C25CONTRACTOR_REQUIREMENTS_FOR_PERFORMANCE_ON_A_GOVERNMENT_SITE.pdf
PDF 83 KB Posted
- Solicitation number
- N66604-17-Q-1739
About this file
C25 Base Access Requirements, Attachment 3
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ: N66604-17-Q-1739
Attachment 3
C25 CONTRACTOR REQUIREMENTS FOR PERFORMANCE ON A GOVERNMENT SITE
(MAR 2016)
(a) Contractor personnel shall comply with all current badging and security procedures required to gain access to any Government site. Access to Naval Undersea Warfare Center Division, Newport sites may only be gained by obtaining a badge (either permanent or temporary) from the security office. Compliance with SECNAV M-5510.30, Section 9-20, FACILITY ACCESS DETERMINATION
(FAD) PROGRAM is specifically required. Badges shall be issued only after completion of SF85P available at: https://www.opm.gov/forms/standard-forms/
Contractor personnel requiring a Common Access Card, access to controlled unclassified information
(CUI) and/or user level access to DoN or DoD networks and information systems, system security and network defense systems, or to system resources providing visual access and/or ability to input, delete or otherwise manipulate sensitive information without control to identify and deny sensitive information, are required to have a favorably adjudicated NACLC.
The Contractor shall ensure that Contractor personnel employed on any Government site become familiar with and obey Activity regulations. Contractor personnel shall not enter restricted areas unless required to do so and until cleared for such entry. The Contractor shall request permission to interrupt any activity roads or utility services in writing a minimum of 15 calendar days prior to the date of interruption.
Contractor personnel shall wear personal protective equipment in designated areas. All contractor equipment shall be conspicuously marked for identification.
The contractor shall strictly adhere to Federal Occupational Safety and Health Agency (OSHA)
Regulations, Environmental Protection Agency (EPA) Regulations, and all applicable state and local requirements.
(b) The contractor shall ensure that each contractor employee reads the pamphlet entitled, “Occupational
Safety and Health Information for Contractors” prior to commencing performance at any NUWCDIVNPT site. This document is available under “Contractor Safety Information” at:
http://www.navsea.navy.mil/Home/WarfareCenters/NUWCNewport/ContactUs/VisitorInformation.aspx
(c) The contractor shall ensure that each contractor employee reads the document entitled, “NUWC
Division Newport Environmental Policy” prior to commencing performance at any NUWCDIVNPT site.
This document is available at:
http://www.navsea.navy.mil/Home/WarfareCenters/NUWCNewport/ContactUs/VisitorInformation.aspx
(d) The contractor shall ensure that each contractor employee who is resident at any NUWCDIVNPT site completes ISO 14001 Awareness training within 30 days of commencing performance at that site. This training is available on the ISO 14001 webpage on the NUWCDIVNPT Intranet and is also available on the NUWC Division Newport Internet site. This document is available at:
http://www.navsea.navy.mil/Home/WarfareCenters/NUWCNewport/ContactUs/VisitorInformation.aspx
(e) The contractor shall remove from the Government site any individual whose presence is deemed by the Commander, NUWCDIVNPT, to be contrary to the public interest or inconsistent with the best interests of national security.
(f) The contractor shall perform in accordance with the following, as applicable:
https://www.opm.gov/forms/standard-forms/ http://www.navsea.navy.mil/Home/WarfareCenters/NUWCNewport/ContactUs/VisitorInformation.aspx http://www.navsea.navy.mil/Home/WarfareCenters/NUWCNewport/ContactUs/VisitorInformation.aspx http://www.navsea.navy.mil/Home/WarfareCenters/NUWCNewport/ContactUs/VisitorInformation.aspx
RFQ: N66604-17-Q-1739
Attachment 3
(1) OSHA 29 CFR1910 General Industry Standard
(2) OPNAV Instruction 5100.23 (series) Navy Safety and Occupational Health Program Manual
(3) NUWCDIVNPT 5100.5 (series) Occupational Safety and Health
(4) NUWCDIVNPT 5100.16 (series) Compressed Air Safety
(5) NUWCDIVNPT Emergency Action Guidelines
(6) NAVFAC P307 – NAVFAC: Management of Weight Handling Equipment
(7) NUWCDIVNPTINST 5090.3 (series) Hazardous Materials Control Program
(g) Prior to commencing any work that falls under the following areas, the contractor shall provide to the
Contracting Officer’s Representative (COR) (if no COR is assigned provide to the NUWCDIVNPT
Safety Office Attn: Carol Bernier), on company letterhead, a complete listing of all qualified and trained employees who will perform the work:
(1) Permit required Confined Space Program
(2) Control of Hazardous Energy (Lock out / Tag out)
(3) Respiratory Protection
(4) Walking-Working Surfaces, Fall Protection Program and Scaffolding
(h) The contractor shall follow the posted provisions of the building’s Emergency Action Plan (EAP) for any mishap, incident, or emergency situation.
(i) The contractor shall report unsafe work conditions and safety hazards to their supervisor, the COR, and the NUWC Safety Office.
(j)The contractor shall notify the COR and the NUWCDIVNPT Safety Office as soon as practicable, upon learning that a mishap (injury / property damage) has occurred during the performance of work at
NUWCDIVNPT.
File details come from the government source that posted it. Updated .