Attachment 2 - Performance Based Milestone Payments.pdf

PDF 415 KB Posted

Attached to
TR-364A Projectors Federal contract opportunity
Solicitation number
N6660423R0112
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to TR-364A Projectors, newest first.
File Type Posted
Amendment 0002 - N6660423R01120002.pdf PDF
Amendment 0001 - Solicitation N6660423R0112.pdf PDF
N6660423R0112.pdf PDF
Exhibit A - Contract Data Requirements List.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TR-364A CLIN 0001 Milestones (First Article Projectors)

Severable/Cumulative Percent CLIN 0001 Price Milestone Completion Verification Method

1. Preliminary Configuration Review (PCR) Completion

Severable 20% PCR is conducted IAW the SOW. TPOC receives, reviews, and accepts contractor-submitted PCR presentation package and supporting technical documentation.

2. Final Configuration Review (FCR) Completion

Cumulative - based on milestone #1 20% FCR is conducted IAW the SOW. TPOC receives, reviews, and accepts contractor-submitted FCR presentation package and supporting technical documentation.

3. First Article material received Cumulative - based on milestones #1 and #2. 20% Contractor provides internal report to TPOC which provides proof of purchased material receipt (receipt report and date received).

4. Delivery of First Article Projectors Cumulative - based on milestones #1, #2, and #3. 20% Contractor delivers First Article Projectors and the Government receives them.

TOTAL: 80%

TR-364A PRODUCTION

CLIN 0002 Milestones

Severable/Cumulative Percent CLIN Price Milestone Completion Verification Method

1. Drawings and Production Documentation released.

Severable 15%

DCMA representative receives, reviews, and accepts contractor-submitted Product Baseline Drawing listing and supporting technical documentation. Contractor provides internal report to DCMA representative which provides proof of release of production documentation.

2. Material Ordered Cumulative - based on milestone #1 15% Contractor provides internal report to DCMA representative which provides proof that the material was ordered (PO number and date issued).

3. 90% of material line items received. Cumulative - based on milestones #1 and #2 20% Contractor provides internal report to DCMA representative which provides proof that the material was received against the purchase orders (PO) which were placed.

TOTAL: 50%

Solicitation N66604-23-R-0112 for TR-364A Transducers Proposed Milestone Progress Payment Plan