N6660421Q0191.pdf
PDF 462 KB Posted
- Attached to
- Construction - Locker Room HVAC Federal contract opportunity
- Solicitation number
- N6660421Q0191
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q and A.pdf | ||
| N6660421Q0191 Amendment 0003.pdf | ||
| Attachment_3_USE OF MASKS AND OTHER PUBLIC HEALTH MEASURES OSD000860-21 RES FINAL.pdf | ||
| N6660421Q0191 Amendment_0002.pdf | ||
| N6660421Q0191 Amendment_0001.pdf | ||
| Attachment_2_ Covid Questionare.pdf | ||
| Attachment_4_ 52.204_24 COMPLETE AND RETURN.pdf | ||
| Attachment_3_ DOD-GUIDANCE-ON-THE-USE-OF-CLOTH-FACE-COVERINGS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1300893615
PROJECT TITLE AND DESCRIPTION: B80 Women's Locker Room HVAC
PROPOSAL DUE: 23 February 2021, 2:00 PM EST; E-mail to: Michael.Ouellette@navy.mil and Kathleen.Hourihan@navy.mil
MAGNITUDE OF PROJECT PER FAR 36.204: Betw een $25,000 and $100,000.
METHOD OF PAYMENT: Government Purchase Card
THIS IS A 100% SMALL BUSINESS SET ASIDE; NAICS 238220; $16.5 M
SITE VISIT: Please note-Due to current COVID-19 pandemic, all attendees shall follow guidance from the Centers for Disease Control and Prevention. Please see Section A for complete Site Visit details. We may need to hold more than one visit depending on the number of attendees. These site visits w ill be conducted back to back to minimize schedule impacts for all attendees.
SITE VISIT DATE and TIME: 08 February 2021, 9:00 am; Meet at Building 80, NUWC Division New port. Please allow for suff icient time to process site visit request. See Section A.
IMPORTANT: PLEASE NOTE THAT TECHNICAL INFORMATION IS REQUIRED WITH SUBMISSION OF OFFER. PLEASE SEE SECTIONS L AND M FOR SPECIFIC REQUIRMENTS. OFFERORS NOT SUBMITTING THIS INFORMATION RISK BEING EXCLUDED FROM CONSIDERATION FOR AWARD.
Offerors shall complete and submit Attachment 4 FAR Provision 52.204-24 w ith proposals.
MICHAEL N OUELLETTE (401)-832-5568
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
22-Jan-2021
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________120 calendar days after receiving aw ard, notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________23 Feb 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
NAVAL UNDERSEA WARFARE CENTER
MICHAEL NORMAN OUELLETTE , CODE 0221
CONTRACTS DEPARTMENT
1176 HOWELL STREET, BLDG. 1258
NEWPORT RI 02841-1708
N66604
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: 401-832-5568 TEL: FAX:
N6660421Q0191 60
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section A - Solicitation/Contract Form
SITE VISIT INSTRUCTIONS
SITE VISIT INSTRUCTIONS
Check-in will begin at 09:00 AM (EST) on 08 February 2021 in the lobby of NUWCDIVNPT Building 80, Newport, RI.
The following rules apply for the site visit:
• This will be an Unclassified site visit.
• The site visit will be scripted, no questions will be allowed during the tour.
• Follow-up questions can be submitted via email to Michael.Ouellette@navy.mil and Kathleen.Hourihan@navy.mil.
• The use of any type of camera during the site visit is strictly prohibited.
• All interested attendees must pre-register by email to Michael.Ouellette@navy.mil and Kathleen.Hourihan@navy.mil. Please include “N6660421R0191 Site Visit” in the subject line of the email.
• In Addition to pre-registration, all participants MUST have an approved Visit Request.
• Instructions for submitting a visit request can be found at the following link:
http://www.navsea.navy.mil/Home/Warfare-Centers/NUWC-Newport/Contact-Us/Mandatory-Visit- Request/
• Access to NUWC Division Newport WILL NOT be granted under any circumstances without a valid visit authorization request on file. Please list Kathleen Hourihan, Code 0232, as the Government POC when submitting the visit request.
Visiting NUWC during COVID-19
• Please review attachment #4 Covid Questionnaire, and follow the most up to date CDC guidelines in determining access to this Government Facility.
• Face coverings must be worn at all times, please refer to attachment #5.
• Visitor Control - NUWC Newport Building 80 Lobby outside of NUWC Gate 23 Is open Monday- Friday from 7 a.m. to 3:30 p.m. (except holidays)
NUWC NEWPORT DIVISION VISITOR REQUEST
INFORMATION
A visit request is MANDATORY for all visitors to NUWC Division Newport; government and civilian, regardless of the duration or classification of the visit. Access to NUWC Division Newport will not be granted under any circumstances without a valid visit authorization request (VAR) on file.
If you can submit your VAR via JPAS, you do not need to send a VAR on company letterhead.
Due to the number of visit requests received, please allow 3-5 business days for processing time, whether received by JPAS or on Company Letterhead via FAX or EMAIL.
Visitors who arrive prior to the 3-5 working day processing window may not be guaranteed access.
