Text version

1300844790

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1) Dissolve the set-aside and re-solicit full and open, 2) extend the RFQ closing date to 25 June 2020 2:00 PM EST, 3) revise Section L to incorporate a requirement to the TECH EVAL FACTOR 1, Subfactor (b), 4) schedule an additional site visit on 11 June 2020 9:00AM EST, 5) Refresh and revise clauses

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-May-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6660420R8176

X 9B. DATED (SEE ITEM 11)

20-Apr-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-May-2020

CODE

NAVAL UNDERSEA WARFARE CENTER

MICHAEL BROOMFIELD, CODE 0222

CONTRACTS DEPARTMENT

1176 HOWELL STREET, BLDG. 1258

NEWPORT RI 02841

N66604 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6660420R8176

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 22-May-2020 04:00 PM to 25-Jun-2020 02:00

PM.

The required performance has changed from PROJECT TITLE AND DESCRIPTION: Installation of (2) 6” Class 1500 control valves, associated flanges, piping, supports, radiographic & ultrasonic testing of welds. SITE VISIT: 01 May 2020, 10:00 AM, EST-See Section A for instructions. Please note-Due to current COVID-19 situation, all attendees should follow guidance from the Centers for Disease Control and Prevention. Please see attached questionaire that may assist you in determining whether to attend the site visit. Also, please see attachmnet for face covering requirements on DoD installations. We may need to hold more than one visit depending on the number of attendees. These would be conduted back-to-back to minimize imact to an attendee's schedule.PROPOSAL DUE:22 May 2020, 4:00 PM EST; E-mail to:

leslie.brazil@navy.mil and michael.h.broomfield@navy.mil

MAGNITUDE: IAW FAR 36.204, BETWEEN $25,000 AND $100,000.

THE METHOD OF PAYMENT WILL BE WIDE AREA WORKFLOW.

THIS IS A 100% SMALL BUSINESS SET ASIDE; NAICS 236220; $39.5 MIIMPORTANT:

PLEASE NOTE THAT TECHNICAL INFORMATION IS REQUIRED WITH SUBMIISSION OF OFFEROR.

SEE SECTIONS AND L AND M FOR SPECIFIC REQUIREMENTS. OFFERORS NOT SUBMITTING THIS

INFORMATION RISK BEING EXCLUDED FROM CONSIDERATION FOR AWARD

to PROJECT TITLE AND DESCRIPTION:Construction Contract: Installation of (2) 6” Class 1500 control valves, associated flanges, piping, supports, radiographic & ultrasonic testing of welds. SITE VISIT: 11 June 2020, 09:00 AM, EST-See Section A for instructions. Please note-Due to current COVID-19 situation, all attendees should follow guidance from the Centers for Disease Control and Prevention. Please see attached questionaire that may assist you in determining whether to attend the site visit. Also, please see attachmnet for face covering requirements on DoD installations. We may need to hold more than one visit depending on the number of attendees. These would be conduted back-to-back to minimize imact to an attendee's schedule.PROPOSAL DUE: 25 June 2020, 2:00 PM EST; E-mail to: leslie.brazil@navy.mil and michael.h.broomfield@navy.mil

MAGNITUDE: IAW FAR 36.204, BETWEEN $25,000 AND $100,000.THE

METHOD OF PAYMENT WILL BE WIDE AREA WORKFLOW.

FULL AND OPEN COMPETITION; NAICS 236220; $39.5 MIL

IMPORTANT: PLEASE NOTE THAT TECHNICAL INFORMATION IS REQUIRED WITH SUBMIISSION OF

OFFEROR. SEE SECTIONS AND L AND M FOR SPECIFIC REQUIREMENTS. OFFERORS NOT

SUBMITTING THIS INFORMATION RISK BEING EXCLUDED FROM CONSIDERATION FOR AWARD.

