Sheet1
| CONTRACTOR NAME: |
| QUOTE NUMBER: |
| MINIMUM SPECS | WHERE DOES THE QUOTE MENTION THIS REQUIREMENT? |
| (PARAGRAPH / SECTION) | MEETS REQUIREMENT | |
| (Y OR N) | IF NO | |
PROVIDE DETAIL AS TO WHY
| SOW 2.1 - Chamber Exterior | Width: 17’9” (+0% / -10%) | between 16' 0" and 17' 9" |
| Height: 14’11” (+0% / -10%) | between 13' 6" and 14' 11" |
| Depth: 17’3” (+0% / -10%) | between 15' 6" and 17' 3" |
| The exterior of the chamber shall be painted. | |
| SOW 2.2.1 - Chamber Interior | Width: 13'4" |
| Height: 12'0" |
| Depth: 14'8" |
| SOW 2.2.2.1 | One (1) panel, 24” x 24” or larger |
| Pass-through panel shall be located on the left side of the chamber when looking at the door from the outside. |
| Chamber shall meet acoustic performance requirements (SOW 3.0), while cabling in use. |
SOW 2.2.2.2 Minimum of six (6) internal low profile light fixtures with an external switch.
| SOW 2.2.2.3 | One (1) panel, 6” x 12” or larger OR eight (8) threaded ¾” hose connections, four (4) on the inside and four (4) on the outside of the chamber | specify which requirement your quote meets |
| Panel (or hose connections) shall be located on the left side of the chamber when looking at the door from the outside. | |
| Chamber shall meet acoustic performance requirements (SOW 3.0), while water piping is connected. | |
| SOW 2.2.2.4 | Six (6) noise level meter mounting mechanisms that allow for height adjustment. |
| Affixed roughly in the center of each surface. |
| Mounting mechanisms shall be placed as follows: one (1) on each wall not containing a door for a total of three (3); one (1) on the door; and at least one (1) on the ceiling. |
| SOW 2.2.2.5 | Two (2) quad 20A receptacles |
| One (1) located on the left side, and one (1) located on the right side of the chamber. |
| SOW 2.3 - Ventilation | The chamber shall be ventilated to allow for passive air exchange such that the chamber does not exceed an average of 10 degree temperature increase in one (1) hour with a 4 kilowatt heat load. |
| Ventilation connections to Government air conditioning system shall be provided on the wall containing the door, or on the left side of the chamber, as looking at the door from the outside. |
| SOW 2.4 - Door | One (1) manually operated door, with opening bar or knob. |
| The chamber door shall be hinged on the right hand side of the exterior, opening outward from the chamber. |
| The chamber door shall be equipped with acoustic wedges or panels to support the acoustic performance requirements of the chamber as specified in SOW paragraph 3.1. |
| The chamber door shall be a minimum of 7’ wide and a maximum of 8’ wide x 8’ tall. |
| The chamber door shall be placed in the 17’9” side of the chamber |
| SOW 3.1 - Acoustic Noise Reduction | Frequency (Hz) | 63 | 125 | 250 | 500 | 1000 | 2000 | 4000 | 8000 |
| Noise Reduction (dB) -Threshold | 10 | 20 | 20 | 20 | 20 | 20 | 20 | 20 |
| Noise Reduction (dB) - Goal | 15 | 25 | 25 | 25 | 25 | 25 | 25 | 25 |
SOW 3.2 - Cut off Frequency The hemi-anechoic chamber cut-off frequency shall be equal to or less than 250Hz.
| SOW 4.0 - Pre-Shipment Testing | The contractor shall test the chamber for operation and conformance in accordance with the purchase specifications prior to shipment. |
| Results of the Pre-Shipment Testing shall be delivered in accordance with CDRL A001. |
| SOW 5.0 - On Site Assembly | The contractor shall conduct on-site assembly of the equipment at the Naval Undersea Warfare Center Division, Newport RI. |
| Upon on-site assembly, the contractor shall test the chamber for operation and conformance in accordance with the purchase specifications. |
| A report on the results of the On-Site Assembly Testing performed shall be delivered in accordance with CDRL A001. |