is formed to a specific shape or design during manufacture; (ii) which has end use function(s) dependent in whole or in part upon its shape or design during end use; and (iii) which under normal conditions of use does not release more than very small quantities, e.g., minute or trace amounts of a hazardous chemical, and does not pose a physical hazard or health risk to employees.
Boundary of containment means a continuous tight seal (barrier) to prevent the release of functional mercury during normal operation and maintenance. Examples include the exterior of a fluorescent lamp, glass capsule of a mercury switch, and container for mercury reagents. A double boundary of containment consists of two independent seals.
Functional mercury means mercury or mercury compound(s) contained in equipment that is required for the equipment to operate properly, such as that found in mercury switches, fluorescent lamps, flat-panel monitors, thermostats, thermostat probes, small coin type batteries, barometers, and dental amalgams.
Hardware means any article, container, piece of material, individual part, subassembly, assembly, component, or system to which mercury control requirements apply.
Mercury-free means hardware that does not contain functional mercury and is not contaminated by mercury or mercury compounds.
Portable means items that are frequently transported during normal operation. Desk lamps, shop lights, and hand-held instruments are considered portable, while bulbs in stationary light fixtures are not. In general, items that require transport only during maintenance, installation, and removal of the items are not considered portable.
(b) The Contractor, and all subcontractors and vendors, shall ensure that mercury or mercury containing compounds are not intentionally added to, or come in direct contact with, hardware or supplies furnished under this contract.
(1) The Contractor shall ensure that mercury and mercury compounds are not taken onboard naval vessels by Contractor, subcontractor, or vendor personnel except for functional mercury used in batteries, dental amalgams, fluorescent lamps, flat-panel monitors, required instruments, sensors or controls, weapon systems, and chemical analysis reagents specified by the Naval Sea Systems Command (NAVSEA).
(2) Portable fluorescent lamps and portable instruments containing elemental mercury must be shock-proof in accordance with MIL-DTL-901E entitled Requirements for Shock Tests, H.I. (High Impact) Shipboard Machinery, Equipment, and Systems and have mercury enclosed by a double boundary of containment. Some devices with liquid crystal display (LCD) screens utilize a fluorescent bulb backlight to illuminate the LCD screen.
No additional restrictions or controls apply to devices with LCD screens; however, the Contractor shall remove the LCD screen and seal it in plastic following any evidence that the backlight failed.
(3) For Submarines, any use of mercury containing items must be approved as required by the Nuclear Powered Submarine Atmosphere Control Manual (S9510-AB-ATM-010/U) Volume 1.
(4) The Contractor shall ensure that mercury and mercury compounds do not contact hardware surfaces in systems covered by NAVSEA Manual NAVSEA 0989-064-3000 entitled Cleanliness Requirements for Nuclear Propulsion Plant Maintenance and Construction, submarine air systems, level I systems per NAVSEA Publication 0948-LP-045-7010, NAVSEA Material Control Standard, or the submarine safety program (SUBSAFE) surfaces during maintenance or repair. Such hardware is designated as mercury-free. The Contractor shall ensure that all other hardware that could be structurally degraded by contamination with elemental mercury or reactive mercury compounds is separated from it by sufficient distance, or boundaries of containment that effectively prevents contact in all but the most extreme circumstances.
(5) The Contractor shall check any hardware surfaces in the above systems which are known or suspected to have come in contact with mercury or mercury compounds for evidence of structural degradation and external mercury contamination. The existence of external mercury contamination can be determined following MIL-STD- 2041D entitled Control of Detrimental Materials.
(6) The presence of mercury in a product may be determined by checking product labeling on material safety data sheets or safety data sheets. Chemical analysis is not required.
(7) The Contractor shall dispose of any mercury and mercury compounds in accordance with OPNAV Manual (OPNAV M-5090.1) entitled Environmental Readiness Program Manual of 10 January 2014.