Please note, all individuals not in possession of a common access card (CAC) or Teslin Card (Retired Military/Dependent ID), will require a DBIDS card for access.
No unescorted access will be granted without a valid DBIDs card or ID mentioned above.
NUWCDIVNPT VISITOR REQUEST INFORMATION
NEEDED:
**Information must be on Company Letterhead**
1) Company/Organization Name, Address, Telephone, and FAX Number
2) Cage Code
3) Visitor(s) Full Name (As it appears on government issued ID – i.e. Driver’s License)
4) Visitor(s) Full Social Security Number
5) Visitor(s) Date of Birth
6) Visitor(s) Place of Birth (City & State)
a. If born outside the U.S, you MUST provide a Naturalization Number or US Passport
7) Visitor(s) Citizenship
8) Level of Clearance: UNCLASSIFIED or as appropriate
a. SCI Level Access MUST be coordinated SSO to SSO
9) Do they possess a CAC, Teslin or DBIDs Card? (Yes or No)
a. Please specify which visitor(s) have CAC, Retired Military/Dependent ID, DBIDS, or NOT
APPLICABLE
10) NUWCDIVNPT Point of Contact (Sponsor)
a. MUST be a NUWC Government Employee
11) Specific Date(s) of Visit, to include Year
12) Purpose of Visit
13) Contract Number, if applicable
a. If NO Contract Number is provided, then the visit will be for 30 days at the UNCLASSIFIED
Level
14) Authorized Signature:
a. Name, Title, Signature, and Date of Requesting Company/Organization Authorizing Official (MUST be a US Citizen)
b. Smaller companies that do not have a Security Officer to sign may use another Official or Secretary.
c. Individuals MUST NOT Sign their own request
Submit Visitor Request(s) and/or SECNAV form(s) 5512/1 via:
JPAS SMO CODE: 666045 (If no access to JPAS, use methods below)
EMAIL FORM TO: nuwc_npt_access_control@navy.mil
FAX FORM TO: (401) 832-4396
**ALL INCOMPLETE VISIT REQUESTS WILL BE DENIED**
Please call NUWC visitor control at (401) 832-2152 if you want to verify any visits or status on vetting.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job B80 Women's Locker Room HVAC
FFP
B80 HVAC modifications in accordance with the attached Specification and Drawings.
FOB: Destination
VENDOR PART NR: 300000135303-0010
PURCHASE REQUEST NUMBER: 1300893615
PSC CD: Z2AA
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Lot Submittals
FFP
Submittals in accordance with Attachment 1, Specification.
FOB: Destination
PSC CD: Z2AA
NET AMT
Section C - Descriptions and Specifications
SCOPE OF WORK
SCOPE OF WORK
New HVAC System for Women’s Locker Room
Building 80
The contractor shall provide all necessary materials, labor, services, equipment, and incidental related work as required to provide a new complete and usable HVAC system per the accompanying drawings and specifications. The work shall include but not be limited to the following:
� Removal of existing roof top exhaust fans.
� Provide and install new roof top unit, including all required roof working and supports, electrical wiring and conduit, duct work, crane services, and other incidental work required for the installation.
� Provide and install new insulated ductwork, diffusers, dampers, and other required accessories to provide air-side distribution as shown on drawing.
� Provide and install HVAC DDC controls including controllers, wiring, input and output devices, programming, and all other materials and labor as required to achieve proper control functions as stated on drawing.
� Removal and re-installation of existing suspended ceiling, and select cutting of openings in walls (above ceiling) as required for installation of ductwork. Provide patching, painting, and restoration of existing room finishes resulting from damage or required modifications associated with this project.
� Provide all other incidental, labor, materials, and services required for the successful completion of the work.
CLAUSES INCORPORATED BY FULL TEXT
C-228-H002 MINIMUM INSURANCE REQUIREMENTS (NAVSEA) (JAN 2019)
(a) In accordance with the clause(s) of this contract entitled "Insurance--Work On a Government Installation" (FAR 52.228-5) and “Liability and Insurance” (DFARS 252.217-7012), as applicable, the Contractor shall procure and maintain insurance, of at least the kinds and minimum amounts set forth below:
(i) Workers' compensation and employer’s liability coverage shall be at least $100,000, except as provided in FAR 28.307-2(a), if applicable
(ii) Bodily injury liability insurance coverage shall be written on the comprehensive form of policy of at least
$500,000 per occurrence.
(iii) Automobile liability policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.
(b) To be approved by the Contracting Officer, insurance certificates must include the following cancellation policy statement: Prior to cancellation or material change in coverage, the contractor shall give 30 days written notice to the Contracting Officer.
(c) Physical work cannot begin until the insurance certificate has been approved by the Contracting Officer. Failure to provide an acceptable insurance certificate will not remove the contractor’s responsibility to meet the delivery requirements outlined in Section F and FAR 52.211-11, Liquidated Damages – Supplies, Services, or Research and Development, if applicable.
