1301014733 B6MODOFF

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. Provide Questions and Answ ers #1 through #12. See continuation page.

2. Provide revised draw ings dated July 2022. See Attachment J-3.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Aug-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6660422Q0562

X 9B. DATED (SEE ITEM 11)

27-Jul-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Aug-2022

CODE

NAVAL UNDERSEA WARFARE CENTER

JOSEPH SCARPA, CODE 0222, 401-832-1499,

CONTRACTS DEPARTMENT

1176 HOWELL STREET, BLDG. 1258

NEWPORT RI 02841-1708

N66604 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6660422Q0562

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS AND ANSWERS #1 - 12

Due Date is not extended; proposals remain due 2:00 PM ET Thusday 11 Aug 2022.

Question #1. What will security will be like to get into and out of the job-site daily?

Answer #1. Once Contractor employees individually get through the full badging process (allow sufficient time), those badges will be good for 179 days, and getting through Gate 17 (open 0600-1800 M-F) will be relatively normal, assuming you are not driving medium box trucks or large tractor trailers. When inside Building 6, Contractor will be escorted by Government Personnel.

Question #2. Are the Porta-King assembly instructions available?

Answer #2. Refer to Attachment J-11 Manufacturer Shop Drawings (informational only).

Question #3. How is Contractor to secure roof to I-Beam (outer edge of the wall and existing wall)?

Answer #3: Refer to Attachment J-11 Manufacturer Shop Drawings.

Question #4. Where are all the openings located, including the windows?

Answer #4. See drawing sheets A-1 and A-2.

Question #5. Where is the Emergency lighting and fire alarm systems connecting?

Answer #5. Emergency Light fixture is to connect to Lighting Wiring before the switch. Fire Alarm work is to be coordinated with NAVSTA Fire Inspector prior to any work taking place. Fire Alarm panel is located at front entrance of Building 6.

Question #6. Will outages need to be “Off Hours” as specified? (Electrical/Sprinkler)

Answer #6. Outages will need to be off hours to modify the Fire Suppression system as needed; the building will need to be evacuated.

Question #7. What is the finish height of the Acoustic Ceiling? Detail B/2 has 11’. Note 1 of ACT says 2’ below roof.

Answer #7. Two feet below roof deck. Acoustical ceiling should be 10 feet from floor to ceiling grid.

Question #8: Electrical ... we see a need to pull 8 circuits but top of Sheet E-1 indicates only 2.

Answer #8: See revised drawing sheet E-1. Contractor is to pull as many circuits from Power Panel illustrated in sheet E-1.

Question #9: Structural column adjacent to front center of cage is not indicated on drawings ... but it seems needed to remain. Request confirmation.

Answer #9: Column is indicated on drawing sheets A-1 and A-2. Column is to remain in place, as it is a structural support column.

Question #10: Confirm door hardware is Government-furnished.

Answer #10: Door hardware is Government-furnished.

Question #11: Vinyl composite flooring. There is an expansion joint down center of concrete slab. Confirm need for skim coat and moisture mitigation system.

Answer #11: Contractor shall propose and provide suitable substrate system on top of existing concrete slab.

Offeror is required to discuss its technical approach to provide a suitable leveling and moisture mitigation system to prevent floor failure, in the technical portion of its quotation.

Question #12: Confirm need for Contractor to furnish and install acoustical ceiling system.

Answer #12: Acoustical ceiling system is Government-furnished. Contractor shall install suspended ceiling system oriented to accommodate lighting layout as shown on plans.

Submit questions to joseph.scarpa6.civ@us.navy.mil or (401) 832-1499 with copy to kathleen.m.hourihan.civ@us.navy.mil or (401) 832-3292.

If you cannot participate in this contract opportunity, please email a brief explanation such that we can continuously improve our acquisition process.

(End of Q&A)

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 01 Wage Determination

RI20220001 Mod 8

10 24-JUN-2022

Attachment 02 Specification B6 23 13-MAY-2022 Attachment 03 Drawing Set B6 7 01-DEC-2021 Attachment 04 List of Key Personnel

Fill-in by Offeror

Attachment 05 Visitor Request Information Needed

Attachment 06 SECNAV Form 5512 Base Access Pass

Attachment 07 Consolidated DoD COVID-19 Guidance

57 29-JUN-2022

Attachment 08 DD Form 3150 Vaccination Certification

Attachment 09 COVID-19 Questionnaire 1 10-FEB-2022

Attachment 10 Government-Furnished Building Products

3 27-JUL-2022

Attachment 11 Manufacturer Shop Drawings - Informational

23 13-MAY-2020

Attachment 12 Indication of Interest Optional Form to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 01 Wage Determination

RI20220001 Mod 8

10 24-JUN-2022

Attachment 02 Specification B6 23 13-MAY-2022 Attachment 03 Drawing Set B6 Rev 1 7 26-JUL-2022 Attachment 04 List of Key Personnel

Fill-in by Offeror

Attachment 05 Visitor Request Information Needed

Attachment 06 SECNAV Form 5512 Base Access Pass

Attachment 07 Consolidated DoD COVID-19 Guidance

57 29-JUN-2022

Attachment 08 DD Form 3150 Vaccination Certification

Attachment 09 COVID-19 Questionnaire 1 10-FEB-2022 Attachment 10 Government-Furnished

Building Products

3 27-JUL-2022

Attachment 11 Manufacturer Shop Drawings - Informational

23 13-MAY-2020

Attachment 12 Indication of Interest Optional Form

(End of Summary of Changes)