SECTION I - CONTRACT CLAUSES

The following have been added by reference:

52.222-42 Statement Of Equivalent Rates For Federal Hires MAY 2014 52.222-55 Minimum Wages Under Executive Order 13658 DEC 2015 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017 mailto:michael.h.broomfield@navy.mil mailto:michael.h.broomfield@navy.mil

The following have been added by full text:

DFARS52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any DFARS (48 CFR 2) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(End of clause)

The following have been deleted:

52.219-6 Notice Of Total Small Business Set-Aside NOV 2011

SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

52.222-33 Notice of Requirement for Project labor Agreement MAY 2010

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

52.204-17 Ownership or Control of Offeror JUL 2016 52.214-34 Submission Of Offers In The English Language APR 1991 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.236-27 Site Visit (Construction) FEB 1995

The following have been added by full text:

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any DFARS (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(End of provision)

The following have been modified:

PROPOSAL REQUIREMENTS

GENERAL NOTES TO OFFERORS:

The RFP will be made available only through the Government Point of Entry, also known as ContractOpportunities (formerly FBO) at: http://www.beta.sam.gov Offerors are hereby notified that, from time to time, the Government may post additional information to the Beta.sam web site relating to this RFP (e.g., responses to questions, amendments, etc.). It is the Offeror’s responsibility to check the web site for any such information.

All questions concerning this procurement, either technical or contractual, must be submitted via email. The cut-off date for questions will be 06/17/2020. No direct discussion between the technical representative and prospective Offeror will be conducted. Questions shall besubmitted to the following point of contact:

PRIMARY:

Name: Michael Broomfield Email: michael.h.broomfield@navy.mil

ALTERNATE

Name: Leslie Brazil Email: leslie.brazil@navy.mil

PROPOSALS

Offerors shall submit proposal by electronic means. All electronic submissions shall be sent to Michael.h.broomfield@navy.mil and leslie.brazil@navy.mil. Submissions must be received by the closing date and time located on the cover page of the SF 1442. Proposal attachments must be in formats readable by Microsoft Office or Adobe PDF.

(A) Proposal Format. This section specifies the format that Offerors shall use in submitting proposals in response to this solicitation. Offerors shall comply with the detailed instructions for the format and content of the proposals;

proposals that do not comply may be considered unacceptable and may render the Offeror ineligible for award.

(B) Organization. In the Technical Proposal, the Offeror shall provide information and documentation to clearly and concisely identify the Offeror’s overall ability to meet the requirements of the solicitation. The Offeror shall divide the Technical Proposal into the following factors in the order listed below:

TECHNICAL PROPOSAL

Factor 1: Technical Capability Subfactor (a): Experience and Capability to Complete Project Offeor shall provide a technical capability statement outlining their experience and capability to complete the project identified in the SOW and Drawings.

Subfactor (b): Technical Solution to Complete Project

1) Offeror shall provide a narrative describing their understanding and technical solution to completing the project described in the solicitation. Narrative must describe steps to complete the project, demonstrating that project will be completed within timeframe specified in the solicitation.

2) Offeror shall provide documentation proving that welding operators were qualified in accordance with ASME BPVC SEC IX or AWS B2.1/B2.1M, AR-2 level by providing qualification test records and have performed welding on similar projects, specifically, welding of pipe equal to or greater than pressures of 3500 psig.

Factor 2: Past Performance

The Offeror shall provide a maximum of three (3) past performance references, if available, that reflect recent and relevant experience performed within three (3) years of the solicitation closing date. The Offeror shall include contract/task order number, contract/task order type (firm fixed price, time & material or cost type), total contract/task order amount, short description of work performed, and names and e-mail addresses for Contracting Officer, Contracting Officer’s Representative (COR) if applicable, Government Program Manager (PM) or Construction Manager (CM), or industry equivalent (if non Government effort). Past performance references shall demonstrate the ability to handle the scope and magnitude of this proposed construction project. The Offeror shall include a brief discussion on how the references provided are relevant to the work being proposed.

FACTOR 3: Price Offerors shall fill in the Section B pricing for CLIN 0001. The offeror shall provide one price to complete the entire job.

(End of Summary of Changes)