(End of text)
C-237-H002 SUBSTITUTION OF KEY PERSONNEL (NAVSEA) (OCT 2018)
(a) The Contractor agrees that a partial basis for award of this contract is the list of key personnel proposed. Accordingly, the Contractor agrees to assign to this contract those key persons whose resumes were submitted with the proposal necessary to fulfill the requirements of the contract. No substitution shall be made without prior notification to and concurrence of the Contracting Officer in accordance with this requirement.
Substitution shall include, but not be limited to, subdividing hours of any key personnel and assigning or allocating those hours to another individual not approved as key personnel.
(b) All proposed substitutes shall have qualifications equal to or higher than the qualifications of the person to be replaced. The Contracting Officer shall be notified in writing of any proposed substitution at least forty-five (45) days, or ninety (90) days if a security clearance is to be obtained, in advance of the proposed substitution. Such notification shall include: (1) an explanation of the circumstances necessitating the substitution; (2) a complete resume of the proposed substitute; (3) an explanation as to why the proposed substitute is considered to have equal or better qualifications than the person being replaced; (4) payroll record of the proposed replacement; and (5) any other information requested by the Contracting Officer to enable him/her to judge whether or not the Contractor is maintaining the same high quality of personnel that provided the partial basis for award.
(c) Key personnel are identified in an attachment in Section J.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 120 dys. ADC 1 NAVAL STATION NWPT, RECEIVING
OFFICER
RECEIVING OFFICER
47 CHANDLER STREET
NEWPORT RI 02841
401-841-3827 FOB: Destination
N66604
0002 N/A N/A N/A N/A
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within (Contracting Officer insert number) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than . * The time stated for completion shall include final cleanup of the premises.
*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
(End of clause)
Section G - Contract Administration Data
252.204-7006 BILLING INSTRUCTIONS (OCT 2005)
When submitting a request for payment, the Contractor shall--
(a) Identify the contract line item(s) on the payment request that reasonably reflect contract work performance; and
(b) Separately identify a payment amount for each contract line item included in the payment request.
G-232-H002 PAYMENT INSTRUCTIONS AND CONTRACT TYPE SUMMARY FOR PAYMENT
OFFICE (NAVSEA) (JUN 2018)
(a) The following table of payment office allocation methods applies to the extent indicated.
For Government Use Only
Contract/Order Payment Clause
Type of Payment Request
Su pp ly
Se rv ic e
C on st ru ct io n
Payment Office Allocation Method
52.212-4 (Alt I), Contract Terms and Conditions— Commercial Items 52.216-7, Allowable Cost and Payment 52.232-7, Payments under Time-and-Materials and Labor-Hour Contracts
Cost Voucher X X N/A Line item specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN on the deliverable line or deliverable subline item for which payment is requested.
52.232-1, Payments Navy Shipbuilding Invoice (Fixed Price)
X N/A N/A Line Item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.
Contract/Order Payment Clause
Type of Payment Request
Su ic e
C on st ru ct io n
Payment Office Allocation Method
52.232-1, Payments;
52.232-2, Payments under Fixed-Price Research and Development Contracts;
52.232-3, Payments under Personal Services Contracts;
52.232-4, Payments under Transportation Contracts and Transportation-Related Services Contracts; and 52.232-6, Payments under Communication Service Contracts with Common Carriers
Invoice X X N/A Line Item Specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN on the deliverable line or deliverable subline item for which payment is requested.
52.232-5, Payments Under Fixed-Price Construction Contracts
Construction Payment Invoice
N/A N/A X Line Item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.
52.232-16, Progress Payments
Progress Payment*
X X N/A Contract-wide proration. Funds shall be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN. Progress Payments are considered contract level financing, and the “contract price” shall reflect the fixed price portion of the contract per FAR 32.501-3.
52.232-29, Terms for Financing of Purchases of Commercial Items;
52.232-30, Installment Payments for Commercial Items
Commercial Item Financing*
X X N/A Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2) and 32.1007(b)(2).
52.232-32, Performance- Based Payments
Performance- Based Payments*
X X N/A Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2) and 32.1007(b)(2).
252.232-7002, Progress Payments for Foreign Military Sales Acquisitions
Progress Payment*
X X N/A Allocate costs among line items and countries in a manner acceptable to the Administrative Contracting Officer.
Contract/Order Payment Clause
Type of Payment Request
Su ic e
C on st ru ct io n
Payment Office Allocation Method
*Liquidation of Financing Payments. Liquidation will be applied by the payment office against those ACRNs which are identified by the payment instructions for the delivery payment and in keeping with the liquidation provision of the applicable contract financing clause (i.e., progress payment, performance-based payment, or commercial item financing).
(b) This procurement contains the following contract type(s):
Item Type
0001 FFP
FFP – Firm Fixed Price
G-232-H004 GOVERNMENT PURCHASE CARD METHOD OF PAY (NAVSEA) (OCT 2018)
(a) Payment will be made via the Government Purchase Card once evidence of material receipt or service completion and an invoice are received. At the time of shipment, or completion of services, but no later than two business days after shipment, contact the individual identified below to obtain the account number to be charged. The Government Purchase Card must not be charged without first obtaining final authorization from the appropriate Government Purchase Cardholder.
(b) To facilitate delivery, clearly mark all boxes, cartons, containers and packing slips with the order number referenced on the order. Include an itemized and serialized invoice. (NOTE: these numbers can be found on the face of the order or contract.)
(c) To expedite payment, please do not include your invoice with your shipment. Please mail invoice separately to the address below. Any invoice is required for payment to be authorized using the Government Purchase Card. Current DoD and Local policy does not allow the use of third party card processing companies such as Pay Pal, PayPro, etc.
(d) Mail invoices and bankcard authorizations to:
NUWCDIVNPT
Purchasing Agent, Code 1071 1176 Howell Street Newport, RI 02841 E-Mail Address: nuwc_npt_1071hd.fct@navy.mil If you cannot e-mail, please call 401-832-5552.
G-242-H001 GOVERNMENT CONTRACT ADMINISTRATION POINTS-OF-CONTACT AND
RESPONSIBILITIES (NAVSEA) (OCT 2018)
(a) The Government reserves the right to administratively substitute any of the points of contact listed below at any time.
(b) The contracting officer is the only person authorized to change this contract or orders issued thereunder. The Contractor shall not comply with any order, direction or request of Government personnel
- that would constitute a change - unless it is issued in writing and signed by the Contracting Officer or is pursuant to specific authority otherwise included as part of this contract. If, in the opinion of the contractor, an effort outside the existing scope of this contract is requested, the contractor shall promptly comply with the Notification of Changes clause of this contract.
(c) The points of contact are as follows:
(i) The Procuring Contracting Officer (PCO) is:
Kathleen Hourihan
Address: NUWC Division Newport; Newport, RI 02841 Phone: (401)832-3292 E-mail: kathleen.hourihan@navy.mil
(ii) The Contract Specialist is:
Name: Michael Ouellette Address: NUWC Division Newport; Newport, RI 02841 Phone: (401)832-5568 E-mail: michael.ouellette@navy.mil
(d) The Technical Point of Contact (TPOC) is the contracting officer’s representative for technical matters when a COR is not appointed. The TPOC is responsible for technical issues of contract administration, such as providing all items of Government Furnished Information (GFI), Government Furnished Material (GFM) and Government Furnished Equipment (GFE) if specified in the contract as well as the inspection and acceptance of all contract deliverables.
The Technical Point of Contact (TPOC) is: TO BE COMPLETED AT TIME OF AWARD Name: [ * ] Address: [ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx]; FAX: (Area Code) xxx- [xxxx] E-mail: [ * ]
(e) The Alternate Technical Point of Contact (ATPOC) is responsible for TPOC responsibilities and functions in the event that the TPOC is unavailable due to leave, illness, or other official business.
The Alternate Technical Point of Contact (ATPOC) is:
Name: [ * ] Address:
[ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx]; FAX: (Area Code) xxx- [xxxx] E-mail: [ * ]
(f) The Competition Advocate will review complaints from the contractors and ensure that all contractors are afforded a fair opportunity to be considered, consistent with the procedures in the contract.
The NUWCDIVNPT Competition Advocate is:
Name: Stephen Lamb Address: NUWC Division Newport; Newport, RI 02841 E-mail: stephen.a.lamb1@navy.mil
(g) The Contractor's point of contact for performance under this contract is: CONTRACTOR TO
COMPLETE
Name:
Title:
Address:
Phone:
E-mail:
[ * ] To be completed at contract award
Section H - Special Contract Requirements
H-2-0004
CONTRACTOR REQUIREMENTS FOR PERFORMANCE ON A GOVERNMENT SITE (APR 2018)
(a) Control of Contractor Personnel
The contractor shall comply with the requirements of NUWCDIVNPTINST 5500.4C regarding performance at Government facilities. All persons engaged in work while on Government property shall be subject to search of their persons and vehicles at any time by the Government, and shall report any known or suspected security violations to the Security Department of the contracting activity. Assignment, transfer, and reassignment of contractor personnel shall be at the discretion of the contractor. However, the contractor shall remove from contract performance any person who endangers life, property, or national security through improper conduct.
Such removal shall not relieve the contractor from meeting its contractual obligations and shall not be considered an excusable delay as defined in FAR 52.249-14.
(b) Contract Personnel Administration
The contractor is responsible for managing its employees and guarding against any actions that are of the nature of personal services or give the perception that personal services are being provided. If the contractor feels that any actions constitute, or are perceived to constitute personal services, it is the contractor's responsibility to notify the PCO immediately in accordance with the clause FAR 52.243-7. When on-site in Government office spaces, laboratories, test facilities, or ship assets, Contractor employees shall be clearly identified as a Contractor (e.g.
utilizing Common Access Cards (CACs) and sign identifications in office spaces). In addition, Contractor employees shall identify themselves as Contractor personnel when answering telephones and sending emails.
Contractor personnel cannot lead/manage/supervise Government personnel. Contractor program /project managers/Senior Technical Representative (STR) shall be clearly identified and known as such by Government employees. As circumstances permit, periodic meetings shall be conducted between the COR and the Contractor organization program manager/project manager.
(c) Early Dismissal and Closure of Government Facilities
When a Government facility is closed or Federal employees are dismissed early (due to severe weather, security threat, security exercise, or a facility related problem) that prevents personnel from working, onsite contractor personnel regularly assigned to work at that facility shall follow the same reporting and/or departure directions given to Government personnel. The contractor shall not direct charge to the contract for such time off, but shall follow parent company policies regarding taking leave (administrative or other). Non-essential contractor personnel, who are not required to remain at or report to the facility, shall follow their parent company policy regarding whether they should go/stay home or report to another company facility. Subsequent to an early dismissal and during periods of inclement weather, onsite contractors should monitor radio and television announcements before departing for work to determine if the facility is closed or operating on a delayed arrival basis.
When Federal employees are excused from work due to a holiday or a special event (that is unrelated to severe weather, a security threat, or a facility related problem), on site contractors shall continue working established work hours or take leave in accordance with parent company policy. Those contractor employees who take leave shall not direct charge the non- working hours to the contract. Contractors are responsible for predetermining and disclosing their accounting standards, and company policy. Contractors shall follow their disclosed charging practices during the contract period of performance, and shall not follow any verbal directions to the contrary.
The Contracting Officer will make the determination of cost allowability for time lost due to facility closure in accordance with FAR, applicable Cost Accounting Standards, and the Contractor's established accounting policy.
(d) Training Requirements
(A) The contractor shall ensure that each contractor employee performing work at any NUWC Division Newport site take the following actions:
• Complete all required trainings as indicated on the following website:
https://newportalv3.nwpt.nuwc.navy.mil/10/101/Training/SitePages/TrainingWelcome.as px
• Read the documents titled “Occupational Safety and Health Information for Contractors” and “NUWC Division Newport Environmental Policy”, available at the following website, prior to performing any work:
http://www.navsea.navy.mil/Home/WarfareCenters/NUWCNewport/ContactUs/VisitorInformation.aspx
• Complete Environmental Awareness training, available at the following website, within 30 days of commencing performance:
http://www.navsea.navy.mil/Home/WarfareCenters/NUWCNewport/ContactUs/VisitorInformation.aspx
(2) The contractor shall email the following web address indicating completion of items (B) and (C) above upon completion of both: NWPT.NUWC_NPT_1023_Training@navy.mil
(e) Safety Requirements
(1) Prior to commencing any work that falls under the following areas, the contractor shall provide a complete listing of all qualified and trained employees who will perform the work on company letterhead to the Contracting Officer’s Representative, or, if no COR is assigned, to the NUWC Division Newport Safety Office:
(A) Permit required Confined Space Program
(B) Control of Hazardous Energy (Lock out / Tag out)
(C) Respiratory Protection
(D) Walking-Working Surfaces, Fall Protection Program and Scaffolding
(2) The contractor shall follow the posted provisions of the building’s Emergency Action Plan (EAP) for any mishap, incident, or emergency situation.
(3) The contractor shall report unsafe work conditions, safety hazards, and any mishaps (injury/property damage) to their supervisor, the COR, and the NUWC Division Newport Safety Office.
WAGE DETERMINATION
"General Decision Number: RI20210001 01/01/2021 Superseded General Decision Number: RI20200001 State: Rhode Island Construction Types: Building, Heavy (Heavy and Marine) and Highway
Counties: Rhode Island Statewide.
BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories) HEAVY, HIGHWAY AND MARINE CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis‐Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above‐mentioned types of contracts entered into by the federal government that are subject to the Davis‐Bacon Act itself, but it does not apply to contracts subject only to the Davis‐Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)‐(60).
Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/01/2021
ASBE0006‐006 12/01/2019
Rates Fringes
HAZARDOUS MATERIAL HANDLER
(Includes preparation, wetting, stripping, removal scrapping, vacuuming, bagging & disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)..............$ 36.60 22.40
ASBE0006‐008 09/01/2019
Asbestos Worker/Insulator
Includes application of all insulating materials, protective coverings, coatings & finishes to all types of mechanical systems.$ 43.60 29.90
BOIL0029‐001 01/01/2017
BOILERMAKER......................$ 42.42 24.92
BRRI0003‐001 06/01/2020
Bricklayer, Stonemason, Pointer, Caulker & Cleaner.......$ 42.55 28.02
BRRI0003‐002 03/01/2020
Marble Setter, Terrazzo Worker & Tile Setter.............$ 40.78 28.92
BRRI0003‐003 03/01/2020
Finisher.........................$ 34.10 27.88
CARP0330‐001 06/05/2020
CARPENTER (Includes Soft Floor Layer).....................$
39.13
28.60
Diver Tender.....................$ 40.13 28.60
DIVER............................$ 50.73 28.60
Piledriver.......................$ 39.13 28.60
WELDER...........................$ 40.13 28.60
FOOTNOTES:
When not diving or tending the diver, the diver and diver tender shall receive the piledriver rate. Diver tenders shall receive $1.00 per hour above the pile driver rate when tending the diver.
Work on free‐standing stacks, concrete silos & public utility electrical power houses, which are over 35 ft. in height when constructed: $.50 per hour additional.
Work on exterior concrete shear wall gang forms, 45 ft. or more above ground elevation or on setback: $.50 per hour additional.
The designated piledriver, known as the ""monkey"": $1.00 per hour additional.
CARP1121‐002 01/06/2020
MILLWRIGHT.......................$ 39.07 29.15
ELEC0099‐002 06/01/2020
Rates Fringes
ELECTRICIAN......................$ 41.61 57.24%
Teledata System Installer........$ 31.21 13.10%+14.93
Work of a hazardous nature, or where the work height is 30
ft. or more from the floor, except when working
OSHA‐approved lifts: 20% per hour additional.
Work in tunnels below ground level in combined sewer outfall:
20% per hour additional.
ELEV0039‐001 01/01/2020
Rates Fringes ELEVATOR
MECHANIC................$ 53.25 34.765+a+b FOOTNOTES:
(B) PAID HOLIDAYS: New Years Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.
(C) Employer contributes 8% basic hourly rate for 5 years or more of service of 6% basic hourly rate for 6 months to 5 years of service as vacation pay credit.
ENGI0057‐001 12/01/2020
Operating Engineer: (power plants, sewer treatment plants, pumping stations, tunnels, caissons, piers, docks, bridges, wind turbines, subterranean & other marine and heavy construction work)
GROUP 1.....................$ 42.55 27.70+a GROUP 2.....................$ 40.55 27.70+a GROUP 3.....................$ 36.17 27.70+a GROUP 4.....................$ 33.32 27.70+a GROUP 5.....................$ 39.60 27.70+a GROUP 6.....................$ 30.40 27.70+a GROUP 7.....................$ 24.40 27.70+a GROUP 8.....................$ 36.25 27.70+a GROUP 9.....................$ 40.17 27.70+a
a. BOOM LENGTHS, INCLUDING JIBS:
150 feet and over + $ 2.00 180 feet and over + $ 3.00
210 feet and over + $ 4.00 240 feet and over + $ 5.00 270 feet and over + $ 7.00 300 feet and over + $ 8.00 350 feet and over + $ 9.00 400 feet and over + $10.00
a. PAID HOLIDAYS:
New Year's Day, President's Day, Memorial Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day. a: Any employee who works 3 days in the week in which a holiday falls shall be paid for the holiday.
a. FOOTNOTES:
Hazmat work: $2.00 per hour additional.
Tunnel/Shaft work: $5.00 per hour additional.
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Cranes, lighters, boom trucks and derricks
GROUP 2: Digging machine, Ross Carrier, locomotive, hoist, elevator, bidwell‐type machine, shot & water blasting machine, paver, spreader, graders, front end loader (3 yds.
and over), vibratory hammer & vacuum truck, roadheaders, forklifts, economobile type equipment, tunnel boring machines, concrete pump and on site concrete plants.
GROUP 3: Oilers on cranes.
GROUP 4: Oiler on crawler backhoe.
GROUP 5: Bulldozer, bobcats, skid steer loader, tractor, scraper, combination loader backhoe, roller, front end loader (less than 3 yds.), street and mobile‐powered sweeper (3‐yd. capacity), 8‐ft. sweeper minimum 65 HP).
GROUP 6: Well‐point installation crew.
GROUP 7: Utility Engineers and Signal Persons
GROUP 8: Heater, concrete mixer, stone crusher, welding machine, generator and light plant, gas and electric driven pump and air compressor.
GROUP 9: Boat & tug operator.
ENGI0057‐002 11/01/2020
Power Equipment Operator (highway construction projects; water and sewerline projects which are incidental to highway construction projects; and bridge projects that do not span water)
GROUP 1....................$ 35.70 27.70+a GROUP 2....................$ 30.40 27.70+a GROUP 3....................$ 24.40 27.70+a GROUP 4....................$ 30.98 27.70+a GROUP 5....................$ 34.68 27.70+a GROUP 6....................$ 34.30 27.70+a GROUP 7....................$ 29.95 27.70+a
GROUP 8....................$ 31.33 27.70+a GROUP 9....................$ 33.28 27.70+a
a. FOOTNOTE: a. Any employee who works three days in the week in which a holiday falls shall be paid for the holiday.
a. PAID HOLIDAYS: New Year's Day, President's Day, Memorial Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day & Christmas Day.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Digging machine, crane, piledriver, lighter, locomotive, derrick, hoist, boom truck, John Henry's, directional drilling machine, cold planer, reclaimer, paver, spreader, grader, front end loader (3 yds. and over), vacuum truck, test boring machine operator, veemere saw, water blaster, hydro‐demolition robot, forklift, economobile, Ross Carrier, concrete pump operator and boats
GROUP 2: Well point installation crew
GROUP 3: Utlity engineers and signal persons GROUP 4: Oiler on cranes
GROUP 5: Combination loader backhoe, front end loader (less than 3 yds.), forklift, bulldozers & scrapers and boats
GROUP 6: Roller,skid steer loaders, street sweeper
GROUP 7: Gas and electric drive heater, concrete mixer, light plant, welding machine, pump & compressor
GROUP 8: Stone crusher GROUP 9: Mechanic & welder
ENGI0057‐003 12/01/2020
BUILDING CONSTRUCTION
Power Equipment Operator
GROUP 1....................$ 41.82 27.70+a GROUP 2....................$ 39.82 27.70+a GROUP 3....................$ 39.60 27.70+a GROUP 4....................$ 35.60 27.70+a GROUP 5....................$ 32.75 27.70+a GROUP 6....................$ 38.90 27.70+a GROUP 7....................$ 38.47 27.70+a GROUP 8....................$ 35.79 27.70+a a.BOOM LENTHS, INCLUDING JIBS:
150 ft. and over: + $ 2.00 180 ft. and over: + $ 3.00 210 ft. and over: + $ 4.00 240 ft. and over: + $ 5.00 270 ft. and over: + $ 7.00 300 ft. and over: + $ 8.00 350 ft. and over: + $ 9.00 400 ft. and over: + $10.00
a. PAID HOLIDAYS: New Year's Day, President's Day, Memorial Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day & Christmas Day. a: Any employee who works 3 days in the week in which a holiday falls shall be paid for the holiday.
a. FOOTNOTE: Hazmat work: $2.00 per hour additional.
Tunnel/Shaft work: $5.00 per hour additional.
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Cranes, lighters, boom trucks and derricks.
GROUP 2: Digging machine, Ross carrier, locomotive, hoist, elevator, bidwell‐type machine, shot & water blasting machine, paver, spreader, front end loader (3 yds. and over), vibratory hammer and vacuum truck
GROUP 3: Telehandler equipment, forklift, concrete pump & on‐site concrete plant
GROUP 4: Fireman & oiler on cranes GROUP 5: Oiler on crawler backhoe
GROUP 6: Bulldozer,skid steer loaders,bobcats, tractor, grader, scraper,combination loader backhoe, roller, front end loader (less than 3 yds.), street and mobile powered sweeper (3 yds. capacity), 8‐ft. sweeper (minimum 65 hp)
GROUP 7: Well point installation crew
GROUP 8: Heater, concrete mixer, stone crusher, welding machine, generator for light plant, gas and electric driven pump & air compressor
IRON0037‐001 09/16/2020
IRONWORKER.......................$ 37.43 29.62
LABO0271‐001 06/02/2019
LABORER
GROUP 1.....................$ 31.80 25.05
GROUP 2.....................$ 32.05 25.05
GROUP 3.....................$ 32.55 25.05
GROUP 4.....................$ 32.80 25.05
GROUP 5.....................$ 33.80 25.05
LABORERS CLASSIFICATIONS
GROUP 1: Laborer, Carpenter Tender, Mason Tender, Cement Finisher Tender, Scaffold Erector, Wrecking Laborer, Asbestos Removal [Non‐Mechanical Systems]
GROUP 2: Asphalt Raker, Adzemen, Pipe Trench Bracer, Demolition Burner, Chain Saw Operator, Fence & Guard Rail Erector, Setter of Metal Forms for Roadways, Mortar Mixer, Pipelayer, Riprap & Dry Stonewall Builder, Highway Stone Spreader, Pneumatic Tool Operator, Wagon Drill Operator, Tree Trimmer, Barco‐Type Jumping Tamper, Mechanical Grinder Operator
GROUP 3: Pre‐Cast Floor & Roof Plank Erectors
GROUP 4: Air Track Operator, Hydraulic & Similar Self‐Powered Drill, Block Paver, Rammer, Curb Setter, Powderman & Blaster
GROUP 5: Toxic Waste Remover
LABO0271‐002 06/02/2019
HEAVY AND HIGHWAY CONSTRUCTION
LABORER
COMPRESSED AIR
Group 1....................$ 49.23 23.50 Group 2....................$ 38.75 23.50 Group 3....................$ 51.23 23.50
FREE AIR
Group 1....................$ 41.30 23.50
Group 2....................$ 38.75 23.50 Group 3....................$ 43.30 23.50
LABORER
Group 1....................$ 31.80 23.05 Group 2....................$ 32.05 23.05 Group 3....................$ 32.80 23.05 Group 4....................$ 25.30 23.05 Group 5....................$ 33.80 23.05
OPEN AIR CAISSON,
UNDERPINNING WORK AND
BORING CREW
Bottom Man.................$ 37.80 23.05 Top Man & Laborer..........$ 36.85 23.05
TEST BORING
Driller....................$ 38.25 23.05 Laborer....................$ 36.85 23.05
LABORER CLASSIFICATIONS
GROUP 1: Laborer; Carpenter tender; Cement finisher tender;
Wrecking laborer; Asbestos removers [non‐mechanical systems];
Plant laborer; Driller in quarries
GROUP 2: Adzeperson; Asphalt raker; Barcotype jumping tamper; Chain saw operators; Concrete and power buggy operator; Concrete saw operator; Demolition burner; Fence and guard rail erector; Highway stone spreader; Laser beam operator; Mechanical grinder operator; Mason tender; Mortar mixer; Pneumatic tool operator; Riprap and dry stonewall builder; Scaffold erector; Setter of metal forms for roadways; Wagon drill operator; Wood chipper operator;
Pipelayer; Pipe trench bracer
GROUP 3: Air track drill operator; Hydraulic and similar powered drills; Brick paver; Block paver; Rammer and curb setter; Powderperson and blaster
GROUP 4: Flagger & signaler GROUP 5: Toxic waste remover
LABORER ‐ COMPRESSED AIR CLASSIFICATIONS
GROUP 1: Mucking machine operator, tunnel laborer, brake person, track person, miner, grout person, lock tender, gauge tender, miner: motor person & all others in compressed air
GROUP 2: Change house attendant, powder watchperson, top person on iron
GROUP 3: Hazardous waste work within the ""HOT"" zone
LABORER ‐ FREE AIR CLASSIFICATIONS
GROUP 1: Grout person ‐ pumps, brake person, track person, form mover & stripper (wood & steel), shaft laborer, laborer topside, outside motorperson, miner, conveyor operator, miner welder, heading motorperson, erecting operator, mucking machine operator, nozzle person, rodperson, safety miner, shaft & tunnel, steel & rodperson, mole nipper, concrete worker, form erector (wood, steel and all accessories), cement finisher (this type of work only), top signal person, bottom person (when heading is 50' from shaft), burner, shield operator and TBM operator
GROUP 2: Change house attendant, powder watchperson
GROUP 3: Hazardous waste work within the ""HOT"" zone
PAIN0011‐005 06/01/2020
PAINTER
Brush and Roller............$ 35.62 22.55 Epoxy, Tanks, Towers, Swing Stage & Structural Steel.......................$ 37.62 22.55 Spray, Sand & Water Blasting....................$ 38.62 22.55 Taper.......................$ 36.37 22.55 Wall Coverer................$ 36.12 22.55
PAIN0011‐006 06/01/2020
GLAZIER..........................$ 39.18 22.55
SWING STAGE: $1.00 per hour additional.
PAID HOLIDAYS: Labor Day & Christmas Day.
PAIN0011‐011 06/01/2020
Painter (Bridge Work)...........$ 52.25 22.55
PAIN0035‐008 06/01/2011
Sign Painter.....................$ 24.79 13.72
PLAS0040‐001 06/03/2019
CEMENT MASON/CONCRETE FINISHER...$ 36.00 27.15
FOOTNOTE: Cement Mason: Work on free swinging scaffolds under 3 planks width and which is 20 or more feet above ground and any offset structure: $.30 per hour additional.
PLAS0040‐002 07/01/2019
CEMENT MASON/CONCRETE FINISHER...$ 32.85 22.20
PLAS0040‐003 07/01/2019
PLASTERER........................$ 37.55 27.50
PLUM0051‐002 08/31/2020
Plumbers and Pipefitters.........$ 44.69 31.20
* ROOF0033‐004 12/01/2020
ROOFER...........................$ 39.40 28.06
SFRI0669‐001 01/02/2020
SPRINKLER FITTER.................$ 45.67 24.74
* SHEE0017‐002 12/01/2020
Sheet Metal Worker...............$ 38.58 36.73
TEAM0251‐001 05/01/2019
Rates
Fringes
TRUCK DRIVER
GROUP 1....................$
27.96
26.8525+A+B+C
GROUP 2....................$ 27.61 26.8525+A+B+C
GROUP 3....................$ 27.66 26.8525+A+B+C
GROUP 4....................$ 27.71 26.8525+A+B+C
GROUP 5....................$ 27.81 26.8525+A+B+C
GROUP 6....................$ 28.21 26.8525+A+B+C
GROUP 7....................$ 28.41 26.8525+A+B+C
GROUP 8....................$ 27.91 26.8525+A+B+C
GROUP 9....................$ 28.16 26.8525+A+B+C
GROUP 10....................$ 27.96 26.8525+A+B+C
A. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, plus Presidents' Day, Columbus Day, Veteran's Day & V‐J Day, providing the employee has worked at least one day in the calendar week in which the holiday falls.
B. Employee who has been on the payroll for 1 year or more but less than 5 years and has worked 150 Days during the last year of employment shall receive 1 week's paid vacation; 5 to 10 years ‐ 2 weeks' paid vacation; 10 or more years ‐ 3 week's paid vacation.
C. Employees on the seniority list shall be paid a one hundred dollar ($100.00) bonus for every four hundred (400) hours worked, up to a maximum of five hundred dollars ($500.00)
All drivers working on a defined hazard material job site shall be paid a premium of $2.00 per hour over applicable rate.
TRUCK DRIVER CLASSIFICATIONS
GROUP 1: Pick‐up trucks, station wagons, & panel trucks GROUP 2: Two‐axle on low beds GROUP 3: Two‐axle dump truck GROUP 4: Three‐axle dump truck GROUP 5: Four‐ and five‐axle equipment
GROUP 6: Low‐bed or boom trailer.
GROUP 7: Trailers when used on a double hook up (pulling 2 trailers)
GROUP 8: Special earth‐moving equipment, under 35 tons GROUP 9: Special earth‐moving equipment, 35 tons or over GROUP 10: Tractor trailer
WELDERS ‐ Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis‐Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health‐related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health‐related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .