N6660421Q0059 Sole Source Justification 1.pdf
PDF 499 KB Posted
- Attached to
- Torpedo Mounted Dispenser Shock Mount Assemblies Modifications Federal contract opportunity
- Solicitation number
- N66604-21-Q-0059
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Shock Amount GFP Form.pdf | ||
| Clause 52_204_24.pdf | ||
| TMD SMA Statement of Work.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
v1.5_JANUARY2020
SOLE SOURCE JUSTIFICATION
Torpedo Shock Mount Assembly Modifications
DESCRIPTION OF REQUIREMENT:
The Naval Undersea Warfare Center, Division Newport requires modification of the
The estimated cost for this modification is . Delivery is 8 weeks after award of contract.
MFGR Part No Description/Title Qty Configs (If applicable)
7052960 Shock Mount Assemblies 769 Rev B
7052960 Shock Mount Assemblies First
Article Test (FAT)
5 Rev B
SOLE SOURCE JUSTIFICATION
Huestis Machine Corporation has a long history and expertise in modifying SMAs for NAVSEA
Part Number
. Huestis Machine Corporation has the expertise, data packages, set-up and tooling capability in place for performing these modifications in the required timeframe. The modifications to the
SMAs are a vital part of the Ordnance Alteration (ORDALT) that is currently on hold awaiting these modified SMAs, which is impacting the Intermediate Maintenance Activities (IMAs) aggressive FY21 schedule.
If this requirement were to be awarded to another company, it would require Government inspection, approval and verification of their manufacturing and testing facilities which would greatly impact the current schedule. Huestis Machine Corporation, with its facility set-up and tooling capabilities, prior experience, and work on modifying SMAs, is the only choice to fulfill this requirement within the anticipated cost and necessary project schedule, therefore meeting the
Navy’s mission.
v1.5_JANUARY2020
Requiring Department:
Based on the above, I recommend this acquisition be conducted on a Sole Source Justification basis. I certify the technical data which form the basis of this justification are complete and accurate.
APPROVAL:
Contracting Officer:
Based on the above, I have determined that the circumstances of the contract action deem only one source reasonably available/only can fulfill the requirements. I certify that this justification is accurate and complete to the best of my knowledge and belief.