(8) If the use of mercury or mercury compounds cannot be avoided, a risk assessment and waiver request, if required, must be performed and submitted per the NAVSEA Hazardous Material Avoidance Process (T9070-AL- DPC-020/077-2). For systems covered by the NAVSEA Manual NAVSEA 0989-064-3000 entitled Cleanliness Requirements for Nuclear Propulsion Plant Maintenance and Construction, submit the risk assessment and waiver request, if required to Nuclear Propulsion (NAVSEA 08).
(c) In all cases where mercury or a mercury compound has contacted hardware surfaces required to be mercury-free the Contractor shall immediately provide a report to the NAVSEA Dry Environmental Systems and Hazardous Materials (NAVSEA 05P5) via the cognizant contract administration safety office. Reports concerning systems covered by NAVSEA Manual 0989-064-3000 must include NAVSEA Nuclear Propulsion Directorate (SEA 08) in the distribution. Reports must be in letter form and include the date and details of the contact, the surfaces contacted, the recovery actions taken, and the status of the affected surfaces.
C-223-H003 EXCLUSION OF MERCURY (NAVSEA) (MAR 2019)
(a) Definitions. As used in this text:
Article means a manufactured item other than a fluid or particle: (i) which is formed to a specific shape or design during manufacture; (ii) which has end use function(s) dependent in whole or in part upon its shape or design during end use; and (iii) which under normal conditions of use does not release more than very small quantities, e.g., minute or trace amounts of a hazardous chemical, and does not pose a physical hazard or health risk to employees.
Boundary of containment means a continuous tight seal (barrier) to prevent the release of functional mercury during normal operation and maintenance. Examples include the exterior of a fluorescent lamp, glass capsule of a mercury switch, and container for mercury reagents. A double boundary of containment consists of two independent seals.
Functional mercury means mercury or mercury compound(s) contained in equipment that is required for the equipment to operate properly, such as that found in mercury switches, fluorescent lamps, flat-panel monitors, thermostats, thermostat probes, small coin type batteries, barometers, and dental amalgams.
Hardware means any article, container, piece of material, individual part, subassembly, assembly, component, or system to which mercury control requirements apply.
Mercury-free means hardware that does not contain functional mercury and is not contaminated by mercury or mercury compounds.
Portable means items that are frequently transported during normal operation. Desk lamps, shop lights, and hand-held instruments are considered portable, while bulbs in stationary light fixtures are not. In general, items that require transport only during maintenance, installation, and removal of the items are not considered portable.
(b) The Contractor, and all subcontractors and vendors, shall ensure that mercury or mercury containing compounds are not intentionally added to, or come in direct contact with, hardware or supplies furnished under this contract.
(1) The Contractor shall ensure that mercury and mercury compounds are not taken onboard naval vessels by Contractor, subcontractor, or vendor personnel except for functional mercury used in batteries, dental amalgams, fluorescent lamps, flat-panel monitors, required instruments, sensors or controls, weapon systems, and chemical analysis reagents specified by the Naval Sea Systems Command (NAVSEA).
(2) Portable fluorescent lamps and portable instruments containing elemental mercury must be shock-proof in accordance with MIL-DTL-901E entitled Requirements for Shock Tests, H.I. (High Impact) Shipboard Machinery, Equipment, and Systems and have mercury enclosed by a double boundary of containment. Some devices with liquid crystal display (LCD) screens utilize a fluorescent bulb backlight to illuminate the LCD screen.
No additional restrictions or controls apply to devices with LCD screens; however, the Contractor shall remove the LCD screen and seal it in plastic following any evidence that the backlight failed.
(3) For Submarines, any use of mercury containing items must be approved as required by the Nuclear Powered Submarine Atmosphere Control Manual (S9510-AB-ATM-010/U) Volume 1.
(4) The Contractor shall ensure that mercury and mercury compounds do not contact hardware surfaces in systems covered by NAVSEA Manual NAVSEA 0989-064-3000 entitled Cleanliness Requirements for Nuclear Propulsion Plant Maintenance and Construction, submarine air systems, level I systems per NAVSEA Publication 0948-LP-045-7010, NAVSEA Material Control Standard, or the submarine safety program (SUBSAFE) surfaces during maintenance or repair. Such hardware is designated as mercury-free. The Contractor shall ensure that all other hardware that could be structurally degraded by contamination with elemental mercury or reactive mercury compounds is separated from it by sufficient distance, or boundaries of containment that effectively prevents contact in all but the most extreme circumstances.
(5) The Contractor shall check any hardware surfaces in the above systems which are known or suspected to have come in contact with mercury or mercury compounds for evidence of structural degradation and external mercury contamination. The existence of external mercury contamination can be determined following MIL-STD-2041D entitled Control of Detrimental Materials.
(6) The presence of mercury in a product may be determined by checking product labeling on material safety data sheets or safety data sheets. Chemical analysis is not required.
(7) The Contractor shall dispose of any mercury and mercury compounds in accordance with OPNAV Manual (OPNAV M-5090.1) entitled Environmental Readiness Program Manual of 10 January 2014.
(8) If the use of mercury or mercury compounds cannot be avoided, a risk assessment and waiver request, if required, must be performed and submitted per the NAVSEA Hazardous Material Avoidance Process (T9070-AL- DPC-020/077-2). For systems covered by the NAVSEA Manual NAVSEA 0989-064-3000 entitled Cleanliness Requirements for Nuclear Propulsion Plant Maintenance and Construction, submit the risk assessment and waiver request, if required to Nuclear Propulsion (NAVSEA 08).
(c) In all cases where mercury or a mercury compound has contacted hardware surfaces required to be mercury-free the Contractor shall immediately provide a report to the NAVSEA Dry Environmental Systems and Hazardous Materials (NAVSEA 05P5) via the cognizant contract administration safety office. Reports concerning systems covered by NAVSEA Manual 0989-064-3000 must include NAVSEA Nuclear Propulsion Directorate (SEA 08) in the distribution. Reports must be in letter form and include the date and details of the contact, the surfaces contacted, the recovery actions taken, and the status of the affected surfaces.
C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018)
The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit A, attached hereto.
C-242-H001 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (OCT 2018)
(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
C-243-H003 CONFIGURATION MANAGEMENT (NAVSEA) (NOV 2022)
(a) Baseline Definition - All contractual documentation in effect at the time of contract award shall constitute the Contract Baseline, which shall be considered incorporated in the baseline documentation.
(b) General Requirement - (1) The Contractor shall maintain a Configuration Control Program to assure that all detail level work being performed under this contract is in compliance with appropriate baseline documentation.
The Contractor shall prepare a Configuration Management Plan in accordance with the requirements of the contract.
If required, the Contractor’s Configuration Management Plan shall be submitted through the appropriate Contract Data Requirements List (CDRL) for approval by the Government.
(2) Whenever a situation arises wherein the Contractor cannot comply with a baseline document, or whenever intent of such documentation is significantly changed by detail level documentation, the Contractor shall submit change documents to modify the baseline to resolve the conflict or to allow non-compliance. Whenever the cost of implementing a proposed change is less than the threshold requiring certified cost or pricing data, the Contractor shall provide such detail of related costs as to allow the Government to determine an equitable adjustment for the change document submission. Whenever the contract cost changes by an amount greater than the threshold requiring certified cost or pricing data, the Contractor shall complete such cost and pricing data as the Contracting Officer shall require detailing all related costs, and attach it to the change document. Requirements for cost and pricing data shall be determined by the gross amount of the change unless otherwise directed by the Contracting Officer. Change documentation shall be submitted to the Contracting Officer in accordance with the appropriate CDRL, and as described in paragraphs (c) through (f) below.
(c) Engineering Change Proposals (ECPs) - ECPs shall be prepared in accordance with the approved configuration management plan…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .